Table of Contents

Project Scope Statement…………………………………………………… Page 1

Project Lifecycle………………………………………………..………………. Page 2

Stakeholder Analysis………………………..................................... Page 3

Project Deliverables ………………………..................................... Page 4

Project Objectives & Success Criteria.................................... Page 5

Project Assumptions ………………….......................................... Page 6

Project Constraints …..……………….......................................... Page 7

Work Breakdown Structure……………………….......................... Page 8 to Page 10

Cost Baseline……………………………………………………….……………. Page 11 to Page 12

Communication Management Plan………….……………….......... Page 13

Risk Response Plan………………………….................................... Page 14

Responsibility Assignment Matrix……………………................... Page 15 to Page 16

Project Scope Statement1.1 Vision Statement

Nepenthean imports, packages and distributes global wine varietals to wine retailers and consumers.

1.2 Business NeedThe current wine market has shown the need for a

Chilean wine that is of high quality at an affordable price point.

1.3 Project Description• To import fermented Cabernet Sauvignon Chilean wine• Bottle 50,472 750ml-bottles; label and store 4,206 12-bottle

cases ready for distribution between June 1st to July 1st, 2013.

Project LifecyclePHASE NAME REQUIREMENTS PLANNING IMPLEMENTATION CLOSURE

Phase Objectives Define requirements

Finalize cost/ schedule, estimates and allocate resources

Fulfill product requirements Ready for distribution

Project Management

Process Deliverables

Project charter

Preliminary project scope

Scope statement

Resource allocation

Cost baseline

Project Management Plan

Work Breakdown Structure

Communication plan

Weekly status reports

Test results

Sign off from sponsors

Product Process Deliverables

Product tech sheet (4,206 cases of 12 (750ml) bottles Cabernet Sauvignon Nepenthean reserved)

10 % of operational waste

Label spec & regulation

Bottle spec

QC/QA standard document

Documentation of all testing results for reference Contacts for vendors (cost, schedule, volume)

Passed testing result at final QC at destination

Approved label arrive bottling company

Approved bottle (cork, seal) design, spec

Payment to contact vendors (transportation) for completion

Status report

4,206 cases of 12 (750ml) bottled, stored, and ready for distribution

Payment to contract vendors

End of phase communication status report sent

Sign off on project closure

Rick Santos
Project Mgmt plan includes the other documents mentioned in this section so it is redundant

Stakeholder Analysis

STAKEHOLDER NEEDS EXPECTATIONS DELIVERABLES

DTC- Director Consumer Manager- takes care of all distribution

Status report

Communication about the project

On-time, 4,206 cases Weekly status report sent on Mondays

QC & QA person- creates relationship with bottling company, wine maker;

Scheduled sample testing at origin and destination On-time testing schedule

Weekly status report sent on Mondays

Weekly sample testing schedule sent on Mondays

Product ManagerStatus report

Communication about the project

On-time, quality product, on budget

Weekly status report sent on Mondays

Contract vendors (bottling company and wine maker; label graphic designer; etc)

Status report, # of case, volume of wine, spec

Project scheduleTimely payment

Seasonal/ yearly projection sent from the end of the prior season/ year

Label specification and creative concept sent

IS IS NOT

Creation of wine technical specification before wine ships from origin Winemaking

Signed vendor contracts Pricing analysis, structure, and model

Perform on-time scheduled quality check Marketing requirements document; marketing, sales, and distribution plan

Provide label and packaging specifications Project management team is not responsible for purchasing wine from Chile

Delivery of wine to the bottling facility

Project Deliverables (Scope)

OBJECTIVE SUCCESS CRITERIA

To create wine technical specification A clear stated wine tech spec to follow through out the project

To transport wine from origin to destination from June 1st, 2013 – July 1st 2013

Amount of delay between actual hand off date and planned ‐hand off date. Delay by one month is considered acceptable‐

To delivery wine to the bottling facility Bottling facility receive 10,000 gallon of wine by July 1st, 2013.

To hand over bottled and labeled 4,206 cases for storage and distribution

4,206 cases ready for storage and distribution by August 1st 2013

To perform quality control along specified project timeline A successful quality report from the quality control manager

Project Objectives & Success Criteria

Rick Santos
In your project description, this is with wines in bottle already???

Project Assumptions

• We're not making the wine but we're importing the wine from Chile• Marketing team will handle all marketing plan• We’re using company contracted bottling facility • We’re outsourcing label graphic design • Nepenthean legal department will ensure compliance

Project Constraints

• Bottling facility receives 10,000 gallons of wine by August 1st, 2013. • Package design completed by July 1st, 2013. • Quality check report completed by August 1st, 2013

Rick Santos
Your dates re not matching up so it is confusing.

Work Breakdown Structure1. Requirements

1.1 Preliminary Scope Statement

1.2 Project Charter

1.3 Requirements Review Process

2. Planning

2.1 Project Management Plan

2.1.1 Scope Statement

2.1.2 Work Breakdown Structure

2.1.3 Project Schedule

2.1.4 Cost Baseline

2.1.5 Communication Plan

2.2 Quality Control Strategy

2.3 Change Request Implementation Process Plan

2.4 Submit vendor contracts and purchase orders

2.5 Submit packaging specifications

3. Implementation

3.1 Project Management Deliverables

3.1.1 Vendor/Contract Management Plan

3.1.1.1 Formal vendor contact document

3.1.1.2 Terms and conditions document

3.1.2 Quality/ Validation Documents

3.2 Testing and Quality Check

3.2.1 Provide Samples

3.2.2 Test Results

3.2.3 Report Defects (if any) to project manager

3.2.4 Final Composition Analysis

3.3 Transition from origin to US port

3.4 Transition from US port to Bottling Facility

3.4 Final Approval of Package Specifications

3.4.1 Bottle Color

3.4.2 Bottle Size

3.4.3 Cork Color

3.4.4 Cork Size

3.4.5 Foil Color

3.4.6 Foil Size

3.4.7 Label Design

3.4.8 Label Size

3.4.9 Supply Case Design to Bottling Company

3.5 Acceptance of Final Wine Bottling

3.6 Acceptance of Final Packaging

4. Closure

4.1 Project Management Deliverables

4.1.1 Final Report

4.1.1.1 Report to stakeholders

4.2 Product Deliverables

4.2.1 Stakeholders sign-off document

4.2.2 Release to storage facility

4.2.2.2.1 Storage facility sign-off

Cost Baseline

Did not see ay cost for the wine itself?? - rick

Communications Management Plan

DOCUMENT FREQUENCY FORMAT DISTRIBUTION QA MANAGER DTC PRODUCT

MANAGERPROJECT

MANAGER VENDOR

REQUIREMENTS

Project Charter Once MS word Email R R O R

Communication Plan Once MS word Email O R

Label spec Once MS word Email I O R R

QA QC standard Once MS word Email O/I S/I R/S

Product Spec Once MS word Email I O R R

PLANNING

Vendor contract agreement Updates as needed MS word Email R R R R

Scope Statement Once MS word Email R R O R

IMPLEMENTATION

QA result 3 times (shipping, arrival, bottled) PDF Email I O R R

CLOSURE

End communication status report Once MS word R R R R R

O=owner I-input required R- reviewer S-sign off required

Risk Response Plan

ID RISK TYPE RISK DESCRIPTION RISK TRIGGER

IMPACTED AREAS PROBABILITY IMPACT PRIORITY STRATEGY OWNER STATUS

4 Project Management Schedule slippage Imposed

datesSchedule

CostScope

M H 1 Mitigate Project Manager O

5 Product Product spoilage QA filesSchedule

CostScope

L H 1 Transference and Enhance

Product Manager C

3 External Labor strike Labor union

ScheduleCost L L 3 Acceptance Project

Manager O

2 External Custom inspection hold-up Custom Schedule

Cost L L 3 Mitigate Project Manager O

8 ExternalRegulation and

policy of importing wine

changesGov.

ScheduleCost

ScopeL H 3 Acceptance/

EnhanceProduct Manager C

9 External Severe weather Weather ScheduleCost M H 2 Acceptance Project

Manager O

10 Product Product cost increases Vendor Cost

Scope L M 3 Mitigate Project Manager C

12 Organizational Vendor selection during the project

Bad vendor relation

ScheduleCost

ScopeL H 3 Share/

EnhanceProject

Manager C

Responsibility Assignment Matrix