Pavement Maintenance & Reconstruction: “Critical Quality Control” Kevin McGlumphy, P.E. – Road Science Div of AMCC Bob Siffert – Asphalt Paving Systems (APS)

Upload: apwa-florida-chapter-2013-annual-meeting-and-trade-show

Post on 27-Jun-2015

50 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: T18 critical quality control - siffert

Pavement Maintenance & Reconstruction: “Critical Quality Control”

Kevin McGlumphy, P.E. – Road Science Div of AMCCBob Siffert – Asphalt Paving Systems (APS)

Page 2: T18 critical quality control - siffert

Quality Control Starts with GOOD Project Selection…

“Right Road, Right Treatment, Right Time”

Page 3: T18 critical quality control - siffert

Quality Control for Dummies (and/or Engineers)…

1. Make sure your specifications are FAIR and

PERFORMANCE DRIVEN.

2. Plan on ENFORCING the specifications.

3. Verify design values and emulsion properties.

4. A properly trained inspection team is critical.

5. 80% of QC happens when inspector SHOWS UP!

6. Other 20% happens if inspector Stays All Day.

Page 4: T18 critical quality control - siffert

Quality Control for Engineers (and/or Dummies)…

7. Require an EXPERIENCED contractor.

8. Calculate yields road-by-road.

9. Make sure proper surface prep is done.

10. Monitor the quality and the quantity of all

materials that come to the job.

~Don’t count a process out just because you

“heard it failed” for someone else.

Page 5: T18 critical quality control - siffert

Micro-Surfacing

Page 6: T18 critical quality control - siffert

Critical QC for Micro-Surfacing1. Mix Design

a. Right Aggregate? b. Right Emulsion?c. Right Additives?

2. Machine Calibration a. “Counting Clicks”

Page 7: T18 critical quality control - siffert

Critical QC for Micro Surfacing

4. Residual AC Content

5. Return to Traffic:

a. 30-60 min

3. Application Rates

a. Singles: 18-22 lbs/SY

b. Doubles: 28-32 lbs/SY

Page 8: T18 critical quality control - siffert

Critical QC for Micro Surfacing

Page 9: T18 critical quality control - siffert

Micro Surfacing Discussion…

Page 10: T18 critical quality control - siffert

Chip Seal / Surface Treatment

Page 11: T18 critical quality control - siffert

Chip Seal Types

Single Chip Seal

Double Chip Seal

Cape Seal

Page 12: T18 critical quality control - siffert

Critical QC for Chip Seal

1.Emulsion Shot Rate

2. Aggregate Spread Rate

Page 13: T18 critical quality control - siffert

Critical QC for Chip Seal

4. Ambient Temp?

5. Clean Stone?

6. Emulsion Properties?

3. Distance between Distributer & Spreader?

Page 14: T18 critical quality control - siffert

Chip Seal Discussion…

Page 15: T18 critical quality control - siffert

Cold In-Place Recycling & Full Depth Reclamation

Page 16: T18 critical quality control - siffert

Critical QC for CIR & FDR1. Subsurface investigation & mix design 2. Verify design and materials.3. Project Selection – FDR or CIR? 4. Monitor additives during stabilization – CHECK YIELDS

Page 17: T18 critical quality control - siffert

Critical QC for FDR & CIR

5. Compaction effort & moisture content.

6. Rebuild to proper grades & elevations.

7. Check the cutting depth often.

Page 18: T18 critical quality control - siffert

FDR & CIR Discussion…

Page 19: T18 critical quality control - siffert

Question & Answer Session