×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [bfactory operations]
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System
214 views
P5 Report on Running of the Tevatron and PEP-II A. Seiden
36 views
July 7, 2008Bill Wisniewski1 Identify the assets Look at reuse potential Preserve the assets Minimal maintenance state Settle ownership Plan & execute
213 views
Strategy for Moving Forward in PPA Page 1 Strategy for Moving Forward in Particle Physics and Astrophysics at SLAC Steven M. Kahn Associate Laboratory
219 views
P5 Report on Running of the Tevatron and PEP-II A. Seiden HEPAP Meeting March 4, 2006
217 views
Strategy for Moving Forward in Particle Physics and Astrophysics at SLAC
32 views