×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [calorimeter trigger]
UK ATLAS Upgrade project Report to STFC OsC
49 views
Status and Prospects of the H → γγ Analysis
17 views
Calorimetria di ATLAS
45 views
Reflections of a System Run Coordinator Or Equivalent! Bruce M Barnett STFC, Rutherford Appleton Laboratory L1Calo Collaboration Meeting 11-13 January
215 views
The backplane and crate infrastructure for the digital processors of the ATLAS Level-1 Calorimeter Trigger (L1Calo) are presented, The L1Calo system is
217 views
Abstract
23 views
LHC CMS Upgrade Project CD-1 Alternative Selection and Cost Range Steve Webster Federal Project Director August 26, 2013 CD-1 Executive Session
213 views
Offline Software for the ATLAS Combined Test Beam
33 views
Upgrade Cal. Trigger R&D
27 views
ATLAS Letter of Intent Phase II Upgrade
51 views
Tony Gillman ASSO - 16 October 2001 ASSO - Level-1 Calorimeter Trigger Cluster and Jet/Energy Processors l Overview l Deliverables l Programme organisation
220 views
Napoli, 21 Settembre 2005C.Roda per Lar & Tile ATLAS Italia 1 Calorimetria di ATLAS HADRONIC TILECAL EM ACCORDION ECA Barrel ECC ECA Barrel ECC
214 views
< Prev
Next >