SYSTEM-WIDE PROCESS CONTROLS UPGRADE

Detroit Water & Sewerage Department

Page 2: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

System-wide Process Controls Upgrade

Agenda Detroit Water and Sewerage Department (DWSD) Old Control System Limitations Project Scope Design Highlights Implementation Challenges Project Results Moving Forward

Page 3: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Detroit

Page 4: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

About DWSD

Third largest municipal water and sewer utility in the United States

Over $500 Million in revenue

Provides services to more than 4 million retail and wholesale customers

Service area of 1079 square miles

Yellow - Wholesale Red - Retail

Page 5: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Water Wastewater SystemsDWSD System Overview• 5 Water Treatment Plants• 20 Water Booster Stations• 10 Wastewater Collection Stations• 1 Wastewater Treatment Plant• 7 CSO Basins• 13 In-system Storage Devices• 200 Remote Monitoring/Control Sites

Valve, Pressure, Sewer Meter, Precipitation Gauge, CSO outfall, Dam, Level

Page 6: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department
Page 7: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Old System Limitations• Limited monitoring due to constraints on “tone multiplexing”• Single line of communication• Limited configuration options for Operator (Trending, Alarming, Historical Reviews)• Unable to provide Equipment status and Process Alarms • Parts and repair services becoming unavailable• Extremely difficult to integrate with other control systems

Page 8: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Background - 1964

Page 9: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Background

Page 10: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Background

Page 11: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Background

Page 12: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Project Scope Provide system monitoring and control from a single location Provide common equipment and functionality at all locations Achieve economies of operation Increase system reliability at SCC and remote facilities Ensure continued high water quality Ensure stable water distribution pressure Minimize CSO events Continue effective wastewater treatment

Page 13: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Project Scope Improve efficiencies of operations and maintenance personal Maximize use of standard off-the-shelf hardware and software Better Alarm Management Provide Redundancy Communication co-ordination (regular and emergency) Provide role based security access Provide historical database

Page 14: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Scope HighlightsDescription of new control system System component layout (include diagram) System Control Center video wall map RTU types Redundant communication description Redundant Power sources Historical data collection Disaster Recovery

Page 15: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Control System Upgrade Implementation Process Design workshops Graphics workshops Control narrative workshops Factory Acceptance Testing Phase over testing System acceptance testing

Training (more than 700 people)

Page 16: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Control System Network

Page 17: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Primary Communication

AT & TOPT-E-MAN NETWORK

Page 18: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

First backup Communication

AT & TOPT-E-MAN NETWORK

AT & TPNT

NETWORK

Page 19: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Secondary backup Communication

Radio repeater Sites

Page 20: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Pump Station Features Automatic Pump Control Auto Pump Sequencing Communication Redundancy Instrumentation redundancy Detailed equipment alarms Power redundancy

Page 21: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Pump Station

Page 22: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Remote monitoring site Features

Communicates to SCC and other remote sites via 900 MHz spread spectrum radios Custom protocol for security Can communicate to 10 other locations Remote configuration/parameter changes capability

Page 23: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Remote Site

Page 24: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Implementation Challenges

Limited system access during peak season periods Multiple System Networks Phase-over conducted on live system Physical relocation of Operations staff Adaptation of Operations staff

Page 25: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Solution

Page 26: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Solution

Page 27: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

SolutionBetter monitoring capability -

• GIS based video wall map• 3600 graphics• Alarm Management• 30,000 I/O points/tags• Network diagnostics graphic• Control system diagnostics graphic

Page 28: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Project Results Better management of distribution systems and remote sites Improved ability to react to rapidly changing conditions Reduced operations and maintenance costs Improved Alarm Management Increased Energy Efficiency Automated operational reports generation Increase system availability Implemented regulatory reports

Page 29: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Lessons Learned More collaboration with end users during

design phase

Software upgrade strategy needed

Revision control

System security

Page 30: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Moving Forward

Backup control center

System-wide software and hardware upgrade

Energy Management

Hydraulic Modeling Integration

Additional automated reporting

Ongoing software strategy improvements

Page 31: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Backup Control Center

Page 32: SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department

Detroit Water & Sewerage Department