×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [beam dumps]
11_LeakDetection
212 views
FWKE Dr.-Ing. H.Büttig Mitglied der Leibniz-Gemeinschaft OPERATION OF A
[email protected]
SOLID STATE AMPLIFIER AT THE S.C. LINAC ELBE HARTMUT BÜTTIG
213 views
The C70 ARRONAX Hands-on phase and operation Freddy Poirier (IN2P3/Subatech) WAO 2012 ARRONAX: Accelerator for Research in Radiochemistry and Oncology
215 views
Stripping foil studies for Project-X A.I. Drozhdin May 29, 2012 Outline 1. H - handling in the beam line: a) foil stripping b) stripping due to Blackbody
215 views
The LHC HVAC system Contents: -Layout and history of existing LHC HVAC system -Referential for improvement of existing system -Possible improvements -Conclusions
217 views
03/4/2009CLIC Meeting 1 Erk Jensen, BE-RF CLIC meeting CERN, 03-Apr-2009
214 views
Integrable Optics Test Accelerator Sergei Nagaitsev Fermilab April 3, 2013
216 views
Nov 28, 2013 Power Converters Availability for post-LS1 LHC
[email protected]
TE-EPC-CCE
212 views
High Power Input Optics for Advanced Virgo Julien Marque, Benjamin Canuel, Richard Day, Eric Génin, Flavio Nocera, Federico Paoletti The European Gravitational
220 views
Session B – Key Discussion Topics Facilitator – E. Lessard DOE Accelerator Safety Workshop SLAC National Accelerator Laboratory 8-17-2010 to 8-19-2010
217 views
LHC Beam Operation CommitteeJune, 14 th 20111 UFOs in the LHC Tobias Baer LBOC June, 14 th 2011 Acknowledgements: N. Garrel, B. Goddard, E.B. Holzer, S
219 views
27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 1 Barry Barish 2 nd Asian ILC R&D Seminar 29-September-08 Progress toward the ILC ATF-2
216 views
Next >