×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [customer interarrival]
1 Ardavan Asef-Vaziri Jan 2011Operations Management: Waiting Lines 1 Made-to-stock (MTS) operations. Product is manufactured and stocked in advance. Safety
216 views
simulacion promodel
552 views
Input Analysis 1. Initial steps of the simulation study have been completed. Through a verbal description and/or flow chart of the system operation
212 views