table of contents - back combinedbackcombined.com/wp-content/uploads/2020/10/back... · list of...

119

Upload: others

Post on 24-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

1

Page 2: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

TAB

LE OF C

ON

TEN

TSCompany Introduction and Overview............................................................................3

Board of Directors.......................................................................................................4

Eng.Walid Shaaban ......................................................................................................5

Quality Policy..............................................................................................................6

Mission and Vision......................................................................................................7

Health and Safety Policy..............................................................................................8

ISO Quality Management Certificate..............................................................................10

Company License........................................................................................................11

Central Tenders Committee Certificate (CTC) Grade -2-..............................................12

Municipality license and CTC Registration Grade -2-..................................................13

Chamber of Commerce Registration .........................................................................14

Organization Chart......................................................................................................15

Construction Projects................................................................................................16

List of Main Technical Staff and CV of Key Personnel....................................................92

Plant and Equipment...............................................................................................118

Page 3: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

3

COMPANY INTRODUCTION AND OVERVIEW

Back Combined General Trading & Contracting Company (BCC), is a construction contractor that is committed to deliver quality services.

Our team is resourceful and dedicated to achieve client satisfaction and employee protability, simultaneously.

Our proactive approach creates value for our clients and safeguards our most important asset: our employees.

Safety and integrity are our priorities and are central to everything that we aspire to achieve.

With BCC on your team you will have access to our experience and expertise which will ensure management and completion of your projects in a time and budget efficient manner.

Page 4: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

Eng. Walid Kamal Shaaban.............Founder and Managing Partner

Tareq Fareed Abdul Rahman Al Othman..............................Partner

Abdulaziz Faisal Abdul Mohsen Al Khatrash........................Partner

Naser Ibrahim Naser Boursley.............................................Partner

Wajdi Abdulaziz Ahmad Hammad........................................Partner

BOARD OF DIRECTORS

Page 5: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

ENG. WALID K. SHAABANFounder and Managing Partner

Overview

Employment

Education

Personal

Back Combined General Trading & Contracting . (May 2012 till Now) First United Building Construction & Decorations Co (June 2009 till May 2012 )First United (May 2005 till June 2009)First United (Dec 2000 till May 2005) First United (Oct 1999 till Dec 2000)

• Beirut Arab University 1993-1998• Major: BS in Civil Engineering• Construction Planning & Management • Structural Analysis,• Design of Concrete/Steel Structures

• Self-Motivated Person • Commercial acumen• Innovative ideas• Inspiring innovation

• Identify and direct business development activities • Ensure that all corporate objectives are pursued• Organize activities for business development• Develop strategic business plans• Establish company culture, values and vision • Manage risk management plans

Founder & Managing PartnerOperations ManagerProject Manager Project Engineer Site Engineer

Graduated from Lebanon as a Civil Engineer in 1998, self-motivated and resourceful managing director with a proven ability to develop and strengthen management teams in order to maximize company profitability and efficiency. Experienced leading and growing all sectors of a business to make it a dynamic and progressive organization. Possessing excellent communication skills and able to establish sustainable and profitable relationships with customers, suppliers and office management across the world.

Page 6: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

GENERALThis Quality Program is the mean of assuring that all items of work are in conformance with the Contract Drawings and Specifications, and describe the inspections and tests that will be performed.

QUALITY MEETINGThe Project Manager, before construction operation begins shall meet with the Engineer's Representative or his representative on site to determine the Quality Program parameters and administrative interfaces with the Company regarding quality activities. The purpose of this meeting is to ensure that there are no misunderstandings regarding the quality control requirements for the project and to develop a mutual understanding relative to the quality system including forms to be used for recording the quality control operations, inspection, tests, approvals and certifications. Method statement will be prepared and agreed, to organise the work properly.

APPLICATION OF THE QUALITY PROGRAMDuring the Quality Program meeting, unique project specific items requiring the addition or subtraction to sections of the Quality Program will be identified. These additions, and/or deletions will be incorporated into the Project's Quality Program and will be submitted to the Engineer’s Representative or his representative on site for review and approval.

REVISIONS TO THE QUALITY CONTROL PROGRAMProject Manager is responsible for the preparation, compilation, review, issuance, and maintenance and revision control of the Quality Program with the approval of the Engineer’s representative.

QUALITY POLICY

Page 7: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

7

MISSION AND VISIONMissionBack Combined strives to render services that are reflective of our team’s efficiency and geared towards total client satisfaction.

We are a group of hard-working and devoted individuals that have come together as a team, with the shared goal of improving the standards of construction and project maintenance in the vast and competitive market of Kuwait.

Parallel to delivering achievement-driven services, Back Combined is dedicated to building strong and cordial partnerships with clients and customers. We are confident in our expertise and tenacity and take pleasure in building dreams.

We guarantee an experience that will leave you content and satisfied. Our professional ethics and the caliber of our service is what makes our organization unique and distinct.

VisionOur belief in the 3D’s, Dreaming-Designing-Delivering, motivates Back Combined to consistently strive to achieve their goal in keeping quality services as our utmost priority, our vision is to be the most innovative and efficient team in the region.

Page 8: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

HEALTH AND SAFETY POLICY

This policy is based on a sincere desire to eliminate personal injuries, occupational illness and damage to equipment and property, as well as to protect the general public whenever and wherever the public comes in contact with, or is affected by the company’s work.Company management and field supervisors are charged with the responsibility for planning safety into each work task with the goal of avoiding incidents, conditions and actions that could lead to occupational injuries or illness. While the ultimate success of a Health and Safety program depends upon the full cooperation of each individual employee, it is management’s responsibility to see that Health and Safety rules and procedures are established and enforced.Safety should never be sacrificed for production. It must be considered an integral part of quality control, cost reduction and job efficiency. Every supervisor will be held accountable for the safety performance demonstrated by the employees under his supervision.The goal is the total elimination of accidents from our operations.

In all of its operations, BCC is guided by an estab-lished Health and Safety policy.

Page 9: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

9

There are three sound reasons for this goal: A worthy business endeavor need not cause human suffering through disabling injury occupational illness, or loss of life. A superior Health and Safety record reflects the superior professional competence and serves to promote business thereby contributing to the continued growth and success of the company. Accidents increase cost, and result in a loss of profits.Our policy is to accomplish our work in a safe and healthy manner. Management and supervision at every level are charged with the task of integrating this policy into positive and productive business practices.

1.

2.

3.

HEALTH AND SAFETY POLICY

Page 10: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

ISO QUALITY MANAGEMENT CERTIFICATE

COMPANY LICENSE

Page 11: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

11

COMPANY LICENSE

Page 12: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

CENTRAL TENDERS COMMITTEE CERTIFICATE (CTC) GRADE -2-

Page 13: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

13

CTC REGISTRATION GRADE -2- AND MUNICIPALITY LICENSE

Page 14: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

CHAMBER OF COMMERCE REGISTRATION

Page 15: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

15

ORGANIZATIONCHART

Page 16: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

CO

NST

RU

CT

ION

P

RO

JECTS

Page 17: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

17

PROJECTS

Alsdairawi Commercial Complex ....................................................................................................................................18Mazaya v Tower ...............................................................................................................................................................20AMS Tower – Bneid Al Gar ..............................................................................................................................................24Khalid Tower – Qibla ........................................................................................................................................................28Jade high end Residential building .................................................................................................................................30Hicham Al Sager Cardiac Hospital and Rehabilitation center .......................................................................................34Al Fulaij Commercial Complex ........................................................................................................................................38Ali Alghanim Sulaibikhat Clinic .......................................................................................................................................40Delta Serviced Apartments .............................................................................................................................................42

PRIVATE HOUSESPrivate chalet - Bneider ....................................................................................................................................................46Private Villa - Surra ...........................................................................................................................................................50Private Villa - Mishrif ........................................................................................................................................................54Private Villa - Alfayha .......................................................................................................................................................58Private Villa - Dahiyat Abdullah Al Salem .......................................................................................................................60Private Villa - Nuzha .........................................................................................................................................................62Private Villas - Dahiyat Abdullah Al Salem .....................................................................................................................64Private Villa - Alshaab ......................................................................................................................................................68Private Villa - Mansouria ..................................................................................................................................................70Private Villa Shuwaikh .....................................................................................................................................................72Private Villa Al Salam .......................................................................................................................................................73Private Villas - Salwa .......................................................................................................................................................74Private Villa - Alsalam ......................................................................................................................................................76Private Chalet - Khiran .....................................................................................................................................................78

OTHER PROJECTSAl Marzouk Mosque - Sabah Al Salem ..........................................................................................................................82Pearl Marzouk Project .....................................................................................................................................................84Souk Al Kuwait Project ....................................................................................................................................................86Urban Dining Restaurants Jabriya ..................................................................................................................................88Khaleejia Land Scape ......................................................................................................................................................90

Page 18: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

ALSDAIRAWI COMMERCIAL COMPLEX

Page 19: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

19

Owner

Architecture

Scope of work

Status

Location

Built Up Area

ALSDAIRAWI COMMERCIAL COMPLEX

Heirs of The Late Salem Abdullah Al Sdairawi

Pan Arab (Pace)

Turn Key

Handed Over

Hawalli, Tunis street

7500 m2

Page 20: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

MAZAYA V TOWER

Page 21: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

21

MAZAYA V TOWER

Owner

Architecture

Scope of work

Status

Location

Built Up Area

Ali Mahmoud Ali Tifouni

Dar Al Salem Engineering Consultant

Turn Key

Handed Over

Jabriya - next to Mazaya clinic 1

8000 m2 of 22 Floors

Page 22: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction
Page 23: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

23

MAZAYA V

Page 24: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

AMS TOWER – BNEID AL GAR

Page 25: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

25

Owner

Architecture

Scope of work

Status

Location

Built Up Area

AMS TOWER BNEID AL GAR

Sheikh Abdulla Mansour Mubarak Abdulla Al Jaber Al Sabah

ESAS Architects

Turn Key

Ongoing

Bneid Al-gar, in front of Alsalam Hospital

7500 m2

Page 26: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction
Page 27: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

27

AMS TOWER – BNEID AL GAR

Page 28: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

KHALID TOWER – QIBLA

Page 29: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

29

KHALID TOWER QIBLA

Owner

Architecture

Scope of work

Status

Location

Built Up Area

Mr.Khalid Saleh Al -Ghunaim Sons Co.

Soor Engineering Bureau/Manzilli Deisgn Studio

Turn key

On going

Kuwait City Alqibla

9500 m2 /22 floors

Page 30: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

JADE HIGH END RESIDENTIAL BUILDING

Page 31: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

31

JADE HIGH END RESIDENTIAL

BUILDING

Owner

Architecture

Scope of work

Status

Location

Built Up Area

Jadeite Group

Studio Toggle Architects

Turn key

On going

Medan Hawalli

5500 m2

Page 32: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction
Page 33: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

33

JADE HIGH END RESIDENTIAL BUILDING

Page 34: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

HICHAM AL SAGER CARDIAC HOSPITAL AND REHABILITATION CENTER

Page 35: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

35

Owner

Donor

Architecture

Scope of work

Status

Location

Built Up Area

HISHAM AL SAGER CARDIAC HOSPITAL AND REHABILITATION CENTER

Ministry of Health

Mr. Khaled Abdulla Hamed Al Saqer

AGI Architects

Turn key

Handed Over

Al Shuwaikh Al Sabah Area

17 500 m2

Page 36: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction
Page 37: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

37

HICHAM AL SAGER CARDIAC HOSPITAL AND REHABILITATION CENTER

Page 38: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

AL FULAIJ COMMERCIAL COMPLEX

Page 39: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

39

Owner

Architecture

Scope of work

Status

Location

Built Up Area

AL FULAIJ COMMERCIAL COMPLEX

Heirs of the Late Abdulaziz Fahed Al Fulaij

Scale Consultant Office

Turn Key

Under Construction

Shwaikh, in front of Al-Tilal Mall

12 500 m2

Page 40: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

ALI ALGHANIM SULAIBIKHAT CLINIC

Page 41: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

41

Owner

Donor

Architecture

Scope of work

Status

Location

Built Up Area

ALI ALGHANIM SULAIBIKHAT CLINIC

Ministry of Health

Mr. Ali Alghanem

AGI Architects

Civil works

Handed over

Sulaibikhat

10,000 m2

Page 42: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

DELTA SERVICED APARTMENTS

Page 43: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

43

Owner

Architecture

Scope of work

Status

Location

Built Up Area

DELTA SERVICED APARTMENTS

Delta Real Estate (Tamdeen)

Option One International

Turn Key

Handed Over

Sabah Alsalem

2 Buildings of 7 000 m2

Page 44: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PRIVATE

Page 45: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

45

HOUSES

Page 46: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PRIVATE CHALET - BNEIDER

Page 47: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

47

Owner

Architecture

Scope of work

Status

Location

Build Up Area

PRIVATE CHALET BNEIDER

Sheikh Abdulla Nasser Sabah Al Ahmad Al Sabah

PAD10 Architects

Turn Key

Handed Over

Bnaider

9000 m2

Page 48: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction
Page 49: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

49

PRIVATE CHALET - BNEIDER

Page 50: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PRIVATE VILLA - SURRA

Page 51: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

51

Owner

Architecture

Scope

Status

Location

Built Up Area

PRIVATE VILLA SURRA

Mr. Ziad Mohamad Al Sanusi

ESAS Architects

Turn key

Handed Over

Al Surra

1250 m2

Page 52: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction
Page 53: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

53

PRIVATE VILLA - SURRA

Page 54: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PRIVATE VILLA - MISHRIF

Page 55: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

55

Owner

Architecture

Scope of work

Status

Location

Built Up area

PRIVATE VILLA MISHRIF

Khalida Al Wazzan

Studiotoggle

Turn key

Handed Over

Mishrif

2500 m2

Page 56: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction
Page 57: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

57

PRIVATE VILLA - MISHRIF

Page 58: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PRIVATE VILLA - ALFAYHA

Page 59: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

59

Owner

Architecture

Scope of work

Status

Location

Built Up Area

PRIVATE VILLA ALFAYHA

Mr. Mohammad Al Hassan

Studiotoggle

Turn key

On going

Al Fayha

1400 m2

Page 60: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PRIVATE VILLA - DAHIYAT ABDULLAH AL SALEM

Page 61: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

61

Owner

Architecture

Scope of work

Status

Location

Built Up Area

PRIVATE VILLA DAHIYAT ABDULLAH AL SALEM

Mr. Tareq Al Wageyan

AAP- Associated Architects Partnership

Turn key

On going

Dahiyat Abdulla Al Salem

2200 m2

Page 62: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PRIVATE VILLA - NUZHA

Page 63: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

63

Owner

Architecture

Scope of work

Status

Location

Built Up Area

PRIVATE VILLA NUZHA

Mr. Hasan Almatrouk

Studiotoggle

Turn key

On going

Nuzha

2000 m2

Page 64: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PRIVATE VILLAS - DAHIYAT ABDULLAH AL SALEM

Page 65: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

65

Owner

Architecture

Scope of work

Status

Location

Built Up Area

PRIVATE VILLAS - DAHIYAT ABDULLAH AL SALEM

Private

Al Bannaoun Gen. Trad. & Cont Company

Civil Works

Under Construction

Dahiyat Abdullah Al Salem

8800 m2

Page 66: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction
Page 67: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

67

PRIVATE VILLAS - DAHIYAT ABDULLAH AL SALEM

Page 68: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PRIVATE VILLA - ALSHAAB

Page 69: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

69

Owner

Architecture

Scope of work

Status

Location

Build Up Area

PRIVATE VILLA AL SHAAB

Meshari Bin Salamah

Al Humaidi Architects

Turn key

Handed over

Al Shaab

1100 m2

Page 70: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PRIVATE VILLA - MANSOURIA

Page 71: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

71

PRIVATE VILLA MANSORIA

Owner

Architecture

Scope of Work

Status

Location

Build Up Area

Abdul Moez Al Mutawa

Jassim Al Shehab Architects

Turn key

Handed Over

Al Mansoriya

2000 m2

Page 72: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

Owner:

Architecture

Scope of work

Status

Location

Built Up Area

PRIVATE VILLA SHUWAIKH

Mr. Eayyad Al Khatrash

Helen Seufi

Turn key

Handed over

Shuwaikh Residential Area

2000 m2

Page 73: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

73

Owner

Architecture

Scope of work

Status

Location

Built Up Area

PRIVATE VILLAALSALAM

Mrs. Samar Al Abdulghafour

Kayan Architects

Civil Works

Handed Over

Al Salam

1250m2

Page 74: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PRIVATE VILLAS - SALWA

Page 75: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

75

Owner

Architecture

Scope of work

Status

Location

Built Up Area

PRIVATE VILLAS SALWA

Mr. Mohamad Al Sanusi

Roma International

Turn key

Handed over

Salwa

3700 m2

Page 76: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PRIVATE VILLA - ALSALAM

Page 77: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

77

Owner

Architecture

Scope of work

Status

Location

Built Up Area

PRIVATE VILLA AL SALAM

Mr.Hilal Arnaot

AGC

Finishing & Interior Décor

Handed over

Al Salam

2000 m2

Page 78: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PRIVATE CHALET - KHIRAN

Page 79: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

79

Owner

Architecture

Scope of work

Status

Location

Built Up Area

PRIVATE CHALET KHIRAN

Mr. Khalid Al Sabti

Dar Al Hadiah / Unique Design

Civil

Handed over

Khiran

1200 m2

Page 80: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

OTHER

Page 81: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

81

PROJECTS

Page 82: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

AL MARZOUK MOSQUE - SABAH AL SALEM

Page 83: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

83

Owner

Architecture

Scope of work

Status

Location

Built Up Area

AL MARZOUK MOSQUE SABAH AL SALEM

Tamdeen Consultancy Company

Option One International

Turn key

Handed over

Sabah Al Salem

1500 m2

Page 84: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PEARL MARZOUK PROJECT

Page 85: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

85

Owner

Architecture

Scope of work

Status

Location

PEARL MARZOUK PROJECT

Kuwait Real Estate Company (KREC)

PAD10 Architects

Revevoation / Elevations uplifting

Handed Over

Salmiya Ras Al Ard

Page 86: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

SOUK AL KUWAIT PROJECT

Page 87: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

87

Owner

Architecture

Scope of work

Status

Location

SOUK AL KUWAIT PROJECT

Aqarat Real Estate

PAD10 Architects

Full Renovation

Handed Over

Kuwait City/Al-dirwaza

Page 88: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

URBAN DINING RESTAURANTS JABRIYA

Page 89: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

89

Owner

Architecture

Scope of work

Status

Location

Built Up Area

URBAN DINING RESTAURANTS JABRIYA

Urban International Real Estate

Jassim Al Shehab Consultants

Turn key

Handed over

Jabriya

1000 m2

Page 90: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

KHALEEJIA LAND SCAPE

Page 91: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

91

Owner

Architecture

Scope of work

Status

Location

Buil Up Area

KHALEEJIA LAND SCAPE

National Investment Company

PAD10 Architects

Hard and soft land scape

Finished in 2017

Sharek, Kuwait City

2500 m2

Page 92: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

LIST OF MAIN TECHNICAL STAFF AND CV OF KEY PERSONNEL

Position Name Qualification Graduation year

Managing Partner Walid Kamal Shaaban BS Civil Engineering Beirut Arab University 1998

Project Manager Ehab Dawood BS Civil Engineering Bannha University 1999

Operations Manager Wesam Al Bashiti BS Civil Engineering Bannha University 2003

Project Manager Magdy Ghaly BS Civil Engineering Ain Shams University 2007

Project Manager Bashar khanfar B. Sc. Civil Engineering Jordan University of Science and Technology 2007

Project Engineer Ahmad Damiri BS Civil Engineering October 6 University 2008

Project Engineer Mahmoud Abu Qurs BS Civil Engineering Hashemite University Jordan 2010

Tendering Engineer Huzefa Noorbhaiwala B. Sc. Civil Engineering Maharaja Sayajirao University, India 2010

Project Engineer Kenawy Ahmed BS Civil Engineering Higher Institute for Engineering, Egypt 2010

Project Engineer Ahmad Ghanim Diab B. Sc. Civil Engineering Halwan University, Egypt 2011

Site Engineer Maher Ibrahim BS Civil Engineering Higher Institute for Engineering & Technology, Egypt 2012

Procurement & Control Engineer Ahmad Fadle B. Sc. Civil Engineering Ain Shams University, Egypt 2012

Site Engineer Ratna Kishore B-Tech, Jawaharlal Nehru Technological University, India 2013

Architecture Ahmed Abdulla Abbas Bachelor in Architecture Al Ahliyya Amman University, Jordan 2013

Page 93: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

93

Position Name Qualification Graduation year

Managing Partner Walid Kamal Shaaban BS Civil Engineering Beirut Arab University 1998

Project Manager Ehab Dawood BS Civil Engineering Bannha University 1999

Operations Manager Wesam Al Bashiti BS Civil Engineering Bannha University 2003

Project Manager Magdy Ghaly BS Civil Engineering Ain Shams University 2007

Project Manager Bashar khanfar B. Sc. Civil Engineering Jordan University of Science and Technology 2007

Project Engineer Ahmad Damiri BS Civil Engineering October 6 University 2008

Project Engineer Mahmoud Abu Qurs BS Civil Engineering Hashemite University Jordan 2010

Tendering Engineer Huzefa Noorbhaiwala B. Sc. Civil Engineering Maharaja Sayajirao University, India 2010

Project Engineer Kenawy Ahmed BS Civil Engineering Higher Institute for Engineering, Egypt 2010

Project Engineer Ahmad Ghanim Diab B. Sc. Civil Engineering Halwan University, Egypt 2011

Site Engineer Maher Ibrahim BS Civil Engineering Higher Institute for Engineering & Technology, Egypt 2012

Procurement & Control Engineer Ahmad Fadle B. Sc. Civil Engineering Ain Shams University, Egypt 2012

Site Engineer Ratna Kishore B-Tech, Jawaharlal Nehru Technological University, India 2013

Architecture Ahmed Abdulla Abbas Bachelor in Architecture Al Ahliyya Amman University, Jordan 2013

Position Name Qualification Graduation year

Site Engineer Alaa Khanfar B. Sc. Civil Engineering Jordan University of Science and Technology 2013

Architecture Ahmed Abd Elkafy Bachelor in Architecture Al Minia University, Egypt 2014

Site Engineer Imad Sabbagh BS Civil Engineering Beirut Arab University 2015

Quantity Surveyor Reem Afchal Bachelor Interior Design American University of Technology 2015

Site Engineer Abdul Rahim Ahmad B. Sc. Civil Engineering Assuit University, Egypt 2015

Site Engineer Ola Rayan Arnaoot B. Sc. Civil Engineering Al Ahliyya Amman University, Jordan 2016

Site Engineer Ahmed Abu Hishmesh BS Civil Engineering Al Zarqa university, Jordan 2017

Architecture Toufik Al Sayegh Master in Architecture Lebanese University 2019

Financial Manager Mohamad Abdel Baqi Bachelor of Commerce Alexandria University 1999

Office Manager Zainab Naeem Bachelor Business Administration, Annamalai University, India 2008

Acountant Emad Sayed Bachelor of Commerece Ain Shams University 1998

Purchasing Officer Wael Shaaban Diploma in finance 1998

HR Officer Fikry Gamal kamel Diploma in human resources 1998

Page 94: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

OUR PROFFESIONALS EXPERTS

Eng.Ehab DawoodProject Manager

OverviewEmployment

Education

Personal

Back Combined Company (March 2015 till date)EL-Nisif Construction Company (March,2006 till March 2015)Asas general Construction Co- (March 2004 till March 2006)Ministry of Water Resources and Irrigation-Egypt (Aug 2002 till Feb 2004)

•Bachelor Civil Engineering – Year 1999

•Result oriented •Team Leader •Inspiring innovation •Challenging

Areas of expertise include:•Develops the project task list to define scope of work according to the requirements of the contract with the Consultants & Client.•Budgets and schedules each task of the project task list in conjunction with Project Architect and Heads of other services.•Review and action material, shop drawing, sample, mock-up etc. submittals.•Issuing instructions to the sub-contractors for their action to comply with the construction contract time and quality requirements.

PM/CMProject Manager Project Manager Site Engineer

Graduated as a Civil Engineer in 1999. Certified project management professional and project planning, implementation and execution. Proven ability to support multiple projects with medium to high complexity. Consistent track record of on-time and on-quality delivery. Efficiently synthesize project information and accurately establish project scope. Set project costs and productivity benchmarks. Proven quality assurance, risk management and change management expertise.

•Coordinate with the designers and Consultants to resolve site queries.•Monitors project tasks to maintain design budget, schedule and scope of work.•Monitors that construction is in accordance with plans and specifications. •Gives clear and understandable instructions to staff to avoid confusion re-work and errors. Follows up with staff to ensure compliance with requirements.•Ensures proper project handover and client satisfaction with the end product.

Page 95: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

95

Eng. Wesam Al BashitiOperations Manager

Overview

Employment

Education

Personal

Back Combined Company (January 2015 till date)Burgan One General Trading & Contracting Co., Kuwait,(July 2007 till January 2015)Al-Eamar Engineers Contractors Company for Construction, Amman, JORDAN (June 2005 till July 2007)Guiten Company Spa for Maintenance, Building and Real Investment, LIBYA (October 2003 till June 2005)

Operations ManagerCivil Engineer

Site Engineer

Site Engineer

•Bachelor Civil Engineering – Year 2003•General Examination Board, Osta Omar School, Derna, LIBYA -Year 1998-1997.

•Highly motivated •Result oriented •Effective •Devoted

Areas of expertise include:•Design, develop and implement best quality practices and processes for product developments.•Maintain, monitor and ensure highest quality in services or products. •Develop and initiate quality standards for tests, inspections and evaluations. •Design and develop forms and instructions for evaluating, assessing, reporting and documenting on quality standards in products or services. •Develop strategies to evaluate precision and accuracy of

Graduated as a Civil Engineer in 2003 with extensive. Experience in planning and directing activities concerned with development, application, and maintenance of quality standards for industrial processes, materials, and products: Develops and initiates standards and methods for inspection, testing, and evaluation, utilizing knowledge in engineering fields such as chemical, electrical, or mechanical. Establishes program to evaluate precision and accuracy of production equipment and testing, measurement, and analytical equipment and facilities.v

analytical equipment, tests & measurements and production equipment.•Troubleshoot and resolve problems relating to quality control aspects.•Lead, direct and assist technical, professional staff in measuring and testing a product or a service.•Tabulate and document data relating to products, processes, materials, its qualities and reliabilities.•Research, study, compile and prepare material on quality control activities, processes and procedures.•Train staff, technicians and professionals on the aspects of quality control activities.

Page 96: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

OUR PROFFESIONALS EXPERTS

Eng. Magdy GhalyProject Manager

OverviewEmployment

Education

Personal

Back combined company - Project managerBack Combined Company – Site Engineer- Ahmadiah Contracting & Trad. Co. – Site Engineer- Barcom for Construction Co. – Site Engineer- Samcrete for Construction Co. – Site Engineer-

Nov. 2018 till dateSep.2014 till Oct. 2018Dec 2008 till Sept. 2014 Jan 2008 till Nov. 2008 August 2007 till Dec. 2007

• Ain Al Shams Uniuversity – Faculty of Engineering• Bachelor of Engineering Civil &Structural Department • Year 2007

• Highly motivated, result oriented , effective & devoted • Flexible & adaptable with changing environments.• Good Human relation

Areas of expertise include:• Acting as the main technical advisor on a construction site for subcontractors, crafts people and operatives.• Setting out, leveling and surveying the site.• Checking plans, drawings and quantities for accuracy of calculations.• Ensuring that all materials used and work performed are as per specifications.• Overseeing the selection and requisition of materials and plant.• Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project.• Managing, monitoring and interpreting the contract design documents supplied by the client or architect.

Graduated as a Civil Engineer in 2007 with expertise inperforming technical, organizational and supervisory role involved in construction operations and acting as the main technical advisor on a construction site for subcontractors, crafts people and operatives Liaising with and working alongside architects, engineers, construction managers, supervisors, planners, surveyors and subcontractors and share responsibility for site security, health and safety, and the organization and supervision of material and human resources.

Page 97: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

97

Eng. Bashar khanfarProject Manager

Overview

Employment

Education

Affiliation

Back Combined Company – project manager Nasa construction. Co. – construction managerNasa construction co. – Site EngineerAl-Eamar al hadetha Co. – Site Engineer

•Jordan university of science and Technology – Faculty of Engineering•Bachelor of Engineering Civil (Structural Department).Year 2007

•Advanced course in Auto cad •Advanced Course in Primavera

Areas of expertise include:•Checking plans, and quantities for accuracy of calculations;•Ensuring that work performed are as per specifications;•Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project;•Managing and monitoring that the progress convenient with the cpm schedule •Selecting the subcontractors and prepare their subcontract agreement•Quality control.

Graduated as a Civil Engineer in 2007 with experience in management, engineering , planning ,and construction of large scale of construction projects governmental and private projects, set project cost , certain quality assurance, commendable track record in time and quality.

Feb.2019 till dateNov 2017 till Jan. 2019Aug 2015 till Oct. 2017Apr 2007 till Jul. 2015

Page 98: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

OUR PROFFESIONALS EXPERTS

Eng.Ahmad DamiriProject Engineer

Overview

Employment

Education

Personal

Back Combined General Trading & Contracting Co. (2012 - till date ) Hot Engineering & construction Company (Aldar Company)-(2010-2012) First United General Trading & Contracting Co.- (2008 -2010)

• 6 October University• Major: Bachelor of Science of Civil Engineering • Construction Planning & Management• Structural Analysis,• Design of Concrete/Steel Structures• Year 2008

• Highly motivated, result oriented , effective & devoted • Creative• Challenging• Good Human relation

Areas of expertise include:• Plan the construction project• Supervise & monitor the site labor force through general foreman • Preparation of necessary paperwork for completion of work• Analyze various factors at construction job• Tri-Lingual (English/Arabic )• New Product Introduction• Preparation of daily reports• Problem Solving• Reviewing plans project site on daily basis

Project Engineer Site Engineer Site Engineer

Graduated as a Civil Engineer in 2008 with experience in management, engineering and construction of large scale projects in infrastructure, housing and urban buildings. Desires a Project Manager that utilizes my technical background and expertise in Architecture, Planning and Engineering. Would like to work for an established international engineering firm that specializes in urban building constructions.

Page 99: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

99

Eng. Mahmoud Burhan Abu-QursProject Engineer

Overview

Employment

Education

Personal

Back Combined General Trading & Contracting Co. (2012 - till date) Al Daleel (June-2011 to January 2012)Abu-Erishe Bro. Company ( Jordan )(Sep-2010 to Mar 2011)

• Hashemite University – Jordan• Major: B.Sc. Degree in Civil Engineering at Faculty of Engineering. • Construction Planning & Management• Structural Analysis,• Design of Concrete/Steel Structures year 2010

• Highly motivated, result oriented , effective & devoted• Good communication, planning and organizational skills• Good Human relation• Able to work on your own initiative as well as being a team player

Areas of expertise include:• Drafting, Laying Out, and Specifying Technical Devices, Parts, and Equipment.• Making Decisions and Solving Problems• Communicating with Supervisors, Peers, or Subordinates.• Analyze various factors at construction job. • Documenting/Recording Information.• Thinking Creatively.• Organizing, Planning, and Prioritizing Work.• Estimating the Quantifiable Characteristics of Products, Events, or Information.• Scheduling Work and Activities.• Developing Objectives and Strategies.

Graduated as a Civil Engineer in 2010 with experience. Over 10 years experience by exploring the dynamics of a challenging career in a fast track organization by reshaping my Engineering knowledge and integrated skills. My corporate mission is to meet the needs of employer through technical excellence and innovative solutions.

Project Engineer Site Engineer Site Engineer

Page 100: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

OUR PROFFESIONALS EXPERTS

Eng.Huzefa NoorbhaiwalaTendering Engineer

Overview

Employment

Professional Affiliation

Education

Personal

Back Combined General Trading & Contracting, Kuwait (May 2016 till Now)Al Buhaira Contracting Company, Dubai (Jan 2014-Dec 2015)Safal Construction Pvt Ltd, India (May 2011-Dec 2013)Sahara Prime City Ltd, India (May 2009-Apr 2011)

•Certificate Courses: AutoCAD 2010, M.S Office

•Bachelor Civil Engineering-Maharaja Sayajirao University,India •Honor: Got First Class•Year 2010

•Good judgment and organizing abilities. •Highly motivated & result oriented. •Spontaneous & Honest with work. •Quick learner & Self-confident.

Areas of expertise include:•Sound knowledge of taking Quantities from drawings. •Concrete and Steel analysis.•Preparation of BOQ & various sheets as required. •Preparation of Price Analysis, Various work estimates. •Floating Enquiries.•Detail studying of drawings.

Tendering Engineer Quantity SurveyorBilling Engineer Site Engineer

Graduated as a Civil Engineer in 2010 with experience. Over 11 years experience in construction engineering, pricing & quantity Surveying. An ambitious and dedicated Civil Engineer with strong practical and technical skills.

Page 101: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

101

Eng. Kenawy AhmedProject Engineer

Overview

Employment

Education

Personal

Back Combined Company (October 2016 till date)Back Combined Company (May 2015 to Aug 2017) Bnaider International General Trading & Contracting Co (April 2014 till May 2015)Al Rahman Company, Egypt (April 2013 to January 2014) Al Aref Company, Egypt (December 2012 to March 2013)

•Bachelor Civil Engineering •Year 2010

•Well organized. •Good planner. •Problem-solver. •Decision maker.

Areas of expertise include:•Undertaking surveys•Checking technical designs and drawings to ensure that they are followed correctly•Conduct regular inspections and assess the work performance done by all subcontractors•Ensuring projects meet agreed specifications, budgets or timescales •Liaising with clients, subcontractors and other professional staff, especially quantity surveyors and the overall project manager

Graduated as a Civil Engineer in 2010 with experience in civil engineering duties: Q.C, Construction, Site & Project Management. Highly skilled and resourceful Civil Site Engineer with excellent record of cost-effective project completion. Able to function effectively as an independent worker or as part of a team.

Project Engineer Site Engineer Civil EngineerCivil Engineer Civil Engineer

•Providing technical advice and solving problems on site •Preparing site reports and filling in other paperwork•Liaising with quantity surveyors about the ordering and negotiating the price of materials•Ensuring that health, safety and sustainability policies and legislations are adhered to

Page 102: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

OUR PROFFESIONALS EXPERTS

Eng. Ahmed Ghanem Project Engineer

Overview

Employment

Education

Personal

In Egypt:•Company: Concord for engineering & contracting. In 6th of October city, Egypt Jul 2011- Jul 2012 -Site Engineer •Company: Darwish consulting engineers Ltd. In 6th of October city, Egypt Jul 2012- Jul 2014 -Site Engineer

In Kuwait:•Company: 90 Degree construction Jan 2015- Aug2015 Site engineer •Company: AL KHADA International Sep 2015- Apr 2016 Site engineer at AL AHMADI HOSPITAL •Company: ARCHIOOD DESIGN May 2016- Oct 2018 Snr. Site Engineer •Company: Al Ryada & Bonyan Nov 2018- Nov2019 Snr. Site engineer •Company: Back combined co. Dec 2019 Till Now Project Engineer

Bachelor Degree of Engineering (civil department) - 2011

•Very good with AutoCAD 2D•Professional user for Internet & E-Mail.•Good problem solving and analytical skills.•Able to operate Microsoft office (Word – Excel – Power Point – Access).•Efficient management and organizational skills. •Good communication and writing skills.

Areas of expertise include:•Supervise project employees , including external contractors , and sub-contractors •Write daily detailed reports logging work progress for quality assurance purpose•Supervising the entire of site and construction activities encompassing technical inputs coordinating site management activities •Interacting with supplies for achieving cost effective

Graduated as a Civil Engineers in 2011 with experience in construction and infrastructure projects. Experience in site supervision, construction works Knowledge of construction methods and construction sequence in civil structural construction above and below the ground

purchase of equipment , accessories and material with timely delivery so as to minimize project cost •Effective problem-solving skills•Ability to make quick but precise decisions•Strong work endurance; can sustain high-level focus for several hours•Performs at a high level within a team framework

•Open minded and able to work in complex projects and environment.•Ability to work without close supervision & to work under stress and pressure.•Smart and Hard worker, Self-motivated, easy-learner & Flexible.•Good communication and interpersonal skills with ability to work independently and in a team environment.•Quick to learn.

Page 103: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

103

Eng. Maher IbrahimSite Engineer

Overview

Employment

Education

Personal

Professional Affiliation

Back Combined Company (November 2013 till date)

•Bachelor of Civil Engineering•Year 2012

•Highly motivated, result oriented , effective & devoted •Flexible & adaptable with changing environments. •Good Human relation

•Training Course in sap level 1 From Armed Forces•Training Course in Auto cad 2D From Armed Forces•Training course in Engineering Of ce Saied Behery•Training Course in Elmokawlon ElArab From 3/7/2011 to 28/7/2011•Training Course in Talat Mustafa from 1/8/2010 to 1/9/2010•Training Course in Al – QABANDI united CO in Kuwait from 9/2/2013 to 24/4/2013

Areas of expertise include:• Setting out sites and organizing facilities• Ensuring projects meet agreed specifications, budgets or timescales• Liaising with clients, subcontractors and other professional staff • Checking and preparing site reports, designs and drawings• Problem solving• Ensuring site safety• Overseeing building work

Site Engineer

Graduated as a Civil Engineer in 2012 with experience in performing technical, organizational and supervisory role on construction projects; setting out, checking and preparing site repor ts, des igns and drawings invo lve d in construction operations. Liaising with and working alongside architects, engineers, construction managers, supervisors, planners, surveyors and subcontractors and share responsibility for site security, health and safety, and the organization and supervision of material and human resources.

• Supervising contracted staff• Providing technical advice• Ordering and negotiating the price of materials • Managing parts of construction projects• Undertaking surveys

Page 104: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

OUR PROFFESIONALS EXPERTS

Eng. Ahmed FadleProcurement and Control Engineer

Overview

Employment

Education

Personal

Back Combined Co. (BCC) – General Trading & Contracting (Kuwait)-Procurement and Control Engineer

• Bachelor of Civil Engineering – Ain Shams University (Egypt), Graduation Year: 2012• Project Management (PRMG) – DiplomaThe American University in Cairo (AUC)] [May 2017 – May 2020• Project Management – DiplomaUniversity of Stuttgart – Städtebau Institut (SI) - Germany] ,Feb. 2015 – June 2015year 2012

• Ability to work under pressure.• Very good Communication skills.• Patient.• Good Presentation skills.• Good Negotiation and Persuasion skills.• Fast-learner.

Areas of expertise include:•Planning, cost management•Procurement•Contracting•Risk management•Resources management•Estimation and bidding

Feb. 2018 till date

Graduated as a Civil Engineer in 2012 with experience in project management; site coordination, planning, budgeting, controlling, procurement, contracting, estimating , bidding and business development. Career record of working on various mega projects in different countries. Highly motivated and dedicated to gain new knowledge and experiences in order to contribute in company development and growth.

Page 105: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

105

Eng. Ratna KishoreSite Engineer

Overview

Employment

Education

Personal

Back Combined Company (March 2015 till date)Bayan National Company (November 2014 till March 2015) Construction Management & Building Company (CMBC), Kuwait (November,2006 till March 2014)

•Bachelor Civil Engineering •Year 2013

•Well organized •Good planner •Problem-solver •Decision maker

Graduated as a Civil Engineer in 2013 with experience in Construction Management, Execution and Supervision including take-offs, estimating, budgeting, contracting, purchasing and invoicing. Experience in full on-site construction management and land development; effectively scheduling, monitoring and inspecting all work from start to customer orientation. Working effectively with architects, engineers, developers, designers, contractors, consultants, inspectors, city officials, decorators and agents.

Site Engineer Civil Engineer Project Manager

Page 106: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

OUR PROFFESIONALS EXPERTS

Eng. Ahmed Abdulla A. Abbas Technical Team Leader Architecture

Overview

Employment

Professional Affiliation

Education

Personal

•Back Combined General Trading & Contracting - Technical Team Leader •Option-1 International Consultants, Kuwait - Architect•2K Architects and Planners, Jordan - Architect•Make Architects, London - Assistant Architect•Line Design Contracting, Kuwait- Architect

•Revit From Trixel Academy, 2014•3Ds Max From Element 80 Academy, 2011•Photoshop From New Horizon Academy, 2010

•MSc in Sustainable Mega Buildings from Cardiff Uni. , Wales ,UK•Bachelor in Architecture From Amman Al Ahliyya Uni. , Jordan year 2013

•Dynamic And Self-Motivated •Critical Thinker and Problem Solver•Detail and Accuracy Oriented•Team Player with leading Skills

Areas of expertise include:•Architectural and Interior Design•Project Coordination •Preparing and Checking Shop Drawings•Proficient with AutoCAD & 3Ds Max

Jan 2020 till NowJuly 2017 – Dec 2019July 2016 – Sept 2016Nov 2015 – Jan 2016Oct 2013 - June 2014

Graduated as an Architect in 2013 holding MSc in Sustainable Mega Buildings, LEED Green Associate with experience in large scale building design. Skilled project Coordinator with good knowledge of building engineering and performance, Possess advanced technical and computer skills, excellent attention to details and innovative problem solving to ensure that every project design is well Coordinated and accurately executed to the highest possible standards.

•LEED Green Associate, March 2017•Kuwait Society of Engineers & Jordan Engineers Association, Since2013 •ELTS ( Score 7.0) , April 2014

Page 107: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

107

Eng. Alaa Khanfar Project Engineer

Overview

Employment

Education

Personal

•Back combined company - Project manager/ Project Engineer •Al Daleel company - project manager •Sayed Hameed Behbhani and sons - Senior Site engineer•Dehdari construction - Site engineer

•High school diploma Bayan Bilingual School 1997-2007•Bachelor Civil Engineering – Year 2013•Project Management institute {PMI} Project management professional- 2018

•Good planner.•Problem-solver.•Decision maker.•Critical Thinker •Risk assessment

Areas of expertise include:•Undertaking surveys•Checking technical designs and drawings to ensure that they are followed correctly•Conduct regular inspections and assess the work performance as per Quality control policy •Ensuring projects meet agreed Baseline.

June 2019 till NowMarch 2018 -June 2020 March 2015 - March 2018April 2013 - March 2015

Graduated as a Civil Engineer in 2013 with experience in the construction industry. autonomous worker committed to providing high quality services. Proficient in Computer Added Design and certified project manager professional.

•Coordinate with all services •providing technical advice and solving problems on site•develop plan to track progress •Negotiation of Subcontractor claims.•Ensuring that health, safety and sustainability policies and legislations are adhered to

Page 108: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

OUR PROFFESIONALS EXPERTS

Eng. Ahmed Mohamed Abd Elkafy Technical Office - Architecture Site Engineer & 3D Visualizator

Overview

Employment

Education

Affiliation

Personal

•Back Combined General Trading & Contracting –Technical Office Engineer & Site Engineer.•Design Engineer in consultant office in Kuwait •Site Engineer in Epyption Al Alamia company•Trainer of Engineering Programms in Al manara Academy

•Minia University 2014•Major: BS in Architecture Engineering

•Advanced course in AutoCAD 2d & 3d•Revit Architecture •Sketch up & Vray

•Self-Motivated High Performance •Team worker & Good Learner•Detail- and Accuracy-Oriented•Flexible & adaptable with changing environments

Areas of expertise include:•Ensuring Projects meet agreed specifications•Coordinating with subcontractors•Proficient with AutoCAD , Revit , Sketch up , Vray , Photoshop & Lumion•Scheduling work and activities•Accuracy in Quantity Calculations•Checking & preparing Site Reports, designs, & drawings

Graduated as an Architect in 2014 with experience in designing , contructions , 3d visualisation and making animations for projects. Seeking to develop my technical skills, work experience and creative towards making significant contribution to the growth and development of the company.

Dec 2019 till NowDec 2018 till Dec 2019Jul 2016 till Nov 2018Jun 2014 till Jun 2016

•Photoshop•Lumion

Page 109: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

109

Eng.Imad SabbaghSite Engineer

Overview

Employment

Education

Professional Affiliation

Personal

Back Combined General Trading & Contracting (Jan 2016 till Now)Enterprises A R Hourie, Rive Gauche Tower project, Lebanon (Apr 2015 – Sept 2015)

•Beirut Arab University•Major: BS in Civil Engineering•British System (IGCSE), High school, Kuwait •Year 2015

•Advanced course in Etabs (BIM-ME Training Centre) •Advanced Course in Primavera-P6 (Global Studies Institute)

•Self-Motivated High Performance •Team worker & Good Learner •Detail- and Accuracy-Oriented

Areas of expertise include:•Ensuring Projects meet agreed specifications •Coordinating with subcontractors•Setting out, leveling, & surveying the site •Proficient with AutoCAD & Primavera •Scheduling work and activities•BOQ Preparation of civil works•Accuracy in Quantity Calculations•Value Engineering•Checking & preparing Site Reports, designs, & drawings

Site Engineer Site Engineer

Graduated as a Civil Engineer in 2015 with experience in learning and achieving supervision in all phases of construction operations. Seeking to develop my tech-nical skills, work experience and creative towards making significant contribution to the growth and development of the company.

Page 110: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

OUR PROFFESIONALS EXPERTS

Eng.Reem AfchalQuantity Surveyor

Overview

Employment

Education

Computer Skills

Personal

Back Combined Company (2016 till date)Projects Group, Nour Squar, Tripoli (2014 to 2016)

• BA in Interior Designing, American University of Technology • Year 2015

• AutoCAD • Photoshop • 3D Max

• Team Worker & Good learner• Hard working, Independent & Flexible

Areas of expertise include:•Responsible for checking and managing the quantities for variety of residential and commercial projects (preliminary design & design development& detailed Design Drawings issued for Construction &Landscape Drawings).•Assist sit in preparing Bill of Quantities (BOQ).•Coordination with tendering engineer.•Coordination with structural engineer.

Graduated as an Interior Designer in 2015 with a professional work experience with academic background from a reputable university in Lebanon. Enthusiastic to learn new programs and techniques and to gain valuable experience using my knowledge, and competences, and never stop progressing my skills. I promote “knowing how to think” as a basic requirement of “knowing how to do”.

Quantity Surveyor Interior Designer

•Preparing the list of drawings (Plans, Partitioning Plans, Sections, Elevations, Wall Sections,).•Efficient collaborator in many projects.•Estimation of quantities as per drawing.•Rate analysis of extra items.•Take of quantities of items and area

Page 111: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

111

Eng.Abdelrahim AhmedSite Engineer

Overview

Employment

Education

Personal

Back Combined Company – Site Engineer ELNOOR Construction Company, Egypt –project MangerELNOOR Construction Company ,Egypt - Site EngineerElomda Construction Company, Egypt. – Site Engineer

•Assuit Uniuversity – Faculty of Engineering•Bachelor of Engineering Civil &Structural Department Year 2015

•Highly motivated, result oriented , effective & devoted•Flexible & adaptable with changing environments.•Good Human relation

Areas of expertise include:•Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives;•Setting out, leveling and surveying the site;•Checking plans, drawings and quantities for accuracy of calculations;•Ensuring that all materials used and work performed are as per specifications;

Jan.2020 till dateSept 2018 till Des.2019Jan 2017 tillAug.2018Dec 2016 till Dec.2017

Graduated as a Civil Engineer in 2015 performing technical, organizational and supervisory role involved in construction operations and acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives Liaising with and working alongside architects, engineers, construction managers, supervisors, planners, surveyors and subcontractors and share responsibility for site security, health and safety, and the organization and supervision of material and human resources.

•Overseeing the selection and requisition of materials and plant;•Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project;•Managing, monitoring and interpreting the contract design documents supplied by the client or architect.

Page 112: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

OUR PROFFESIONALS EXPERTS

Eng. Ola Rayan Arnaoot Site Engineer (Civil)

Overview

Employment

Education

Personal

Back Combined General Site & Contracting Co .-Tendering EngineerJoud Contracting company between Kuwait & Qatar - Owner representative and quality control

•Al-Ahliyya Amman University Faculty of civil Engineering •Bachelor of Civil Engineering (General) -2016

•Looking to the general benefit as a main goal in accordance with position responsibilities•Very adaptable with changing environment •Highly motivated and ready to find best techniques and ways to reach a wanted result or goal in accordance with the space of responsibility •Appreciating management ethics, techniques & skills, considering that to be an important reason of team satisfaction especially in the field of thinking and accuracy seeking.

Areas of expertise include:•Tendering field , checking & studying tender documents with technical details & quantities to be ready for submission with the best competitive prices with best techniques•Procurement field , sharing responsibility of preparing quotations and best options of sub-contractors to be ready to use at the ongoing sites•Sharing responsibility of running site that includes following sub-

November 2017 till NowOctober 2016 till end of October 2017

Graduated as a Civil Engineer in 2016 with experience in the field of construction, from consulting to contracting field, acting as a civil engineer at tendering & procurement department, after working at construction sites sharing responsibility of technical and shop-drawings department, subcontractors and site works, and working alongside architects, engineers, construction managers, supervisors, planners and surveyors, all under safety and security conditions.

contractors, paper works, submitting shop-drawings & co-ordination, inspection & quality control, all to be in accordance with the planned time schedule and consultant over-view

Page 113: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

113

Eng. Ahmed Abu HishmehSite Engineer

OverviewEmployment

Education

Personal

Back Combined Company (Oct 2017 till date) Syed Hamid Behbehani Contracting Company (February2015 to July 2015)

•B. SC Civil Engineer, Al Zarqa University, Jordan •Year 2017

•Highly motivated& Result oriented•Flexible & adaptable with changing environments. •Good Human Relation

Areas of expertise include:•Problem solving•Ordering and negotiating the price of materials •Ensuring site safety•Managing parts of construction projects •Overseeing building work•Undertaking surveys•Setting out sites and organizing facilities •Supervising contracted staff

Graduated as a Civil Engineer in 2017 with experience, capable of performing technical, organizational and supervisory role in construction projects. My work includes checking and preparing site reports, designs and drawings involved in construction operations. Liaising with and working alongside architects, engineers, construction managers, supervisors, planners, surveyors and subcontractors.

Site EngineerTrainee Civil Engineer

•Ensuring projects meet agreed specifications, budgets or timescales •Liaising with clients, subcontractors and other professional staff •Checking and preparing site reports, designs and drawings

Page 114: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

OUR PROFFESIONALS EXPERTS

Arch. Toufic A. SayeghProject CoordinatorArchitecture

Overview

Employment

Education

Personal

PROJECT COORDINATOR, BACK COMBINED CO. BCC-KUWAIT CITY, KUWAITINTERN ARCHITECT, CONSOLIDATED ENGINEERING COMPANY SAL - KHATIB & ALAMI

•MASTERS IN ARCHITECTURE, FACULTY OF ARCHITECTURE AND FINE ARTS - LEBANESE UNIVERSITY (2019)•Spatial Dynamics and Computation, design as a knowledge-Based Process.

•Able to work as a part of a team or individually.•Learn new skills and grasp new information rapidly.•Compiling data for architectural plans, specifications, reports etc. •Ability to remain calm under pressure and maintain good humor.•High levels of creativity, imagination and vision. •Developing specific goals and plans to prioritize, organize, and accomplish work.•Competence in computer-aided design (CAD), 3D.•Sketchup pro. •Preparing layouts, drawings, execution files and sketches.

Graduate as an Architect in 2019; sa strong believer in the ability of the architecture and research combined with design thinking for strengthening our societies and having a positive effect on the world. Only together we can build a better future.

Dec. 17 2019 – PresentAUG. 31 2016 – Oct. 5 2016

Areas of expertise include:•Architecture Designs•Urban Planning•Architectural Urban Case Studies•Housing projects • Site surveys •Residential conversions

•Landscape planning •Interior design •Problem solving

Page 115: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

115

Mohammad Abdel BakyFinance Manager

Overview

Employment

Education

Personal

Back Combined General Trading & Contracting . (May 2012 till Now) First United Agricultural Contracting CO (May 2010 till April 2012) Egypt Kuwait For Trading – Cairo ( May 2002- Aug,2003)New Horizons Computer Learning Centre –Egypt ( April 2001-April 2002) Multi Pharma Co For Medicine (July 2000 to March 2001)

• Alexandria University• Major: Bachelor of Commerce (Accounting) • Auditing Financial Information• Auditing Financial Information• Financial Forecasting And Risk Analysis year 1999

• Self-Motivated Person• Client-Facing (Customer Service) And Interpersonal Skills • Analytical Ability• Team Working• Organisational Skills And Ability To Manage Deadlines

Areas of expertise include:• Preparing the journal entries• Posting the ledgers.• Preparing Bank Reconciliation• Preparing monthly cash flow.• Preparing monthly Salary & the Indemnity & vacation for Staff. • Make all daily, monthly, yearly journal vouchers• In general directing all the journal vouchers within the company.

Financial Manager Chief Accountant Accountant Accountant Exectutive AccountantExternal Auditor Trainee

Graduated in Accounting in 1999 with experience, a detail oriented with excellent knowledge of accounts possesses rich experience in financial planning, analysis and accounting principles. Admirable capacity of improving and maximize overall business and finance function integration through effective communication processes. Experienced in keeping the records of daily financial transactions and analyzing the financial aspects of organization. Innovator with creative skills and experiences to improve overall business processes.

• Reviewing all staff receivables accounts.• Keeping and maintaining the company fixed assets registry and calculate the depreciation•Prepare a monthly financials file for the top management that includes the final performance of the month.• Good Knowledge of the Kuwaiti Labour Low

Page 116: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

OUR PROFFESIONALS EXPERTS

Zainab NaeemOffice Manager

Overview

Employment

Education

Personal

Back Combined General Trading & Contracting, (May 2012 till Now) Safat Enterprise Solutions Company, (Jan 2011-May 2012)First United Company, Kuwait, (Feb 2009-Jan2011)First United Company, Kuwait (Jan2005-Feb 2009)

• Annamalai University – India• Major: Bachelor’s in Business Administration• Principles of Management• Business Mathematics and Statistics• Business Economics• Introduction to Operations Researchyrear 2008

• Good judgment, managerial and organizing abilities, inventiveness• Adapting to and understanding changes in business environment• Maintain professional attitude and a calm approach under high pressure situation • Open to learning and a positive approach in life

Areas of expertise include:• Office Management• Teambuilding & Supervision• Staff Development & Training• Policies & Procedures Manuals• Report & Document Preparation • Spreadsheet & Database Creation

Graduated in Business Administration in 2008. A dedicated and technically skilled with a versatile administrative support skill set developed through experience as an office manager, secretary, administrative assistant. Excel in resolving employer challenges with innovative solutions, systems and process improvements proven to increase efficiency, customer satisfaction and the bottom line.

Office ManagerAdmin & HR ExecutiveExecutive Secretary (Head Office) Secretary (Site Offices)

• Accounts Payable / Receivable • Bookkeeping & Payroll• Records Management• Meeting & Event Planning• Inventory Management • Expense Reduction

• Financial and Management Accounting• Production and Material Management• Personnel Management and Industrial Relations • Marketing Management• Business Data Processing• Business Laws

Page 117: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

117

Emad SayedAccountant

OverviewEmployment

Education

Personal

Back Combined Company (June 2012 till date)Asian Building Materials Group (April 2007 to May 2012) Fine weather Company (Year 2003 to Year 2007)Compo Majic International (Year 2001 to Year 2003) Homa Exchange Company (Year 1998 to Year 2000)

•Bachelors Faculty of Commerce, Ain Shams University year 1998

•Experience of administrative coordination and administration and finance •Proficiency in the use of all ready-made programs•Ability to work under pressure

Areas of expertise include:•Assist with the preparation, analysis and verification of accounting records, financial statements and reports to ensure accuracy and adherence to reporting and procedural standards•Maintain the general ledger operations•Coordinate audits in accordance with internal and external procedures•Assist with special projects related to process improvements•Support the month end close process•Audit, process and pay vendor invoices in an accurate and timely manner

Accountant Accountant AccountantJr. Accountant Cashier

Graduated in 1998 with experience in handling the complete accounting cycle, including opening, posting entries and closing of accounts and preparation of various accounting reports. Expertise include handling tasks related to cash disbursement and cash reconciliation. Possess excellent organizational skills with demonstrated ability to effectively prioritize to meet strict deadlines & has proven ability to quickly learn and use new technologies and tools.

•Reconcile invoices to purchase orders and bill customers•Resolve AP and AR problems with vendors and customers•Collect, categorize, calculate, verify and enter data to maintain accurate records•Assist with budget development and financial forecasting •Monitor and analyze budget variances•Record and process employee expense reports and reconcile credit card statements

Page 118: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

PLANT AND EQUIPMENT#

Type of Plant / Equipment Min Nos. Capacity Year Of Manufacture

Duration Available on Site

Present Location Condition

1 Tower Crane 5 50 ml / 8 TON

2000 Full Time BCC Sites Very Good

2 Hoist 4 2 TON 2016/17/18 Full Time BCC Sites Very Good

3 Mobile Crane 2 40 TON 1990 Full Time BCC Sites Very Good

4 Mobile Crane 1 50 TON 1995 Full Time BCC Sites Very Good

5 Compressor 5 220 CFM 2014-2019 Full Time BCC Store Very Good

6 Compactor 5 2 TON 2013 Full Time BCC Store Very Good

7 Vibrator 12 - 2013 Full Time BCC Store New

8 Trowler 6 - 2013 Full Time BCC Store New

9 Concrete Pump 4 36 m 1990 Part Time Conc. supplier store Very Good

10 Concrete Pump 2 42 m 1996 Part Time Conc. supplier store Very Good

11 Bar bending & Bar cutting machine 6 42 mm 2013-2020 Full Time BCC Store Very Good

12 Generator 1 350 KVA 2014 Full Time BCC Store Very Good

13 Generator 1 200 KVA 2015 Full Time BCC Store Very Good

14 Generator 5 50 KVA 2016-2020 Full Time BCC Store Very Good

15 Grinder / Drill / Jack Hammer 30 - 2018-2020 Full Time BCC Store Very Good

16 Cuplock steel scaffolding 50,000 m2 - 2013 Full Time BCC Store Very Good

17 Doka H beams /Aluminum H Beams 50,000 m2 4 m 2013 Full Time BCC Store Very Good

18 Peri Climbing system 1,000 m2 18 m 2015 Full Time BCC Store New

19 Peri single bracket 20 M 42 mm 2013 Full Time BCC Store New

Page 119: TABLE OF CONTENTS - Back Combinedbackcombined.com/wp-content/uploads/2020/10/Back... · List of Main Technical Staff and CV of Key Personnel ... The Project Manager, before construction

119

We BACK up each other, and COMBINED we will finish any mission