systems development project riordan manufacturing final draft
DESCRIPTION
TRANSCRIPT
![Page 1: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/1.jpg)
SYSTEMS DEVELOPMENT PROJECT RIORDAN MANUFACTURING
CIS/319 – Computers and Information Processing
August 4, 2012
Valora Hawkins
Dr. Roger Aylstock
![Page 2: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/2.jpg)
Riordan Manufacturing Background Objectives Issue and Opportunity Identification Proposed System Improvements Stakeholders List Software Requirements Sales Process Flow Charts Manufacturing Process Flow Charts Offer Solution
Table of Contents
![Page 3: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/3.jpg)
Systems Development Project
Riordan Manufacturing’s Background
![Page 4: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/4.jpg)
Issue and Opportunity Identification Proposed System Improvements Present & illustrate Inventory and Supply Chain
Management Requirements
OBJECTIVES
![Page 5: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/5.jpg)
Operations and inventory process for Riordan Manufacturing involves many steps as raw materials flow through the manufacturing process
The process involves a paper trail from start to finish that leaves room for error and costs Riordan Manufacturing annually by not implementing an automated inventory management system in place
Current process is divided into three functional areas, raw materials receiving, manufacturing with inventory, and product shipping.
Present the Issue and Opportunity Identification
![Page 6: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/6.jpg)
Company is currently faced with increasing labor costs and a decrease in productivity.
The current process costs Riordan Manufacturing a large amount of money on an annual basis from raw materials on hand, warehousing for raw materials, salaries that could be automated and finished product inventory on hand
Present the Issue and Opportunity Identification Continues….
![Page 7: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/7.jpg)
Proposed System Improvements
We are introducing an inventory and supply chain management software by NetSuite; this software will help Riordan Manufacturing use customer demand to drive manufacturing and raw materials on hand.
Goal of Software Implementation
![Page 8: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/8.jpg)
Who is involved in the process?
Stakeholder ListRiordan Manufacturing’s Vendors
Manufacturing Staff
Receiving Area Team Sales Staff
Receiving Area Supervisor Shipping Department
Inventory Clerk Riordan Manufacturing’s Customers
![Page 9: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/9.jpg)
Automated raw materials inventory process. Eliminate the paper trail as materials progress through the
manufacturing process. Automate the inventory process as sales orders are
submitted. Link raw materials inventory, manufacturing, product
inventory, and sales orders to maximize efficiency.
Automating the process will save Riordan Manufacturing money and reduce errors from the manual tracking process.
Inventory and Supply Chain Management Key Requirements
![Page 10: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/10.jpg)
1.1 Customer goes on website and places order for finished products
1.1.1 System verifies inventory on hand
1.1.2 If quantity is not on hand, customer is contacted
1.1.3 If customer wants to proceed, rush manufacturing
1.2 If inventory on hand, system deducts the order from inventory
1.2.1 Order is billed and shipped
1.3.1 Raw materials order is sent to vendors to replace raw materials inventory
1.3.2 Manufacturing team pulls raw materials on hand and starts a manufacturing process to replace inventory
1.3.3 Inventory is updated
1.3.4 Raw materials order is sent to vendors bring raw materials inventory above minimal levels
Requirements for Software Implementation
![Page 11: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/11.jpg)
Sales Process Flow Charts
N
Y
N
![Page 12: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/12.jpg)
Manufacturing Process Flow Chart
![Page 13: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/13.jpg)
Streamlined Customer Ordering ProcessStreamlined Inventory ManagementStreamlined Manufacturing ProcessAutomated Raw Materials Inventory
Offer Solution
![Page 14: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/14.jpg)
Questions?
![Page 15: Systems development project riordan manufacturing final draft](https://reader035.vdocuments.us/reader035/viewer/2022081518/547b1f32b379595e2b8b4c1b/html5/thumbnails/15.jpg)
Hu, J. Q., Vakili, P., & Huang, L. (2004). Capacity and Production Management in a Single Product Manufacturing System. Annals Of Operations Research, 125(1-4), 191-204. doi:10.1023/B:ANOR.0000011191.49933.04
NetSuite. (1998). Retrieved from http://www.netsuite.com/portal/products/netsuite/supply-inventory/main.shtml
The Computer Journal. (1985) 28 (2) : 97-104.Defining Systems Requirements to meet Business Needs: a Case Study Example
University of Phoenix. (2005). Virtual Organizations. Riordan Manufacturing. Retrieved July 12, 2012, from University of Phoenix, Week Two, CIS/319 –Computers and Information Processing Course Web site.
References