T-506 REPORT FOR 6-25-13 • Install sample PF14 and cool down • Accumulated 20 MR over shift T-506 PLAN FOR 6-26-13 • Dedicated run with dosimeter to correct dose rate estimates from EGS • Complete 3 rd of four 20 MRad exposures

Upload: dawn-bryan

Post on 01-Jan-2016

11 views

Category:

Documents


0 download

DESCRIPTION

T-506 REPORT FOR 6-25-13. Install sample PF14 and cool down Accumulated 20 MR over shift. T-506 PLAN FOR 6-26-13. Dedicated run with dosimeter to correct dose rate estimates from EGS Complete 3 rd of four 20 MRad exposures. First Results - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: T-506 REPORT FOR 6-25-13

T-506 REPORT FOR 6-25-13

• Install sample PF14 and cool down

• Accumulated 20 MR over shift

T-506 PLAN FOR 6-26-13

• Dedicated run with dosimeter to correct dose rate estimates from EGS

• Complete 3rd of four 20 MRad exposures

Page 2: T-506 REPORT FOR 6-25-13

First Results

5 MR irradiation of “Standard” (float-zone) p-type sensor

No increase in depletion voltage

~7% loss of signal might be inconsistent calibration (warm v. cold).

20 MR exposure done yesterday!

Before Irradiation

After 5 MRad