×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [barrel commissioning]
Roma 16 maggio 2006 Commissione I Detector status Pisa commitments Analysis Laboratory tests TileCal Status report (ATLAS-Pisa)
217 views
ATLAS Tile Calorimeter WBS 3.4 Larry Price ANL M&O Status and Plans Toronto August 3, 2005
225 views
ATLAS @ UVic Rob McPherson UVic/IPP GSC-19 Site Visit to UVic 13 October 2006 Physics Very brief overview of the motivation for the LHC and ATLAS
218 views