TA Testing Plans

Walter E. MillerOSC/ARC

[email protected]

SSSC 29 September 2009

TA Testing Plans-Overview

• Line Operations-September 2009

• TA Activation Flight #2 (Closed Door)

• Open Door Envelope Expansion Flights (TA Caged @ 23 degrees)

• TA-Aperture Misalignment Expansion Flight (Open Door)

• FORCAST Line Operations

• TA Characterization #1/First Light Flight (Aperture Fixed @ 23 degrees)

• Open Door Envelope Expansion Flights (TA Caged)

• TA Characterization #2 and #3

• Early Science

SSSC 29 September 2009

SSSC 29 September 2009

Segment 2 – Tracking dates

TA Activation #2FCF

TA Characterization Flight #2 & #3

2009

2010 TA Characterization #1 / First Light Attempt

Science Flight Platform FlightTA FlightGround TestingData AnalysisContingency Flight

Door @ 10%

Door @ 100%

as of 09/14/2009IMS:SOFIA_MS090911ajl.mpp

ISF

FRR #3 AFSRB

TA-Aperture Misalignment

Line Operations-September 2009• Fast Diagnostic Camera Installed and Tested (Juergen Wolf)

• FPI Reinstallation

• Darkfield Correction (KT)

• UPS Status Correction (KT)

• Communication Bug Fix (KT)

• Flight Media Release (Dryden software CM process)

• Controller Adjustments

• Tracker Tests

• Flexible Body Compensation (FBC)

• Operator Training

SSSC 29 September 2009

Polaris with/without Background Subtraction

TA Activation Flight #2

• TA Operation Behind Closed Door-October 2009

• Test Uncaging, Local Stabilization and Inertial Stabilization

• Test Coarse Drive-Fine Drive “Coupled Mode”

• TA Activation Flight #1 in December 2007 had VIS and Gyro Problems

• No Aero-Acoustic Disturbances

• No Optical Tracking Evaluation

• Other Activations: Gate Valve, NT Fans, FFU

• TA Control via TAOC Laptop (No MCCS)

SSSC 29 September 2009

TA-Aperture Misalignment Expansion• Last Flight of 23 Degree Open Door Expansion Series

• Daytime Flight Late January 2010

• Aperture Fixed at 23 Degrees and URD Fully Open

• Main Goal: Aero-Acoustic Evaluation with Misalignment

• Secondary Goal: Start of TA Characterization with Open Door

• Operation with VIS Uncaged

• Operation in Local Stabilization

• Primary Mirror Covered

• TA Control via TAOC Laptop

SSSC 29 September 2009

FORCAST Line Operations• Hangar and Line Operations with FORCAST

• TA Control via MCCS (Engineering Build #4)

• Evaluation of TA-MCCS Functional ICD

• Evaluation of Workstation GUIs

• Evaluation of SOFIA Command Language

• Evaluation of TA Control from PI Computer

• Evaluation of Closed Loop Aperture Control (Slaved to TA Elevation)

• Fourteen Nights in February 2010

• Upon Completion, Reversion to TA Standalone Setup (TAOC)

• Operator Training for TA Characterization and First Light Flight

SSSC 29 September 2009

TA Characterization and First Light

• First FORCAST Flight

• Aperture Fixed at 23 Degrees and URD Fully Open

• First Night-time Flight with Optical Tracking

• Detailed Flight Plan with Multiple Legs

• Evaluation of Pointing Jitter (High Speed FORCAST Imaging)

• TA Control via TAOC Laptop

• Attempt at First Light Infrared Image

SSSC 29 September 2009

TA Characterization #2 and #3

• Two Additional TA Night-time Evaluations (June 2010)

• After Completion of Open Door Aircraft Expansion Flight Series

• After Completion of FORCAST Line Operations #2

• Final Tests Prior to Early Science Flights

• TA Control via MCCS (Short Science #1 Build)

SSSC 29 September 2009