t-506 report for 6-25-13
DESCRIPTION
T-506 REPORT FOR 6-25-13. Install sample PF14 and cool down Accumulated 20 MR over shift. T-506 PLAN FOR 6-26-13. Dedicated run with dosimeter to correct dose rate estimates from EGS Complete 3 rd of four 20 MRad exposures. First Results - PowerPoint PPT PresentationTRANSCRIPT
T-506 REPORT FOR 6-25-13
• Install sample PF14 and cool down
• Accumulated 20 MR over shift
T-506 PLAN FOR 6-26-13
• Dedicated run with dosimeter to correct dose rate estimates from EGS
• Complete 3rd of four 20 MRad exposures
First Results
5 MR irradiation of “Standard” (float-zone) p-type sensor
No increase in depletion voltage
~7% loss of signal might be inconsistent calibration (warm v. cold).
20 MR exposure done yesterday!
Before Irradiation
After 5 MRad