table of contents
DESCRIPTION
Vision, Goals and History Consultant Study Summary Strategic Project Goals Phase One Objectives Appendix. Table of Contents. Vision. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/1.jpg)
![Page 2: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/2.jpg)
Table of Contents
Vision, Goals and History Consultant Study Summary Strategic Project Goals Phase One Objectives Appendix
![Page 3: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/3.jpg)
VisionAs a critical component of the transportation network on campus, the University of Maryland’s bicycle planning efforts will be a cornerstone of its commitment to take responsibility for the future, and will contribute to it being widely recognized as a national model for a Green University.
![Page 4: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/4.jpg)
GoalsThe goals are: Significantly increase bicycling on
campus as an alternative to automobile travel
Reduced automobile use will: Reduce congestion and GHG
emissions Reduce the amount of space and
money dedicated to motor vehicle parking
Contribute to sustainability efforts Improve campus wellness
Increase safety and mobility Model engagement in collaborative
partnerships as indicated in the campus Strategic Plan
![Page 5: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/5.jpg)
History
Bicycle Advocacy
Group Formed
Bicycle Study
Commisioned
Bicycle Program funded
![Page 6: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/6.jpg)
Campus Bicycle Study Infrastructure Recommendations
Spot Improvements Crosswalk Transition Curbramp Stair ramp Intersection improvement Move signal actuator Adjust gate
Bicycle Facilities Bike station Bike lockers Covered bike parking Bike box Dismount zone
Route Facilities Bike lane Shared lane marking Climbing lane Contra flow climbing lane
![Page 7: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/7.jpg)
Campus Bicycle Study Recommendations (con’t) Increase number of racks Enhance coordination with stakeholders Undertake a comprehensive pedestrian and bicycle facility inventory Foster connection between bicycling and transit Increase outreach Provide bicycle safety training Actively promote bicycles as part of the sustainability plan Establish a strategy for typing ridership to carbon reduction goals Expand and reorient bicycle information on the DOTS website Implement bicycle rental program Improve bicycle registration process Investigate bike sharing systems Advocate for external improvements related to connections to campus, the
purple line and any public/private partnerships Revise guidelines for scooters and mopeds Develop a wayfinding strategy Increase bicycle police presence Create student led enforcement group Revise design guidelines in the Facilities Master Plan to reflect current best
practices
![Page 8: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/8.jpg)
BAG Recommendations
Implement Yellow Route from the year 1 Phase in the Campus Bicycle Study.
![Page 9: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/9.jpg)
DOTS Key Learnings The bicycle study has some weaknesses to
include: Limited consideration of off-campus connections Lack of focus in selecting target group Lack of rigor in cost estimates
The BAG recommendation has some limitations to include: One route doesn’t provide rich information for growth
and may be confusing Some of the elements of the Yellow route may not
suit our population as well as other study recommendations
![Page 10: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/10.jpg)
Phase One Implementation
Driver Education•Drivers and
cyclists must under stand the rules of the road
Divisional Collaboration•Commuter
cycling enhancement must be a collaborative effort
Unified Message•Working
together maximizes the available resources and builds buy-in
![Page 11: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/11.jpg)
Implementation
Physical Promotion
Programs
Partnering Process
Implementation of the Bicycle Plan considers 5 key areas for improvement to ensure campus wide adoption and buy-in.
![Page 12: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/12.jpg)
2009/2010 Key Events – PhysicalRoute Facilities: Identify several roads throughout campus as
vehicular/bike roadways as designated by Maryland State Highway road markings and add covered parking. (DOTS) ADSB Presentation was 7/24, initial proposal denied.
Suggested routes will be highlighted in an educational brochures and signs will be added to the exits of some parking lots.
Cole Field house is proposed location for covered parking. Install more racks at key buildings (DOTS)
Existing racks have been charted. High density rack locations have been incorporated into a
map.
![Page 13: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/13.jpg)
2009/2010 Key Events – Physical (con’t)
Bike Facilities Move Bike Shop to Cole Field house
(CRS) Scheduled for Fall Opening.
Spot Improvements: When connections require
Elements such as curb cuts and rack replacements
![Page 14: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/14.jpg)
Cole Bike Station
COLE FIELD HOUSE SERVICES
Covered bike parking Informational Boards
and Kiosks Bicycle Maintenance Bicycle Classes Departure Point for
Bicycle Tours Close access to other
modes of transportation
![Page 15: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/15.jpg)
Map of Proposed Bicycle Routes These routes are based on the multi-colored routes proposed by Toole Consulting but put more emphasis on commuting to and from off-campus locations.
![Page 16: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/16.jpg)
Shared Roadway Pavement Markings (Sharrow)
Suitable for Roadways too narrow
for bicycle lane To connect
disconnected bicycle facilities e.g. lanes, paths
Shall only be used on roads with posted speed limit less than 35 mph
Design Shall be placed after
each intersection Approximately 14 “sharrow” markings are proposed.
![Page 17: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/17.jpg)
Bike Lane Marking Design (MD-MUTCD)
![Page 18: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/18.jpg)
Signage
18 signs were requested.
7 signs were approved.
Signs were posted Spring 2010.
![Page 19: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/19.jpg)
2009/2010 Key Events – Promotion Create Map showing racks and trails
(DOTS) Create “Getting There by Bike” guide to
area points of interest. (DOTS) Also multimodal map that shows how to “get there”
without a car? Collaborate on outreach main
events~First –Look Fair, Resident Hall Move-in days, Orientation, Bike to Work Day, Earth Day etc. (CRS and DOTS)
Improve and link DOTS and CRS bicycle related websites (DOTS and CRS)
![Page 20: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/20.jpg)
2009/2010 Key Events – Promotion - Target Audiences
• living on or near campus Tier 1: Incoming Freshmen
• living on or near campus Tier 2 : Upper-class students
• living within 3 miles of campus with a fitness level that would allow them to immediately begin a bicycle commute
Tier 3 : Active students
• living within 3 miles of campus or willing to consider living within 3 miles of campusTier 4 : Active Faculty/Staff
• Some programming must educate drivers about watching for bicyclistsDRIVERS: Share the Road
![Page 21: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/21.jpg)
2009/2010 Key Events –Programs Create Outreach programs and classes (CRS)
Confident City Riding Course Basic Bicycle Maintenance Course Bike Shop Open House Women specific programming (DOTS&CRS)
Develop long term bike lease/rental program (CRS & DOTS)
Bike Commuter Shower Pass(Ritchie) Employees can request a pass to use the showers
at Ritchie.
![Page 22: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/22.jpg)
2009/2010 Key Events – Partnering Develop and maintain external
relationships related to grants and other financial support(DOTS)
Collaborate with the Wellness Coalition and Campus Student groups to raise faculty, staff and student awareness (DOTS & CRS)
Create and implement advocacy plan for regional collaboration regarding off-campus connections (DOTS) John Farley from Office of Administrative Affairs
![Page 23: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/23.jpg)
2009/2010 Key Events – Process Address theft concerns:
Leave hanging info tags on bikes using cable locks reminding students to register and get a better lock (DOTS & CRS)
Create unified campus process for bike registration and recovery as well as collection of abandoned bikes (DOTS, CRS & PS, RF, Capstone)
Address safety concerns by; “Premier” Bicycle Registration comes with a U-
lock (DOTS & PS) Collaborate with Public Safety on safety
concerns
![Page 24: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/24.jpg)
2009/2010 Metrics
Observe the impact of a low cost, compact infrastructure improvement on bicycling
Evaluate how the infrastructure changes work for bicyclists and how they look for the rest of the campus
Evaluate how the infrastructure changes impact safety and mobility of campus community
Measure how collaboration with other campus departments leads to adoption of bicycling as an alternative to cars for the daily commute
This project will guide us in our efforts to improve bicycling conditions on, to and from campus prior to a more comprehensive Campus Bicycle Plan implementation by allowing us to:
![Page 25: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/25.jpg)
2009/2010 Metrics
# of bicycle permits registered. Goal: 350 new permits
Repeat of the bicycle count from the consultant study Goal: 85% increase in overall ridership,
100% increase in female ridership # of students participating in CRS
bicycle related programming Collection of anecdotal feedback from
SGA, RSA and GSG
![Page 26: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/26.jpg)
Going Forward
2010/2011
![Page 27: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/27.jpg)
2010/2011
EXPECTED OUTCOME More than 800 registered
bicycles on campus. Waiting list for classes at the
Bike Shop Demand outpaces supply for
bike share program SGA and other student groups
are more involved with Green Transportation
Stakeholders are prepared for new changes such as mandatory bicycle registration and stricter enfCRSement
CULTURE CHANGES Incoming Freshmen and
Faculty/Staff are fully aware of campus options related to alternative or multi-modal transportation including biking
Campus Stakeholders, including non-bikers are more aware and supportive of increasing bicycle traffic on campus and limiting car traffic
![Page 28: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/28.jpg)
2010/2011Work with stakeholders to evaluate the
metrics and determine what steps to take next, such as:
Develop a way- finding strategyIncrease bicycle police presenceCreate student led enforcement groupRevise design guidelines in the
Facilities Master Plan to reflect current best practices
![Page 29: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/29.jpg)
Infrastructure Changes
Implement additional infrastructure changes
Advocate for improvement of 193/azalea lane intersection
Advocate for lights on Paint Branch Trail
Seek grants for transformation of Comcast Walk to multi-use trail
Shared Road Markings
![Page 30: Table of Contents](https://reader036.vdocuments.us/reader036/viewer/2022081604/56815f88550346895dce8f7a/html5/thumbnails/30.jpg)
Infrastructure Changes - ParkingObjective: Manage scare resources to
install racks in the highest priority locations in order to anticipate parking needs as the bicycle community develops.
Develop robust data on racks (GIS) Develop a rack inventory system Develop rack strategic plan that
minimizes use of sidewalks