table of - shoptech the e2 shop...

25

Upload: doandat

Post on 09-Jun-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Table of Contents Welcome ....................................................................................................................................................... 1

Additional Resources ................................................................................................................................ 1

Hardware and Software Requirements ........................................................................................................ 2

Recommended Implementation Plan ........................................................................................................... 2

Phase One – Planning ................................................................................................................................... 3

Organize an Implementation Team .......................................................................................................... 3

Discuss the Company’s Vision ............................................................................................................... 3

Discuss the Implementation Method ................................................................................................... 4

Workflow Considerations ......................................................................................................................... 4

Assign Duties for the E2 Shop System ...................................................................................................... 5

Determine Go Live Date ........................................................................................................................... 6

Installing the Software .............................................................................................................................. 6

Data Conversions (If Applicable) ............................................................................................................... 6

Review Special Forms ............................................................................................................................... 7

Part Numbers ............................................................................................................................................ 7

Job Tracking .............................................................................................................................................. 8

Posting Material to Jobs ........................................................................................................................... 9

Inventory / Purchasing .............................................................................................................................. 9

Phase Two – Training .................................................................................................................................... 9

Getting Started - Classroom Training .................................................................................................... 9

Virtual Classes ....................................................................................................................................... 9

Online Tutorials ................................................................................................................................... 10

On-Site Training/Implementation ....................................................................................................... 10

Practice with Sample Company Data .................................................................................................. 10

One-on-One Internet Training ............................................................................................................ 10

Phase Three – Implementing ...................................................................................................................... 11

Gather Data ............................................................................................................................................ 11

Logging In ................................................................................................................................................ 11

User Security ........................................................................................................................................... 11

Create New Users ................................................................................................................................... 12

Company Maintenance – Edit Button .................................................................................................... 12

Company Maintenance – Defaults Button ............................................................................................. 12

Enter Table Items .................................................................................................................................... 13

Startup Checklist ..................................................................................................................................... 13

Enter Open Items .................................................................................................................................... 16

Shop Floor Entries ............................................................................................................................... 17

Accounting Entries .............................................................................................................................. 19

Verify Accuracy of Data Entry ............................................................................................................. 20

Phase IV - After Care ................................................................................................................................... 21

Assign a System Administrator ............................................................................................................... 21

Consulting Services ................................................................................................................................. 21

Technical Support – Maintenance Options ............................................................................................ 21

1 | P a g e

Welcome Shoptech Software would like to welcome you as a new user of the best shop control system on the

market today. As a result of enhancement suggestions from our customers, the E2 Shop System

continues to grow in features and function while maintaining a reputation for ease of use and reliability.

Add to that our commitment to provide the highest quality of customer support, and it is easy to

understand why so many others have made the same decision.

Making the transition to any new system can be a bit overwhelming, but with our proven road map to a

successful implementation, we will help make the process as smooth as possible. This guide will assist

you in the formulation of an Implementation Plan by providing the steps for a 4 phase approach utilizing

one of the following two methods:

• Full: Implement all areas of the software you intend to use at one time

• Staged: Implement areas of the software you intend to use over time, in logical segments

It is important to understand that disruptions will likely occur during this phase; however, you can

minimize them by having a defined plan, a strong team leader, and a well trained staff.

Additional Resources The following resources are available to assist in the implementation process:

Getting Started Class

Two-day class designed for new customers to provide an overview of E2 along with insights for

implementation.

Virtual Classes

Online, interactive classes designed to provide daily users of E2 an overview of the key areas of the

system.

Online Tutorials

Recorded content regarding the key features of E2 that can be accessed 24/7.

E2 Help

In-software help that provides a detailed overview of how each area of the system works.

Implementation Specialist

Shoptech personnel trained to assist you implement E2 by coordinating conversion timelines and

walking you through the stages outlined in this manual.

On-Site Consultations

Customized training that takes place in your shop designed to help you decide how to specifically

configure the System to fit your needs.

As you can see, you will not be alone during this process and our goal is the same as yours: to get the E2

Shop System up and running for your business as quickly and efficiently as possible.

Welcome aboard!

2 | P a g e

Hardware and Software Requirements It is imperative you have all your hardware and software requirements met prior to your “Go Live Date.”

If you do not have the equipment already it will be important to order it in enough time to assure it is

installed and operational.

An up to date list of hardware and software requirements can be found on Shoptech’s website:

www.shoptech.com . This information can also be obtained by contacting the Implementation Specialist

who has been assigned to your account.

Recommended Implementation Plan The following 4 stage Implementation Plan is proven to minimize the disruption in your business:

• Phase 1: Planning

• Phase 2: Training

• Phase 3: Implementing

• Phase 4: After Care

In the following sections of this document we will describe the decision points and considerations for

each Phase to achieve a successful implementation.

3 | P a g e

Phase One – Planning

Organize an Implementation Team Selecting the appropriate individuals for your Implementation Team is an important aspect of Phase

One, and pulling from a cross-section of the end users is generally the best way to proceed. If possible,

include:

• Department Heads

• End Users

• Management

When determining who should be included, be mindful of schedules and availability so you can strike a

balance between representation and the ability to meet and make decisions in a timely manner. With

that in mind, we recommend selecting two individuals to oversee the Team. Designate one individual to

be the Team Leader and the other as the backup. Both members should have the same commitment to

the Plan, share the company’s vision to make it successful, and have the authority to carry it out or seek

guidance when questions arise.

Regardless its composition, it is the Implementations Team’s responsibility to:

• Understand management’s goals, vision, and priorities

• Develop a method of implementing E2 in your business (Full or Staged)

• Develop an Implementation Plan with your Shoptech Consultant

Implementation Specialist (if no on site consulting services have been purchased)

Outside Consultant (if consulting services have been purchased)

• Successfully execute the Implementation Plan

• Ensure that all Shoptech resources (Training, Consulting and Support) are used in accordance to the

Implementation Plan

• Seek management’s help as needed, to meet the implementation schedule

Discuss the Company’s Vision If members of the Team were not involved in the process, share why the decision was made to purchase

the E2 Shop System. Make a list of the expectations and goals you have for the software and prioritize

them. We recommend the following categories, which lend themselves well to the Staged Approach:

• Needs: What is needed at this moment to operate your business?

Orders

Purchasing

Shipping/Receiving

Billing

• Wants: What would you like the software to provide for you?

Estimating

Inventory

4 | P a g e

Job Costing

• Wish: What do you hope to accomplish with the software?

Scheduling

Quality

Detailed reporting and Data analysis

While this list will look different from one company to another, the key is to identify YOUR priorities and

pass them along to the Team. As time passes and your use of the software grows, you can re-visit these

items and establish a new list as appropriate.

Discuss the Implementation Method As noted previously, there are two approaches to implementing systems:

• Staged (Recommended)

In a Staged Method, the software is implemented in small, logical segments that have well-defined start

and finish implementation dates. Once a segment is implemented, it is reviewed and assessed to make

sure it is working as expected before the next segment is begun. If changes are needed, the Team

determines if they impact the next segment and adjusts accordingly.

• Full

The Full Implementation Method employs a relatively straight-forward approach and assumes all the

modules your company plans to use are brought online at one time, using a “master” start and end date

for the entire process.

When determining which Method will work best for your Company, consider the following factors:

• Needs, Wants, and Wishes

This breakout lends itself well to the Staged Implementation Method.

• Available Resources

Who will perform the work and what other duties are required?

• Data Input

How much data needs to be entered from the previous system and how will it be done?

• Legacy Systems

How will E2 interface during the conversion period and will they run in parallel for a time?

• Risk Tolerance

How much risk is management willing to take to reach the Company’s goals?

Workflow Considerations If you have not already done so, document your current workflow, placing the processes in sequential

order. Note employee responsibilities: Who does what? When, where, and how do they do it? When

finished, compare it against this common E2 Shop System workflow:

5 | P a g e

• Estimating enters new Parts with Bills of Material and Routers

• Quotes are sent to Customers

• Orders are entered from accepted Customer Quotes

• Inventory is posted at Order Processing or on release to the floor (Inventory Transfer/Fill Job

Requirements)

• Appropriate paperwork is generated

• Purchasing orders needed material

• Material and hardware are received

• Jobs are distributed to the shop floor

• Manufacturing starts

• Labor is reported by clock or entered by office the next day

• Parts are set aside for Outside Services

• Purchase Orders are cut (from Outside Service Requirements)

• Parts are shipped to Vendors

• Parts are received back

• Parts are completed and are packaged for shipping/ stocking

• Customer Orders go to billing

• Stock Releases are placed into inventory Accounts Receivable Department

Generates Customer Invoices

Receives payments (Cash Receipts)

• Accounts Payable Department

Generates Vendor Invoices

Pays current A/P Invoices (Cash Disbursements)

• End of month transactions are performed (Journal Entries)

Financial Statements are generated

With this sample workflow you should be able to assign the correct employee.

Assign Duties for the E2 Shop System Below is a list to be used when assigning the employee to an area in E2. This will give a good basis to

develop security and training outline for the employees involved with the implementation.

Duty Name Position

Quoting _______________________ ______________________

Orders _______________________ ______________________

Shipping _______________________ ______________________

Purchasing _______________________ ______________________

Receiving _______________________ ______________________

6 | P a g e

Inventory Control _______________________ ______________________

Labor Reporting _______________________ ______________________

Scheduling _______________________ ______________________

Accounts Receivable _______________________ ______________________

Accounts Payable _______________________ ______________________

General Ledger _______________________ ______________________

Job Costing Analysis _______________________ ______________________

Determine Go Live Date Once you have mapped out the processes and considered how you will use the system, set your Go Live

Date, taking these issues into consideration:

• Time to convert any Legacy data (see the section on Data conversions)

• Time to order and install any needed new hardware

• Training of personnel

• Time to load any open items to start the system

Open orders

Purchase Orders

AR and AP

As you develop your Implementation Plan, consider using tools available on the market designed to help

with project management by allowing you to assign individuals to tasks and develop time frames to keep

you on track.

Installing the Software Installation of the E2 Shop System Software has multiple considerations:

• Installing:

The SQL Component

The E2 Shop System

• Logging into the system for the first time

Backups

Due to frequent changes in Hardware and SQL requirements, the Installation Instruction may be printed

from the Shoptech website www.shoptech.com .

Data Conversions (If Applicable) This area will only apply if your company has decided to convert any data from your current (Legacy)

system into E2. Typical records to convert include:

• Customers

• Vendors

7 | P a g e

• Parts

• Employees

• Work Centers

• Various Base Table data

It is important to understand that if you have “Bad Data” in your Legacy system it will simply be

converted into E2 as “Bad Data.” Therefore, to prevent problems from inaccurate or incomplete

information, it is very important to clean up as many of these “bad” records as possible prior to

converting. Based on your input, your Implementation Specialist will work with you to create timelines

for sending your data to Shoptech’s Data Conversion Specialists in order to meet the Go Live date you

have set.

Specific considerations for this process include:

• What data is going to be converted

• Who is going to gather the data

• Who is going to verify the accuracy of the converted data

How long will it take to review

Review Special Forms Before going live with E2, review the following forms:

• Accounts Payable Checks

• Bill of Lading

• Laser Labels

Parts

Shipping

Box

These forms should be printed and verified for alignment prior to going live as opposed to finding out

the day you will need them.

Part Numbers How to assign part numbers is a question that comes up often during implementation. To start, consider

the different kinds of parts (and their associated numbers) you deal with:

• Customer Parts

• Raw Material

• Hardware Supplies

Once you have identified the Parts you will work with, consider how you want to identify them.

• Customer Part Numbers

Generally the Part Number used to identify them in the system is the same number the customer has on

the Customer (Purchase) Order. Many customers will not pay an invoice unless it has the part number

they provided.

8 | P a g e

• Raw Material

With regards to these items, a common consideration is whether you want to identify them by their

geometry or their material composition. For example, do you make it (3.00_316_SS) or (SS_316_3.00)?

3.00 Being Size and Shape (3” Diameter Round)

316 Being the material type

SS Being the material class

Much of how to configure these items depends on what is easier for you to use and order from a

vendor.

• Hardware / Supplies

Use a system that will identify what the item is and your employees will understand. Bear in mind the

part number will often be different from vendor to vendor so you may want to consider the use of User

Defined fields to allow for these distinctions.

Regardless the parts you deal with and how you decide to identify them, consistency is the most

important aspect of any numbering system. The people that will be entering parts into the database

need to follow the same numbering scheme to avoid confusion and duplication.

As a general rule, we strongly encourage you to avoid leaving “blank spaces” in part numbers. Instead,

consider using dashes (-) or underscores (_) as separators so it is easy to determine the exact values

used.

Job Tracking There are three methods E2 provides with regards to Job Numbering:

• Order Plus Item Number (Recommended)

We strongly recommend this method as it automatically associates Jobs to the Order on which they

were processed. For example, assume a Customer Order has three items on it. If the Order Number is

1000, the Jobs will be numbered accordingly:

1000-01

1000-02

1000-03

• Sequential

E2 still automatically assigns the number, but they are no longer tied to the Order they are on. For

example, assume a starting number of 2000 is entered as the first Job Number to use. In the example

above, the Order Number would remain 1000, but the Jobs would be numbered as follows:

2000

2001

2002

• Free Form Text

9 | P a g e

While offering the most flexibility, this method is also least recommended as it requires the User to

enter a Job Number for every Job created on an Order. Not only can this slow Order Entry down

significantly, every Job MUST have a unique number assigned to it, meaning it is now up to you to create

and maintain this list outside of E2.

Posting Material to Jobs Consideration will need to be made about applying material to Jobs’; that is, should it be posted at order

entry or later? Do you automatically allow the material to be posted or do you want to have more

control over the process with regards to timing and quantities? This is a conversation you should have

with your Shoptech Consultant to determine the best possible process for you.

Inventory / Purchasing Along with the issue of when to post material, you will also need to consider how you are going to use

and stock it. Do you buy material directly to jobs, or do you purchase some to jobs and keep some high

use materials available in inventory? If kept in inventory, how much material do you use at a time? How

are you able to purchase it? These questions are very important as you consider how to define your

Purchased Parts and are central to the use of Purchasing Factors in your business.

Phase Two – Training No software package can be successfully implemented without proper training, and our multiple options

provide many tools to help get you "up and running" on the E2 Shop System in the shortest time

possible.

Getting Started - Classroom Training A two-day class designed for new customers to provide an overview of how E2 works along with insights

for a successful implementation. Given the scope and focus of the class, it is recommended that only

personnel involved with the overall implementation of E2 attend while remaining personnel take

advantage of our Virtual Classes to provide the information they will need regarding the use of the

system. Class schedules and registration are available by logging into the Shoptech Community

(https://shoptech.force.com/customers/login) and clicking the Classroom Registration tab.

Getting Started Classes are available to customers on full maintenance.

Virtual Classes These online, interactive classes are designed to provide daily users of E2 an overview of the key areas of

the system. Each class lasts approximately 2 to 2.5 hours and allows users to attend only those sessions

that relate to their job functions, reducing time away from the shop. Class schedules and registration are

available by logging into the Shoptech Community (https://shoptech.force.com/customers/login)

and clicking the Classroom Registration tab.

Virtual Classes are available to customers on full maintenance.

10 | P a g e

Online Tutorials Recorded content regarding the key features of E2 that can be accessed 24/7 by logging into the

Shoptech Community (https://shoptech.force.com/customers/login) and clicking the My Training

tab and then click Catalog tab.

Online Tutorials are available to customers on full maintenance.

On-Site Training/Implementation On-Site Training/Implementation can be tailored specifically to fit your needs and is conducted directly

at your facility to provide the most direct training possible. A Shoptech Consultant will work closely with

you to identify issues, develop a Meeting Agenda, and set a time that is most convenient for you for the

training to take place. By coming to your business and using your data, disruptions to daily work are

minimized while training impact is maximized.

Onsite Consultations are not included in maintenance, but can be purchased in time frames that best fit

your needs.

Practice with Sample Company Data Included with the system install is a Sample Company database that all Users will be able to access.

The Sample Company is a good place for Employees to “get their feet wet” while entering information to

get a sense of the System Flow. If you are having your data converted, consider turning your own data

into a Customized Sample Company for your Employees to use. Contact your Implementation Specialist

for assistance in creating this kind of Sample Company.

One-on-One Internet Training Implementation Specialists have the ability to connect with your System via the Internet, allowing them

to see your specific Data, a feature that can be especially useful when you need help understanding a

specific area of the software.

During your warranty period, two (2) hours of One-on-One Training are available at no charge. After the

warranty period, or beyond the initial two hours, this service is billable at an hourly rate. Ask your

Implementation Specialist for the details and to schedule a time that is convenient for you should you

require this service

11 | P a g e

Phase Three – Implementing There are basic items that must be entered regardless of which areas of the system you plan to use. We

have broken this section down to a natural flow for an Implementation of the E2 Shop System and

provided a Check List of “to do” items as a guide.

Gather Data Once you determine your conversion date, make sure you will have your converted data in time to go

live. In addition to the records being converted for you, make sure to gather the data from your Legacy

system that is NOT being converted but will still need to be entered into E2 once the conversion is

completed. Make sure this list is “as of” the conversion date so it will match the converted values where

appropriate. If you are converting the accounting module at this time, you must do so as of the last day

of a month. Below are the required listings:

• Active Customers

• Active Vendors

• Active Employees

• Chart of Accounts

• Outside/Inside sales staff/ with commission rate

• Departments (typically based on payroll departments)

• Work Centers (task or machine to make a part)

• Operations (description of a task within a work center)

• Open quotations

• Open customer orders

Enter old job cost for open jobs (optional)

• Take a physical inventory if tracking quantities on hand

• Open vendor purchase orders

• Open Requests for Quotation

• Open Accounts Receivable

• Open Accounts Payable

• Trial balance (beginning balances for general ledger)

• Parts list

Logging In Once you have entered the initial unlock code, you can log into the software by entering Supervisor for

the User ID and Pass for the Password. You will be logged into the Sample Company provided with the

software. If you are not having your data converted, you will need to create your New Company by

going to Company Maintenance and clicking the New button.

User Security Security in the Shop System can be as stringent or relaxed as you choose. The flexibility of the system

allows you to control access to each menu item or report on a per user basis. The system administrator

12 | P a g e

can set up a template for Security in Company maintenance; once set, any new Users will automatically

inherit these access levels. Each individual User can have access tailored to the needs of the job being

performed. Access set at the user level will override the template in Company Maintenance.

Create New Users User IDs must be created for every person that needs to log in to the system. Administrators must set

the initial password for new users but can allow the user to re-set the password upon the initial log in.

One person should be set up as “Supervisor” that will have access to all areas of the system and can

maintain Users and Security Settings.

Note: The system administrator should not log in as supervisor for daily functions, only when needing

to do high level security items.

Company Maintenance – Edit Button Establish the following information in Company Maintenance | Edit:

• Company Code

• Company Name

• Shipping Address

• Holidays

• Auto Numbering

These should not be set until you are ready to enter new data.

Use a number which is very different than your current numbers. Data Collection

Consider validation settings regarding Time Tickets entered via real time data collection

devices

• Order Entry

Automatically Post Parts

Inventory Posting Method

Job Number Creation Time and Attendance

Shift set up

Auto Rounding

Company Maintenance – Defaults Button While there are a number of Company Default settings to be addressed, the items listed below are of

particular significance given the impact they can have on the System.

• Customer Defaults

Customer Billing G/L Coding Driven By

Determines whether Customer Invoices will be populated by Work Codes or Product Codes

QuickBooks users must use Product Code.

13 | P a g e

• General Ledger

Default Currency Code

This will be used in setting up Customers and Vendors

Accounting Fiscal Year

Default General Ledger Accounts and Bank Codes Interfaces

Determine any use of 3rd party software

Reference the User Guide for further information regarding these settings.

Enter Table Items One of the most critical parts of getting the system up and running is the entry of Table items, typically

referred to as “Core Tables” (Customers, Vendors, Employees, Work Centers, G/L Accounts, etc.) and the

“Base Tables” (Operations, G/L Group Codes, Tax Codes, Terms Codes, etc.) used to create them. These

records serve as the building blocks of E2 and are called upon continuously throughout its use; therefor

it is absolutely crucial that the items in the Table Maintenance section be entered in a thorough manner.

If not, the data you enter “down the road” will be incomplete or even incorrect.

In the excitement of working with a new system many users are tempted to try shortcuts or skip steps

such as leaving addresses or telephone numbers blank in Customer Entry. At the time, this might seem

harmless; however, the result is that someone will have to go back through each customer, one at a

time and correct the information in the future. The old saying, “do it right the first time” certainly

applies to Table setup.

As a company, you may start using the Shop Floor Control area prior to the accounting system; we

simply assume there is another software package that contains the financial data. Even if this is so, the

Chart of Accounts (General Ledger Codes) still needs to be entered as they show up as required fields

throughout the system and are essential to capturing accurate Job Costs. When the user decides to

convert the accounting data, it must be done on the first day of the month since the General Ledger is

posted by one whole month at a time as opposed to a designated date range. See the instructions for

the accounting conversion procedures at the end of this section for additional details.

Startup Checklist While every company has its own way of doing business, years of experience of implementing systems

has led to this checklist regarding Shoptech’s recommendations for the entry of Table Data and Open

Items. It is important to make every effort stick to this order and refrain from “skipping ahead” because

later records might rely on bypassed information. Check off each area as it is completed to provide a

framework for progress. Additional details for each record are located in the User’s Guide. If you have

questions or run into issues, feel free to contact your Implementation Specialist or call our Technical

Support Team at 1-800-677-9640 or email them at [email protected] .

G/L Group Codes (Base Table): System is shipped with a list of default Group Codes that can be edited

as needed.

14 | P a g e

• Finished [ ] Date ____________ By _______________________________________

General Ledger Codes (Core Table): Represent your Company’s chart of accounts and are required in

many areas of the System even if the Accounting Module is not used.

• Finished [ ] Date ____________ By _______________________________________

Bank Codes (Core Table): Create a Bank Code for each account that needs to be reconciled (Checking,

Money Market, etc.)

• Finished [ ] Date ____________ By _______________________________________

Attendance Codes (Base Table): Used to determine whether work should be considered Productive or

not; they are required to enter Holidays in Company Maintenance.

• Finished [ ] Date ____________ By _______________________________________

Terms Codes (Base Table): System is shipped with a list of default Terms Codes that can be edited as

needed.

• Finished [ ] Date ____________ By _______________________________________

Work Codes (Base Table): Associated with Customers; Allows generation of Sales information based on

whom you sell to.

• Finished [ ] Date ____________ By _______________________________________

Product Codes (Base Tables): Associated with Parts; Allows generation of Sales information based on

what you sell. Product Code must be used when using QuickBooks Interface.

• Finished [ ] Date ____________ By _______________________________________

Tax Codes (Base Table): Used as needed to collect taxes on Sales or track taxes on Purchases; Use an

EXEMPT Code otherwise.

• Finished [ ] Date ____________ By _______________________________________

Salesmen (Core Table): Allows for tracking of Sales by specific Sales personnel, including commissions.

• Finished [ ] Date ____________ By _______________________________________ Departments

(Base Table): Used for reporting labor and scheduling.

• Finished [ ] Date ____________ By _______________________________________ Employees

(Core Table): People that perform the work in the shop.

• Finished [ ] Date ____________ By _______________________________________

Company Maintenance (Defaults Button) - Complete the Customer, General Ledger, Inventory, Quoting,

Forms and Interfaces/Documents Tabs. Refer to Company Maintenance in the Reference Manual.

• Finished [ ] Date ____________ By _______________________________________

15 | P a g e

Company Maintenance (Edit Button) – Enter the defaults for General, Data Collection, Time and

Attendance, Order Entry, Scheduling and Time Tickets. You may also enter Default Security and

Holidays. Refer to Company Maintenance in Reference Manual.

• Finished [ ] Date ____________ By _______________________________________

Customer Codes (Core Table): Represents companies to whom you sell products or provide services.

• Finished [ ] Date ____________ By _______________________________________

Shipping Codes (Base Table): Represents the ways in which material can be shipped to or from the

shop; values can be used on the Bill of Lading form

• Finished [ ] Date ____________ By _______________________________________

Vendor Types (Base Table): Allows grouping of Vendors into segments such as Steel, Heat Treat, Plating,

etc.

• Finished [ ] Date ____________ By _______________________________________ Vendors (Core

Table): Companies from which you purchase material or services.

• Finished [ ] Date ____________ By _______________________________________

Operations (Base Table): Represents processes that can be performed on Work Centers.

• Finished [ ] Date ____________ By _______________________________________ Work Centers

(Core Table): Represents where work is performed in the shop.

• Finished [ ] Date ____________ By _______________________________________

Collection Terminals (Base Table): Represents real-time data collection devices located in the shop.

• Finished [ ] Date ____________ By _______________________________________

Currency Codes (Base Table): System is shipped with a list of default Currency Codes that can be edited

as needed. Your “native” Currency Code should be set to an Exchange Rate of 1. Additional Currency

Codes should be configured accordingly.

• Finished [ ] Date ____________ By _______________________________________

Reason Codes (Base Table): Used in conjunction with Customer and Vendor Returns in addition to Time

Tickets (scrapped parts); for systems that have the Quality Module, they are also associated with

Corrective Actions and Non-Conformance records

• Finished [ ] Date ____________ By _______________________________________

The following Base Tables can be created as needed (Quality Module Base Tables)

Corrective Action Codes Finished [ ] Date ____________ By ____________________________

Maintenance Codes Finished [ ] Date ____________ By ____________________________

16 | P a g e

Document Review Codes Finished [ ] Date ____________ By ____________________________

Document Types Codes Finished [ ] Date ____________ By ____________________________

Feedback Codes Finished [ ] Date ____________ By __________________________

Non-Conformance Codes Finished [ ] Date ____________ By __________________________

Training Codes Finished [ ] Date ____________ By ___________________________

Additional Records (Non-Table Items)

Open Quotations: Optional; Can be used to create Orders at a later date.

• Finished [ ] Date ____________ By _______________________________________

Open Orders: Needed in order to get Job Numbers entered into the System for production purposes

and Job Costs; Part Numbers may be entered on the fly if they have not been defined as a Table Item.

• Finished [ ] Date ____________ By _______________________________________

Open Requests For Quotation: Optional; Can be used to create Purchase Orders and update Purchased

Part costs.

• Finished [ ] Date ____________ By _______________________________________

Open Purchase Orders: Needed for material or services that have been purchased but not yet received.

• Finished [ ] Date ____________ By _______________________________________

The following processes apply if the Accounting Module is being used.

Open Accounts Receivable: Needed for A/R Aging purposes and for Cash Receipts.

• Finished [ ] Date ____________ By _______________________________________ Open Accounts

Payable: Needed for A/P Aging and for Cash Disbursements.

• Finished [ ] Date ____________ By _______________________________________

Outstanding Checks: Needed for reconciliation purposes; Needs to be entered for each account

accordingly.

• Finished [ ] Date ____________ By _______________________________________ Beginning

Balances: Needed for accurate Financial Statements.

Finished [ ] Date ____________ By _______________________________________

Enter Open Items Even if data is being converted, there will still be open records that need to be entered. The following list

represents the minimum information needed to enter these records.

• Chart of Accounts

• Active Customers

• Active Vendors

17 | P a g e

• Active Employees

• Work Centers (task or machine to make a part) Parts List

Not truly required to enter open records (though recommended)

Is required to track inventory levels With this you can enter:

• Inventory Quantities On Hand (if tracking)

• Open Quotations

• Open Customer Orders

Enter old Job Cost for open Jobs (optional)

• Open Vendor Purchase Orders

The Accounting Module can be brought online at the same time as the Shop Floor portion of the

software or later.

• Open Accounts Receivable

• Open Accounts Payable

• Beginning Balances (for General Ledger)

Converting to a new system provides a good opportunity to “clean house” of old records that are no

longer useful. Keep this in mind as you consider exactly what records to enter into E2.

Shop Floor Entries

Enter Inventory Quantity on Hand

For accurate Job Costing and Asset Valuation you must have an accurate count of Available Inventory

items. The list from your current system should be in a format that will provide the following

information:

Inventory for Finished Goods, Raw Material, and Hardware (available for future Orders )

Bin Locations for the Inventory

This information will be entered using the Inventory Adjustments feature of E2.

Note: If your inventory has been part of a conversion with manufactured parts that include a Bill of

Materials, determine if the converted data has already removed allocated inventory from your count.

If so, entering open orders could cause a re-allocation of need material.

Enter Open Quotes

This is an Optional task. If your company wants to track and analyze how Estimating is doing, you can

enter all the current open quotes or you can simply start entering new ones as they are received.

Enter Open Orders

When entering open Orders, you don’t want to reinvent the wheel. Your Company’s needs regarding

costing information will determine the amount of data you will need to provide. Regardless the amount

of details needed, you should turn off the Auto Numbering option for Orders and disable the Auto Post

function (Company Maintenance | Edit | Order Entry) when entering open Orders; they can be turned

back on afterward as desired.

18 | P a g e

For any of the methods used below, enter Open Orders based on Ship Date starting with the earliest

date.

• Your Company is not capturing any cost. It is as simple as entering:

Customer

Order Date

Product Code or Work Code, as required

Remaining open quantity

Delivery Date(s)

Sell Price

Description

If there is an existing Job Number System in place, use that as the open Job Number and start using E2

numbering for new Order (and Jobs) as of the day you go live. Remember to make the new number

sequence very different from your previous one.

• Your Company is manually capturing cost (not using Data Collection). Enter the following:

Customer

Order Date

Product Code or Work Code as required

Remaining open quantity

Delivery Date(s)

Sell Price

Description

Add Miscellaneous Charges for Labor, Material, and Outside cost

These costs should be for the remaining open Quantity

• Your Company is capturing costs using Data Collection Clocks. Enter the following:

Customer

Order Date

Product Code or Work Code as required

Remaining open quantity

Delivery Date(s)

Sell Price

Description

Add Miscellaneous Charges for Labor, Material, and Outside cost

These costs should be for the remaining open Quantity

Provide to the shop floor a copy of a traveler

No routing necessary train to clock in and use Step zero

Assure any open Purchase Orders are entered for this job

19 | P a g e

The best method for entering open Orders will be covered with your Shoptech Consultant during your

pre-implementation conversations.

Enter Open Purchase Orders

These are Purchase Orders that cover Material, Outside Services, Inventory, and non-Inventory Items.

There is some information that will be needed to accomplish this task. You will want to turn off the Auto

Number function for Purchase Orders in Company Maintenance.

• Vendor

• P.O. Date

• Identify if Outside Service

• Description

• Part Number/Service

• Open Quantity

• Price

• Job Number/Stock (if for Inventory) Due Date

The Shop Floor is now running “Live” on the new E2 Shop System. All new entries will only be entered

into E2.

Accounting Entries If you are using the Accounting Module, here are additional “opening considerations.”

Set the Fiscal Year

Before any entries are entered, make sure the fiscal year is set to the oldest open invoice in A/R or A/P.

The system will not allow you to type a transaction in a period that is not open.

Fiscal Year Date is maintained under Company Maintenance | Defaults | General Ledger tab.

Enter Open Accounts Receivable

You will need a current open A/R Aging with the following information to enter this data:

• Invoice Number

• Customer

• Invoice Date

• Outstanding Amount open

The Part/Item number or quantity is not needed. The word “Conversion” can be used as the Part /Item

Number. This will identify that it was from the old system and the information can be found there. The

quantity would be 1 for the total remaining open due.

Note: Once completed, an Aging would need to be generated to prove the accuracy of the total open

A/R to the ending Balance in your old system and the General Ledgers beginning balance in the E2 Shop

System.

Enter Open Accounts Payable

You will need a current open A/P Aging with the following information to enter this data:

20 | P a g e

• Invoice Number

• Vendor

• Invoice Date

• GL Expense Account

• Outstanding Amount open

Note: Once completed, an Aging would need to be generated to prove the accuracy of the total open

A/P to the ending Balance in your old system and the General Ledgers beginning balance in the E2 Shop

System.

Enter Beginning General Ledger Balances

Finally, enter the beginning balances into the GL accounts from the previous accounting system.

Negative balances begin with a leading hyphen. Balances should be entered under Tables | GL Codes

under the This Year tab. There are a few things to consider depending on whether you are implementing

the Accounting Module at the start of your Fiscal Year or some time during the Fiscal Year.

Implementing at the Start of a New Fiscal Year

• Ending balances from the Balance Sheet are all that will be needed

Sales and Expense-related G/L Accounts start out with a zero balance

• If final balances are not available, enter the balances prior to the adjusting entries

Adjust the appropriate balances once an adjusted Balance Sheet is available

Implementing During a Fiscal Year

• Ending Balances from Balance Sheet and Income Statement will be needed

Sales and Expense-related G/L Accounts must account for the activity that has already taken

place

Current Earnings must also be entered to account for the profit or loss incurred during the same

period

Verify Accuracy of Data Entry The key to making sure that all your information was entered properly is to run reports in E2 Shop

System and compare the reports to your prior system.

• To verify order entry, print a job schedule or a backlog summary. Either report will show you a listing

of all open orders

• To verify open purchase orders, print a Purchase Order Summary filtered by open only

• To verify open quotations, print a Quotation Summary filtered by status pending

• To verify open Accounts Receivable, print an aging summary under the A/R menu. The “As-Of Date”

on the aging would be your conversion date

• To verify open Accounts Payable, print an aging summary under the A/P menu. The “As-Of Date” on

the aging would be your conversion date

• To verify beginning numbers are correct for general ledger, print a Trial Balance located under GL

menu. Select the first period and print the report. Look at the first column beginning balance

21 | P a g e

numbers. The grand total should be zeroes across the bottom of the page. This lets you know you

are in balance because all the debits equal the credits

• Print an Inventory Summary to see a parts list with quantities on hand

Use the Inventory Adjustment menu to fix any incorrect quantities

Congratulations! You are now LIVE in the E2 Shop System!

Phase IV - After Care

Assign a System Administrator During the Planning Phase, a “System Administrator” should have been chosen. This can be the Team

Leader or someone previously groomed for this position. Whether this is a full-time job will depend on

the size of your Company and the number of users. The following tasks are generally the responsibility

of the System Administrator.

• Hardware Maintenance

• Regularly scheduled backup of data (should be daily)

• Periodic file maintenance

• Answering user questions

• Training new users

• Installing new E2 releases and upgrades

• Working with E2 support to resolve issues

• Be the source for customer reports or report maintenance

Consulting Services In addition to assisting with the implementation of E2, your Implementation Specialist will assist you

with any problems you may encounter during the six-month period following your purchase of the

System and will help explain and coordinate training options, as well as act as your liaison with the

Development Team if there was a data conversion.

Beyond these standard services, the Shoptech Consulting Group can also work with you on-site to

develop best practices based on a customized training and implementation plan geared toward your

industry and system requirements.

Once your system is up and going, you may also find it worthwhile to have an Onsite Consultant perform

an audit of your system and processes to make sure you are fully utilizing the software to its potential.

Regardless the scenario, your Consultant’s job is to make your business run as efficiently as possible with

the tools available in the E2 Shop System. Contact the Consultant Group at 800-677-9640 for additional

information.

Technical Support – Maintenance Options In addition to access to your Implementation Specialist, you also receive free phone support during the

first six months after the purchase of the E2 Shop System. After this six-month warranty period, a yearly

22 | P a g e

(twelve-month) maintenance package is available at a percentage of the current list price of your

system. Maintenance covers:

• Unlimited phone support

• Free basic classroom training

• Access to current updates and future enhancements of the software

The Support staff is available Monday through Friday 8:00 AM until 8:00 PM Eastern time.

To log a support issue, you may contact us at 800-677-9640. An auto-attendant answers the phone and

directs you to make a selection: #1, #2, #3, or #4 … Below is a description of each call queue:

• Option #1: Shop Floor Control calls pertain to any menu options from Routing/Estimation through

and including the menu Cost Analysis.

• Option #2: Hardware calls pertain to loading and updating the software, troubleshooting and

installing data collection, error messages, and printing issues.

• Option #3: Accounting calls pertain to Accounts Receivable, Accounts Payable, General Ledger,

Bank Reconciliation, and Payroll interfaces.

• Option #4: Implementation Specialist calls pertain to training questions, data conversion issues,

and information about additional products you may need.

Based on your selection, your call is routed to a technical support person skilled to handle your question.

In those unusual instances they are unable to answer your question, your call will be routed to another

technician with the expertise to resolve your issue. If our Technical Support Agents are busy with other

customers at the time of you call, our goal is to respond to your issue within one hour. You can also

submit technical issues by emailing [email protected] or by faxing the details to 513794-7789.

Either method is treated with the same priority as a phone call.

We also offer a plan that allows you to purchase updates only, at a decreased percentage of the full

Maintenance Plan.

If a Maintenance Plan is not purchased, calls to Support are billed on a per-call, hourly basis. When using

this method, you will be asked to prepay the fee before service is rendered. You may complete a credit

card authorization to obtain service.