Page 1: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

SYSTEM IMPACT RE-STUDY #2 FINAL REPORT

WA300W Wind Project

Prepared for:

El Paso Electr ic Company

Prepared by:

TRC Engineers, LLC 249 Western Avenue Augusta, ME 04330

(207) 621-7000

March 2012

dgutierr
Typewritten Text
Page 2: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

FOREWORD

This report was prepared for the project Interconnection Customer, by System Planning at El Paso Electric Company. Any correspondence concerning this document, including technical and commercial questions should be referred to:

Dennis Malone Director – System Planning Department

El Paso Electric Company 100 North Stanton

El Paso, Texas 79901 Phone: (915) 543-5757 Fax: (915) 521-4763

Or

David Gutierrez Principal Engineer

El Paso Electric Company 100 North Stanton

El Paso, Texas 79901 Phone: (915) 543-4083 Fax: (915) 521-4763

Page 3: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

Table of Contents

EXECUTIVE SUMMARY ......................................................................................................................................... 1

1. INTRODUCTION .............................................................................................................................................. 5

1.1 PERFORMANCE CRITERIA ................................................................................................................................. 5

2. STUDY METHODOLOGY .............................................................................................................................. 7

2.1 ASSUMPTIONS .................................................................................................................................................. 7 2.2 PROCEDURE ..................................................................................................................................................... 7

2.2.1 Development and Description of Cases ................................................................................................. 7 2.2.2 Contingency List .................................................................................................................................. 10

3. STEADY STATE POWER FLOW ANALYSIS ........................................................................................... 11

3.1 PRE-PROJECT POWER FLOW EVALUATION ..................................................................................................... 11 3.1.1 Pre-Project N-0 Flow Violations ......................................................................................................... 11 3.1.2 Pre-Project N-1 Flow Violations ......................................................................................................... 11

3.2 POST-PROJECT POWER FLOW EVALUATION ................................................................................................... 12 3.2.1 Post-Project N-0 Power Flow Analysis ............................................................................................... 12 3.2.2 Post-Project N-1 Power Flow Analysis ............................................................................................... 12

3.3 PHASE-SHIFTER TAP RANGE ANALYSIS ......................................................................................................... 16 3.4 HEAVY NORTHERN PNM DISPATCH ANALYSIS ............................................................................................. 17 3.5 POWER FLOW ANALYSIS CONCLUSION .......................................................................................................... 18

4. STEADY STATE VOLTAGE ANALYSIS ................................................................................................... 20

5. SHORT CIRCUIT ANALYSIS ...................................................................................................................... 22

5.1 SHORT CIRCUIT ANALYSIS MODELING .......................................................................................................... 22 5.2 SHORT CIRCUIT ANALYSIS PROCEDURE ......................................................................................................... 24 5.3 SHORT CIRCUIT ANALYSIS RESULTS .............................................................................................................. 25 5.4 SHORT CIRCUIT ANALYSIS CONCLUSIONS ..................................................................................................... 26

6. STABILITY ANALYSIS ................................................................................................................................. 27

6.1 DYNAMIC MODELING .................................................................................................................................... 27 6.2 STABILITY STUDY CASE DEVELOPMENT ........................................................................................................ 28 6.3 STABILITY ANALYSIS RESULTS ...................................................................................................................... 29 6.4 LOW VOLTAGE RIDE THROUGH ANALYSIS .................................................................................................... 32 6.5 STABILITY ANALYSIS CONCLUSION ............................................................................................................... 33

7. COST ESTIMATES ........................................................................................................................................ 34

8. DISCLAIMER .................................................................................................................................................. 48

9. CONCLUSIONS .............................................................................................................................................. 49

Page 4: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

List of Figures

Figure 2-1: Study Scenarios ............................................................................................................ 9Figure 2-2: WA300W Interconnection One-Line Diagram .......................................................... 10Figure 7-1: WA300W POI Substation One-line for Scenario 1 ................................................... 36Figure 7-2: Arroyo 345 kV Substation One-Line for Scenario 1 ................................................. 38Figure 7-3: WA300W POI Substation One-line for Scenario 2 ................................................... 41Figure 7-4: WA300W POI Substation One-line for Scenario 3 ................................................... 43Figure 7-5: Arroyo 345 kV Substation One-Line for Scenario 3 ................................................. 45

List of Tables

Table 1-1: EPE and New Mexico Performance Criteria ................................................................. 6Table 3-1: Pre-Project 2016 N-1 Flow Violations ........................................................................ 11Table 3-2: 2014 peak N-1 power flow analysis results – Scenario 1 ............................................ 13Table 3-3: 2014 peak N-1 power flow analysis results – Scenario 3 ............................................ 13Table 3-4: 2016 off-peak N-1 power flow analysis results – Scenario 1 ...................................... 14Table 3-5: 2016 peak N-1 power flow analysis results – Scenario 1 ............................................ 14Table 3-6: 2016 peak N-1 power flow analysis results – Scenario 2 ............................................ 15Table 3-7: PNM Peak Heavy Northern Generation Dispatch ....................................................... 17Table 3-8: Scenario 1 - 345 kV Network Upgrades ..................................................................... 19Table 3-9: Scenario 1 – Transmission Line Network Upgrades ................................................... 19Table 3-10: Scenario 2 - 345 kV Network Upgrades ................................................................... 19Table 3-11: Scenario 3 - 345 kV Network Upgrades ................................................................... 19Table 4-1: Shunt Reactors Requirements for Scenario 1 .............................................................. 20Table 4-2: Shunt Reactors Requirements for Scenario 2 .............................................................. 20Table 4-3: Shunt Reactors Requirements for Scenario 3 .............................................................. 21Table 5-1: Interconnection Transmission Lines ........................................................................... 22Table 5-2: Generator Short Circuit Modeling Data ...................................................................... 23Table 5-3: EPE Buses Short Circuit Summary Results - Scenario 1 ............................................ 25Table 5-4: EPE Buses Short Circuit Summary Results - Scenario 2 ............................................ 26Table 6-1: Generator Models Used for Studies ............................................................................ 27Table 6-2: Stability Post-Project Case Scenarios .......................................................................... 28Table 6-3: 2014 Stability Analysis Results for both Peak and Off-Peak Cases ........................... 30Table 6-4: 2016 Stability Analysis Results for both Peak and Off-Peak Cases ........................... 31Table 7-1: EPE Interconnection Facilities Costs for WA300W POI ............................................ 35Table 7-2: Network Upgrade Cost for WA300W 345 kV Substation for Scenario 1 .................. 37Table 7-3: Network Upgrade Cost for Arroyo 345 kV Substation for Scenario 1 ....................... 39Table 7-4: Transmission Line Network Upgrade Costs for Scenario 1 ........................................ 40Table 7-5: Network Upgrade Cost for WA300W 345 kV Substation for Scenario 2 .................. 42Table 7-6: Network Upgrade Cost for Arroyo 345 kV Substation for Scenario 2 ....................... 42Table 7-7: Network Upgrade Cost for WA300W 345 kV Substation for Scenario 2 .................. 44Table 7-8: Network Upgrade Cost for Arroyo 345 kV Substation for Scenario 3 ....................... 46

Page 5: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

Appendices

Appendix A WA300W System Impact Study Statement of Work Appendix B Power Flow Contingency List Appendix C Phase Shifter Tap Range Analysis Results Appendix D Dynamic Modeling Data Appendix E Stability Plots Appendix F Worst Contingency Analysis Plots Appendix G Project Schedule

Page 6: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012 1

WA300W Project System Impact Study

Executive Summary

The first WA300W System Impact Study (SIS) was completed in October 2011. However, an earlier queued project, LU99.8S (99.8 MW solar powered project interconnecting at the Luna 345 kV Station), withdrew from El Paso Electric Company’s (EPE’s) interconnection queue in November 2011, thus requiring the Re-Study #1. Furthermore, near the end of the Re-Study #1 process, CR180S (180 MW solar power project interconnected at Public Service Company of New Mexico’s (PNM’s) Hidalgo 115 kV Substation) withdrew from the PNM’s interconnection queue in December 2011, thus requiring this Re-Study #2 (“Study). The study objective was to determine the impact that the proposed WA300W 300 MW wind powered generating plant, interconnected on the West Mesa – Arroyo 345 kV line, 36 miles south of PNM’s West Mesa Substation, would have on EPE and Southern New Mexico transmission systems. The proposed Commercial Operation date for this project is December 31, 2013. The study considered three transmission system configurations:

1. The existing Arroyo Phase Shifter removed and new Phase Shifting Transformer installed north of the WA300W POI (Scenario 1).

2. The existing Arroyo Phase Shifter remaining at its current location (Scenario 2). 3. The existing Arroyo Phase Shifter by-passed (Scenario 3).

Furthermore, the proposed WA300W project impact on EPE and Southern New Mexico transmission systems was evaluated by performing the power flow analysis with heavy northern PNM dispatch modeled in the study cases. The study also determined the Phase-Shifting transformer tap range that would meet the existing north to south power flow requirements - 135 to 150 MW in the off peak case, and 10 to 20 MW in the peak case. Two interconnection projects in the EPE study queue that have Interconnection Agreements (IA) with EPE and three interconnection projects that have executed Facilities Study Agreements (FSA) were included in this Study. The five interconnection projects included in this SIS are:

1. MS99W: 50.4 MW wind powered project interconnected on the Springerville – Luna 345 kV line 30 miles from Luna 345 kV station (IA with EPE).

2. DS92S: 92 MW solar powered project interconnected on the Diablo-Santa Teresa 115 kV line 5.7 miles from Diablo 115 kV station (IA with EPE).

3. AA100W: 100 MW wind powered project interconnected on the Amrad-Artesia 345 kV, 65 miles east of Amrad 345 kV substation (Facility Study in EPE queue).

4. ART320W: 320 MW wind powered project interconnected at Artesia 345 kV bus (Facility Study in EPE queue).

5. RG87G: 87 MW gas powered project interconnected at Rio Grande 115 kV bus (Facility Study in EPE queue).

Page 7: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012 2

The generation from the MS99W and DS92S projects was modeled as being delivered to all entities in the Western Electricity Coordinating Council (WECC), while the generation from the AA100W, ART320W and WA300W projects was modeled as being delivered to all WECC entities except EPE and New Mexico. The RG87G generation was modeled as being dispatched to the EPE control Area (11). Therefore, no specific transmission path for energy sales has been defined, nor does this study guarantee that a transmission path will be available when the Interconnection Customer is placed in service. This Study Area was limited to studying the impacts on WECC Area 11 - EPE (TX) and Area 10 - PNM (NM).

Steady State Results

The power flow analysis was conducted for peak and off peak 2014 and 2016 cases. The power flow results showed that thermal/overload violations existed on the system before the WA300W project was added. The power flow analysis results also showed that the addition of the WA300W project to the system would have an adverse impact on the EPE and PNM transmission systems unless proposed Network Upgrades in place. These Network Upgrades include:

• Scenario 1 - Addition of a 3rd 345/115 kV transformer at Arroyo 345 kV Substation and re-conductoring or rebuilding of the following 115 kV lines: Sol – Lane, Luna-Hurley, Hurley-MD, and Las Cruces - Arroyo.

• Scenario 2 – Replacement of an existing Arroyo Phase-Shifting transformer with a new Phase Shifting transformer that has +/- 40 degrees tap range.

• Scenario 3 - Addition of a 3rd 345/115 kV transformer at Arroyo 345 kV Substation. Pre-existing and post-project criteria violations occur in the Arizona area (Area 14) and were not addressed in this study.

Short Circuit Results

A short circuit analysis was performed to determine if the addition of the WA300W project to the EPE transmission system would cause any of EPE’s or relevant neighboring transmission system’s existing substation circuit breakers to exceed their interrupting capability ratings. The results of this short circuit study show that the pre-existing maximum fault currents with the WA300W project in service do not exceed the breaker interrupting capability of any of the breakers on the EPE and PNM transmission system. Therefore, no replacement of existing circuit breakers on the EPE and PNM transmission systems will be required at this time.

Page 8: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012 3

Stability Results

System stability was analyzed for contingencies relevant to the Projects POI and Study Area, with and without the WA300W project for peak and off -peak base case load conditions, and for Scenario 1 and 2. The stability results showed that the WA300W project addition to the system does not have an adverse impact to Study Area system stability performance and is able to meet FERC/WECC Low Voltage Ride Through (LVRT) standards.

Cost Estimates

Good faith cost estimates have been determined. The cost estimates are in 2012 dollars (no escalation applied) and are based upon typical construction costs for previously performed similar construction. These estimated costs include all applicable labor and overheads associated with the engineering, design, and construction of these new facilities. These estimates did not include the cost for any other Interconnection Customer owned equipment or associated design and engineering except for those located at the POI.

The estimated total cost for the required upgrades is for Scenario 1 is $52.91 Million. This breaks down to $2.15 Million for the EPE Interconnection Cost1 and $50.76 Million for Network Upgrades Cost2. The Generator Interconnection Cost3

For Scenario 2, the estimated total cost for the required upgrades is $23.14 Million. This breaks down to $2.15 Million for the EPE Interconnection Cost1 and $20.99 Million for Network Upgrades Cost2. The Generator Interconnection Cost3 estimates are not included.

estimates are not included.

For Scenario 3, the estimated total cost for the required upgrades is $24.24 Million. This breaks down to $2.15 Million for the EPE Interconnection Cost1 and $22.09 Million for Network Upgrades Cost2. The Generator Interconnection Cost3 estimates are not included.

The estimated time frame for Engineering, Procurement, and Construction of Network Upgrades is approximately 3 years for Scenario 1, 2 years for Scenario 2, and 2 years for Scenario 3 upon notice to proceed with construction from the Interconnection Customers. At this time it is may be feasible to meet the requested interconnection date depending upon the scenario chosen.

1 EPE Interconnection Cost: Cost of faculties paid for by interconnector but owned and operated by EPE

from the Change of Ownership Point to the Point of Interconnection. Not subject to transmission credits. 2 Network Upgrades Cost: Cost of facilities from the Point of Interconnection outward, paid for by the

interconnector but owned and operated by EPE. Subject to transmission credits. 3 Generator Interconnection Cost: Cost of facilities paid for by interconnector and owned and operated by the

interconnector from the generator faculties to the Change of Ownership Point, which is typically at the Point of Interconnection substation first dead-end. Not subject to transmission credits.

Page 9: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012 4

Conclusion The system impact study shows that the proposed WA300W project will have an adverse impact on the EPE and Southern New Mexico transmission systems. Proposed Network Upgrades will be needed for the project interconnection. Network Upgrades required by the project vary, depending on which of the three scenarios is used for the interconnection.

Page 10: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

5

1. Introduction

The Interconnection Customer proposed interconnection of 300 MW of wind powered generation with up to 300 MW of battery back-up to the EPE 345 kV transmission system. EPE requires that a SIS be performed for generation facilities desiring to connect to the El Paso Electric Transmission System. The proposed in-service date is December 31, 2013.

1.1 Performance Criteria

The Study was performed according to Western Electricity Coordinating Council (WECC), North American Electric Reliability Corporation (NERC), and EPE standards. The EPE local reliability standards can be found in Section 4 of EPE’s FERC Form No. 715. The steady state analysis was performed by using the GE PSLF Version 17.8 program.

Transformer tap and phase-shifting transformer angle movement, as well as static VAR device switching, were allowed for the steady state pre-contingency analysis. All regulating equipment such as transformer controls and switched shunts were fixed at pre-contingency positions when the contingency analysis was performed. All facility loadings, as well as voltages 69 kV and greater, were monitored within the El Paso, New Mexico and Arizona control areas.

Pre-contingency flows on lines and transformers were required to remain at or below the normal rating, while post-contingency flows on lines and transformers were required to remain at or below the emergency rating. Flows above 100% of an element’s rating, either pre- or post-contingency, were considered violations.

Post-project voltage criteria violations that either exacerbate or improve an existing pre-project violation were not considered an adverse impact to the system.

The performance criteria utilized in qualifying violations in the study area are shown in Table 1-1.

Page 11: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

6

Table 1-1: EPE and New Mexico Performance Criteria

* Taiban Mesa and Guadalupe 345 kV bus voltage must be between 0.95 and 1.10 p.u. under normal and contingency conditions. ** For PNM buses in southern New Mexico the allowable N-1 voltage drop is 7%.

*** Provided operator action can be utilized to adjust voltages back down to 1.05

Area Conditions Loading Limits

Voltage (p.u.) Voltage Drop

Application

EPEC

Normal Normal Rating

0.95 - 1.05 69kV and above 0.95 - 1.10 Artesia 345 kV 0.95 - 1.08 Arroyo 345 kV PST source side

0.90 - 1.05 Alamo, Sierra Blanca and Van Horn 69kV

Contingency Emergency Rating

0.925 - 1.05 7% 60 kV to 115 kV 0.95 - 1.07 7% Artesia 345kV 0.95 - 1.08 7% Arroyo 345kV PST source side

0.90 - 1.05 Alamo, Sierra Blanca and Van Horn 69kV

0.95 - 1.05 7% Hidalgo, Luna, or other 345 kV buses

PNM

Normal ALIS Normal Rating 0.95-1.05 46 kV and above*

Contingency N-1

Emergency Rating

0.925-1.08*** 6 %** 46 kV to 115 kV 0.90 – 1.08*** 6 %** 230 kV and above

Contingency N-2

Emergency Rating 0.90-1.08*** 10 % 46 kV and above*

Tri- State

Normal ALIS Normal Rating 0.95-1.05 All buses

Contingency N-1

Emergency Rating

0.90 – 1.10 6 %

Tri-State buses in the PNM Service Area (list provided by

Tri-State)

0.90-1.10 7 % Tri-State buses in southern and northeastern New Mexico (list

provided by Tri-State) Contingency

N-2 Emergency

Rating 0.90-1.10 10% All buses

Page 12: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

7

2. Study Methodology

2.1 Assumptions

The following assumptions are consistent for all study scenarios unless otherwise noted.

• This study assumed that all system expansion projects as planned by area utilities by the year under analysis are completed, and that any system improvements required by the interconnections senior to the WA300W Project are implemented.

• This study did not analyze any transmission service from the interconnection point to any specific point on the grid for the interconnections senior to the WA300W Project.

2.2 Procedure The analyses in this study included only Steady State, Short Circuit, and Stability Analysis, as stated in the WA300W System Impact Study Statement of Work in Appendix A. A description of the procedures used to complete the analyses is presented below.

2.2.1 Development and Description of Cases

100% peak summer load 2014 and 2016 WECC power flow cases were used and modified, as listed below, to establish 2014 and 2016 benchmark cases without the proposed interconnection project. 2014 and 2016 off-peak cases were created from peak cases at 60% of the peak load, with generation adequately dispatched for that load level, to determine any off-peak violations. In Scenario 1 and 2, the Arroyo Phase-Shifter was set to 10-20 MW N-S in the peak and 135-151 MW N-S in the off-peak cases. The Eddy County DC tie operational flow was at 0 MW.

Page 13: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

8

Benchmark Cases – 2014 and 2016: The 2014 and 2016 benchmark cases included the following generation:

1. 570 MW of generation (Luna Energy Facility) interconnected at the Luna 345 kV bus and scheduled to the WECC grid.

2. 141 MW of generation (Afton CT) interconnected at the Afton 345 kV Substation and scheduled to PNM through the EPE/PNM control area at the West Mesa 345 kV bus.

3. 160 MW of generation (Pyramid) interconnected at PNM’s Pyramid 115 kV Substation and scheduled to the PNM grid.

4. 80 MW of generation (Lordsburg) interconnected at PNM’s Lordsburg 115 kV Substation and scheduled to the PNM grid.

5. 94 MW of generation (Afton ST) interconnected at the Afton 345 kV Substation and scheduled to PNM.

6. 50.4 MW of generation (MS99W) interconnected on the Luna – Springerville 345 kV line 30 miles from Luna and scheduled to the WECC grid.

7. 92 MW of generation (DS92S) interconnected on the Diablo-Santa Teresa 115 kV line 5.7 miles from Diablo 115 kV station and scheduled to the WECC grid.

8. 320 MW of generation (ART320W) interconnected at Artesia 345 kV bus, and scheduled to all WECC entities except EPE and New Mexico.

9. 100 MW of generation (AA100W) interconnected on the Amrad-Artesia 345 kV, 65 miles east of Amrad 345 kV substation, and scheduled to all WECC entities except EPE and New Mexico.

10. 87 MW of generation (RG87G) interconnected at EPE’s Rio Grande 115 kV Substation and scheduled to EPE area.

11. 300 MW of generation (Guadalupe Wind Project) interconnected at the Guadalupe 345 kV bus and scheduled to Area 14 (Arizona).

12. 176 MW of generation (Pajarito Project) interconnected at the West Mesa #3 115 kV bus and scheduled to the PNM grid.

13. 50 MW of generation (Taiban Mesa Project) interconnected at the Taiban Mesa 345 kV bus and scheduled to Area 14 (Arizona).

14. 37.5 MW of generation (Torrance Biomass Project) interconnected at the Willard 115 kV bus and scheduled to Area 14 (Arizona).

Page 14: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

9

Post-Project Cases – 2014 and 2016: In both, peak and off-peak cases, two locations for the Arroyo Phase-Shifter were evaluated: - Scenario 1: Arroyo Phase-Shifter removed and new Phase Shifter

installed north of the POI; - Scenario 2: Arroyo Phase-Shifter at current location. - Scenario 3: Arroyo Phase-Shifter by-passed

2014 and 2016 Scenario 1, 2 and 3 post-project cases were created from the benchmark cases described above, as shown in Figure 2-1.

Figure 2-1: Study Scenarios

Scenario 1 Scenario 2

Scenario 3

Arroyo Phase-Shifter

West Mesa

Arroyo Phase-Shifter

WA300W POI

Arroyo

G G WA300W POI

West Mesa

Arroyo

West Mesa

G WA300W POI

Arroyo

Page 15: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

10

Figure 2-2: WA300W Interconnection One-Line Diagram

2.2.2 Contingency List

All outages (115 kV and above) were modeled in the subsystem files. The list of contingencies used in this study can be found in Appendix B. Based on engineering judgment, these contingencies were selected to represent a good cross section of potential contingencies that would stress the EPE, PNM’s southern New Mexico, and southern Arizona systems. This study was performed only for N-0 and N-1 conditions. A list of contingencies that correctly simulated contingencies on the Northern New Mexico transmission system was received from PNM and included in the overall contingency list.

Page 16: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

11

3. Steady State Power Flow Analysis

3.1 Pre-Project Power Flow Evaluation

Peak and off peak base cases were evaluated for overloaded facilities under both normal and contingency conditions prior to the addition of the WA300W project.

3.1.1 Pre-Project N-0 Flow Violations Power flow study analysis results showed no overloaded transmission facilities were present in the El Paso Electric (EPE) and Public Service Company of New Mexico (PNM) areas under non-contingency system conditions prior to the addition of the WA300W project.

3.1.2 Pre-Project N-1 Flow Violations Power flow contingency analysis results show that a few overloads existed in New Mexico prior to the addition of the WA300W project, as shown in Table 3-1.

Table 3-1: Pre-Project 2016 N-1 Flow Violations

From Bus

kV

To Bus

kV

Ckt ID

Area

Rating (MVA)

Contingency

Off Peak

Peak

% of Emergency Rating

NORTON_2 115 BUCKMAN 115 1 10 116.0 BA-STA 115 kV (RL) 72.0 116.8

BUCKMAN 115 WHITEROK 115 1 10 115.0 BA-STA 115 kV (RL) 68.7 111.2

ETA 115 WHITEROK 115 1 10 115.0 BA-STA 115 kV (RL) 66.0 106.4

DONA_ANA 115 PICACHO 115 1 10 91.0 LUNA-MIMBRES 115 kV 78.9 101.5

PRAGER 115 MONTANO 115 1 10 156.0 SANDIA-WEST MESA 345 kV 57.1 101.1

Page 17: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

12

3.2 Post-Project Power Flow Evaluation

This section provides a high-level understanding of the WA300W projects’ impact on the loading of transmission lines and transformers in the Study Area. The analysis was performed under both normal and contingency conditions.

3.2.1 Post-Project N-0 Power Flow Analysis Power flow study results for the EPE and PNM areas showed that the addition of the WA300W project to the existing system would not cause any flow violation under non-contingency system conditions.

3.2.2 Post-Project N-1 Power Flow Analysis Power flow study results showed that the addition the WA300W project to the existing system would cause power flow violations in the EPE, Tri-State and PNM control areas under contingency system conditions in all three scenarios, as shown in Tables 3-2 through Tables 3-7.

Page 18: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

13

Table 3-2: 2014 peak N-1 power flow analysis results – Scenario 1 Arroyo Phase-Shifter located north of WA300W POI

From Bus

kV

To Bus

kV

Ckt ID

Area

Rating (MVA)

Contingency

W/O Project

With Project

Delta

% of Emergency Rating

Post - Pre

Project ARROYO 345 ARROYO 115 1 11 224.0 ARROYO 345/115 kV Ckt2 85.5 107.6 22.1

Note: Las Cruces – Arroyo 115 kV line loads 100.4% of its emergency rating for the loss of Luna-Mimbres 115 kV line when 3rd Arroyo 345/115 kV Network Upgrade in place in 2014.

Table 3-3: 2014 peak N-1 power flow analysis results – Scenario 3

Arroyo Phase-Shifter By-Passed

From Bus

kV

To Bus

kV

Ckt ID

Area

Rating (MVA)

Contingency

W/O Project

With Project

Delta

% of Emergency Rating

Post - Pre

Project ARROYO 345 ARROYO 115 1 11 224.0 ARROYO 345/115 kV Ckt2 101.0 105.6 4.6

Notes: Pre-project system not designed to operate under Scenario 3.

Page 19: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

14

Table 3-4: 2016 off-peak N-1 power flow analysis results – Scenario 1 Arroyo Phase-Shifter located north of WA300W POI

From Bus

kV

To Bus

kV

Ckt ID

Area

Rating (MVA)

Contingency

W/O Project

With Project

Delta

% of Emergency Rating

Post - Pre Project

DONA_ANA 115 PICACHO 115 1 10 91.0 NEWMAN-AFTON 345 kV line (Note 1) 48.6 104.6 56.0

SOCORROP 115 EL_BUTTE 115 1 10 60.0 HIDALGO-GREENLEE 345 kV line (Note 2) 62.0 108.0 46.0

EL_BUTTE 115 SPACE_T 115 1 10 48.0 HIDALGO-GREENLEE 345 kV line (Note 2) 67.5 107.4 39.9

SPACE_T 115 PICACHO 115 1 10 48.0 HIDALGO-GREENLEE 345 kV line (Note 2) 70.0 109.5 39.5

MD 115 HURLEY_# 115 1 10 131.0 LUNA-HIDALGO 345 kV line 74.4 104.0 29.6 HURLEY_# 115 LUNA 115 1 10 131.0 LUNA-HIDALGO 345 kV line 76.8 106.4 29.6

Notes: 1. Dona Ana – Picacho 115 kV line was identified as a pre-project violation in 2016. 2. Socorro – Elephant Butte, Elephant Butte – Space T and Space T - Picacho 115 kV line overload for the loss of Hidalgo – Greenlee 345

kV line disappears when Belen – Bernardo series reactors switched in.

Table 3-5: 2016 peak N-1 power flow analysis results – Scenario 1

Arroyo Phase-Shifter located north of WA300W POI

From Bus

kV

To Bus

kV

Ckt ID

Area

Rating (MVA)

Contingency

W/O Project

With Project

Delta

% of Emergency Rating

Post - Pre Project

ARROYO 345 ARROYO 115 1 11 224.0 ARROYO 345/115 kV Ckt2 85.7 111.6 25.9 SOL 115 LANE___# 115 1 11 159.4 CALIENTE-SE2 115 kV 94.1 101.7 7.6 NORTON_2 115 BUCKMAN 115 1 10 116.0 BA-STA 115 kV (RL) 116.7 117.0 0.4 BUCKMAN 115 WHITEROK 115 1 10 115.0 BA-STA 115 kV (RL) 111.2 111.5 0.3 ETA 115 WHITEROK 115 1 10 115.0 BA-STA 115 kV (RL) 106.4 106.7 0.3

Page 20: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

15

From Bus

kV

To Bus

kV

Ckt ID

Area

Rating (MVA)

Contingency

W/O Project

With Project

Delta

% of Emergency Rating

Post - Pre Project

DONA_ANA 115 PICACHO 115 1 10 91.0 LUNA-MIMBRES 115 kV 101.5 126.0 24.5 HURLEY_# 115 LUNA 115 1 10 131.0 LUNA-HIDALGO 345 kV 70.9 101.7 30.8 PRAGER 115 MONTANO 115 1 10 156.0 SANDIA-WEST MESA 345 kV 101.1 101.3 0.2

Table 3-6: 2016 peak N-1 power flow analysis results – Scenario 2

Arroyo Phase-Shifter located at Arroyo 345 kV Substation

From Bus

kV

To Bus

kV

Ckt ID

Area

Rating (MVA)

Contingency

W/O Project

With Project

Delta

% of Emergency Rating

Post - Pre Project

NORTON_2 115 BUCKMAN 115 1 10 116.0 BA-STA 115 kV (RL) 116.8 117.0 0.2 BUCKMAN 115 WHITEROK 115 1 10 115.0 BA-STA 115 kV (RL) 111.2 111.4 0.2 ETA 115 WHITEROK 115 1 10 115.0 BA-STA 115 kV (RL) 106.4 106.6 0.2 DONA_ANA 115 PICACHO 115 1 10 91.0 LUNA-MIMBRES 115 kV 101.5 93.5 -7.0 PEGS 115 CINIZA 115 1 10 58.0 AMBROSIA-PEGS 230 kV 87.2 100.2 13.0 PRAGER 115 MONTANO 115 1 10 156.0 SANDIA-WEST MESA 345 kV 101.1 103.3 2.2

Page 21: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

16

In order to mitigate the flow violation for Scenario 1, the recommendation is to add a 3rd 345/115 kV autotransformer at Arroyo and to re-conductor or rebuild the following 115 kV lines: Sol – Lane, Luna-Hurley, Hurley-MD and Las Cruces - Arroyo. The power flow analysis results for Scenario 2 showed that the existing Phase Shifter could not hold required North to South power flow at all times – detailed analysis results were documented in Section 3.3. In this scenario, the power flow from WA300W would depend on the Arroyo Phase-Shifter tap settings, with most of the power flowing towards PNM’s West Mesa 345 kV Substation. In Scenario 3, the loss of one of the 345/115 kV autotransformers at Arroyo 345 kV station overloads the other (parallel) autotransformer. Recommendation is to add a 3rd 345/115 kV autotransformer at Arroyo substation to mitigate this criteria violation.

3.3 Phase-Shifter Tap Range Analysis The N-1 contingency analysis that allowed the transformer tap and phase-shifting transformer angle movement, as well as static VAR device switching, was conducted in order to evaluate tap range capabilities of the existing or new Phase Shifter transformer to maintain the required north to south power flow – 135 to 150 MW in the off peak case and 10 to 20 MW in the peak case. The results showed that:

• For Scenario 1 – a new Phase Shifting transformer must have a negative range of at least -85 degrees. Recommendation is to install a Phase Shifter with a tap range of +35/ -85 degrees.

• For Scenario 2 – an existing Arroyo Phase Shifting Transformer has a tap range of +/- 34 degrees. The 2016 off peak case results show that for the loss of Hidalgo – Greenlee 345 kV line the existing Phase Shifter would not be able to maintain 135 to 150 MW north to south power flow. For such power flow the Phase Shifter need a negative tap range of at least -37 degrees. Recommendation is to install a new Phase Shifter with a tap range +/- 40 degrees.

One-line diagrams that demonstrate analysis results can be found in Appendix C.

Page 22: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

17

3.4 Heavy Northern Dispatch Analysis The power flow analysis was performed under the heavy northern dispatch condition for the base case and three post project scenarios as suggested by PNM. The generation dispatch is shown in Table 3-8.

Table 3-7: Peak Heavy Northern Generation Dispatch

Bus # Bus Name kV Pmax (MW)

2014 2016 Pgen (MW)

Pgen (MW)

10318 SJUAN_G1 22 373 360 272

10319 SJUAN_G2 24 373 350 262

10320 SJUAN_G3 22 544 544 544

10904 E_BASIN 13.8 0 37.5 37.5

10983 LONEMS2 0.57 51 50 50

10929 PAJARIT2 13.8 131.8 0 88

10928 PAJARIT1 13.8 131.8 0 88

10945 GRANPH2G 0.57 99 99 99

10942 GRANPH1G 0.57 201 201 201

10321 SJUAN_G4 22 544 360.5 164.5

13501 ELBUT_US 2 6.9 10.4 0 0

13501 ELBUT_US 3 6.9 10.4 0 0

10910 HIDSOLPV2 0.48 80 0 0

10894 HIDSOLT 13.8 105.2 0 0

10261 REEVE_G1 13.8 44 0 0

10262 REEVE_G2 13.8 44 0 0

10263 REEVE_G3 13.8 67 0 0

10246 PERSONG1 18 132 132 132

10415 LVGT 13.8 20 0 0

10486 AFTONG 18 149 141 141

10934 HLWR_DS 0.48 100 0 0

10909 REDMESA4 0.69 102 0 0

10997 LONEMS 0.57 204 200 200

10491 LRDSBGG1 13.8 40 0 0

10492 LRDSBRG2 13.8 40 0 0

12058 PEGS1 17.6 230 220 220.9

12094 PYRMDG1 13.8 40 0 0

12094 PYRMDG1 13.8 40 0 0

12095 PYRMDG2 13.8 40 0 0

12095 PYRMDG2 13.8 40 0 0

12020 CLAPHAM 115 0 0 0

Page 23: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

18

Bus # Bus Name kV Pmax (MW)

2014 2016 Pgen (MW)

Pgen (MW)

12063 ROSEBUD s1 13.8 0 -37.2 -20.9

12063 ROSEBUD s2 13.8 0 -14 -7.8

13303 EL_VADO1 4.16 9.5 0 5

13300 ABIQUI12 4.16 13.8 8 9.6

13316 ETA 11 0 0 0

13311 TA-3-BL 13.8 5 0 0

13310 TA-3-AL 13.8 5 0 5

13310 TA-3-AL 13.8 15 0 0

13311 TA-3-BL 13.8 21.5 0 0

10394 LEF_G1 18 150 0 142.5

10395 LEF_G2 18 150 0 142.5

13402 BLACKWTR 345 50 50 50

10396 LEF_S1 18 300 0 0

10995 ARGONNEG 0.6 90 90 90

10485 AFTONS 13.8 110 94 94

10903 VEF 18 143 143 143

10933 HLWR_4 0.69 100 100 100

13501 ELBUT_US 1 6.9 10.4 0 0 12116 HESSBDW s2 13.8 0 0 -5 12116 HESSBDW s1 13.8 0 0 -5

The analysis results showed that Bernardo – Socorro and Bernardo – Belen 115 kV lines overload for the loss of Macho Springs – Luna 345 kV line under peak load condition before WA300W project was added. Furthermore, the analysis results showed that Las Cruces – Arroyo 115 kV line overloads under N-0 condition in the 2016 peak case when Phase Shifter located north of POI (Scenario 1). Recommendation is to re-conductor Las Cruces – Arroyo 115 kV line by 2016 if the developer proceeds with Scenario 1.

3.5 Power Flow Analysis Conclusion

The analysis showed that the addition of the WA300W project to the system would have an adverse impact on the EPE, PNM and Tri-State transmission systems. For Scenario 1, the recommendation is to add a 3rd 345/115 kV autotransformer at Arroyo and re-conductor the following 115 kV lines: Sol – Lane, Luna-Hurley, Hurley-MD and Las Cruces - Arroyo, as shown in Table 3-8 and Table 3-9.

Page 24: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

19

Table 3-8: Scenario 1 - 345 kV Network Upgrades

From Bus

kV

To Bus

kV

Ckt. ID

Length (miles)

Rating (MVA)

In-service by

3RD 200/224 MVA ARROYO 345/115 kV TRANSFORMER 2014 +34 / -85 DEGREE PHASE SHIFTING TRANSFORMER located North of the POI on the West Mesa to POI 345 kV line 2014

Table 3-9: Scenario 1 – Transmission Line Network Upgrades

From Bus

kV

To Bus

kV

Length (miles)

Rating (MVA)

Conductor

In-service by

LANE 115 SOL 115 2.1 262.0 556.5 ACSS 2016 HURLEY 115 LUNA 115 14.6 262.0 795 ACSR 2016 HURLEY 115 MD 115 6.2 262.0 795 ACSR 2016 LAS CRUCES 115 ARROYO 115 4.1 262.0 556.5 ACSS 2016

The analysis showed that the addition of the WA300W Project to the system would have an adverse impact since an existing Phase Shifting transformer would not be able to maintain 135 to 150 MW north to south power flow in 2016 under light load conditions. The recommendation is to replace the existing Arroyo Phase Shifter with a new one that is capable of maintaining required power flows at all times. Recommended Network Upgrades for Scenario 2 are shown in Table 3-10.

Table 3-10: Scenario 2 - 345 kV Network Upgrades

From Bus

kV

To Bus

kV

Ckt. ID

Length (miles)

Rating (MVA)

In-service by

+40 / -40 DEGREE PHASE SHIFTING TRANSFORMER located at ARROYO 2016

For Scenario 3 - Arroyo Phase-Shifter by-passed - the 2014 analysis results showed that the addition of the WA300W project to the system would cause one of the Arroyo 345/115 kV autotransformers to overload for the loss of the other autotransformer. The recommendation is to add a 3rd 345/115 kV autotransformer at Arroyo.

Table 3-11: Scenario 3 - 345 kV Network Upgrades

From Bus

kV

To Bus

kV

Ckt. ID

Length (miles)

Rating (MVA)

In-service by

3RD 200/224 MVA ARROYO 345/115 kV TRANSFORMER 2014

Page 25: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

20

4. Steady State Voltage Analysis

Bus voltages within the Study Area were compared, under both normal and contingency conditions, with and without the WA300W project in service. The Performance Criterion, shown in Table 1-1, was considered when analyzing bus voltages for violations.

All scenarios require shunt reactors to be installed before the Project placed in-service, as shown in Table 4-1 through Table 4-3.

Table 4-1: Shunt Reactors Requirements for Scenario 1

From Bus

kV

To Bus

kV

MVAR

Controlling kV In-service

by

WEST MESA 345 PST 345 100 WEST MESA 345 2014* ARROYO 345 WA300W POI 345 50.0 ARROYO 345 2014** WA300W POI 345 WA300W 345 50.0 WA300W POI 345 2014 WA300W 345 WA300W POI 345 54.0 WA300W 345 2014*** PST – Phase Shifting Transformer

*- Existing West Mesa – Arroyo PST 100 MVAR reactor shunt to be used as 100 MVAR West Mesa – (relocated Arroyo) PST shunt reactor, controlling West Mesa 345 kV bus.

**- Existing Arroyo PST - West Mesa 50 MVAR reactor shunt to be used as 50 MVAR Arroyo – WA300W POI shunt reactor, controlling Arroyo 345 kV bus.

***- WA300W – WA300W POI 50 MVAR reactor shunt not included in the Network Upgrade cost estimate.

Table 4-2: Shunt Reactors Requirements for Scenario 2

From Bus

kV

To Bus

kV

MVAR

Controlling kV In-service by

WEST MESA 345 WA300W POI 345 100 WEST MESA 345 2014* ARROYO PST 345 WA300W POI 345 50.0 ARROYO PST 345 2014** WA300W POI 345 WA300W 345 50.0 WA300W POI 345 2014 WA300W 345 WA300W POI 345 54.0 WA300W 345 2014***

PST – Phase Shifting Transformer *- Existing West Mesa – Arroyo PST 100 MVAR reactor shunt to be used as 100 MVAR West

Mesa – WA300W POI shunt reactor, controlling West Mesa 345 kV bus. **- Existing Arroyo PST - West Mesa 50 MVAR reactor shunt to be used as 50 MVAR Arroyo

– WA300W POI shunt reactor, controlling Arroyo 345 kV bus. ***- WA300W – WA300W POI 50 MVAR reactor shunt not included in the Network Upgrade

cost estimate.

Page 26: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

21

Table 4-3: Shunt Reactors Requirements for Scenario 3

From Bus

kV

To Bus

kV

MVAR

Controlling kV In-service by

WEST MESA 345 WA300W POI 345 100 WEST MESA 345 2014* ARROYO PST 345 WA300W POI 345 50.0 ARROYO PST 345 2014** WA300W POI 345 WA300W 345 50.0 WA300W POI 345 2014 WA300W 345 WA300W POI 345 54.0 WA300W 345 2014***

PST – Phase Shifting Transformer *- Existing West Mesa – Arroyo PST 100 MVAR reactor shunt to be used as 100 MVAR West

Mesa – (relocated Arroyo) PST shunt reactor, controlling West Mesa 345 kV bus. **- Existing Arroyo PST - West Mesa 50 MVAR reactor shunt to be used as 50 MVAR Arroyo

– WA300W POI shunt reactor, controlling Arroyo 345 kV bus. ***- WA300W – WA300W POI 50 MVAR reactor shunt not included in the Network Upgrade

cost estimate. The voltage analysis results showed that after the addition of the WA300W project with proposed shunt reactors in place the Study area transmission network voltages stayed within criteria limits or did not significantly change from the pre-project voltage levels.

Page 27: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

22

5. Short Circuit Analysis

A short circuit analysis was performed to determine if the addition of the WA300W project to the EPE transmission system will cause any of EPE’s or relevant neighboring transmission system’s existing substation circuit breakers to exceed their interrupting capability ratings.

5.1 Short Circuit Analysis Modeling Three cases were developed to perform this analysis, two with and one without the WA300W project. One of the two cases with the Project in service had Arroyo Phase Shifter modeled north of the POI (Scenario 1), and the other case had Arroyo Phase Shifter modeled at its current location (Scenario 2). Any planned or proposed third party generation listed in EPE’s study queue ahead of the WA300W project were also modeled in the cases.

The proposed Interconnector Customer’s transmission line was modeled as shown in Table 5-1. The modeling data of the WA300W project is described in Table 5-2.

Table 5-1: Interconnection Transmission Lines

From Bus To Bus kV Ckt.

ID Length

(mi.) Line Impedance (pu)

R1 X1 R0 X0 WA300POI WA300_C 345 1 72.0 0.00264 0.03653 0.02419 0.09438 WA300_C WA300_C2 345 1 26.0 0.00095 0.01319 0.00874 0.03408

Page 28: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

23

Table 5-2: Generator Short Circuit Modeling Data

Project Total

Output (MW)

Interconnection Customer

GSU

Unit ID

Pmax (MW)

Qmax (MVAR)

Qmin (MVAR)

Z subtransient

Rating (MVA)

Voltage (kV)

Z subtransient

Red Canyon (Phase 1) 150 G1 150 72.5 -72.5 0 +j 0.01523 207/227 345/34.5 0 +j0.08

Cedar Hills (Phase 2) 150 G1 150 72.5 -72.5 0 +j 0.01523 207/227 345/34.5 0 +j0.08

dgutierr
Typewritten Text
XXXXXXXX
dgutierr
Typewritten Text
XXXXXXXX
dgutierr
Typewritten Text
dgutierr
Typewritten Text
xxxxxxxxx
dgutierr
Typewritten Text
dgutierr
Typewritten Text
dgutierr
Typewritten Text
dgutierr
Typewritten Text
dgutierr
Typewritten Text
dgutierr
Typewritten Text
dgutierr
Typewritten Text
dgutierr
Typewritten Text
xxxxxxxxxx
dgutierr
Typewritten Text
xxxxxxx
dgutierr
Typewritten Text
dgutierr
Typewritten Text
xxxxxx
dgutierr
Typewritten Text
dgutierr
Typewritten Text
dgutierr
Typewritten Text
xxxxxxxxxxxx
dgutierr
Typewritten Text
dgutierr
Typewritten Text
Page 29: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

24

5.2 Short Circuit Analysis Procedure The initial short circuit analysis was performed with all other third-party generation projects ahead of the WA300W project in the study queue in service and WA300W project out of service. This identified the “base case” fault duties of the circuit breakers. The short circuit analysis was performed again with WA300W project in service. Three-phase to ground, two-phase to ground, and single-phase line-to-ground faults were simulated at selected buses in the El Paso Electric Co. system with terminal voltages at 69 kV and above. ASPEN One Liner and Batch Short Circuit Module were used to perform the short circuit analysis. The short circuit fault analyses were performed with the following settings: • Transmission line G+jB ignored. • Shunts with positive sequence impedance ignored. • Transformer line shunts ignored • The pre-fault voltage was calculated using a Flat bus voltage of 1.05 per unit. The difference between the fault current values in the two cases demonstrates the post-project fault contribution of the WA300W project to the pre-project fault current levels in the EPE system. The resulting fault currents in the post-project scenario were compared to the smallest breaker interruption ratings at each of the substations to determine whether or not the WA300W project caused any breaker to be over-duty. Increase in bus faults currents of 100 Amps or more are shown in the tables below.

Page 30: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

25

5.3 Short Circuit Analysis Results The short circuit analysis results for the EPE monitored buses are shown below in

Table 5-3 and Table 5-4; Short circuit results for the buses on the PNM system are shown in Table 5-5 and Table 5-6.

Table 5-3: EPE Buses Short Circuit Summary Results - Scenario 1 Arroyo Phase Shifter North of POI

Bus Fault On:

Lowest Breaker Rating (kA)

Fault

Pre Project Current Pre X/R

Post Project Current Post

X/R

Impact Delta

Within Lowest Rating

Amperes

Amperes

Amperes Yes/No

ARR_PST 345 kV 25

3LG 4831.7 17.685 7657.3 13.0844 2825.6 Yes 2LG 5048.4 14.5081 7356 13.4323 2307.6 Yes 1LG 3984.8 3.74053 6608.4 13.9824 2623.6 Yes

ARROYO 115 kV 22

3LG 14948 16.7978 15143.3 16.9021 195.3 Yes 2LG 14656.4 16.8242 14809.8 16.9205 153.4 Yes 1LG 14041.9 16.8583 14147.4 16.9449 105.5 Yes

ARROYO 345 kV 40

3LG 7456.1 13.6276 7678 13.5631 221.9 Yes 2LG 7204.9 13.9931 7375.7 13.942 170.8 Yes 1LG 6522.3 14.5485 6625.6 14.5385 103.3 Yes

Corona 345 kV 40

3LG 10427.4 20.2153 10552.7 20.0646 125.3 Yes 2LG 10465.9 18.1664 10564.4 18.0555 98.5 Yes 1LG 10105.8 14.8572 10174.9 14.7722 69.1 Yes

COX 115 kV N/A

3LG 14587.2 15.842 14771.9 15.9195 184.7 N/A 2LG 14253.1 15.3648 14398.1 15.4348 145 N/A 1LG 13487 14.6266 13583.7 14.672 96.7 N/A

LAS CRUCES 115 kV

3LG 12073.5 9.18367 12178.1 9.16367 104.6 2LG 11373.2 8.53277 11453.6 8.51865 80.4 1LG 9436.9 6.5479 9475.9 6.53444 39

NEWMAN 115 kV 50

3LG 35305.9 56.9263 35454.5 56.7555 148.6 Yes 2LG 40201.9 49.1159 40332.4 48.9934 130.5 Yes 1LG 41848.4 44.1082 41969.8 43.9936 121.4 Yes

NEWMAN 345 kV 50

3LG 10961.6 23.2691 11119.1 23.0932 157.5 Yes 2LG 11029.9 20.5558 11154.2 20.4308 124.3 Yes 1LG 10695.5 15.9773 10783.5 15.8745 88 Yes

Page 31: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

26

Table 5-4: EPE Buses Short Circuit Summary Results - Scenario 2 Arroyo Phase Shifter at Arroyo

Bus Fault On:

Lowest Breaker Rating (kA)

Fault

Pre Project Current Pre X/R

Post Project Current Post X/R

Impact Delta

Within Lowest Rating

Amperes Amperes Amperes Yes/No

ARR_PST 345 kV 25

3LG 4831.7 17.685 4948.3 17.7174 116.6 Yes 2LG 5048.4 14.5081 5143.3 14.5797 94.9 Yes 1LG 3984.8 3.74053 4032.5 3.76822 47.7 Yes

PNM conducted its own short circuit study with data provided by TRC and El Paso Electric. In its analysis PNM concluded that no breaker duties were found to be impacted by the project. PNM conducted the analysis by concentrating on the worst case duty “seen” by each breaker in the PNM system. This is based on the need to conduct a study using the system reactance and resistance networks separately and combining to provide a true “X/R” ratio, which is utilized to determine the transient offset for which a breaker is called upon to interrupt. The “Breaker Rating Module” of ASPEN software program was used for this analysis.

5.4 Short Circuit Analysis Conclusions The results of this short circuit study show that the pre-existing maximum fault

currents with the WA300W project in service do not exceed the breaker interrupting capability of any of the breakers in the EPE or PNM transmission system. Therefore, no replacement of existing circuit breakers on the EPE transmission systems will be required at this time.

Page 32: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

27

6. Stability Analysis

Stability analysis was performed for peak and off-peak load conditions to determine the degree of impact, if any, the Project may have on the EPE and Southwestern New Mexico transmission system performance. This analysis evaluated the performance of the system for selected contingencies, and addressed issues including, but not limited to, transient stability, dynamic stability (i.e. damping) and low voltage ride through (LVRT). The simulations were conducted using the PSLF power flow and dynamic simulation software, General Electric, Inc. PSLF load flow software package, Version 17.8. Dynamic stability simulations were conducted for peak and off-peak load conditions with the Projects units on at full capacity and off.

6.1 Dynamic Modeling EPE provided the base cases and dynamic file data base for this part of the study. The Interconnection Customers provided the detailed model data sheets and/or parameter values. The Project was modeled as two generators:

- Two 150 MW wind generator and one 0 MW energy storage generator; - Two 75 MW wind generators and two 75 MW energy storage generators; - Two 0 MW wind generators and two 150 MW energy storage generators.

Detailed PSLF model data for the WA300W unit can be found in Appendix C. Table 6-1 shows the models used for the studies.

Table 6-1: Generator Models Used for Studies

Project Turbine Type Notes PSLF Model

ART320W GE 2.5 MW Full Converter Model standard GEWTG

AA100W GE 1.5 MW DFAG Model standard with

PSLF Assume LVRT II

GEWTG

MS50.4W Siemens VS 1.8 MW

Variable speed, doubly-fed asynchronous generators with rotor-side converter (DFAG) Used PSLF Generic model with default parameters

WT3G

RG9 GE LMS-100 GENROU, ESAC7B, GGOV1, PSS2A

As shown to the Left

Page 33: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

28

6.2 Stability Study Case Development Four base cases were used to simulate Peak and Off-Peak conditions. These base cases were modified to include the WA300W project - modeled as: full wind output (no energy storage output), half wind half energy storage, and full energy storage output (no wind generation) in both scenarios, Scenario 1 and Scenario 2. The analysis compared the system response to the fault simulations before and after the WA300W project was added. The dynamic study cases are listed in Table 6-2

Table 6-2: Stability Post-Project Case Scenarios Descriptions

Year

Peak Case OFF- Peak Case

Arroyo PST = 10 MW N-S Arroyo PST = 151 MW N-S

Eddy County HVDC OFF Eddy County HVDC OFF

2014

Scenario 1

300 MW Wind

0 MW Energy Storage

300 MW Wind

0 MW Energy Storage

150 MW Wind

150 MW Energy Storage

150 MW Wind

150 MW Energy Storage

0 MW Wind

300 MW Energy Storage

0 MW Wind

300 MW Energy Storage

2014

Scenario 2

300 MW Wind

0 MW Energy Storage

300 MW Wind

0 MW Energy Storage

150 MW Wind

150 MW Energy Storage

150 MW Wind

150 MW Energy Storage

0 MW Wind

300 MW Energy Storage

0 MW Wind

300 MW Energy Storage

2016

Scenario 1

300 MW Wind

0 MW Energy Storage

300 MW Wind

0 MW Energy Storage

150 MW Wind

150 MW Energy Storage

150 MW Wind

150 MW Energy Storage

0 MW Wind

300 MW Energy Storage

0 MW Wind

300 MW Energy Storage

2016

Scenario 2

300 MW Wind

0 MW Energy Storage

300 MW Wind

0 MW Energy Storage

150 MW Wind

150 MW Energy Storage

150 MW Wind

150 MW Energy Storage

0 MW Wind

300 MW Energy Storage

0 MW Wind

300 MW Energy Storage

Page 34: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

29

6.3 Stability Analysis Results The stability analysis showed that the EPE and Southwestern New Mexico transmission system remained stable for the all the simulated faults before and after the addition of the Project with the proposed Network Upgrades in place. Simulated fault locations, time durations, and system response are shown in Table 6-3 and Table 6-4. The stability plots of these faults can be found in Appendix E. Worst Condition Analysis (WCA) did not reveal any frequency or voltage criteria violations as the result of the WA300W project. The WCA results can be found in Appendix F.

Page 35: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

30

Table 6-3: 2014 Stability Analysis Results for both Peak and Off-Peak Cases 2014 SIS – WA300W 300 MW Wind Output Results

# Fault Location Event Description Clearing (cycles)

Light Load Peak Load Project

Off Project On Scenario 1

Project On Scenario 2

Project Off

Project On Scenario 1

Project On Scenario 2

1 West Mesa Three Phase fault at West Mesa 345 kV bus.

West Mesa 345 kV = 4.0, Sandia 345 kV = 4.0 Stable Stable* Stable* Stable Stable* Stable*

2 West Mesa Three Phase fault at West Mesa 345 kV bus.

West Mesa 345 kV = 4.0, Rio Puerco 345 kV = 4.0 Stable Stable* Stable* Stable Stable* Stable*

3 West Mesa Three Phase fault at West Mesa 345 kV bus.

West Mesa 345 kV = 4.0, Arroyo PST 345 kV = 4.0 Stable N/A N/A Stable N/A N/A

4 Arroyo PST Three Phase fault at 345 kV Arroyo Phase Shifting Trans.

Arroyo PST 345 kV = 4.0, West Mesa 345 kV 345 kV = 4.0 Stable N/A N/A Stable N/A N/A

5 West Mesa Three Phase fault at West Mesa 345 kV bus.

West Mesa 345 kV = 4.0, WA300WPOI 345 kV = 4.0 N/A N/A Stable* N/A N/A Stable*

6 POI Three Phase fault at WA300W 345 kV POI bus.

WA300WPOI 345 kV = 4.0, West Mesa 345 kV = 4.0 N/A N/A Stable* N/A N/A Stable*

7 POI Three Phase fault at WA300W 345 kV POI bus.

WA300WPOI 345 kV = 4.0, Arroyo PST 345 kV = 4.0 N/A N/A Stable* N/A N/A Stable*

8 Arroyo PST Three Phase fault at 345 kV Arroyo Phase Shifting Transf.

Arroyo PST 345 kV = 4.0, Arroyo 345 kV = 4.0 Stable N/A Stable* Stable N/A Stable*

9 West Mesa Three Phase fault at West Mesa 345 kV bus.

West Mesa 345 kV = 4.0, Arroyo PST1 345 kV = 4.0 N/A Stable* N/A N/A Stable* N/A

10 POI Three Phase fault at WA300W 345 kV POI bus.

WA300WPOI 345 kV = 4.0, Arroyo PST1 345 kV = 4.0 N/A Stable* N/A N/A Stable* N/A

11 POI Three Phase fault at WA300W 345 kV POI bus.

WA300WPOI 345 kV = 4.0, Arroyo 345 kV = 4.0 N/A Stable* N/A N/A Stable* N/A

12 Arroyo PST Three Phase fault at 345 kV Arroyo Phase Shifting Transf.

Arroyo PST1 345 kV = 4.0, WA300WPOI 345 kV = 4.0 N/A Stable* N/A N/A Stable* N/A

13 Arroyo Three Phase fault on Arroyo-Newman 345 kV line with stuck 345 kV breaker at Arroyo

Newman 345 kV = 6.0, Arroyo 345 kV = 12.0,

Arroyo 115 kV = 12.0 (Arroyo autotransformer 1 tripped)

Stable Stable* Stable* Stable Stable* Stable*

13 Arroyo Three Phase fault on Arroyo-Newman 345 kV line with stuck 345 kV breaker at Arroyo

Newman 345 kV = 6.0, Arroyo PST 345 kV = 12.0,

Arroyo 345 kV = 12.0 (Arroyo PST tripped)

Stable N/A Stable* Stable N/A Stable*

13 Arroyo Three Phase fault on Arroyo-Newman 345 kV line with stuck 345 kV breaker at Arroyo

Newman 345 kV = 6.0, WA300W POI 345 kV = 12.0, Arroyo 345 kV = 12.0 (Arroyo

WA300W POI tripped)

N/A Stable* N/A N/A Stable* N/A

14 WA300W Three Phase fault at WA300W generator bus

WA300_G 34.5 kV = 4.0 (loss of project) N/A Stable* Stable* N/A Stable* Stable*

Note: Stable - System response stable; Stable* - System response stable and WA300W units stayed in service.

Page 36: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

31

Table 6-4: 2016 Stability Analysis Results for both Peak and Off-Peak Cases 2016 SIS – WA300W 300 MW Wind Output Results

# Fault Location Event Description Clearing (cycles)

Light Load Peak Load Project

Off Project On Scenario 1

Project On Scenario 2

Project Off

Project On Scenario 1

Project On Scenario 2

1 West Mesa Three Phase fault at West Mesa 345 kV bus.

West Mesa 345 kV = 4.0, Sandia 345 kV = 4.0 Stable Stable* Stable* Stable Stable* Stable*

2 West Mesa Three Phase fault at West Mesa 345 kV bus.

West Mesa 345 kV = 4.0, Rio Puerco 345 kV = 4.0 Stable Stable* Stable* Stable Stable* Stable*

3 West Mesa Three Phase fault at West Mesa 345 kV bus.

West Mesa 345 kV = 4.0, Arroyo PST 345 kV = 4.0 Stable N/A N/A Stable N/A N/A

4 Arroyo PST Three Phase fault at 345 kV Arroyo Phase Shifting Trans.

Arroyo PST 345 kV = 4.0, West Mesa 345 kV 345 kV = 4.0 Stable N/A N/A Stable N/A N/A

5 West Mesa Three Phase fault at West Mesa 345 kV bus.

West Mesa 345 kV = 4.0, WA300WPOI 345 kV = 4.0 N/A N/A Stable* N/A N/A Stable*

6 POI Three Phase fault at WA300W 345 kV POI bus.

WA300WPOI 345 kV = 4.0, West Mesa 345 kV = 4.0 N/A N/A Stable* N/A N/A Stable*

7 POI Three Phase fault at WA300W 345 kV POI bus.

WA300WPOI 345 kV = 4.0, Arroyo PST 345 kV = 4.0 N/A N/A Stable* N/A N/A Stable*

8 Arroyo PST Three Phase fault at 345 kV Arroyo Phase Shifting Transf.

Arroyo PST 345 kV = 4.0, Arroyo 345 kV = 4.0 Stable N/A Stable* Stable N/A Stable*

9 West Mesa Three Phase fault at West Mesa 345 kV bus.

West Mesa 345 kV = 4.0, Arroyo PST1 345 kV = 4.0 N/A Stable* N/A N/A Stable* N/A

10 POI Three Phase fault at WA300W 345 kV POI bus.

WA300WPOI 345 kV = 4.0, Arroyo PST1 345 kV = 4.0 N/A Stable* N/A N/A Stable* N/A

11 POI Three Phase fault at WA300W 345 kV POI bus.

WA300WPOI 345 kV = 4.0, Arroyo 345 kV = 4.0 N/A Stable* N/A N/A Stable* N/A

12 Arroyo PST Three Phase fault at 345 kV Arroyo Phase Shifting Transf.

Arroyo PST1 345 kV = 4.0, WA300WPOI 345 kV = 4.0 N/A Stable* N/A N/A Stable* N/A

13 Arroyo Three Phase fault on Arroyo-Newman 345 kV line with stuck 345 kV breaker at Arroyo

Newman 345 kV = 6.0, Arroyo 345 kV = 12.0,

Arroyo 115 kV = 12.0 (Arroyo autotransformer 1 tripped)

Stable Stable* Stable* Stable Stable* Stable*

13 Arroyo Three Phase fault on Arroyo-Newman 345 kV line with stuck 345 kV breaker at Arroyo

Newman 345 kV = 6.0, Arroyo PST 345 kV = 12.0,

Arroyo 345 kV = 12.0 (Arroyo PST tripped)

Stable N/A Stable* Stable N/A Stable*

13 Arroyo Three Phase fault on Arroyo-Newman 345 kV line with stuck 345 kV breaker at Arroyo

Newman 345 kV = 6.0, WA300W POI 345 kV = 12.0, Arroyo 345 kV = 12.0 (Arroyo

WA300W POI tripped)

N/A Stable* N/A N/A Stable* N/A

14 WA300W Three Phase fault at WA300W generator bus

WA300_G 34.5 kV = 4.0 (loss of project) N/A Stable* Stable* N/A Stable* Stable*

Note: Stable - System response stable; Stable* - System response stable and WA300W units stayed in service.

Page 37: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

32

6.4 Low Voltage Ride Through Analysis

All wind generating plants subject to FERC Order No. 661 must meet the following Low Voltage Ride Through (LVRT) criteria: • Wind generating plants are required to remain in-service during three-phase

faults with normal clearing (which is a time period of approximately 4-9 cycles) and single line to ground faults with delayed clearing, and subsequent post-fault voltage recovery to pre-fault voltage unless clearing the fault effectively disconnects the generator from the system. The clearing time requirement for a three-phase fault will be specific to the wind generating plant substation location, as determined and documented by the Transmission Owner for the Transmission District to which the wind generating plant will be interconnected. The maximum clearing time the wind generating plant shall be required to withstand for a three-phase fault shall be 9 cycles, after which, if the fault remains following the location-specific normal clearing time for three-phase faults, the wind generating plant may disconnect from the transmission system. A wind generating plant shall remain interconnected during such a fault on the transmission system for a voltage level as low as zero volts, as measured at the high voltage side of the wind GSU.

• This requirement does not apply to faults that would occur between the wind generator terminals and the high side of the GSU.

• Wind generating plants may be tripped after the fault period if this action is intended as part of a special protection system.

• Wind generating plants may meet the LVRT requirements of this standard by the performance of the generators, or, by installing additional equipment (e.g., Static Var Compensator) within the wind generating plant, or, by a combination of generator performance and additional equipment.

• Existing individual generator units that are, or have been, interconnected to the network at the same location at the effective date of the FERC Order No. 661 Appendix G, LVRT Standard, are exempt from meeting the FERC Order No. 661 Appendix G, LVRT Standard, for the remaining life of the existing generation equipment. Existing individual generator units that are replaced are required to meet FERC Order No. 661 Appendix G LVRT Standard.

The fault clearing times used in the stability analysis include relay operating time, breaker operating time, channel time, and breaker failure time, as necessary.

Page 38: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

33

6.4.1 LVRT Results The ability of the WA300W generation to stay on-line due to contingencies at the WA300W POI is a requirement of both the FERC and EPE. The results showed that all WA300W generation remained on-line for faults at the POI, as shown in Table 6-3 and Table 6-4.

6.5 Stability Analysis Conclusion

The study area remains stable and well damped for all the contingencies analyzed. The WA300W generation remains on-line for all system fault simulations, satisfying FERC Order No. 661 Low Voltage Ride Through (LVRT) criteria.

The Project addition to the system with proposed transmission reinforcements in place does not pose any concern to system stability performance.

Page 39: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

34

7. Cost Estimates

Good faith cost estimates have been determined. The cost estimates are in 2011 dollars (no escalation applied) and are based upon typical construction costs for previously performed similar construction. These estimated costs include all applicable labor and overheads associated with the engineering, design, and construction of these new facilities. These estimates did not include the cost for any other Interconnection Customer owned equipment or associated design and engineering except for those located at the POI.

The estimated total cost for the required upgrades is $52.91 Million for Scenario 1, when Arroyo Phase Shifter removed from Arroyo 345 kV Substation and new Phase Shifting Transformer installed north of WA300W POI. In this Scenario 1, this breaks down to $2.15 Million for the EPE Interconnection Cost4 and $50.76 Million for Network Upgrades Cost5. The Generator Interconnection Cost6

For Scenario 2, Arroyo Phase Shifter at existing location, the estimated total cost for the required upgrades is $23.14 Million. In this Scenario 2, this breaks down to $2.15 Million for the EPE Interconnection Cost4 and $20.99 Million for Network Upgrades Cost5. The Generator Interconnection Cost6 estimates are not included.

estimates are not included.

For Scenario 3, Arroyo Phase Shifter by-passed, the estimated total cost for the required upgrades is $24.24 Million. In this Scenario 2, this breaks down to $2.15 Million for the EPE Interconnection Cost4 and $22.09 Million for Network Upgrades Cost5. The Generator Interconnection Cost6 estimates are not included.

The estimated time frame for Engineering, Procurement, and Construction of Network Upgrades is approximately 2 years for Scenario 1, 2 years for Scenario 2, and 2 years for Scenario 3 upon notice to proceed with construction from the Interconnection Customers. The estimated time frame for Engineering, Procurement, and Construction is 18-24 months for new POI Substations or expansion at existing substations. Appendix G shows the project schedule. Any sequencing in project schedule will delay the overall completion date. A time frame for permitting the project assumed best case scenario. Should the NEPA process be delayed on any section, this will also delay the final completion date.

Tables and one-line diagrams in this section of the report show the WA300W interconnection project, its POI, associated EPE Interconnection facility, Network Upgrades, and estimated costs for both Scenario 1 and Scenario 2.

4 EPE Interconnection Cost: Cost of faculties paid for by interconnector but owned and operated by EPE

from the Change of Ownership Point to the Point of Interconnection. Not subject to transmission credits. 5 Network Upgrades Cost: Cost of facilities from the Point of Interconnection outward, paid for by the

interconnector but owned and operated by EPE. Subject to transmission credits. 6 Generator Interconnection Cost: Cost of facilities paid for by interconnector and owned and operated by the

interconnector from the generator faculties to the Change of Ownership Point, which is typically at the Point of Interconnection substation first dead-end. Not subject to transmission credits.

Page 40: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

35

Table 7-1: EPE Interconnection Facilities Costs for WA300W POI (This Table is Common to All Scenarios)

Element Description Cost Est.

Millions WA300W POI

EPE Interconnection Facilities located at WA300W POI:

• One set of CCVT’s and Structures • Three Lightning arresters and Structures • One set of Transmission Line Dead-end Assemblies

for Substation Dead-end • One Set of 115 kV 3-Phase Metering Units and

structures • One 345 kV 3000 Amp circuit breakers • One 345 kV, 3000 Amp disc. switches • One 50 MVAR shunt reactor • One lot switch and metering structures • One lot, grounding, concrete • Transmission line relaying, communication, and

testing • One set of Transmission Line Dead-end Assemblies

for Substation Dead-end

$2.15

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

18 Months

Page 41: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

36

Figure 7-1: WA300W POI Substation One-line for Scenario 1

Color Code Existing Facilities Network Upgrades EPE Interconnection Facilities Located at POI Interconnection Customer Equipment

S

E W

N

Interconnection Customer’s Point

of Interconnection

Interconnection Customer’s 345 kV Transmission Line

76 Miles Revenue Metering

WA300W POI 345 kV Substation

34.5/345 kV 227 MVA (Typical)

To West Mesa 36 Miles

To Arroyo 345 kV

Switching Station 165.8 Miles

M

54 MVAR REACTOR

WA300W (300 MW)

Phase Shifting

Transformer +34 / -85 Deg

50 MVAR REACTOR

Interconnection Customer’s 345 kV Transmission Line

24 Miles

150 MW Phase 1

150 MW Phase 2

Page 42: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

37

Table 7-2: Network Upgrade Cost for WA300W 345 kV Substation for Scenario 1

Element Description Cost Est. Millions

WA300W 345 kV Substation

A new station with a 345 kV phase shifting transformer requires. The new required equipment includes:

• +34 / -85 degree Phase Shifting Transformer • Six 345 kV 3000 Amp circuit breakers • Twelve 345 kV, 3000 Amp disc. switches • Three 345 kV 2000 Amp Line Switches w/Grounding

Switch • Six CCVT’s and Structures • Three 2000 Amp Line Wave Traps • Six Lightning arresters and Structures • One lot 345 kV bus, insulators, and structural

supports • One lot Transmission line relaying, SCADA,

communication, and testing • One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing • One Control Building including batteries • Yard work and driveway

$27.90

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

24 Months

Page 43: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

38

Figure 7-2: Arroyo 345 kV Substation One-Line for Scenario 1

Color Code Existing Facilities Network Upgrades EPE Interconnection Facilities Located at POI Interconnection Customer Equipment

ARROYO Switching

Station

115 kV

115 kV

S

E

W

N

REMOVE the existing 345 kV Arroyo Phase Shifting Transformer

Arroyo XFMR T3

Existing 345 kV To NEWMAN

To Cox To

Salopek

To Las Cruces

To Jornada

345/115 kV XFMR T5

345/115 kV XFMR T1

To WA300W

POI

NEW 345/115 kV XFMR T6

345 kV

345 kV

To XFMR T2

Relocated Line To

XFMR T4

Page 44: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

39

Table 7-3: Network Upgrade Cost for Arroyo 345 kV Substation for Scenario 1

Element Description Cost Est. Millions

Arroyo 345 kV Substation

Addition of a 3rd 345/115 kV autotransformer requires two new 345 kV breakers, as well as new 115 kV breaker and a half bay with two new 115 kV breakers. The new required equipment includes:

• Two 345 kV and two 115 kV circuit breakers • Four 345 kV, 3000 Amp motor operated switches • Five 115 kV, 2000 Amp disconnect switches with

grounding • One 115 kV 2000 Amp Line Switch w/Grounding • One 115 kV set of CCVT’s and Structures • One 115 kV 2000 Amp Line Wave Traps • One sets of 115 kV Transmission Line Dead-end

Assemblies for Substation Dead-end • 345 kV and 115 kV bus, insulators, and structural

supports • One lot Transmission line relaying, SCADA,

communication, and testing • One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing • One Control Building including batteries • Yard work and driveway

$10.50

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

24 Months

Note: Removal cost for the existing Arroyo Phase Shifting transformer is not included.

Page 45: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

40

Table 7-4: Transmission Line Network Upgrade Costs for Scenario 1

Element Description Total miles

Cost Est. Millions

115 kV Transmission

Reconductor Lane-Sol 115 kV line with 556.6 ACSS 2.1 $0.63

Rebuild Luna to Hurley 115 kV line with 795 ACSR 14.6 $7.37

Rebuild MD to Hurley 115 kV line with 795 ACSR 6.2 $3.13

Reconductor Arroyo-Las Cruces 115 kV line with 556.6 ACSS 4.1 $1.23

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

2 Years

Total Estimate for Transmission Network Upgrades $12.36

115 kV Transmission Network Upgrade estimate assumptions:

• all cross country route; • Ruling Span = 800 ft.; • Loading: NESC Medium, NESC Extreme Wind; • Maximum operating Temperature 100 deg. Celsius; • Access roads includes grading and 5% rock for low spots and paved road crossing

access; • (1) OPGW 48 pair centrum design with stainless steel tubes, 0.502 in diameter, 0.3310

lbs/ft, RBS 15,000, design tension 20% RBS under NESC medium initial; • Conductors: 556 kCMIL 26/7 “Dove” ACSS, design tension 25% RBS under NESC

medium initial; • Double Circuit: Steel monopole design with tangents (100’ direct embed concrete

backfill) with post insulators, running angles (85’ drilled pier foundations) 15-30 degs. with suspension insulators, dead-ends (90 deg.) (85’ drilled pier foundations) suspension insulators on pole;

• Estimate considers 8% of the structures to be dead-end structures between 30 and 90 degrees, 4% angled structures between 5 and 30 degrees and 88% of the structures to be tangent structures between 0 and 5 degrees;

• All structures are galvanized and the estimated cost per pound for steel is $2.00/lb.; • Geotech includes concrete testing; • New construction and no outages associated with any other facilities.

Not Included in Transmission Network Upgrade Estimate:

• Any right-of-way clearing costs; • Hydrology analysis or scour calculations for construction within a flood plain or

adjacent to any washes, rivers, etc.; • Permitting for road or railroad crossings; • Siting costs, land acquisition, environmental permitting, biological assessments/permits,

archeological assessments/permits; • Temporary construction offices and material lay down yard; • Fencing or access gate materials.

Page 46: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

41

Figure 7-3: WA300W POI Substation One-line for Scenario 2

Color Code Existing Facilities Network Upgrades EPE Interconnection Facilities Located at POI Interconnection Customer Equipment

S

E W

N

Interconnection Customer’s Point

of Interconnection

Interconnection Customer’s 345 kV Transmission Line

76 Miles Revenue Metering

WA300W POI 345 kV Substation

34.5/345 kV 227 MVA (Typical)

To West Mesa 36 Miles

To Arroyo 345 kV

Switching Station 165.8 Miles

M

54 MVAR REACTOR

WA300W (300 MW)

Phase Shifting

Transformer +34 / -85 Deg

50 MVAR REACTOR

Interconnection Customer’s 345 kV Transmission Line

24 Miles

150 MW Phase 1

150 MW Phase 2

Page 47: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

42

Table 7-5: Network Upgrade Cost for WA300W 345 kV Substation for Scenario 2

Element Description Cost Est. Millions

WA300W 345 kV Substation

A new 345 kV switching station with three breaker ring bus configuration. The new required equipment includes:

• Three 345 kV 3000 Amp circuit breakers • Six 345 kV, 3000 Amp disc. switches • Three 345 kV 2000 Amp Line Switches w/Grounding

Switch • Six CCVT’s and Structures • Three 2000 Amp Line Wave Traps • Six Lightning arresters and Structures • One lot 345 kV bus, insulators, and structural

supports • One lot Transmission line relaying, SCADA,

communication, and testing • One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing • One Control Building including batteries • Yard work and driveway

$11.59

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

24 Months

Table 7-6: Network Upgrade Cost for Arroyo 345 kV Substation for Scenario 2

Element Description Cost Est. Millions

Arroyo 345 kV Substation

Replacement of an existing 345 kV Phase Shifting Transformer with a new one that has +/- 40 degree tap range.

$9.40

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

24 Months

Note: Removal cost for the existing Arroyo Phase Shifting transformer is not included.

Page 48: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

43

Figure 7-4: WA300W POI Substation One-line for Scenario 3

Color Code Existing Facilities Network Upgrades EPE Interconnection Facilities Located at POI Interconnection Customer Equipment

S

E W

N

Interconnection Customer’s Point

of Interconnection

Interconnection Customer’s 345 kV Transmission Line

76 Miles Revenue Metering

WA300W POI 345 kV Substation

34.5/345 kV 227 MVA (Typical)

To West Mesa 36 Miles

To Arroyo 345 kV Switching Station

165.8 Miles

M

54 MVAR REACTOR

WA300W (300 MW)

50 MVAR

REACTOR

Interconnection Customer’s 345 kV Transmission Line

24 Miles

150 MW Phase 1

150 MW Phase 2

Page 49: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

44

Table 7-7: Network Upgrade Cost for WA300W 345 kV Substation for Scenario 2

Element Description Cost Est. Millions

WA300W 345 kV Substation

A new 345 kV switching station with three breaker ring bus configuration. The new required equipment includes:

• Five 345 kV 3000 Amp circuit breakers • Eight 345 kV, 3000 Amp disc. switches • Three 345 kV 2000 Amp Line Switches w/Grounding

Switch • Six CCVT’s and Structures • Three 2000 Amp Line Wave Traps • Six Lightning arresters and Structures • One lot 345 kV bus, insulators, and structural

supports • One lot Transmission line relaying, SCADA,

communication, and testing • One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing • One Control Building including batteries • Yard work and driveway

$11.59

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

24 Months

Page 50: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

45

Figure 7-5: Arroyo 345 kV Substation One-Line for Scenario 3

Color Code Existing Facilities Network Upgrades EPE Interconnection Facilities Located at POI Interconnection Customer Equipment

ARROYO Switching

Station

115 kV

115 kV

S

E

W

N

REMOVE the existing 345 kV Arroyo Phase Shifting Transformer

Arroyo XFMR T3

Existing 345 kV To NEWMAN

To Cox To

Salopek

To Las Cruces

To Jornada

345/115 kV XFMR T5

345/115 kV XFMR T1

To WA300W

POI

NEW 345/115 kV XFMR T6

345 kV

345 kV

To XFMR T2

Relocated Line To

XFMR T4

Page 51: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

46

Table 7-8: Network Upgrade Cost for Arroyo 345 kV Substation for Scenario 3

Element Description Cost Est. Millions

Arroyo 345 kV Substation

Addition of a 3rd 345/115 kV autotransformer requires two new 345 kV breakers, as well as new 115 kV breaker and a half bay with two new 115 kV breakers. The new required equipment includes:

• Two 345 kV and two 115 kV circuit breakers • Four 345 kV, 3000 Amp motor operated switches • Five 115 kV, 2000 Amp disconnect switches with

grounding • One 115 kV 2000 Amp Line Switch w/Grounding • One 115 kV set of CCVT’s and Structures • One 115 kV 2000 Amp Line Wave Traps • One sets of 115 kV Transmission Line Dead-end

Assemblies for Substation Dead-end • 345 kV and 115 kV bus, insulators, and structural

supports • One lot Transmission line relaying, SCADA,

communication, and testing • One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing • One Control Building including batteries • Yard work and driveway

$10.50

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

24 Months

Note: Removal cost for the existing Arroyo Phase Shifting transformer is not included.

General Cost Assumptions

1. The cost estimates provided are good faith “scoping estimates”. 2. Estimates do not include land or permitting. 3. Interconnection Customer to secure POI site and transfer ownership to EPE. 4. Permitting time frames are included. Actual time frames will vary due to local

and Federal requirements. 5. Estimates are in 2012 Dollars. 6. Where applicable, the Interconnection Customers are responsible for funding and

construction of all transmission facilities from the proposed generator substation to the Points of Interconnection.

Page 52: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

47

7. The Interconnection Customer will supply enough transmission conductor from their last structure outside the POI substation for Termination into the POI substation bus.

8. Interconnection Customers are responsible for Engineering, Procurement, and Construction for all and any FACTs and other transmission compensation devices at their generation site or along their long interconnecting transmission lines to just outside the POI sites.

Page 53: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

48

8. Disclaimer

If any of the project data provided by Interconnection Customer and used in this study varies significantly from the actual data once the WA300W generation equipment is installed, the results from this study will need to be verified with the actual data at the Project Interconnection Customer's expense. Additionally, any change in the generation in EPE’s Interconnection Queue that is senior to the WA300W project may require a re-evaluation of this Study.

Page 54: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

49

9. Conclusions

This WA300W System Impact Study, consisting of Steady State, Short Circuit and Stability Analyses, for a net 300 MW of generation interconnecting on the EPE transmission systems, has demonstrated that the WA300W project will have an adverse impact on the EPE and Southern New Mexico transmission systems for both Scenarios, Scenario 1 and Scenario 2, unless the proposed Network Upgrades in place. The estimated total cost for the required upgrades is $52.91 Million for Scenario 1, when Arroyo Phase Shifter removed from Arroyo 345 kV Substation and new Phase Shifting Transformer installed north of WA300W POI. In this Scenario 1, this breaks down to $2.15 Million for the EPE Interconnection Cost7 and $50.76 Million for Network Upgrades Cost8. The Generator Interconnection Cost9

For Scenario 2, Arroyo Phase Shifter at existing location, the estimated total cost for the required upgrades is $23.14 Million. In this Scenario 2, this breaks down to $2.15 Million for the EPE Interconnection Cost7 and $20.99 Million for Network Upgrades Cost8. The Generator Interconnection Cost9 estimates are not included.

estimates are not included.

For Scenario 3, Arroyo Phase Shifter at existing location, the estimated total cost for the required upgrades is $24.24 Million. In this Scenario 2, this breaks down to $2.15 Million for the EPE Interconnection Cost7 and $22.09 Million for Network Upgrades Cost8. The Generator Interconnection Cost9 estimates are not included.

The good faith estimate of the time frame to Engineer, Procure, and Construct all facilities is 2 years for Scenario 1, 2 years for Scenario 2, and 2 years for Scenario 3.

7 EPE Interconnection Cost: Cost of faculties paid for by interconnector but owned and operated by EPE

from the Change of Ownership Point to the Point of Interconnection. Not subject to transmission credits. 8 Network Upgrades Cost: Cost of facilities from the Point of Interconnection outward, paid for by the

interconnector but owned and operated by EPE. Subject to transmission credits. 9 Generator Interconnection Cost: Cost of facilities paid for by interconnector and owned and operated by the

interconnector from the generator faculties to the Change of Ownership Point, which is typically at the Point of Interconnection substation first dead-end. Not subject to transmission credits.

Page 55: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

Appendix A

Appendix A WA300W System Impact Study Statement of Work

Page 56: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric
Page 57: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric
Page 58: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric
Page 59: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric
Page 60: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric
Page 61: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric
Page 62: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

Appendix B

Appendix B Power Flow Contingency List

Page 63: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST Transmission Lines

1. CHOLLA 500.0 to SAGUARO 500.0 Circuit 1 2. FOURCORN 500.0 to MOENKOPI 500.0 Circuit 1 3. MOENKOPI 500.0 to YAVAPAI 500.0 Circuit 1 4. NAVAJO 500.0 to MOENKOPI 500.0 Circuit 1 5. NAVAJO 500.0 to RACEWAY 500.0 Circuit 1 6. SAGUARO 500.0 to TORTOLIT 500.0 Circuit 1 7. SAGUARO 500.0 to TORTLIT2 500.0 Circuit 1 8. YAVAPAI 500.0 to WESTWING 500.0 Circuit 1 9. RACEWAY 500.0 to WESTWING 500.0 Circuit 1 10. CHOLLA 345.0 to PNPKAPS 345.0 Circuit 1 11. CHOLLA 345.0 to PRECHCYN 345.0 Circuit 1 12. FOURCORN 345.0 to CHOLLA 345.0 Circuit 1 13. FOURCORN 345.0 to CHOLLA 345.0 Circuit 2 14. PRECHCYN 345.0 to PNPKAPS 345.0 Circuit 1 15. BUCKEYE 230.0 to LIBERTY 230.0 Circuit 1 16. CACTUS 230.0 to OCOTILLO 230.0 Circuit 1 17. CACTUS 230.0 to PNPKAPS 230.0 Circuit 1 18. CASGRAPS 230.0 to DBG 230.0 Circuit 1 19. CHOLLA 230.0 to LEUPP 230.0 Circuit 1 20. COCONINO 230.0 to VERDE S 230.0 Circuit 1 21. CTRYCLUB 230.0 to LINCSTRT 230.0 Circuit 1 22. CTRYCLUB 230.0 to GRNDTRML 230.0 Circuit 1 23. DEERVALY 230.0 to ALEXANDR 230.0 Circuit 1 24. DEERVALY 230.0 to PINPKSRP 230.0 Circuit 1 25. EAGLEYE 230.0 to LIBERTY 230.0 Circuit 1 26. EL SOL 230.0 to AGUAFRIA 230.0 Circuit 1 27. GLENDALE 230.0 to GRNDTRML 230.0 Circuit 1 28. LEUPP 230.0 to COCONINO 230.0 Circuit 1 29. LINCSTRT 230.0 to OCOTILLO 230.0 Circuit 1 30. LINCSTRT 230.0 to WPHXAPSN 230.0 Circuit 1 31. LONEPEAK 230.0 to PNPKAPS 230.0 Circuit 1 32. LONEPEAK 230.0 to SUNYSLOP 230.0 Circuit 1 33. MEADOWBK 230.0 to CTRYCLUB 230.0 Circuit 1 34. MEADOWBK 230.0 to SUNYSLOP 230.0 Circuit 1 35. REACH 230.0 to LONEPEAK 230.0 Circuit 1 36. REACH 230.0 to PNPKAPS 230.0 Circuit 1 37. PNPKAPS 230.0 to OCOTILLO 230.0 Circuit 1 38. PNPKAPS 230.0 to PINPKSRP 230.0 Circuit 1 39. PNPKAPS 230.0 to PINPKSRP 230.0 Circuit 2 40. PNPKAPS 230.0 to PINPK 230.0 Circuit 1 41. PRESCOTT 230.0 to PINPK 230.0 Circuit 1 42. PRESCOTT 230.0 to RNDVLYTP 230.0 Circuit 1 43. JOJOBA 230.0 to GILARIVR 230.0 Circuit 1 44. SAGUARO 230.0 to CASGRAPS 230.0 Circuit 1 45. SAGUARO 230.0 to TATMOMLI 230.0 Circuit 1 46. SNTAROSA 230.0 to TATMOMLI 230.0 Circuit 1 47. SNTAROSA 230.0 to DBG 230.0 Circuit 1 48. SURPRISE 230.0 to EL SOL 230.0 Circuit 1

49. SURPRISE 230.0 to WESTWNGW 230.0 Circuit 1 50. VERDE N 230.0 to VERDE S 230.0 Circuit 1 51. WESTWNGW 230.0 to EL SOL 230.0 Circuit 1 52. WESTWNGW 230.0 to PINPK 230.0 Circuit 1 53. WHTNKAPS 230.0 to EL SOL 230.0 Circuit 1 54. WHTNKAPS 230.0 to RUDD 230.0 Circuit 1 55. WPHXAPSS 230.0 to WPHXAPSN 230.0 Circuit 1 56. WPHXAPSS 230.0 to RUDD 230.0 Circuit 1 57. YAVAPAI 230.0 to VERDE N 230.0 Circuit 1 58. YAVAPAI 230.0 to WILOWLKE 230.0 Circuit 1 59. KYR‐NEW 230.0 to OCOTILLO 230.0 Circuit 1 60. KYR‐NEW 230.0 to KNOX 230.0 Circuit 1 61. GILARIVR 230.0 to GILABEND 230.0 Circuit 1 62. WPHXAPSN 230.0 to WHTNKAPS 230.0 Circuit 1 63. FORTROCK 230.0 to RNDVLYAZ 230.0 Circuit 1l 64. FORTROCK 230.0 to JUNIPRMT 230.0 Circuit 65. ALEXNDR 230.0 to ALEXANDR 230.0 Circuit 1 66. GAVILNPK 230.0 to PRESCOTT 230.0 Circuit 1 67. GLENDALW 230.0 to GLENDALE 230.0 Circuit 1 68. GLENDALW 230.0 to AGUAFRIA 230.0 Circuit 1 69. WILOWLKW 230.0 to PRESCOTT 230.0 Circuit 1 70. WILOWLKW 230.0 to WILOWLKE 230.0 Circuit 1 71. AVERY 230.0 to PNPKAPS 230.0 Circuit 1 72. AVERY 230.0 to RACEWAY 230.0 Circuit 1 73. AVERY 230.0 to TS6 230.0 Circuit 1 74. TS1 230.0 to TS2 230.0 Circuit 1 75. TS1 230.0 to TS5 230.0 Circuit 1 76. TS2 230.0 to PALMVLY 230.0 Circuit 1 77. TS6 230.0 to PNPKAPS 230.0 Circuit 1 78. TS4 230.0 to JOJOBA 230.0 Circuit 1 79. TS4 230.0 to PALMVLY 230.0 Circuit 1 80. JUNIPRMT 230.0 to SELIGMAN 230.0 Circuit 1 81. ADAMS 115.0 to ADAMS TP 115.0 Circuit 1 82. BONNYBKE 115.0 to BONNYBKW 115.0 Circuit 1 83. PRESCOTT 115.0 to BAGDAD 115.0 Circuit 1 84. SAG.EAST 115.0 to SAG.WEST 115.0 Circuit 1 85. SAG.EAST 115.0 to MARANA 115.0 Circuit 1 86. SAG.EAST 115.0 to ORACLE 115.0 Circuit 1 87. SAG.WEST 115.0 to SNMANUEL 115.0 Circuit 1 88. SAG.WEST 115.0 to EMPIRE 115.0 Circuit 1 89. SAG.WEST 115.0 to ED‐5 115.0 Circuit 1 90. VLYFARMS 115.0 to ORACLE 115.0 Circuit 1 91. BOOTHILL 115.0 to ADAMS 115.0 Circuit 1 92. BOOTHILL 115.0 to MURAL 115.0 Circuit 1 93. CORONADO 500.0 to CHOLLA 500.0 Circuit 1 94. CORONADO 500.0 to SILVERKG 500.0 Circuit 1 95. PALOVRDE 500.0 to WESTWING 500.0 Circuit 1 96. PALOVRDE 500.0 to WESTWING 500.0 Circuit 2

Page 64: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST Transmission Lines

97. PALOVRDE 500.0 to TS5 500.0 Circuit 1 98. PALOVRDE 500.0 to RUDD 500.0 Circuit 1 99. PERKINPS 500.0 to WESTWING 500.0 Circuit 1 100. SILVERKG 500.0 to BROWNING 500.0 Circuit 1 101. BROWNING 500.0 to KYRENE 500.0 Circuit 1 102. SNTAROSA 500.0 to BROWNING 500.0 Circuit 1 103. SNTAROSA 500.0 to PINAL_W 500.0 Circuit 1 104. JOJOBA 500.0 to GILARIVR 500.0 Circuit 1 105. JOJOBA 500.0 to GILARIVR 500.0 Circuit 2 106. JOJOBA 500.0 to KYRENE 500.0 Circuit 1 107. HASSYAMP 500.0 to REDHAWK 500.0 Circuit 1 108. HASSYAMP 500.0 to KYRENE 500.0 Circuit 1 109. HASSYAMP 500.0 to PALOVRDE 500.0 Circuit 1 110. HASSYAMP 500.0 to PALOVRDE 500.0 Circuit 2 111. HASSYAMP 500.0 to PALOVRDE 500.0 Circuit 3 112. HASSYAMP 500.0 to PINAL_W 500.0 Circuit 1 113. HASSYAMP 500.0 to JOJOBA 500.0 Circuit 1 114. HASSYAMP 500.0 to JOJOBA 500.0 Circuit 2 115. HASSYAMP 500.0 to ARLINTON 500.0 Circuit 1 116. HASSYAMP 500.0 to HARQUAHA 500. Circuit 1 117. HASSYAMP 500.0 to MESQUITE 500.0 Circuit 1 118. ASARCOTP 115.0 to ASARCOSR 115.0 Circuit 1 119. ASARCOTP 115.0 to BONNEYTP 115.0 Circuit 1 120. BONNEYTP 115.0 to BONNYBKW 115. Circuit 1 121. BONNEYTP 115.0 to COOLIDGE 115.0 Circuit 1 122. ELLISON 115.0 to 83.9E3NT 115.0 Circuit 1 123. FRAZIER 115.0 to MOONSHIN 115.0 Circuit 1 124. FRAZIER 115.0 to ROOSEVLT 115.0 Circuit 1 125. GOLDFELD 115.0 to HORSMESA 115.0 Circuit 1 126. GOLDFELD 115.0 to MRMNFLAT 115.0 Circuit 1 127. GOLDFELD 115.0 to CARRELTP 115.0 Circuit 1 128. HAYDENAZ 115.0 to ASARCOTP 115.0 Circuit 1 129. HAYDENAZ 115.0 to KEARNYTP 115.0 Circuit 1 130. HORSMESA 115.0 to FRAZIER 115.0 Circuit 1 131. HORSMESA 115.0 to MRMNFLAT 115.0 Circuit 1 132. KEARNYTP 115.0 to MORRISAZ 115.0 Circuit 1 133. KNOLL 115.0 to MORRISAZ 115.0 Circuit 1 134. MIAMI 115.0 to PINAL 115.0 Circuit 1 135. MIAMI 115.0 to PINTOVLY 115.0 Circuit 1 136. MIAMI 115.0 to 83.9E3NT 115.0 Circuit 1 137. MOONSHIN 115.0 to PINAL 115.0 Circuit 1 138. MOONSHIN 115.0 to 83.5E3NT 115.0 Circuit 1 139. OAKFLAT 115.0 to SILVERT1 115.0 Circuit 1 140. PINAL 115.0 to SILVERT1 115.0 Circuit 1 141. RAY 115.0 to KNOLL 115.0 Circuit 1 142. RAY 115.0 to SUPERIOR 115.0 Circuit 1 143. REFINERY 115.00 to 83.5E3NT 115.0 Circuit 1 144. SILVERK1 115.0 to SILVERT1 115.0 Circuit 1

145. SILVERK2 115.0 to PINTOVLY 115.0 Circuit 1 146. SILVERK2 115.0 to SUPERIOR 115.0 Circuit 1 147. SPURLOCK 115.0 to SUPERIOR 115.0 Circuit 1 148. SPURLOCK 115.0 to CARRELTP 115.0 Circuit 1 149. STEWMTN 115.0 to GOLDFELD 115.0 Circuit 1 150. SUPERIOR 115.0 to OAKFLAT 115.0 Circuit 1 151. CARREL 115.0 to CARRELTP 115.0 Circuit 1 152. 83.5E3NT 115.0 to 83.9E3NT 115.0 Circuit 1 153. SNYDHLAZ 115.0 to SNYDHILL 115.0 Circuit 1 154. AGUAFRIA 230.0 to WESTWNGW 230. Circuit 1 155. AGUAFRIA 230.0 to WESTWNGW 230. Circuit 2 156. AGUAFRIA 230.0 to ALEXANDR 230.0 Circuit 1 157. AGUAFRIA 230.0 to WHITETNK 230.0 Circuit 1 158. ANDERSON 230.0 to KYRENE 230.0 Circuit 1 159. ANDERSON 230.0 to ORME 230.0 Circuit 1 160. BRANDOW 230.0 to KYRENE 230.0 Circuit 1 161. BRANDOW 230.0 to PAPAGOBT 230.0 Circuit 1 162. BRANDOW 230.0 to WARD 230.0 Circuit 1 163. BRANDOW 230.0 to WARD 230.0 Circuit 2 164. CORBELL 230.0 to KYRENE 230.0 Circuit 1 165. KYRENE 230.0 to KYR‐NEW 230.0 Circuit 1 166. KYRENE 230.0 to SCHRADER 230.0 Circuit 1 167. ORME 230.0 to ANDERSON 230.0 Circuit 2 168. ORME 230.0 to RUDD 230.0 Circuit 1 169. ORME 230.0 to RUDD 230.0 Circuit 2 170. PAPAGOBT 230.0 to KYRENE 230.0 Circuit 1 171. PAPAGOBT 230.0 to PINPKSRP 230.0 Circuit 1 172. PINPKSRP 230.0 to BRANDOW 230.0 Circuit 1 173. PINPKSRP 230.0 to BRANDOW 230.0 Circuit 2 174. ROGERS 230.0 to THUNDRST 230.0 Circuit 1 175. ROGERS 230.0 to ROGSWAPA 230.0 Circuit 1 176. ROGERS 230.0 to ROGSWAPA 230.0 Circuit 2 177. SANTAN 230.0 to CORBELL 230.0 Circuit 1 178. SANTAN 230.0 to THUNDRST 230.0 Circuit 1 179. SCHRADER 230.0 to SANTAN 230.0 Circuit 1 180. SILVERKG 230.0 to GOLDFELD 230.0 Circuit 1 181. THUNDRST 230.0 to GOLDFELD 230.0 Circuit 1 182. THUNDRST 230.0 to GOLDFELD 230.0 Circuit 2 183. KNOX 230.0 to SNTAROSA 230.0 Circuit 1 184. RS17 230.0 to SCHRADER 230.0 Circuit 1 185. RS17 230.0 to SCHRADER 230.0 Circuit 2 186. BROWNING 230.0 to SANTAN 230.0 Circuit 1 187. DINOSAUR 230.0 to BROWNING 230.0 Circuit 1 188. SES 230.0 to DINOSAUR 230.0 Circuit 1 189. RUDD 230.0 to PALMVLY 230.0 Circuit 1 190. RUDD 230.0 to WHITETNK 230.0 Circuit 1 191. RUDD 230.0 to LIBERTY 230.0 Circuit 1 192. GREENLEE 345.0 to WINCHSTR 345.0 Circuit 1

Page 65: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST Transmission Lines

193. GREENLEE 345.0 to COPPERVR 345.0 Circuit 1 194. MCKINLEY 345.0 to SPRINGR 345.0 Circuit 1 195. MCKINLEY 345.0 to SPRINGR 345.0 Circuit 2 196. SOUTH 345.0 to GATEWAY 345.0 Circuit 1 197. SOUTH 345.0 to GATEWAY 345.0 Circuit 2 198. SPRINGR 345.0 to CORONADO 345.0 Circuit 1 199. SPRINGR 345.0 to GREENLEE 345.0 Circuit 1 200. SPRINGR 345.0 to VAIL2 345.0 Circuit 1 201. VAIL 345.0 to SOUTH 345.0 Circuit 1 202. WESTWING 345.0 to SOUTH 345.0 Circuit 1 203. WESTWING 345.0 to PINALWES 345.0 Circuit 1 204. WINCHSTR 345.0 to VAIL 345.0 Circuit 1 205. PINALWES 345.0 to SOUTH 345.0 Circuit 1 206. DMP 138.0 to N. LOOP 138.0 Circuit 1 207. DMP 138.0 to NE.LOOP 138.0 Circuit 1 208. DMP 138.0 to SN.CRUZ 138.0 Circuit 1 209. DREXEL 138.0 to IRVNGTN 138.0 Circuit 1 210. DREXEL 138.0 to MIDVALE 138.0 Circuit 1 211. E. LOOP 138.0 to NE.LOOP 138.0 Circuit 1 212. E. LOOP 138.0 to ROBERTS 138.0 Circuit 1 213. E. LOOP 138.0 to LOSREALS 138.0 Circuit 10 214. E. LOOP 138.0 to PANTANO 138.0 Circuit 1 215. IRVNGTN 138.0 to SOUTH 138.0 Circuit 1 216. IRVNGTN 138.0 to TUCSON 138.0 Circuit 1 217. IRVNGTN 138.0 to VAIL 138.0 Circuit 2 218. IRVNGTN 138.0 to RBWILMOT 138.0 Circuit 1 219. IRVNGTN 138.0 to TECHPARK 138.0 Circuit 1 220. MIDVALE 138.0 to SPNC_TP 138.0 Circuit 1 221. N. LOOP 138.0 to RILLITO 138.0 Circuit 1 222. N. LOOP 138.0 to WESTINA 138.0 Circuit 1 223. NE.LOOP 138.0 to RILLITO 138.0 Circuit 1 224. RANVISTO 138.0 to LACANADA 138.0 Circuit 1 225. RANVISTO 138.0 to CATALINA 138.0 Circuit 1 226. RILLITO 138.0 to LACANADA 138.0 Circuit 1 227. S.TRAIL 138.0 to ROBERTS 138.0 Circuit 1 228. SN.CRUZ 138.0 to IRVNGTN 138.0 Circuit 1 229. SNYDER 138.0 to E. LOOP 138.0 Circuit 1 230. SNYDER 138.0 to NE.LOOP 138.0 Circuit 1 231. SOUTH 138.0 to MIDVALE 138.0 Circuit 1 232. SOUTH 138.0 to ASARCO 138.0 Circuit 1 233. SOUTH 138.0 to CYPRUS 138.0 Circuit 1 234. SOUTH 138.0 to GREENVLY 138.0 Circuit 1 235. SOUTH 138.0 to SPNC_TP 138.0 Circuit 1 236. TORTOLIT 138.0 to N. LOOP 138.0 Circuit 1 237. TORTOLIT 138.0 to N. LOOP 138.0 Circuit 2 238. TWNTYSEC 138.0 to E. LOOP 138.0 Circuit 1 239. TWNTYSEC 138.0 to IRVNGTN 138.0 Circuit 1 240. VAIL 138.0 to S.TRAIL 138.0 Circuit 1

241. VAIL 138.0 to FT.HUACH 138.0 Circuit 1 242. RBWILMOT 138.0 to VAIL 138.0 Circuit 1 243. LOSREALS 138.0 to VAIL 138.0 Circuit 1 244. PANTANO 138.0 to LOSREALS 138.0 Circuit 1 245. CANOARCH 138.0 to CYPRUS 138.0 Circuit 1 246. GREENVLY 138.0 to CANOARCH 138.0 Circuit 1 247. GREENVLY 138.0 to CYPRUS 138.0 Circuit 1 248. TECHPARK 138.0 to VAIL 138.0 Circuit 1 249. SPNCER 138.0 to SPNC_TP 138.0 Circuit 1 250. KANTOR 115.0 to CANEZ 115.0 Circuit 1 251. CANEZ 115.0 to SONOITA 115.0 Circuit 1 252. SONOITA 115.0 to VALNCIA 115.0 Circuit 1 253. GATEWAY 115.0 to VALNCIA 115.0 Circuit 1 254. COPPERVR 230.0 to FRISCO 230.0 Circuit 1 255. APACHE 230.0 to BUTERFLD 230.0 Circuit 1 256. APACHE 230.0 to RED TAIL 230.0 Circuit 1 257. APACHE 230.0 to WINCHSTR 230.0 Circuit 1 258. AVRA 115.0 to MARANA 115.0 Circuit 1 259. AVRA 115.0 to SNDARIO 115.0 Circuit 1 260. BICKNELL 345.0 to VAIL 345.0 Circuit 1 261. BICKNELL 115.0 to THREEPNT 115.0 Circuit 1 262. BUTERFLD 230.0 to SAN RAF 230.0 Circuit 1 263. DOSCONDO 230.0 to HACKBERY 230.0 Circuit 1 264. MARANA 115.0 to RATTLSNK 115.0 Circuit 1 265. MORENCI 230.0 to GREEN‐AE 230.0 Circuit 1 266. MORENCI 230.0 to PD‐MORNC 230.0 Circuit 1 267. PD‐MORNC 230.0 to FRISCO 230.0 Circuit 1 268. RED TAIL 230.0 to DOSCONDO 230.0 Circuit 1 269. THREEPNT 115.0 to SNDARIO 115.0 Circuit 1 270. HACKBERY 230.0 to MORENCI 230.0 Circuit 1 271. SAHUARIT 230.0 to BICKNELL 230.0 Circuit 1 272. MEAD N 230.0 to HVRA3A4 230.0 Circuit 1 273. MEAD S 230.0 to MEAD N 230.0 Circuit 1 274. BLYTHE 161.0 to BUCKBLVD 161.0 Circuit 1 275. BLYTHE 161.0 to GLT TAP 161.0 Circuit 1 276. BLYTHE 161.0 to HEADGATE 161.0 Circuit 1 277. BLYTHE 161.0 to BLYTHEAZ 161.0 Circuit 1 278. DAVIS 230.0 to RIVIERA 230.0 Circuit 1 279. DAVIS 230.0 to MEAD N 230.0 Circuit 1 280. DAVIS 230.0 to TOPOCK 230.0 Circuit 1 281. DAVIS 230.0 to TOPOCK 230.0 Circuit 2 282. HOVRA5A6 230.0 to MEAD S 230.0 Circuit 1 283. HOVRA7‐9 230.0 to MEAD S 230.0 Circuit 1 284. MEAD 500.0 to PERKINS 500.0 Circuit 1 285. PARKER 161.0 to BLYTHE 161.0 Circuit 1 286. PARKER 161.0 to BOUSE 161.0 Circuit 1 287. PARKER 161.0 to HEADGATE 161.0 Circuit 1 288. PARKER 161.0 to PARKERAZ 161.0 Circuit 1

Page 66: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST Transmission Lines

289. PARKER 230.0 to EAGLEYE 230.0 Circuit 1 290. PARKER 230.0 to BLK MESA 230.0 Circuit 1 291. PARKER 230.0 to HAVASU 230.0 Circuit 1 292. PARKER 230.0 to HARCUVAR 230.0 Circuit 1 293. COOLIDGE 115.0 to VLYFARMS 115.0 Circuit 1 294. COOLIDGE 115.0 to ED‐2 115.0 Circuit 1 295. COOLIDGE 115.0 to SIGNAL 115.0 Circuit 1 296. COOLIDGE 115.0 to COOLDGAZ 115.0 Circuit 1 297. COOLIDGE 230.0 to SUN ARIZ 230.0 Circuit 1 298. COOLIDGE 230.0 to SUN ARIZ 230.0 Circuit 2 299. BOUSE 161.0 to KOFA 161.0 Circuit 1 300. BOUSE 161.0 to BOUSE AZ 161.0 Circuit 1 301. DEL BAC 115.0 to NOGALES 115.0 Circuit 1 302. EMPIRE 115.0 to CASAGRND 115.0 Circuit 1 303. GILA 161.0 to KNOB 161.0 Circuit 1 304. GILA 161.0 to DOME TAP 161.0 Circuit 1 305. LIBERTY 230.0 to WESTWNGW 230.0 Circuit 1 306. LIBERTY 230.0 to TS4 230.0 Circuit 1 307. LIBERTY 230.0 to ORME 230.0 Circuit 1 308. LIBERTY 230.0 to RUDD 230.0 Circuit 2 309. LIBERTY 230.0 to LONE BUT 230.0 Circuit 1 310. LIBERTY 230.0 to PHXWAPA 230.0 Circuit 1 311. LIBERTY 345.0 to PEACOCK 345.0 Circuit 1 312. LONE BUT 230.0 to TESTTRAK 230.0 Circuit 1 313. LONE BUT 230.0 to SUN ARIZ 230.0 Circuit 1 314. MCCONICO 230.0 to DAVIS 230.0 Circuit 1 315. MCCONICO 230.0 to GRIFFITH 230.0 Circuit 1 316. MCCONICO 230.0 to HARRIS 230.0 Circuit 1 317. ORACLE 115.0 to SNMANUEL 115.0 Circuit 1 318. ORACLE 115.0 to ORACLEAZ 115.0 Circuit 1 319. ADAMS TP 115.0 to APACHE 115.0 Circuit 1 320. ADAMS TP 115.0 to NOGALES 115.0 Circuit 1 321. PHXWAPA 230.0 to LONE BUT 230.0 Circuit 1 322. PINPK 230.0 to GAVILNPK 230.0 Circuit 1 323. PINPK 230.0 to PINPKSRP 230.0 Circuit 1 324. PINPK 230.0 to PINPKSRP 230.0 Circuit 2 325. WLTNMOHK 161.0 to GILA 161.0 Circuit 1 326. WLTNMOHK 161.0 to DOME TAP 161.0 Circuit 1 327. TUCSON 115.0 to DEL BAC 115.0 Circuit 1 328. TUCSON 115.0 to ORACLE 115.0 Circuit 1 329. Line ED‐2 115.0 to SIGNAL 115.0 Circuit 1 330. Line ED‐2 115.0 to ED‐4 115.0 Circuit 1 331. Line ED‐2 115.0 to BRADY 115.0 Circuit 1 332. Line ED‐5 115.0 to ED‐5 AZ 115.0 Circuit 1 333. TESTTRAK 230.0 to CASAGRND 230.0 Circuit 1 334. ED‐4 115.0 to ED‐4 AZ 115.0 Circuit 1 335. ED‐4 115.0 to ED‐5 115.0 Circuit 1 336. HILLTOP 230.0 to MCCONICO 230.0 Circuit 1

337. N.HAVASU 230.0 to PARKER 230.0 Circuit 1 338. N.HAVASU 230.0 to TOPOCK 230.0 Circuit 1 339. HOVRN7N8 230.0 to MEAD S 230.0 Circuit 1 340. HOVRN5N6 230.0 to MEAD S 230.0 Circuit 1 341. HOVRN3N4 230.0 to MEAD S 230.0 Circuit 1 342. HOVRN1N2 230.0 to MEAD S 230.0 Circuit 1 343. HOVRA1A2 230.0 to MEAD S 230.0 Circuit 1 344. KOFA 161.0 to DOME TAP 161.0 Circuit 1 345. GLT TAP 161.0 to KNOB 161.0 Circuit 1 346. BLACKMTN 115.0 to BLKMTNAZ 115. Circuit 1 347. BLACKMTN 115.0 to DEL BAC 115.0 Circuit 348. BLACKMTN 115.0 to SNYDHILL 115.0 Circuit 1 349. BRADY 115.0 to BRADYAZ 115.0 Circuit 1 350. BRADY 115.0 to PICACHOW 115.0 Circuit 1 351. BRAWLEY 115.0 to BRAWLYAZ 115.0 Circuit 1 352. BRAWLEY 115.0 to SANXAVER 115.0 Circuit 1 353. HARCUVAR 230.0 to HARCU AZ 230.0 Circuit 1 354. HARCUVAR 230.0 to HASSYTAP 230.0 Circuit 1 355. N.WADDEL 230.0 to RACEWAY 230.0 Circuit 1 356. PICACHOW 115.0 to PICACHAZ 115.0 Circuit 1 357. PICACHOW 115.0 to RED ROCK 115.0 Circuit 10 358. RATTLSNK 115.0 to TUCSON 115.0 Circuit 1 359. RATTLSNK 115.0 to TWINPEAK 115.0 Circuit 1 360. RED ROCK 115.0 to SAG.EAST 115.0 Circuit 1 361. RED ROCK 115.0 to REDRCKAZ 115.0 Circuit 1 362. SANDARIO 115.0 to SANDARAZ 115.0 Circuit 1 363. SANDARIO 115.0 to BRAWLEY 115.0 Circuit 1 364. SANXAVER 115.0 to SANXAVAZ 115.0 Circuit 1 365. SANXAVER 115.0 to SNYDHILL 115.0 Circuit 1 366. SPKHILTP 230.0 to COOLIDGE 230.0 Circuit 1 367. TWINPEAK 115.0 to TWINPKAZ 115.0 Circuit 1 368. TWINPEAK 115.0 to SANDARIO 115.0 Circuit 1 369. NOGALES 115.0 to KANTOR 115.0 Circuit 1 370. GRIFFITH 230.0 to PEACOCK 230.0 Circuit 1 371. PEACOCK 230.0 to HILLTOP 230.0 Circuit 1 372. PEACOCK 345.0 to MEAD 345.0 Circuit 1 373. TOPOCK 230.0 to BLK MESA 230.0 Circuit 1 374. TOPOCK 230.0 to SOPOINT 230.0 Circuit 1 375. TOPOCK 230.0 to SOPOINT 230.0 Circuit 2 376. HASSYTAP 230.0 to HASSY AZ 230.0 Circuit 1 377. HASSYTAP 230.0 to LIBERTY 230.0 Circuit 1 378. RNDVLYTP 230.0 to RNDVLYAZ 230.0 Circuit 1 379. RNDVLYTP 230.0 to PEACOCK 230.0 Circuit 1 380. ROGSWAPA 230.0 to PINPK 230.0 Circuit 1 381. ROGSWAPA 230.0 to PINPK 230.0 Circuit 2 382. ROGSWAPA 230.0 to SPKHILTP 230.0 Circuit 1 383. FLAGSTAF 345.0 to GLENCANY 345.0 Circuit 1 384. FLAGSTAF 345.0 to GLENCANY 345.0 Circuit 2

Page 67: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST Transmission Lines

385. FLAGSTAF 345.0 to PINPKBRB 345.0 Circuit 1 386. FLAGSTAF 345.0 to PINPKBRB 345.0 Circuit 2 387. GALLEGOS 115.0 to BERGIN 115.0 Circuit 1 388. GLEN PS 230.0 to NAVAJO 230.0 Circuit 1 389. KAYENTA 230.0 to SHIPROCK 230.0 Circuit 1 390. KAYENTA 230.0 to LNGHOUSE 230.0 Circuit 1 391. SHIPROCK 115.0 to FRUITAP 115.0 Circuit 1 392. SHIPROCK 115.0 to MESA FM 115.0 Circuit 1 393. SHIPROCK 345.0 to FOURCORN 345.0 Circuit 1 394. NAVAJO 230.0 to LNGHOUSE 230.0 Circuit 1 395. SHIPROCK 500.0 to MOENKOPI 500.0 Circuit 1 396. ANIMAS 115.0 to MESA FM 115.0 Circuit 1 397. ANIMAS 115.0 to SULLIVAN 115.0 Circuit 1 398. BERGIN 115.0 to FOOTHILS 115.0 Circuit 1 399. BERGIN 115.0 to SAN JUAN 115.0 Circuit 1 400. FOOTHILS 115.0 to HOODMESA 115.0 Circuit 1 401. FRUITAP 115.0 to FRUITLND 115.0 Circuit 1 402. FRUITAP 115.0 to HOODMESA 115.0 Circuit 1 403. GLADETAP 115.0 to HOODMESA 115.0 Circuit 1 404. GLADETAP 115.0 to LAPLATA 115.0 Circuit 1 405. HOODMESA 115.0 to SULLIVAN 115.0 Circuit 1 406. NAVAJO 115.0 to SAN JUAN 115.0 Circuit 1 407. Line TS5 500.0 to RACEWAY 500.0 Circuit 1 408. RACEWAY 230.0 to WESTWNGW 230.0 Circuit 2 409. CHOLLA 500.0 to SILVERKG 500.0 Circuit 1 410. SILVERKG 500.0 to SAGUARO 500.0 Circuit 1 411. FOURCORN 500.0 to FCW 500.0 Circuit 1 412. MOENKOPI 500.0 to RME 500.0 Circuit 1 413. NAVAJO 500.0 to RME 500.0 Circuit 1 414. DRPP 500.0 to FCW 500.0 Circuit 1 415. DRPP 500.0 to FCW 500.0 Circuit 2 416. RME 500.0 to FCW 500.0 Circuit 1 417. SAGUARO 500.0 to TORTOLIT 500.0 Circuit 2 418. RACEWAY 500.0 to PNPKAPS 500.0 Circuit r1 419. DEERVALY 230.0 to WESTWNGE 230.0 Circuit 1 420. WESTWNGW 230.0 to WESTWNGE 230.0 Circuit 1 421. RACEWAY 230.0 to WESTWNGE 230.0 Circuit 1 422. SES 500.0 to BROWNING 500.0 Circuit 1 423. PINAL_S 500.0 to SES 500.0 Circuit 1 424. PINAL_S 500.0 to TORTOLIT 500.0 Circuit 1 425. SNTAROSA 500.0 to SES 500.0 Circuit 1 426. SNTAROSA 500.0 to PINAL_S 500.0 Circuit 1 427. TORTOLIT 138.0 to RILLITO 138.0 Circuit 1 428. NE.LOOP 138.0 to NELP_SVC 138.0 Circuit 1 429. TORTOLIT 138.0 to RANVISTO 138.0 Circuit 1 430. TUCSON 138.0 to DELCERRO 138.0 Circuit 1 431. DELCERRO 138.0 to WESTINA 138.0 Circuit 1 432. SAG.EAST 115.0 to NAVISKA 115.0 Circuit 1

433. SNMANUEL 115.0 to HAYDENAZ 115.0 Circuit 1 434. APACHE 115.0 to SNMANUEL 115.0 Circuit 1 435. BUTERFLD 230.0 to G.SLOAN 230.0 Circuit 1 436. PANTANO 230.0 to NEWTUCSN 230.0 Circuit 1 437. THREEPNT 115.0 to VALEN‐SW 115.0 Circuit 1 438. VALEN‐SW 115.0 to SAN JOAQ 115.0 Circuit 1 439. VALEN‐SW 115.0 to BLACKMTN 115.0 Circuit 1 440. SNDARIO 115.0 to SAN JOAQ 115.0 Circuit 1 441. SNDARIO 115.0 to BRAWLEY 115.0 Circuit 1 442. G.SLOAN 230.0 to PANTANO 230.0 Circuit 1 443. S.BRKRCH 115.0 to SNMANUEL 115.0 Circuit 1 444. NAVISKA 115.0 to ADONIS 115.0 Circuit 1 445. THRNYDLE 115. to CAMDEMAN 115. Circuit 1 446. PICTROCK 115.0 to TWINPEAK 115.0 Circuit 1 447. ADONIS 115.0 to THRNYDLE 115.0 Circuit 1 448. NEWTUCSN 230.0 to SAHUARIT 230.0 Circuit 1 449. CAMDEMAN 115.0 to PICTROCK 115.0 Circuit 1 450. ORACLE 115.0 to S.BRKRCH 115.0 Circuit 1 451. ALA_5 115.0 to ORO_GRAN 115.0 Circuit 1 452. AMRAD 115.0 to LARGO 115.0 Circuit 1 453. AMRAD 345.0 to ARTESIA 345.0 Circuit 1 454. ANTHONY 115.0 to BORDER 115.0 Circuit 1 455. ANTHONY 115.0 to MONTOYA 115.0 Circuit 1 456. ANTHONY 115.0 to NEWMAN 115.0 Circuit 1 457. ANTHONY 115.0 to SALOPEK 115.0 Circuit 1 458. ASCARATE 115.0 to COPPER 115.0 Circuit 1 459. ASCARATE 115.0 to RIVERENA 115.0 Circuit 1 460. AUSTIN_N 115.0 to MARLOW 115.0 Circuit 1 461. AUSTIN_N 115.0 to MARLOW 115.0 Circuit 2 462. BUTERFLD 115.0 to FT._BLIS 115.0 Circuit 1 463. CALIENTE 115.0 to LANE___# 115.0 Circuit 1 464. CALIENTE 115.0 to VISTA__# 115.0 Circuit 1 465. CALIENTE 345.0 to AMRAD 345.0 Circuit 1 466. CALIENTE 345.0 to NEWMAN 345.0 Circuit 1 467. CHAPARAL 115.0 to ORO_GRAN 115.0 Circuit 1 468. COPPER 115.0 to LANE___# 115.0 Circuit 1 469. COPPER 115.0 to PENDALE 115.0 Circuit 1 470. COYOTE 115.0 to CALIENTE 115.0 Circuit 1 471. COYOTE 115.0 to CALIENTE 115.0 Circuit 2 472. COYOTE 115.0 to RGC_DC 115.0 Circuit 1 473. CROMO 115.0 to RIO_GRAN 115.0 Circuit 1 474. DIABLO 115.0 to RIO_GRAN 115.0 Circuit 1 475. DIABLO 115.0 to RIO_GRAN 115.0 Circuit 2 476. DIABLO 115.0 to INSURG 115.0 Circuit 1 477. DYER 115.0 to AUSTIN_N 115.0 Circuit 1 478. DYER 115.0 to SHEARMAN 115.0 Circuit 1 479. BIGGS 115.0 to GR 115.0 Circuit 1 480. FT._BLIS 115.0 to AUSTIN_N 115.0 Circuit

Page 68: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST Transmission Lines

481. GR 115.0 to VISTA__# 115.0 Circuit 1 482. HATCH 115.0 to JORNADA 115.0 Circuit 1 483. HOLLOMAN 115.0 to LARGO 115.0 Circuit 1 484. HORIZON 115.0 to MONTWOOD 115.0 Circuit 1 485. JORNADA 115.0 to ARROYO 115.0 Circuit 1 486. LANE___# 115.0 to WRANGLER 115.0 Circuit 1 487. LAS_CRUC 115.0 to ARROYO 115.0 Circuit 1 488. LAS_CRUC 115.0 to SALOPEK 115.0 Circuit 1 489. LUNA 345.0 to DIABLO 345.0 Circuit 1 490. LUNA 345.0 to HIDALGO 345.0 Circuit 1 491. LUNA 345.0 to AFTON 345.0 Circuit 1 492. MAR 115.0 to LARGO 115.0 Circuit 1 493. MARLOW 115.0 to TROWBRIG 115.0 Circuit 1 494. MESA___# 115.0 to AUSTIN_N 115.0 Circuit 1 495. MESA___# 115.0 to RIO_GRAN 115.0 Circuit 1 496. MILAGRO 115.0 to NEWMAN 115.0 Circuit 1 497. MILAGRO 115.0 to NEWMAN 115.0 Circuit 2 498. MILAGRO 115.0 to LEO 115.0 Circuit 1 499. NEWMAN 115.0 to BUTERFLD 115.0 Circuit 1 500. NEWMAN 115.0 to CHAPARAL 115.0 Circuit 1 501. NEWMAN 115.0 to CROMO 115.0 Circuit 1 502. NEWMAN 115.0 to SHEARMAN 115.0 Circuit 1 503. NEWMAN 345.0 to ARROYO 345.0 Circuit 1 504. NEWMAN 345.0 to AFTON 345.0 Circuit 1 505. NE1 115.0 to NEWMAN 115.0 Circuit 1 506. PELICANO 115.00" "HORIZON 115.00 Circuit 1 507. PELICANO 115.0 to MONTWOOD 115.0 Circuit 1 508. MONTWOOD 115.0 to CALIENTE 115.0 Circuit 1 509. MONTWOOD 115.0 to COYOTE 115.0 Circuit 1 510. ORO_GRAN 115.0 to AMRAD 115.0 Circuit 1 511. SALOPEK 115.0 to ARROYO 115.0 Circuit 1 512. SANTA_T 115.0 to DIABLO 115.0 Circuit 1 513. SANTA_T 115.0 to MONTOYA 115.0 Circuit 1 514. SANTA_T 115.0 to NW2 115.0 Circuit 1 515. SCOTSDALE 115.0 to VISTA__# 115.0 Circuit 1 516. PENDALE 115.0 to LANE___# 115.0 Circuit 1 517. SOL 115.0 to LANE___# 115.0 Circuit 1 518. SOL 115.0 to VISTA__# 115.0 Circuit 1 519. SPARKS 115.0 to HORIZON 115.0 Circuit 1 520. SUNSET_N 115.0 to ASCARATE 115.0 Circuit 1 521. SUNSET_N 115.0 to RIO_GRAN 115.0 Circuit 1 522. TALAVERA 115.0 to ANTHONY 115.0 Circuit 1 523. THORN 115.0 to MONTOYA 115.0 Circuit 1 524. NW2 115.0 to DIABLO 115.0 Circuit 1 525. WHITE_SA 115.0 to ALA_5 115.0 Circuit 1 526. WRANGLER 115.0 to SPARKS 115.0 Circuit 1 527. WRANGLER 115.0 to SPARKS 115.0 Circuit 2 528. AEP 115.0 to AZTECAS 115.0 Circuit 1

529. AEP 115.0 to REA2 115.0 Circuit 1 530. CHAMIZAL 115.0 to COLEGIO 115.0 Circuit 1 531. CHAMIZAL 115.0 to RIVERENA 115.0 Circuit 1 532. CHAVENA 115.0 to AZTECAS 115.0 Circuit 1 533. COLEGIO 115.0 to CHAVENA 115.0 Circuit 534. COLEGIO 115.0 to FTS 115.0 Circuit 1 535. FTS 115.0 to TEC 115.0 Circuit 1 536. INSURG 115.0 to CHAMIZAL 115.0 Circuit 1 537. INSURG 115.0 to CHAVENA 115.0 Circuit 1 538. REA2 115.0 to AZTECAS 115.0 Circuit 1 539. REA2 115.0 to INSURG 115.0 Circuit 1 540. ALCAZAR 115.0 to SANDIA_2 115.0 Circuit 1 541. ALLISONT 115.0 to ALLISON# 115.0 Circuit 1 542. ALLISONT 115.0 to GAMERCO 115.0 Circuit 1 543. AMBROSIA 115.0 to KERMACT 115.0 Circuit 1 544. AMBROSIA 115.0 to TAYLOR_P 115.0 Circuit 1 545. AMBROSIA 230.0 to BISTI 230.0 Circuit 1 546. AMBROSIA 230.0 to WESTMESA 230.0 Circuit 1 547. ARRIBA_T 115.0 to VALENCIA 115.0 Circuit 1 548. ARRIBA_T 115.0 to STORRIE 115.0 Circuit 1 549. ASPEN 115.0 to PRAGER 115.0 Circuit 1 550. AVILA_T 115.0 to AVILA 115.0 Circuit 1 551. B-A 115.0 to BUDAGERS 115.0 Circuit 1 552. B-A 115.0 to NO_BERN 115.0 Circuit 1 553. B-A 115.0 to SHELLTAP 115.0 Circuit 1 554. B-A 115.0 to SIGNET_T 115.0 Circuit 1 555. B-A 345.0 to GUADLUPE 345.0 Circuit 1 556. B-A 345.0 to NORTON 345.0 Circuit 1 557. B-A 345.0 to WESTMESA 345.0 Circuit 1 558. BELAIR_T 115.0 to BEL_AIR 115.0 Circuit 1 559. BELAIR_T 115.0 to HW-CG 115.0 Circuit 1 560. BELAIR_T 115.0 to SPEDRO_T 115.0 Circuit 1" 561. BEV_WOOD 115.0 to HW-11 115.0 Circuit 1 562. BISTI 230.0 to PILLAR 230.0 Circuit 1 563. BLCKRA_T 115.0 to BLCKRA 115.0 Circuit 1 564. BURNHAM 230.0 to GALLEGOS 230.0 Circuit 1 565. CB108 115.0 to CORRALB 115.0 Circuit 1 566. CB108 115.0 to PANORAMT 115.0 Circuit 1 567. CHURCHRT 115.0 to CHURCH_R 115.0 Circuit 1 568. CLAREMNT 115.0 to GIRARD 115.0 Circuit 1 569. COAL_TAP 115.0 to COAL 115.0 Circuit 1 570. COAL_TAP 115.0 to CORNEL_T 115.0 Circuit 1 571. COLINAS 115.0 to ROWE_TAP 115.0 Circuit 1 572. CORNEL_T 115.0 to CORNELL 115.0 Circuit 1 573. CORNEL_T 115.0 to SP-HW-UT 115.0 Circuit 1 574. CORRALB 115.0 to COTTONWT 115.0 Circuit 1 575. CORRALB 115.0 to SARA_CS 115.0 Circuit 1 576. CORRALB 115.0 to SARA_CT 115.0 Circuit 1

Page 69: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST Transmission Lines

577. COTTONWT 115.0 to COTTONWD 115. Circuit 1 578. COTTONWT 115.0 to IRVING 115.0 Circuit 1 579. EAST_TAP 115.0 to EASTRDGE 115.0 Circuit 1 580. EB-HW 115.0 to WINROCK 115.0 Circuit 1 581. EL_CERRO 115.0 to MANZANO 115.0 Circuit 1 582. ELDRADOT 115.0 to COLINAS 115.0 Circuit 1 583. ELDRADOT 115.0 to ELDORAD# 115.0 Circuit 1 584. EMBUDO 115.0 to EAST_TAP 115.0 Circuit 1 585. EMBUDO 115.0 to JUANTABO 115.0 Circuit 1 586. EMBUDO 115.0 to TRAMWAY 115.0 Circuit 1 587. FOURHILL 115.0 to SANDIA_2 115.0 Circuit 1 588. GAMERCO 115.0 to SUNSHN_T 115.0 Circuit 1 589. GIRARD 115.0 to PN-CG 115.0 Circuit 1 590. HAMILTON 115.0 to EMBUDO 115.0 Circuit 1 591. HAWKINS# 115.0 to HAMILTON 115.0 Circuit 1 592. HERMANAS 115.0 to HONDALE 115.0 Circuit 1 593. HW-11 115.0 to WINROCK 115.0 Circuit 1 594. IND_HOSP 115.0 to UNM_T 115.0 Circuit 1 595. INEZ 115.0 to EB-TL 115.0 Circuit 1 596. INEZ 115.0 to MENAUL 115.0 Circuit 1"0 597. ISLETAPA 115.0 to EL_CERRO 115.0 Circuit 1 598. JEFFRSNT 115.0 to JEFFERSN 115.0 Circuit 1 599. JEFFRSNT 115.0 to REEVES_1 115.0 Circuit 1 600. KERMACT 115.0 to KERMAC 115.0 Circuit 1 601. KERMACT 115.0 to RANCHERS 115.0 Circuit 1 602. LAWRNCET 115.0 to EAST_TAP 115.0 Circuit 1 603. LAWRNCET 115.0 to FOURHILL 115.0 Circuit 1 604. LAWRNCET 115.0 to LAWRENC# 115.0 Circuit 1 605. LENKURT 115.0 to PRINCESS 115.0 Circuit 1 606. LEYENDKR 115.0 to TL-1 115.0 Circuit 1 607. LOSANGEL 115.0 to REEVES_1 115.0 Circuit 1 608. LUNA 115.0 to MIMBRES 115.0 Circuit 1 609. MANZANO 115.0 to COLLGE 115.0 Circuit 1 610. MANZANO 115.0 to TOME 115.0 Circuit 1 611. MARQUEZT 115.0 to MARQUEZ 115.0 Circuit 1 612. MEJIA_T 115.0 to MEJIA 115.0 Circuit 1 613. MONTANOT 115.0 to CLAREMNT 115. Circuit 1 614. MONTANOT 115.0 to MONTANO 115.0 Circuit 1 615. MORRIS 115.0 to EMBUDO 115.0 Circuit 1 616. MPLAZA_T 115.0 to LEYENDKR 115.0 Circuit 1 617. MPLAZA_T 115.0 to M_PLAZA 115.0 Circuit 1 618. NO_BERN 115.0 to AVILA_T 115.0 Circuit 1 619. NOE_TAP 115.0 to NOE 115.0 Circuit 1 620. NOE_TAP 115.0 to SUNSHIN# 115.0 Circuit 1 621. NORTHPNM 115.0 to MPLAZA_T 115.0 Circuit 1 622. NORTON_1 115.0 to MEJIA_T 115.0 Circuit 1 623. NORTON_1 115.0 to NORTON_2 115.0 Circuit 1 624. NORTON_1 115.0 to ALGODONE 115.0 Circuit 1

625. NORTON_2 115.0 to BUCKMAN 115.0 Circuit 1 626. OJO 345.0 to TAOS 345.0 Circuit 1 627. ORTIZ 115.0 to TRUMAN_T 115.0 Circuit 1 628. PANORAMT 115.0 to PANORAMA 115. Circuit 1 629. PERSON 115.0 to ANDERSON 115.0 Circuit 1 630. PERSON 115.0 to ISLETAPA 115.0 Circuit 1 631. PERSON 115.0 to SEWER_PL 115.0 Circuit 1 632. PERSON 115.0 to WESMECOT 115.0 Circuit 1 633. PILLAR 230.0 to BURNHAM 230.0 Circuit 1 634. PN-CG 115.0 to CG-1 115.0 Circuit 1 635. PN-CG 115.0 to NORTHPNM 115.0 Circuit 1 636. PRINCESS 115.0 to EB-HW 115.0 Circuit 1 637. RANCHERS 115.0 to SLUCAS_T 115.0 Circuit 1 638. REEVES_1 115.0 to HAWKINS# 115.0 Circuit 1 639. REEVES_1 115.0 to NORTHPNM 115.0 Circuit 1 640. REEVES_2 115.0 to WYOMING 115.0 Circuit 1 641. RODEO_T 115.0 to BECKNER 115.0 Circuit 1 642. S.JOSEPH 115.0 to ASPEN 115.0 Circuit 1 643. SAN_JUAN 345.0 to B-A 345.0 Circuit 1 644. SAN_JUAN 345.0 to OJO 345.0 Circuit 1 645. SAN_JUAN 345.0 to RIOPUERC 345.0 Circuit 1 646. SANDIA_1 115.0 to KAFB 115.0 Circuit 1 647. SANDIA_1 115.0 to LENKURT 115.0 Circuit 1 648. SANDIA_1 115.0 to SANDIA_2 115.0 Circuit 1 649. SEWER_PL 115.0 to S._COORS 115.0 Circuit 1 650. SHELLTAP 115.0 to CUCHILLA 115.0 Circuit 1 651. SHELLTAP 115.0 to STATEPEN 115.0 Circuit 1 652. SIGNET_T 115.0 to JEFFRSNT 115.0 Circuit 1 653. SIGNET_T 115.0 to SIGNETIC 115.0 Circuit 1 654. SLUCAS_T 115.0 to SANLUCAS 115.0 Circuit 1 655. SLUCAS_T 115.0 to GULF_PGT 115.0 Circuit 1 656. SP-83 115.0 to ORTIZ 115.0 Circuit 1 657. Line SP-HW-UT 115.0 to IND_HOSP 115. Circuit 1 658. SP-HW-UT 115.0 to RITA 115.0 Circuit 1 659. SPEDRO_T 115.0 to BEV_WOOD 115.0 Circuit 1 660. SPEDRO_T 115.0 to SANPEDRO 115.0 Circuit 1 661. STATEPEN 115.0 to BECKNER 115.0 Circuit 1 662. SUNSHN_T 115.0 to CHURCHRT 115.0 Circuit 1 663. SUNSHN_T 115.0 to NOE_TAP 115.0 Circuit 1 664. THOMAS 115.0 to MORRIS 115.0 Circuit 1 665. TL-1 115.0 to EB-TL 115.0 Circuit 1 666. TL-1 115.0 to THOMAS 115.0 Circuit 1 667. TOME 115.0 to COLLGE 115.0 Circuit 1 668. TOME 115.0 to RIO_COMM 115.0 Circuit 1 669. TOME 115.0 to FIRST_ST 115.0 Circuit 1 670. TRUMAN_T 115.0 to ALCAZAR 115.0 Circuit 1 671. TRUMAN_T 115.0 to TRUMAN 115.0 Circuit 1 672. UNITED 115.0 to KERMACT 115.0 Circuit 1

Page 70: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST Transmission Lines

673. UNM_T 115.0 to UNM_N 115.0 Circuit 1 674. WARNER 115.0 to SANTA_FE 46.0 Circuit 1 675. WESMECOT 115.0 to WESMECO 115.0 Circuit 1 676. WESMECOT 115.0 to RANDLPHT 115.0 Circuit 1 677. WESTMESA 345.0 to SANDIA 345.0 Circuit 1 678. WESTMS_1 115.0 to WESTMS_2 115.0 Circuit 1 679. WESTMS_1 115.0 to WESTMS_3 115.0 Circuit 1 680. WESTMS_2 115.0 to MARIPOSA 115.0 Circuit 1 681. WESTMS_2 115.0 to S.JOSEPH 115.0 Circuit 1 682. WESTMS_2 115.0 to VOLCANOT 115.0 Circuit 1 683. WYOMING 115.0 to TRAMWAY 115.0 Circuit 1 684. YAHTAHEY 115.0 to ALLISONT 115.0 Circuit 1 685. YAHTAHEY 115.0 to WNDWROCK 115. Circuit 1 686. YAHTAHEY 115.0 to PITT-MID 115.0 Circuit 1 687. ZIA_1 115.0 to ELDRADOT 115.0 Circuit 1 688. ZIA_1 115.0 to RODEO_T 115.0 Circuit 1 689. ZAFARANT 115.0 to AN_TAP 115.0 Circuit 1 690. ZIA_2 115.0 to MGLLUJAN 115.0 Circuit 1 691. RIOPUERC 345.0 to WESTMESA 345.0 Circuit 1 692. ENCHNTED 115.0 to B-A 115.0 Circuit 1 693. LSTHRZNT 115.0 to LOSTHRZN 115.0 Circuit 10 694. LSTHRZNT 115.0 to WESTMS_3 115.0 Circuit 1 695. VOLCANOT 115.0 to VOLCANO 115.0 Circuit 1 696. AN_TAP 115.0 to ALGODONE 115.0 Circuit 1 697. RANDLPHT 115.0 to COAL_TAP 115.0 Circuit 1 698. RANDLPHT 115.0 to RANDLPH 115.0 Circuit 1 699. ALAMOGPG 115.0 to ALAMOGCP 115.0 Circuit 1 700. ALGODONE 115.0 to SNYSIDRO 115.0 Circuit 1 701. BELEN_PG 115.0 to WILLARD 115.0 Circuit 1 702. BERNARDO 115.0 to SOCORROP 115.0 Circuit 1 703. BLACKLAK 115.0 to SPRINGER 115.0 Circuit 1 704. BLUEWATR 115.0 to GRANTS_T 115.0 Circuit 1 705. BLUEWATR 115.0 to PEGS 115.0 Circuit 1 706. CABALLOT 115.0 to MIMBRES 115.0 Circuit 1 707. CABALLOT 115.0 to HOT_SPRG 115.0 Circuit 1 708. CINIZA 115.0 to WINGATE 115.0 Circuit 1 709. CLAPHAM 115.0 to ROSEBUD 115.0 Circuit 1 710. DONA_ANA 115.0 to PICACHO 115.0 Circuit 1 711. DONA_ANA 115.0 to ALAMOGCP 115.0 Circuit 1 712. EL_BUTTE 115.0 to CUCHILLO 115.0 Circuit 1 713. EL_BUTTE 115.0 to PICACHO 115.0 Circuit 1 714. GALLUPPG 115.0 to YAHTAHEY 115.0 Circuit 1 715. GRANTS_T 115.0 to GRANTS 115.0 Circuit 1 716. GULF_PGT 115.0 to MARQUEZT 115.0 Circuit 1 717. HERNANDZ 115.0 to TAOS 115.0 Circuit 1 718. HOT_SPRG 115.0 to CUCHILLO 115.0 Circuit 1 719. LAGUNA 115.0 to GRANTS_T 115.0 Circuit 1 720. LAGUNA 115.0 to PAGUATE 115.0 Circuit 1

721. MORIARTY 115.0 to ALGODONE 115.0 Circuit 1 722. MORIARTY 115.0 to ALGODONE 115.0 Circuit 2 723. OJO 115.0 to HERNANDZ 115.0 Circuit 1 724. PEGS 115.0 to CINIZA 115.0 Circuit 1 725. PEGS 230.0 to AMBROSIA 230.0 Circuit 1 726. PLAYAS 115.0 to PDPLAYAS 115.0 Circuit 1 727. ROWE_TAP 115.0 to VALENCIA 115.0 Circuit 1 728. SMITHLAK 115.0 to AMBROSIA 115.0 Circuit 1 729. SMITHLAK 115.0 to CHURCHRT 115.0 Circuit 1 730. SNYSIDRO 115.0 to LA_JARA 115.0 Circuit 1 731. SOCORROP 115.0 to EL_BUTTE 115.0 Circuit 1 732. SPRINGER 115.0 to CLAPHAM 115.0 Circuit 1 733. SPRINGER 115.0 to YORKCANY 115.0 Circuit 1 734. SPRINGER 115.0 to GLADSTON 115.0 Circuit 1 735. STORRIE 115.0 to SPRINGER 115.0 Circuit 1 736. TAOS 115.0 to BLACKLAK 115.0 Circuit 1 737. TAYLOR_P 115.0 to BLUEWATR 115.0 Circuit 1 738. GLADSTON 115.0 to CLAPHAM 115.0 Circuit 1 739. ALAMOGCP 115.0 to HOLLYWO# 115.0 Circuit 1 740. ALAMOTAP 115.0 to ALAMOGCP 115.0 Circuit 1 741. MD 115.0 to HURLEY_# 115.0 Circuit 1 742. MD 115.0 to TURQUOIS 115.0 Circuit 1 743. MD 115.0 to IVANHOE 115.0 Circuit 1 744. GAVILAN 115.0 to RUIDOSO 115.0 Circuit 1 745. HURLEY_# 115.0 to LUNA 115.0 Circuit 1 746. HURLEY_# 115.0 to CHINO 115.0 Circuit 1 747. RUIDOSO 115.0 to HOLLYWO# 115.0 Circuit 1 748. TURQUOIS 115.0 to HIDALGO 115.0 Circuit 1 749. TURQUOIS 115.0 to PDTYRONE 115.0 Circuit 1 750. BUCKMAN 115.0 to WHITEROK 115.0 Circuit 1 751. ETA 115.0 to BUDAGERS 115.0 Circuit 1 752. ETA 115.0 to LA-MPF 115.0 Circuit 1 753. ETA 115.0 to WHITEROK 115.0 Circuit 1 754. TA- 3 115.0 to ETA 115.0 Circuit 1 755. TA- 3 115.0 to LA-MPF 115.0 Circuit 1 756. PANORAMT 115.0 to VERANDAT 115.0 Circuit 1 757. RR_TAP 115.0 to PALM_T 115.0 Circuit 1 758. PYRTAP1 115.0 to PYRAMID 115.0 Circuit 1 759. PYRAMID 115.0 to PYRTAP2 115.0 Circuit 760. PYRTAP2 115.0 to PLAYAS 115.0 Circuit 1 761. HIDALGO 115.0 to PYRTAP1 115.0 Circuit 1 762. HIDALGO 115.0 to PYRAMID 115.0 Circuit 1 763. B-A 345.0 to RIOPUERC 345.0 Circuit 1 764. REEVES_2 115.0 to ROY 115.0 Circuit 1 765. RIOHONDO 115.0 to IRIS 115.0 Circuit 1 766. SAN_JUAN 345.0 to OJ_EAST 345.0 Circuit 1 767. RIOPUERC 345.0 to B-A 345.0 Circuit 2 768. RIOPUERC 345.0 to WESTMESA 345.0 Circuit 2

Page 71: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST Transmission Lines

769. OJ_EAST 345.0 to OJO 345.0 Circuit 1 770. OJ_EAST 345.0 to RIOPUERC 345.0 Circuit 1 771. ROY 115.0 to AVILA_T 115.0 Circuit 1 772. PACHMANN 115.0 to ENCHNTED 115.0 Circuit 1 773. PACHMANN 115.0 to PRGRSS 115.0 Circuit 1 774. PACHMANN 115.0 to IRIS 115.0 Circuit 1 775. CB108A 115.0 to CORRALB 115.0 Circuit 1 776. RIOPUERC 115.0 to RRT_EAST 115.0 Circuit 1 777. ARRIBA_T 115.0 to GALLINAT 115.0 Circuit 1 778. GALLINAT 115.0 to ARRIBA 115.0 Circuit 1 779. JARALEST 115.0 to JARALES 115.0 Circuit 1 780. JARALEST 115.0 to BELEN_PG 115.0 Circuit 1 781. NORTON_2 115.0 to HERNANDZ 115.0 Circuit 1 782. WILLARD 115.0 to ESTANCIA 115.0 Circuit 1 783. ESTANCIA 115.0 to MORIARTY 115.0 Circuit 1 784. HIDALGO 115.0 to LORDSBRG 115.0 Circuit 1 785. WTA 115.0 to ETA 115.0 Circuit 1 786. TA-3 115.0 to WTA 115.0 Circuit 1 787. NORTON_1 115.0 to STA 115.0 Circuit 1 788. STA 115.0 to WTA 115.0 Circuit 1 789. STA 115.0 to ETA 115.0 Circuit 1 790. LOS_MORR 115.0 to WESTMS_3 115.0 Circuit 1 791. BELEN_PG 115.0 to LOS_MORR 115.0 Circuit 1 792. GUADLUPE 345.0 to TAIBANMS 345.0 Circuit 1 793. TAIBANMS 345.0 to BLACKWTR 345.0 Circuit 1 794. BLCKRA_T 115.0 to WESTMS_3 115.0 Circuit 1 795. MARQUEZT 115.0 to WESTMS_1 115.0 Circuit 1 796. PRAGER 115.0 to LOMAS 115.0 Circuit 1 797. PRAGER 115.0 to MONTANOT 115.0 Circuit 1 798. RR_TAP 115.0 to BLCKRA_T 115.0 Circuit 1 799. ENRON_TS 115.0 to GALLUPPG 115.0 Circuit 1 800. ENRON_TS 115.0 to WINGATE 115.0 Circuit 1 801. PERSON 115.0 to KAFB 115.0 Circuit 1 802. MSSIONT 115.0 to MSSION 115.0 Circuit 1 803. MSSIONT 115.0 to NORTHPNM 115.0 Circuit 1 804. IRVING 115.0 to WAYNE 1 115.0 Circuit 1 805. IRVING 115.0 to WAYNE 2 115.0 Circuit 1 806. LAGUNAT 115.0 to LSTHRZNT 115.0 Circuit 1 807. MEJIA_T 115.0 to ZIA_2 115.0 Circuit 1 808. MEJIA_T 115.0 to MGLLUJAN 115.0 Circuit 1 809. NORTON_1 115.0 to CDELRIO 115.0 Circuit 1 810. PARADIS1 115.0 to IRVING 115.0 Circuit 1 811. REEVES_2 115.0 to MSSIONT 115.0 Circuit 1 812. WESTMS_1 115.0 to PARADIS1 115.0 Circuit 1 813. RIOPUERC 115.0 to PRGRSS 115.0 Circuit 1 814. CDELRIO 115.0 to AN_TAP 115.0 Circuit 1 815. ZIA_2 115.0 to SPACHECO 115.0 Circuit 1 816. ZIA_2 115.0 to ZIA_1 115.0 Circuit 1

817. ZIA_1 115.0 to ZAFARANT 115.0 Circuit 1 818. LAGUNA 115.0 to LAGUNAT 115.0 Circuit 1 819. PALM_T 115.0 to PACHMANN 115.0 Circuit 1 820. MIMBRES 115.0 to HERMANAT 115.0 Circuit 1 821. MIMBRES 115.0 to DEMTAP1 115.0 Circuit 1 822. HERMANAT 115.0 to HERMANAS 115.0 Circuit 1 823. HERMANAT 115.0 to KINDRMOR 115.0 Circuit 1 824. DEMTAP1 115.0 to DEMGOLDT 115.0 Circuit 1 825. DEMGOLDT 115.0 to DEMTAP2 115.0 Circuit 1 826. HIDALGO 115.0 to PLAYAS 115.0 Circuit 1 827. CENTRALP 115.0 to S._COORS 115.0 Circuit 1 828. MARIPOSA 115.0 to PARADIS2 115.0 Circuit 1 829. MARQUEZT 115.0 to KM_SUB 115.0 Circuit 1 830. MARQUEZT 115.0 to UNSER 115.0 Circuit 1 831. MONTANO 115.0 to NORTHPNM 115.0 Circuit 1 832. WESTMS_1 115.0 to CENTRALP 115.0 Circuit 1 833. VOLCANOT 115.0 to ANDERSON 115.0 Circuit 1 834. RRT_EAST 115.0 to RR_TAP 115.0 Circuit 1 835. KM_SUB 115.0 to WESTMS_1 115.0 Circuit 1 836. MARQUEZT 115.0 to KM_TAP 115.0 Circuit 1 837. PERSON 115.0 to DWNTOWN 115.0 Circuit 1 838. REEVES_2 115.0 to NE_SUB 115.0 Circuit 1 839. RIOPUERC 115.0 to LSTHRZNT 115.0 Circuit 1 840. RIOPUERC 115.0 to KM_TAP 115.0 Circuit 1 841. KM_SUB 115.0 to KM_TAP 115.0 Circuit 1 842. NE_SUB 115.0 to TRAMWAY 115.0 Circuit 1 843. DWNTOWN 115.0 to LOMAS 115.0 Circuit 1 844. FRST_STT 115.0 to JARALEST 115.0 Circuit 1 845. FIRST_ST 115.0 to FRST_STT 115.0 Circuit 1 846. MIMBRES 115.0 to AIRPOR_T 115.0 Circuit 1 847. AIRPOR_T 115.0 to PICACHO 115.0 Circuit 1 848. RIOHONDO 115.0 to CB108 115.0 Circuit 1 849. WAYNE 1 115.0 to REEVES_2 115.0 Circuit 1 850. WAYNE 2 115.0 to LOSANGEL 115.0 Circuit 1 851. ENCHNTED 115.0 to IRIS 115.0 Circuit 1 852. PARADIS2 115.0 to WAYNE 1 115.0 Circuit 1 853. ALGODONE 115.0 to PALM_T 115.0 Circuit 1 854. TORRANCE 115.0 to DURAN 115.0 Circuit 1 855. WILLARD 115.0 to TORRANCE 115.0 Circuit 1 856. MORIARTY 115.0 to BUFORD_T 115.0 Circuit 1 857. ALGODONE 115.0 to BUFORD_T 115.0 Circuit 1 858. BUFORD 115.0 to BUFORD_T 115.0 Circuit 1 859. ARGONNE4 138.0 to ARGONNE3 138.0 Circuit 1 860. UNSER 115.0 to WESTMS_1 115.0 Circuit 1 861. PACHMANN 115.0 to ALGODONE 115.0 Circuit 1 862. SPACHECO 115.0 to WARNER 115.0 Circuit 1 863. POWRPLNT 115.0 to WARNER 115.0 Circuit 1 864. MGLLUJAN 115.0 to POWRPLNT 115.0 Circuit 1

Page 72: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST Transmission Lines

865. B-A 115.0 to STA 115.0 Circuit 1 866. SANDIA_1 115.0 to TIJERAS 115.0 Circuit 1 867. TIJERAS 115.0 to ZAMORA 115.0 Circuit 1 868. HIDALGO 345.0 to GREENLEE 345.0 Circuit 1 869. LUNA 345.0 to LEF 345.0 Circuit 1 870. WESTMESA 345.0 to ARR___PS 345.0 Circuit 1 871. DONA_ANA 115.0 to LAS_CRUC 115.0 Circuit 1 872. AMRAD 115.0 to ALAMOGCP 115.0 Circuit 1 873. HOLLOMAN 115.0 to ALAMOGCP 115.0 Circuit 1 874. WESTMESA 345.0 to ARROYO 345.0 Circuit 1 875. MEAD S 230.0 to EQUEST 230.0 Circuit 1 876. MEAD N 230.0 to EQUEST 230.0 Circuit 2 877. MEAD N 230.0 to NEWPORT 230.0 Circuit 1 878. MEAD N 230.0 to EASTSIDE 230.0 Circuit 1 879. MOENKOPI 500.0 to MARKETPL 500.0 Circuit 1 880. NAVAJO 500.0 to CRYSTAL 500.0 Circuit 1 881. FOURCORN 345.0 to RIOPUERC 345.0 Circuit 1 882. FOURCORN 345.0 to SAN_JUAN 345.0 Circuit 1 883. FOURCORN 345.0 to WESTMESA 345.0 Circuit 1 884. FOURCORN 230.0 to PILLAR 230.0 Circuit 1 885. HENDRSON 230.0 to MEAD N 230.0 Circuit 1 886. H ALLEN 500.0 to MEAD 500.0 Circuit 1 887. BC TAP 230.0 to MEAD N 230.0 Circuit 1 888. DAVIS 230.0 to MCCULLGH 230.0 Circuit 1 889. MEAD N 230.0 to DECATUR 230.0 Circuit 1 890. Line MEAD S 230.0 to PAHRUMP 230.0 Circuit 1 891. MEAD S 230.0 to GREENWAY 230.0 Circuit 1 892. MEAD S 230.0 to MCCULLGH 230.0 Circuit 1 893. MEAD S 230.0 to MCCULLGH 230.0 Circuit 2 894. MEAD 500.0 to MARKETPL 500.0 Circuit 1 895. PINTO PS 345.0 to FOURCORN 345.0 Circuit 1 896. SIGURDPS 230.0 to GLENCANY 230.0 Circuit 1 897. WALSENBG 230.0 to GLADSTON 230.0 Circuit 1 898. SHIPROCK 345.0 to SAN_JUAN 345.0 Circuit 1 899. SAN_JUAN 345.0 to MCKINLEY 345.0 Circuit 1 900. SAN_JUAN 345.0 to MCKINLEY 345.0 Circuit 2 901. BLYTHE 161.0 to NILAND 161.0 Circuit 1 902. KNOB 161.0 to PILOTKNB 161.0 Circuit 1 903. HASSYAMP 500.0 to N.GILA 500.0 Circuit 1 904. MOENKOPI 500.0 to ELDORDO 500.0 Circuit 1 905. PALOVRDE 500.0 to DEVERS 500.0 Circuit 1 906. MEAD S 230.0 to ELDORDO 230.0 Circuit 1 907. MEAD S 230.0 to ELDORDO 230.0 Circuit 2 908. PARKER 230.0 to GENE 230.0 Circuit 1 909. BLYTHE 161.0 to BLYTHESC 161.0 Circuit 1 910. CAMINO 230.0 to MEAD S 230.0 Circuit E 911. CAMINO 230.0 to MEAD S 230.0 Circuit W 912. GLADETAP 115.0 to ELPASOTP 115.0 Circuit 1

913. AIRPOR_T 115.0 to AIRPOR 115.0 Circuit 1 914. MEAD S 230.0 to DIAMOND 230.0 Circuit 1 915. MEAD S 230.0 to DIAMOND 230.0 Circuit 2 916. MEAD N 230.0 to MGM-CC 230.0 Circuit 1 917. MEAD N 230.0 to ARDEN 230.0 Circuit 1 918. EQUEST N 500.0 to MEAD 500.0 Circuit 1 919. HARQUAHA 500.0 to DEVERS 500.0 Circuit 1 920. HARQUAHA 500.0 to IH500 500.0 Circuit 1 921. CALIENTE 345.0 to PICANTE 345.0 Circuit 1 922. NEWMAN 115.0 to PIPELINE 115.0 Circuit 1 923. LEO 115.0 to DYER 115.0 Circuit 1 924. PICANTE 345.0 to NEWMAN 345.0 Circuit 1 925. PICANTE 115.0 to BIGGS 115.0 Circuit 1 926. PICANTE 115.0 to GR 115.0 Circuit 1 927. ANTHONY 115.0 to NW3 115.0 Circuit 1 928. ARROYO 115.0 to COX 115.0 Circuit 1 929. APOLLOSS 115.0 to APOLLO 115.0 Circuit 1 930. HATCH 115.0 to LEASBURG 115.0 Circuit 1 931. LE1 115.0 to APOLLOSS 115.0 Circuit 1 932. LE1 115.0 to JORNADA 115.0 Circuit 1 933. SUNSET_N 115.0 to DURAZNO 115.0 Circuit 1 934. DURAZNO 115.0 to ASCARATE 115.0 Circuit 1 935. NW3 115.0 to MONTOYA 115.0 Circuit 1 936. COX 115.0 to APOLLOSS 115.0 Circuit 1 937. APOLLO 115.0 to JORNADA 115.0 Circuit 1 938. LEASBURG 115.0 to JORNADA 115.0 Circuit 1 939. NE1 115.0 to CROMO 115.0 Circuit 1 940. CABALLOT 115.0 to UVAS 115.0 Circuit 1 941. ANTHONY 115.0 to COX 115.0 Circuit 1 942. COX 115.0 to TALAVERA 115.0 Circuit 1 943. ASCARATE 115.0 to COPPER 115.0 Circuit 2 944. GR 115.0 to VISTA__# 115.0 Circuit 2 945. JORNADA 115.0 to AIRPOR 115.0 Circuit 1 946. AFTON 115.0 to AIRPOR 115.0 Circuit 1 947. SOL 115.0 to VISTA__# 115.0 Circuit 2 948. WSTAP 115.0 to WHITE_SA 115.0 Circuit 1 949. WSTAP 115.0 to ALAMOGCP 115.0 Circuit 1 950. DONA_ANA 115.0 to WSTAP 115.0 Circuit 1 951. UVAS 115.0 to MIMBRES 115.0 Circuit 1 952. NEWMAN 115.0 to PICANTE 115.0 Circuit 1 953. PIPELINE 115.0 to BIGGS 115.0 Circuit 1 954. RIO_GRAN 115.0 to RIPLEY 115.0 Circuit 1 955. RIPLEY 115.0 to THORN 115.0 Circuit 1" 956. ASCARATE 115.0 to TROWBRIG 115.0 Circuit 1 957. CALIENTE 115.0 to VISTA__# 115.0 Circuit 2 958. LE1 115.0 to ARROYO 115.0 Circuit 1 959. RIPLEY 115.0 to THORN 115.0 Circuit 2 960. ORO_GRAN 115.0 to JARILLA1 115.0 Circuit 1

Page 73: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST Transmission Lines

961. BERNARDO 115.0 to BELEN_PG 115.0 Circuit 1 962. CALIENTE 115.0 to SE2 115.0 Circuit 1 963. CALIENTE 115.0 to SE2 115.0 Circuit 2 964. SE2 115.0 to LANE___# 115.0 Circuit 1 965. SE2 115.0 to LANE___# 115.0 Circuit 2 966. MSPOI345 345.0 to LUNA 345.0 Circuit 1 967. MSPOI345 345.0 to SPRINGR 345.0 Circuit 1 968. ASCARATE 115.0 to TROWBRIG 115.0 Circuit 2 969. MARLOW 115.0 to TROWBRIG 115.0 Circuit 2 970. MESA___# 115.0 to RIO_GRAN 115.0 Circuit 2 971. SANTA_T 115. to ROADRUNRTAP 115. Circuit 1 972. ROADRUNRTAP 115.0 to DIABLO 115.0 Circuit 1 973. ROADRUNRTAP 115 to ROADRUNER 115 Circuit 1 974. ART320W 345.0 to ARTESIA 345.0 Circuit 1 975. CALIENTE 345.0 to CORONA 345.0 Circuit 1 976. AMRAD 345.0 to AA100W 345.0 Circuit 1 977. AA100W 345.0 to ARTESIA 345.0 Circuit 1 978. CORONA 345.0 to AMRAD 345.0 Circuit 1 979. CORONA 345.0 to AMRAD 345.0 Circuit 2 980. CORONA 345.0 to PICANTE 345.0 Circuit 1 981. CORONA 345.0 to NEWMAN 345.0 Circuit 1 982. LUNA 345.0 to HIDALGO 345.0 Circuit 2 983. HIDALGO 345.0 to SOUTH 345.0 Circuit 1 984. HIDALGO 345.0 to SOUTH 345.0 Circuit 2 985. NEWMAN 345.0 to AFTON 345.0 Circuit 2 986. AFTON 345.0 to LUNA 345.0 Circuit 2

Page 74: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST TRANSFORMERS

1. CHOLLA 500.00 to CHOLLA 345.00 Circuit 1 2. CHOLLA 500.00 to CHOLLA 345.00 Circuit 2 3. FOURCORN 500.00 to FOURCORN 345.00 Circuit 1 4. SAGUARO 500.00 to SAG.EAST 115.00 Circuit 1 5. SAGUARO 500.00 to SAG.WEST 115.00 Circuit 1 6. WESTWING 500.00 to WESTWNGW 230.00 Circuit 2WESTWG 4 34.50 7. WESTWING 500.00 to WESTWNGW 230.00 Circuit 3WESTWG10 34.50 8. WESTWING 500.00 to WESTWING 345.00 Circuit 1WESTWING 34.50 9. YAVAPAI 500.00 to YAVAPAI 230.00 Circuit 1 10. YAVAPAI 500.00 to YAVAPAI 230.00 Circuit 2 11. GILARIVR 500.00 to GILARIVR 230.00 Circuit 1 12. TS5 500.00 to TS5 230.00 Circuit 1 13. TS5 500.00 to TS5 230.00 Circuit 2 14. RACEWAY 500.00 to RACEWAY 230.00 Circuit 1 15. RACEWAY 500.00 to RACEWAY 230.00 Circuit 2 16. CHOLLA 345.00 to CHOLLA 230.00 Circuit 1 17. CHOLLA 345.00 to CHOLLA 230.00 Circuit 2 18. FOURCORN 345.00 to FOURCORN 230.00 Circuit 1 19. FOURCORN 345.00 to FOURCORN 230.00 Circuit 2 20. PNPKAPS 345.00 to PNPKAPS 230.00 Circuit 1 21. PNPKAPS 345.00 to PNPKAPS 230.00 Circuit 2PNPK T4 14.40 22. PNPKAPS 345.00 to PNPKAPS 230.00 Circuit 3PNPK T14 14.40 23. PRESCOTT 230.00 to PRESCOTT 115.00 Circuit 1 24. PRESCOTT 230.00 to PRESCOTT 115.00 Circuit 2 25. SAGUARO 230.00 to SAG.EAST 115.00 Circuit 1 26. SAGUARO 230.00 to SAG.WEST 115.00 Circuit 1 27. CORONADO 500.00 to CORONADO 345.00 Circuit 1 28. CORONADO 500.00 to CORONADO 345.00 Circuit 2 29. KYRENE 500.00 to KYRENE 230.00 Circuit 6KYRENE6 34.50 30. KYRENE 500.00 to KYRENE 230.00 Circuit 7KYRENE7 34.50 31. PERKINS 500.00 to PERK PS1 500.00 Circuit 1 32. PERKINS 500.00 to PERK PS2 500.00 Circuit 1 33. SILVERKG 500.00 to SILVERKG 230.00 Circuit 1SILVERKG 34.50 34. BROWNING 500.00 to BROWNING 230.00 Circuit 1BROWNIN1 34.50 35. BROWNING 500.00 to BROWNING 230.00 Circuit 2BROWNIN2 34.50 36. RUDD 500.00 to RUDD 230.00 Circuit 1RUDD1 12.47 37. RUDD 500.00 to RUDD 230.00 Circuit 2RUDD2 12.47 38. RUDD 500.00 to RUDD 230.00 Circuit 3RUDD3 12.47 39. RUDD 500.00 to RUDD 230.00 Circuit 4RUDD4 12.47 40. RUDD 500.00 to RUDD 230.00 Circuit 5RUDD5 12.47 41. SNTAROSA 500.00 to SNTAROSA 230.00 Circuit 1 42. PINAL_W 500.00 to PINALWES 345.00 Circuit 43. MESQUITE 500.00 to MESQUITE 230.00 Circuit 1 44. GOLDFELD 230.00 to GOLDFELD 115.00 Circuit 45. GOLDFELD 230.00 to GOLDFELD 115.00 Circuit 2 46. SILVERKG 230.00 to SILVERK1 115.00 Circuit 1 47. SILVERKG 230.00 to SILVERK2 115.00 Circuit 1

Page 75: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST TRANSFORMERS

48. SOUTH 345.00 to SOUTH 138.00 Circuit 1SOUTH2 13.80 49. SOUTH 345.00 to SOUTH 138.00 Circuit 2SOUTH2 13.80 50. VAIL 345.00 to VAIL 138.00 Circuit 1VAIL 13.80 51. VAIL2 345.00 to VAIL 138.00 Circuit 1 52. GATEWAY 345.00 to GATEWAY 115.00 Circuit 1 53. WINCHSTR 345.00 to WINCHSTR 230.00 Circuit 1 54. TORTOLIT 138.00 to SAG.EAST 115.00 Circuit 1 55. TORTOLIT 138.00 to SAG.WEST 115.00 Circuit 1 56. TORTOLIT 138.00 to TORTOLIT 500.00 Circuit 1 57. TORTOLIT 138.00 to TORTLIT2 500.00 Circuit 1 58. COPPERVR 345.00 to COPPERVR 230.00 Circuit 1 59. APACHE 230.00 to APACHE 115.00 Circuit 1 60. APACHE 230.00 to APACHE 115.00 Circuit 2 61. BICKNELL 230.00 to BICKNELL 115.00 Circuit 1 62. BICKNELL 345.00 to BICKNELL 230.00 Circuit 1 63. GREEN-AE 345.00 to GREEN-AE 230.00 Circuit 1 64. MEAD 345.00 to MEAD N 230.00 Circuit 1 65. MEAD 500.00 to MEAD N 230.00 Circuit 1 66. PARKER 161.00 to PARKER 230.00 Circuit 1 67. PARKER 161.00 to PARKER 230.00 Circuit 2 68. COOLIDGE 230.00 to COOLIDGE 115.00 Circuit 1 69. COOLIDGE 230.00 to COOLIDGE 115.00 Circuit 2 70. LIBERTY 345.00 to LIBTYPHS 230.00 Circuit 1 71. LIBTYPHS 230.00 to LIBERTY 230.00 Circuit 1 72. CASAGRND 230.00 to CASAGRND 115.00 Circuit 1 73. PEACOCK 345.00 to PEACOCK 230.00 Circuit 1 74. GLEN PS 230.00 to GLENCANY 230.00 Circuit 1 75. GLENCANY 345.00 to GLENCANY 230.00 Circuit 1 76. GLENCANY 345.00 to GLENCANY 230.00 Circuit 2 77. PINPKBRB 345.00 to PINPK 230.00 Circuit 1 78. PINPKBRB 345.00 to PINPK 230.00 Circuit 2 79. PINPKBRB 345.00 to PINPK 230.00 Circuit 3 80. SHIPROCK 230.00 to SHIPROCK 115.00 Circuit 1 81. SHIPROCK 345.00 to SHIPROCK 230.00 Circuit 1 82. SHIPROCK 500.00 to SHIPROCK 345.00 Circuit 1 83. SHIPROCK 500.00 to SHIPROCK 345.00 Circuit 2 84. MEAD 500.00 to MEAD N 230.00 Circuit 2 85. WESTWING 500.00 to WESTWNGE 230.00 Circuit 1WESTWG 1 34.50 86. PNPKAPS 500.00 to PNPKAPS 230.00 Circuit 1 87. PNPKAPS 500.00 to PNPKAPS 230.00 Circuit 2 88. PNPKAPS 500.00 to PNPKAPS 230.00 Circuit 3 89. SES 500.00 to SES 230.00 Circuit 1SES 1 12.47 90. SES 500.00 to SES 230.00 Circuit 2SES 2 12.47 91. TORTOLIT 138.00 to TORTOLIT 500.00 Circuit 3 92. KYRENE 500.00 to KYRENE 230.00 Circuit 8KYRENE8 34.50 93. BICKNELL 230.00 to BICKNELL 115.00 Circuit 2 94. AMRAD 115.00 to AMRAD 345.00 Circuit 1AMRAD_A 13.20 95. ARR___PS 345.00 to ARROYO 345.00 Circuit 1

Page 76: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST TRANSFORMERS

96. ARROYO 115.00 to ARROYO 345.00 Circuit 1 97. ARROYO 115.00 to ARROYO 345.00 Circuit 1 98. CALIENTE 115.00 to CALIENTE 345.00 Circuit 1CALIEN_A 13.80 99. CALIENTE 115.00 to CALIENTE 345.00 Circuit 2 100. DIABLO 115.00 to DIABLO 345.00 Circuit 1DIABLO_A 13.80 101. DIABLO 115.00 to DIABLO 345.00 Circuit 2 102. DIABLO 115.00 to DIABLO 345.00 Circuit 3 103. NEWMAN 345.00 to NEWMAN 115.00 Circuit 1NEWMAN_A 13.80 104. AMBROSIA 115.00 to AMBROSIA 230.00 Circuit 1 105. B-A 345.00 to B-A 115.00 Circuit 1 106. NORTON 345.00 to NORTON_1 115.00 Circuit 1 107. OJO 345.00 to OJO 115.00 Circuit 1 108. RIOPUERC 345.00 to RIOPUERC 115.00 Circuit 1 109. SAN_JUAN 345.00 to SAN_JUAN 230.00 Circuit 1 110. SANDIA 345.00 to SANDIA_2 115.00 Circuit 1 111. WESTMESA 230.00 to WESTMS_1 115.00 Circuit 1 112. WESTMESA 230.00 to WESTMS_2 115.00 Circuit 1 113. WESTMESA 345.00 to WESTMS_1 115.00 Circuit 1 114. WESTMESA 345.00 to WESTMS_2 115.00 Circuit 1 115. PEGS 230.00 to PEGS 115.00 Circuit 1 116. TAOS 115.00 to TAOS 345.00 Circuit 1 117. GLADSTON 230.00 to GLADSTON 115.00 Circuit 1 118. GUADLUPE 345.00 to ARGONNE4 138.00 Circuit 1 119. HIDALGO 345.00 to HIDALGO 115.00 Circuit 120. HIDALGO 345.00 to HIDALGO 115.00 Circuit 2 121. LUNA 345.00 to LUNA 115.00 Circuit 1 122. GALLEGOS 230.00 to GALLEGOS 115.00 Circuit 1 123. MEAD S 230.00 to MEAD 287.00 Circuit 1 124. SANJN PS 345.00 to SAN_JUAN 345.00 Circuit 1 125. MCKINLEY 345.00 to YAHTAHEY 115.00 Circuit 1 126. SHIP PS 230.00 to SHIPROCK 230.00 Circuit 1 127. PICANTE 115.00 to PICANTE 345.00 Circuit 1 128. AFTON 115.00 to AFTON 345.00 Circuit 1

Page 77: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST GENERATORS

1. CORONAD1 22.0 Unit ID 1 2. CORONAD2 22.0 Unit ID 1 3. NAVAJO 1 26.0 Unit ID 1 4. NAVAJO 2 26.0 Unit ID 1 5. NAVAJO 3 26.0 Unit ID 1 6. AGUAFR 3 18.0 Unit ID 1 7. AGUAFR 1 13.8 Unit ID 1 8. AGUAFR 2 13.8 Unit ID 2 9. SANTAN 1 13.8 Unit ID 1 10. SANTAN 3 13.8 Unit ID 2 11. SANTAN 2 13.8 Unit ID 1 12. SANTAN 4 13.8 Unit ID 2 13. Gen ARL-CT1 18.0 Unit ID 1 14. ARL-CT2 18.0 Unit ID 1 15. ARL-ST1 18.0 Unit ID 1 16. HGC-CT1 16.0 Unit ID 17. HGC-ST1 13.8 Unit ID 1 18. HGC-CT2 16.0 Unit ID 1 19. HGC-ST2 13.8 Unit ID 20. HGC-CT3 16.0 Unit ID 21. HGC-ST3 13.8 Unit ID 1 22. MES-CT1 18.0 Unit ID 1 23. MES-CT2 18.0 Unit ID 1 24. MES-ST1 18.0 Unit ID 1 25. MES-CT3 18.0 Unit ID 1 26. MES-CT4 18.0 Unit ID 1 27. MES-ST2 18.0 Unit ID 1 28. CHOLLA 13.8 Unit ID 1 29. CHOLLA2 22.0 Unit ID 1 30. CHOLLA3 22.0 Unit ID 1 31. CHOLLA4 22.0 Unit ID 1 32. FCNGEN 1 20.0 Unit ID 1 33. FCNGEN 2 20.0 Unit ID 1 34. FCNGEN 3 20.0 Unit ID 1 35. FCNGN4CC 22.0 Unit ID 4 36. FCNGN5CC 22.0 Unit ID 5 37. PALOVRD1 24.0 Unit ID 1 38. PALOVRD2 24.0 Unit ID 1 39. PALOVRD3 24.0 Unit ID 1 40. SAGUARO1 15.5 Unit ID 1 41. SAGUARO2 15.5 Unit ID 1 42. WPHX CC1 13.8 Unit ID 1 43. WPHX CC2 13.8 Unit ID 1 44. WPHX CC3 13.8 Unit ID 1 45. YUCCAGEN 13.8 Unit ID 1 46. OCOTST2 13.8 Unit ID 1 47. OCOTST1 13.8 Unit ID 1

48. WPCC5CT1 15.0 Unit ID 1 49. WPCC5CT2 15.0 Unit ID 1 50. WPCC5ST1 16.5 Unit ID 1 51. WPCC4CT1 13.8 Unit ID 1 52. RED-CT1 18.0 Unit ID 1 53. RED-CT2 18.0 Unit ID 1 54. GIL-CT1 18.0 Unit ID 1 55. GIL-CT2 18.0 Unit ID 1 56. GIL-ST1 18.0 Unit ID 1 57. GIL-CT3 18.0 Unit ID 1 58. GIL-CT4 18.0 Unit ID 1 59. GIL-ST2 18.0 Unit ID 1 60. Gen GIL-CT5 18.0 Unit ID 1 61. GIL-CT6 18.0 Unit ID 1 62. GIL-ST3 18.0 Unit ID 1 63. GIL-CT7 18.0 Unit ID 1 64. GIL-CT8 18.0 Unit ID 1 65. GIL-ST4 18.0 Unit ID 1 66. APACHST2 20.0 Unit ID 1 67. APACHST3 20.0 Unit ID 1 68. DMPCCT#1 13.8 Unit ID 1 69. SUNDTGE1 13.8 Unit ID 1 70. SUNDTGE2 13.8 Unit ID 1 71. SUNDTGE3 13.8 Unit ID 1 72. SUNDTGE4 18.0 Unit ID 1 73. SPR GEN1 19.0 Unit ID 1 74. SPR GEN2 19.0 Unit ID 1 75. RED-CT3 18.0 Unit ID 1 76. RED-CT4 18.0 Unit ID 1 77. RED-ST1 18.0 Unit ID 1 78. RED-ST2 18.0 Unit ID 1 79. SANTN 5S 18.0 Unit ID 1 80. SANTN 5A 18.0 Unit ID 1 81. SANTN 5B 18.0 Unit ID 1 82. SANTN 6A 18.0 Unit ID 1 83. SANTN 6S 13.8 Unit ID 1 84. KYREN 7S 13.8 Unit ID 1 85. KYREN 7A 18.0 Unit ID 1 86. SPR GEN3 21.0 Unit ID 1 87. SPR GEN4 21.0 Unit ID 1 88. RVERSIDE 69.0 Unit ID 1 89. HOOVERA3 16.5 Unit ID 1 90. HOOVERA4 16.5 Unit ID 1 91. HOOVERA5 16.5 Unit ID 1 92. HOOVERA6 16.5 Unit ID 1 93. HOOVERA7 16.5 Unit ID 1 94. HOVRA1A2 16.5 Unit ID A1

Page 78: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

CONTINGENCY LIST GENERATORS

95. HOVRA1A2 16.5 Unit ID A2 96. HOVRN1N2 16.5 Unit ID N1 97. HOVRN1N2 16.5 Unit ID N2 98. HOVRN3N4 16.5 Unit ID N3 99. HOVRN3N4 16.5 Unit ID N4 100. HOVRN5N6 16.5 Unit ID N5 101. HOVRN5N6 16.5 Unit ID N6 102. HOVRN7N8 16.5 Unit ID N7 103. HOVRN7N8 16.5 Unit ID N8 104. GLENC1-2 13.8 Unit ID 1 105. GLENC1-2 13.8 Unit ID 2 106. GLENC3-4 13.8 Unit ID 3 107. GLENC3-4 13.8 Unit ID 4 108. GLENC5-6 13.8 Unit ID 5 109. GLENC5-6 13.8 Unit ID 6 110. GLENC7-8 13.8 Unit ID 7 111. GLENC7-8 13.8 Unit ID 8 112. SOPOINT1 16.0 Unit ID 1 113. SOPOINT2 16.0 Unit ID 2 114. SOPOINT3 16.0 Unit ID 3 115. GRIFFTH1 16.0 Unit ID 1 116. GRIFFTH2 16.0 Unit ID 2 117. GRIFFTH3 16.0 Unit ID 3 118. BLYENG1 16.0 Unit ID 1 119. BLYENG2 16.0 Unit ID 1 120. BLYENG3 16.0 Unit ID 1 121. DBG-CT1 18.0 Unit ID 1 122. DBG-CT2 18.0 Unit ID 1 123. DBG-ST1 18.0 Unit ID 1 124. DMPCCT#2 13.8 Unit ID 1 125. DMPCCT#3 13.8 Unit ID 1 126. DRPP G1 24.0 Unit ID 1 127. DRPP G2 24.0 Unit ID 1 128. BLACKWTR 345.0 Unit ID DC 129. SJUAN_G1 22.0 Unit ID 1 130. SJUAN_G2 24.0 Unit ID 1 131. SJUAN_G3 22.0 Unit ID 1 132. SJUAN_G4 22.0 Unit ID 1 133. PERSONG1 18.0 Unit ID 1 134. AFTONG 18.0 Unit ID 1 135. LONEMS 0.6 Unit ID 1 136. PEGS1 17.6 Unit ID 1 137. CLAPHAM 115.0 Unit ID 1 138. PDPLAYAS 13.8 Unit ID 1 139. CHINO 13.8 Unit ID 1 140. EL_VADO1 4.2 Unit ID 1 141. ABIQUI12 4.2 Unit ID 1 142. Gen ETA 11.0 Unit ID 1

143. TA-3-BL 13.8 Unit ID 1 144. TA-3-AL 13.8 Unit ID 1 145. TA-3-AL 13.8 Unit ID 2 146. TA-3-BL 13.8 Unit ID 2 147. LEF_G1 18.0 Unit ID 1 148. LEF_G2 18.0 Unit ID 1 149. LEF_S1 18.0 Unit ID 1 150. ARGONNEG 0.6 Unit ID 1 151. ALAMOGCP 115.0 Unit ID 1 152. AFTONS 13.8 Unit ID 1 153. AMRAD_A 13.2 Unit ID 1 154. NEWMANG3 13.8 Unit ID 1 155. NEWMN4S1 13.8 Unit ID 1 156. NEWMN5G1 13.8 Unit ID 1 157. NEWMN5G2 13.8 Unit ID 1 158. NEWMN5S1 13.8 Unit ID 1 159. NEWMN6G1 13.8 Unit ID 1 160. NEWMN6G2 13.8 Unit ID 1 161. NEWMN6S1 13.8 Unit ID 1 162. CAL1_G1 13.8 Unit ID 1 163. CAL1_G2 13.8 Unit ID 1 164. CAL1_S1 18.0 Unit ID 1 165. CAL2_G1 13.8 Unit ID 1 166. CAL2_G2 13.8 Unit ID 1 167. CAL2_S1 18.0 Unit ID 1 168. RIOGD_G8 17.5 Unit ID 1 169. RIOGD_G9 13.8 Unit ID 1 170. RIOGDG10 13.8 Unit ID 1 171. RIOGDG11 13.8 Unit ID 1 172. ART320W_G1 34.5 Unit ID 173. ART320W_G2 34.5 Unit ID 1

Page 79: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

Appendix C

Appendix C Phase Shifter Tap Range Analysis Results

Page 80: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

Base Case

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 1

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:29:06 2012 temp.wrk

11080

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.026

11111NEWMAN

356.81.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

463

20

453 28

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

246 6

246 5

463

20

453 28

174 65

174

88

12 8

12

3

299 15

294

15

419

87

419

87

140

49

140

25

140

49

139

56151

10

149 1

199 2

198 95

434

41

419

87

149 17

150 5

150 5

150 14

150 17

150 2

Page 81: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_1 Line ART320W 345.0 to ARTESIA 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:29:12 2012 temp.wrk

11080

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.026

11111NEWMAN

356.81.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

463

20

453 28

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

246 6

246 5

463

20

453 28

174 65

174

88

12 8

12

3

299 15

294

15

419

87

419

87

140

49

140

25

140

49

139

56151

10

149 1

199 2

198 95

434

41

419

87

149 17

150 5

150 5

150 14

150 17

150 2

Page 82: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_2 Line CALIENTE 345.0 to AMRAD 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:29:17 2012 temp.wrk

11080

354.61.028

11093LUNA

357.71.037

11217AFTON

358.51.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.043

16101GREENLEE

352.51.022

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.61.028

11093LUNA

357.71.037

11217AFTON

358.51.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.043

16101GREENLEE

352.51.022

11038

CALIENTE

1.033

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02713399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.027

11111NEWMAN

357.21.035

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.041

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

03 1

1

1

6013 14013 2

03 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 45

154 3

155 50

154 22

154 3

179 3

179 2

100

9

9913

163 25

164 41

100

9

99

13

03

463

20

453 28

119 2

119 45

154 3

155 50

154 22

154 3

179 3

179 2

100

9

9913

163 25

164 41

100

9

99

13

03

254 0

254 10

463

20

453 28

178 67

179

90

299 14

294

15

419

88

419

88

140

50

140

24

140

50

139

57151

10

149 1

199 3

198 95

434

42

419

88

149 17

150 5

150 5

150 14

150 17

150 2

Page 83: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_3 Line LUNA 345.0 to DIABLO 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:29:22 2012 temp.wrk

11080

353.21.024

11093LUNA

355.51.031

11217AFTON

355.51.030

13411ART320W 355.3

1.030

11237AMRAD_B

1.036

16101GREENLEE

351.81.020

11266PICANTE

1.026

11038

CALIENTE

1.026

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 347.9

1.008

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 356.0

1.032

HIDALGO

353.21.024

11093LUNA

355.51.031

11217AFTON

355.51.030

13411ART320W 355.3

1.030

11237AMRAD_B

1.036

16101GREENLEE

351.81.020

11038

CALIENTE

1.026

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.01813399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 356.0

1.032

11017ARROYO

1.018

11111NEWMAN

354.31.027

11420WA300POI

1.027

11423ARR___PS1

1.016

11421

WA300_C

1.039

11047MACHO_SPRNGS

1.036

11424

WA300_C2

1.041

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

020 1

1

1

6013 14013 2

020 1

75 8 175 8 2

75 10 175 10 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-18.81.000

1.000

125 8

124 34

277 15

280 47

276 2

277 15

209 11

209 16

100

9

9913

167 18

168 35

100

9

90

5

020

461

17

451 24

125 8

124 34

277 15

280 47

276 2

277 15

209 11

209 16

100

9

9913

167 18

168 35

100

9

90

5

020

309 16

310 24

461

17

451 24

160 65

161

88

1014

10

19

299 19

294

19

424

86

424

86

146

45

146

29

146

45

145

52147

15

145 7

195 6

194 86

440

34

424

86

149 19

150 3

150 3

150 16

150 19

150 0

Page 84: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_4 Line LUNA 345.0 to HIDALGO 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:29:27 2012 temp.wrk

11080

345.31.001

11093LUNA

358.21.038

11217AFTON

358.71.040

13411ART320W 355.3

1.030

11237AMRAD_B

1.045

16101GREENLEE

347.71.008

11266PICANTE

1.033

11038

CALIENTE

1.032

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.2

1.009

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 355.5

1.031

HIDALGO

345.31.001

11093LUNA

358.21.038

11217AFTON

358.71.040

13411ART320W 355.3

1.030

11237AMRAD_B

1.045

16101GREENLEE

347.71.008

11038

CALIENTE

1.032

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02713399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 355.5

1.031

11017ARROYO

1.027

11111NEWMAN

357.11.035

11420WA300POI

1.032

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.043

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-25.81.000

1.000

160 1

160 46

159 26

160 1

170 12

170 7

100

9

9913

73 6

73 3

100

9

88

19

01

510

11

497 23

160 1

160 46

159 26

160 1

170 12

170 7

100

9

9913

73 6

73 3

100

9

88

19

01

246 8

247 2

510

11

497 23

168 63

169

87

1110

11

5

299 13

294

14

418

86

418

86

139

48

139

26

139

48

138

5570

6

7013

119 8

119 82

432

42

418

86

149 16

150 5

150 5

150 14

150 16

150 3

Page 85: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_5 Line LUNA 345.0 to AFTON 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:29:32 2012 temp.wrk

11080

353.31.024

11093LUNA

355.61.031

11217AFTON

355.91.032

13411ART320W 355.3

1.030

11237AMRAD_B

1.040

16101GREENLEE

351.81.020

11266PICANTE

1.029

11038

CALIENTE

1.028

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.0

1.009

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 356.0

1.032

HIDALGO

353.31.024

11093LUNA

355.61.031

11217AFTON

355.91.032

13411ART320W 355.3

1.030

11237AMRAD_B

1.040

16101GREENLEE

351.81.020

11038

CALIENTE

1.028

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02013399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 356.0

1.032

11017ARROYO

1.020

11111NEWMAN

355.21.030

11420WA300POI

1.027

11423ARR___PS1

1.017

11421

WA300_C

1.039

11047MACHO_SPRNGS

1.036

11424

WA300_C2

1.041

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

012 1

1

1

6013 14013 2

012 1

75 8 175 8 2

75 9 175 9 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-15.51.000

1.000

127 8

126 34

028

00

130 2

130 3

100

9

9913

168 18

169 35

100

9

80

5

012

461

18

450 24

127 8

126 34

028

00

130 2

130 3

100

9

9913

168 18

169 35

100

9

80

5

012

185 0

186 13

461

18

450 24

224 77

225

96

19 3

19

8

299 18

294

18

425

89

425

89

147

48

147

26

147

48

146

54146

15

144 7

194 6

193 86

441

36

425

89

149 18

150 3

150 3

150 16

150 19

150 0

Page 86: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_6 Line NEWMAN 345.0 to ARROYO 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:29:38 2012 temp.wrk

11080

354.31.027

11093LUNA

357.21.035

11217AFTON

359.01.040

13411ART320W 355.3

1.030

11237AMRAD_B

1.049

16101GREENLEE

352.31.021

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 345.9

1.003

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 356.0

1.032

HIDALGO

354.31.027

11093LUNA

357.21.035

11217AFTON

359.01.040

13411ART320W 355.3

1.030

11237AMRAD_B

1.049

16101GREENLEE

352.31.021

11038

CALIENTE

1.034

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

0.96913399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 356.0

1.032

11017ARROYO

0.969

11111NEWMAN

358.31.039

11420WA300POI

1.009

11423ARR___PS1

1.006

11421

WA300_C

1.030

11047MACHO_SPRNGS

1.039

11424

WA300_C2

1.033

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 13 175 13 2

75 15 175 15 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-32.21.000

1.000

112 1

112 44

206 21

207 63

205 2

206 21

119 31

119 25

100

9

9913

158 25

159 40

100

9

61

28

02

465

19

455 28

112 1

112 44

206 21

207 63

205 2

206 21

119 31

119 25

100

9

9913

158 25

159 40

100

9

61

28

02

175 35

175 22

465

19

455 28

3920

39

15

299 36

294

34

414

51

414

51

136

17

137

56

136

17

136

25155

12

153 1

203 2

202 94

430

9

414

51

149 27

150 6

150 6

150 25

150 29

150 10

Page 87: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_7 Line NEWMAN 345.0 to AFTON 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:29:43 2012 temp.wrk

11080

354.41.027

11093LUNA

357.41.036

11217AFTON

360.01.043

13411ART320W 355.3

1.030

11237AMRAD_B

1.036

16101GREENLEE

352.41.021

11266PICANTE

1.025

11038

CALIENTE

1.025

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 347.9

1.008

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 356.1

1.032

HIDALGO

354.41.027

11093LUNA

357.41.036

11217AFTON

360.01.043

13411ART320W 355.3

1.030

11237AMRAD_B

1.036

16101GREENLEE

352.41.021

11038

CALIENTE

1.025

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.01713399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 356.1

1.032

11017ARROYO

1.017

11111NEWMAN

353.61.025

11420WA300POI

1.026

11423ARR___PS1

1.016

11421

WA300_C

1.038

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.041

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

021 1

1

1

6013 14013 2

021 1

75 8 175 8 2

75 10 175 10 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-15.71.000

1.000

127 1

127 43

00

054

129 11

129 17

100

9

9913

168 24

169 40

100

9

80

6

021

461

20

451 26

127 1

127 43

00

054

129 11

129 17

100

9

9913

168 24

169 40

100

9

80

6

021

185 16

185 28

461

20

451 26

224 70

225

89

2015

20

19

299 19

294

19

425

86

425

86

147

45

147

29

147

45

146

52147

11

145 3

194 1

194 93

441

33

425

86

149 19

150 2

150 2

150 17

150 20

150 0

Page 88: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_8 Line CALIENTE 345.0 to PICANTE 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:29:48 2012 temp.wrk

11080

354.41.027

11093LUNA

357.51.036

11217AFTON

358.41.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.039

16101GREENLEE

352.41.022

11266PICANTE

1.033

11038

CALIENTE

1.027

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 356.1

1.032

HIDALGO

354.41.027

11093LUNA

357.51.036

11217AFTON

358.41.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.039

16101GREENLEE

352.41.022

11038

CALIENTE

1.027

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 356.1

1.032

11017ARROYO

1.026

11111NEWMAN

357.01.035

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

015 1

1

1

6013 14013 2

015 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

118 1

118 44

129 1

129 48

129 27

129 1

100

9

9913

162 25

163 41

100

9

50

2

015

464

20

453 28

118 1

118 44

129 1

129 48

129 27

129 1

100

9

9913

162 25

163 41

100

9

50

2

015

142 8

142 5

464

20

453 28

140 64

140

89

49 6

50

11

299 14

294

15

416

86

416

86

137

49

138

24

137

49

137

56152

11

150 1

200 2

199 95

431

41

416

86

149 17

150 5

150 5

150 14

150 17

150 2

Page 89: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_9 Line PICANTE 345.0 to NEWMAN 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:29:53 2012 temp.wrk

11080

354.11.027

11093LUNA

357.11.035

11217AFTON

357.41.036

13411ART320W 355.3

1.030

11237AMRAD_B

1.037

16101GREENLEE

352.31.021

11266PICANTE

1.025

11038

CALIENTE

1.025

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 347.9

1.008

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 356.1

1.032

HIDALGO

354.11.027

11093LUNA

357.11.035

11217AFTON

357.41.036

13411ART320W 355.3

1.030

11237AMRAD_B

1.037

16101GREENLEE

352.31.021

11038

CALIENTE

1.025

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02113399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 356.1

1.032

11017ARROYO

1.021

11111NEWMAN

355.71.031

11420WA300POI

1.028

11423ARR___PS1

1.016

11421

WA300_C

1.040

11047MACHO_SPRNGS

1.039

11424

WA300_C2

1.042

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

021 1

1

1

6013 14013 2

021 1

75 8 175 8 2

75 9 175 9 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-23.21.000

1.000

123 1

123 41

9011

9140

9038

9011

18 0

18 6

100

9

9913

167 23

168 39

100

9

42

3

021

461

20

451 26

123 1

123 41

9011

9140

9038

9011

18 0

18 6

100

9

9913

167 23

168 39

100

9

42

3

021

461

20

451 26

114 65

114

90

5811

58

16

299 17

294

17

426

89

426

89

148

45

148

29

148

45

147

53148

12

146 3

196 0

195 92

442

36

426

89

149 18

150 3

150 3

150 16

150 18

150 1

Page 90: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_10 Line HIDALGO 345.0 to GREENLEE 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:29:58 2012 temp.wrk

11080

362.11.050

11093LUNA

360.31.044

11217AFTON

359.91.043

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

346.71.005

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.2

1.009

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.044

16104SPRINGR 355.3

1.030

HIDALGO

362.11.050

11093LUNA

360.31.044

11217AFTON

359.91.043

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

346.71.005

11038

CALIENTE

1.034

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02913399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.044

16104SPRINGR 355.3

1.030

11017ARROYO

1.029

11111NEWMAN

357.91.037

11420WA300POI

1.033

11423ARR___PS1

1.018

11421

WA300_C

1.042

11047MACHO_SPRNGS

1.048

11424

WA300_C2

1.044

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

05 1

1

1

6013 14013 2

05 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-29.91.000

1.000

3741

37 6

159 10

160 38

159 35

159 10

170 18

170 12

100

9

9913

100

9

88

25

05

551

23

536 34

3741

37 6

159 10

160 38

159 35

159 10

170 18

170 12

100

9

9913

100

9

88

25

05

247 14

247 4

551

23

536 34

169 65

169

88

1116

11

11

299 12

294

13

418

87

418

87

139

47

139

26

139

47

138

56

5 3

515

54 8

5481

432

43

418

87

149 16

150 6

150 6

150 13

150 16

150 4

Page 91: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_11 Line LUNA 345.0 to LEF 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:30:03 2012 temp.wrk

11080

352.31.021

11093LUNA

353.61.025

11217AFTON

355.71.031

13411ART320W 355.3

1.030

11237AMRAD_B

1.039

16101GREENLEE

351.21.018

11266PICANTE

1.028

11038

CALIENTE

1.028

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.0

1.009

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 355.4

1.030

HIDALGO

352.31.021

11093LUNA

353.61.025

11217AFTON

355.71.031

13411ART320W 355.3

1.030

11237AMRAD_B

1.039

16101GREENLEE

351.21.018

11038

CALIENTE

1.028

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02013399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 355.4

1.030

11017ARROYO

1.020

11111NEWMAN

355.01.029

11420WA300POI

1.027

11423ARR___PS1

1.017

11421

WA300_C

1.039

11047MACHO_SPRNGS

1.027

11424

WA300_C2

1.041

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

013 1

1

1

6013 14013 2

013 1

75 8 175 8 2

75 9 175 9 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-11.61.000

1.000

62 1

6243

143 15

144 62

143 10

143 15

168 3

168 9

100

9

9913

2640

2648

100

9

86

3

013

538

4

524 52

62 1

6243

143 15

144 62

143 10

143 15

168 3

168 9

100

9

9913

2640

2648

100

9

86

3

013

244 8

245 19

538

4

524 52

182 68

183

90

13 6

13

10

299 18

294

18

423

88

423

88

144

49

145

25

144

49

144

55283

36

277 25

326 22

325123

438

37

423

88

149 18

150 3

150 3

150 16

150 19

150 0

Page 92: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_12 Line WESTMESA 345.0 to ARR___PS 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:30:08 2012 temp.wrk

11080

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.026

11111NEWMAN

356.81.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

463

20

453 28

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

246 6

246 5

463

20

453 28

174 65

174

88

12 8

12

3

299 15

294

15

419

87

419

87

140

49

140

25

140

49

139

56151

10

149 1

199 2

198 95

434

41

419

87

149 17

150 5

150 5

150 14

150 17

150 2

Page 93: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_13 Line MACHO_SPRNGS 345.0 to LUNA 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:30:13 2012 temp.wrk

11080

355.81.031

11093LUNA

360.11.044

11217AFTON

359.51.042

13411ART320W 355.3

1.030

11237AMRAD_B

1.046

16101GREENLEE

352.31.021

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.2

1.009

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 355.8

1.031

HIDALGO

355.81.031

11093LUNA

360.11.044

11217AFTON

359.51.042

13411ART320W 355.3

1.030

11237AMRAD_B

1.046

16101GREENLEE

352.31.021

11038

CALIENTE

1.033

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 355.8

1.031

11017ARROYO

1.026

11111NEWMAN

357.41.036

11420WA300POI

1.029

11423ARR___PS1

1.018

11421

WA300_C

1.040

11047MACHO_SPRNGS

1.057

11424

WA300_C2

1.042

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 8 175 8 2

75 9 175 9 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.61.000

1.000

5434

5479

145 14

146 34

145 39

145 14

170 14

170 9

100

9

9913

1763

1772

100

9

87

21

02

569

2

554 66

5434

5479

145 14

146 34

145 39

145 14

170 14

170 9

100

9

9913

1763

1772

100

9

87

21

02

247 10

247 0

569

2

554 66

183 74

184

97

1313

13

8

299 16

294

17

426

94

426

94

148

52

148

22

148

52

147

5849

1

5011

442

42

426

94

149 18

150 4

150 4

150 15

150 18

150 1

Page 94: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_14 Line MACHO_SPRNGS 345.0 to SPRINGR 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:30:18 2012 temp.wrk

11080

354.21.027

11093LUNA

357.11.035

11217AFTON

357.81.037

13411ART320W 355.3

1.030

11237AMRAD_B

1.043

16101GREENLEE

351.91.020

11266PICANTE

1.031

11038

CALIENTE

1.030

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.0

1.009

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.046

16104SPRINGR 355.9

1.032

HIDALGO

354.21.027

11093LUNA

357.11.035

11217AFTON

357.81.037

13411ART320W 355.3

1.030

11237AMRAD_B

1.043

16101GREENLEE

351.91.020

11038

CALIENTE

1.030

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02413399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.046

16104SPRINGR 355.9

1.032

11017ARROYO

1.024

11111NEWMAN

356.31.033

11420WA300POI

1.028

11423ARR___PS1

1.017

11421

WA300_C

1.040

11047MACHO_SPRNGS

1.038

11424

WA300_C2

1.042

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

05 1

1

1

6013 14013 2

05 1

75 8 175 8 2

75 9 175 9 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-15.91.000

1.000

912

958

146 1

147 47

146 26

146 1

170 6

170 1

100

9

9913

3047

3055

100

9

87

13

05

541

5

527 53

912

958

146 1

147 47

146 26

146 1

170 6

170 1

100

9

9913

3047

3055

100

9

87

13

05

247 2

247 9

541

5

527 53

183 71

183

93

13 4

13

0

299 17

294

17

426

92

426

92

148

49

149

25

148

49

148

56

50 2

5090

442

39

426

92

149 18

150 3

150 3

150 16

150 18

150 1

Page 95: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_15 Line AMRAD 345.0 to AA100W 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:30:23 2012 temp.wrk

11080

354.31.027

11093LUNA

357.01.035

11217AFTON

357.31.036

13411ART320W 355.3

1.030

11237AMRAD_B

1.032

16101GREENLEE

352.51.022

11266PICANTE

1.030

11038

CALIENTE

1.029

11010AMRAD

1.037

13400ARTESIA

345.01.000

10369WESTMESA 348.1

1.009

13399AA100W

358.81.040

13397AA100W_P1

11238AMRAD_A

1.046

16104SPRINGR 356.0

1.032

HIDALGO

354.31.027

11093LUNA

357.01.035

11217AFTON

357.31.036

13411ART320W 355.3

1.030

11237AMRAD_B

1.032

16101GREENLEE

352.51.022

11038

CALIENTE

1.029

11010AMRAD

1.037

13400ARTESIA

345.01.000

11014

ARR___PS

1.02213399AA100W

358.81.040

13397AA100W_P1

11238AMRAD_A

1.046

16104SPRINGR 356.0

1.032

11017ARROYO

1.022

11111NEWMAN

355.81.031

11420WA300POI

1.028

11423ARR___PS1

1.017

11421

WA300_C

1.040

11047MACHO_SPRNGS

1.038

11424

WA300_C2

1.042

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

025 1

1

1

6013 14013 2

025 1

75 8 175 8 2

75 9 175 9 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-17.51.000

1.000

70 1

7046

209 5

210 47

208 16

209 5

239 4

240 9

111 31

112 43

100

7

71

13

025

484

18

472 35

70 1

7046

209 5

210 47

208 16

209 5

239 4

240 9

111 31

112 43

100

7

71

13

025

310 7

311 15

484

18

472 35

182 69

183

91

72 6

71

13

299 17

294

17

424

89

424

89

146

48

146

26

146

48

145

55188

15

185 6

235 8

234103

440

38

424

89

149 18

150 3

150 3

150 16

150 18

150 1

Page 96: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_16 Line AA100W 345.0 to ARTESIA 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:30:28 2012 temp.wrk

11080

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.026

11111NEWMAN

356.81.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

463

20

453 28

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

246 6

246 5

463

20

453 28

174 65

174

88

12 8

12

3

299 15

294

15

419

87

419

87

140

49

140

25

140

49

139

56151

10

149 1

199 2

198 95

434

41

419

87

149 17

150 5

150 5

150 14

150 17

150 2

Page 97: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_17 Line WESTMESA 345.0 to ARR___PS1 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:30:33 2012 temp.wrk

11080

354.91.029

11093LUNA

358.01.038

11217AFTON

360.51.045

13411ART320W 355.3

1.030

11237AMRAD_B

1.054

16101GREENLEE

352.61.022

11266PICANTE

1.040

11038

CALIENTE

1.038

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 352.9

1.023

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.043

16104SPRINGR 355.9

1.032

HIDALGO

354.91.029

11093LUNA

358.01.038

11217AFTON

360.51.045

13411ART320W 355.3

1.030

11237AMRAD_B

1.054

16101GREENLEE

352.61.022

11038

CALIENTE

1.038

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.04613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.043

16104SPRINGR 355.9

1.032

11017ARROYO

1.046

11111NEWMAN

360.31.044

11420WA300POI

1.083

11423ARR___PS1

1.083

11421

WA300_C

1.067

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.066

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

021 1

1

1

6013 14013 2

021 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-34.01.000

1.000

48 8

4853

236 34

237 72

235 13

236 34

164 39

164 34

100

9

9913

8938

8949

100

9

87

43

021

497

17

485 41

48 8

4853

236 34

237 72

235 13

236 34

164 39

164 34

100

9

9913

8938

8949

100

9

87

43

021

236 39

237 27

497

17

485 41

7514

75

14

1235

12

30

299 41

295

35

288

12

288

12

0 00 0

207

14

203 13

253 16

252112

294

35

288

12

149 8

150 31

150 31

150 12

150 13

150 32

Page 98: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_18 Line WA300POI 345.0 to ARR___PS 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:30:38 2012 temp.wrk

11080

352.31.021

11093LUNA

354.31.027

11217AFTON

355.21.030

13411ART320W 355.3

1.030

11237AMRAD_B

1.041

16101GREENLEE

350.61.016

11266PICANTE

1.029

11038

CALIENTE

1.029

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 349.9

1.014

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.046

16104SPRINGR 354.8

1.028

HIDALGO

352.31.021

11093LUNA

354.31.027

11217AFTON

355.21.030

13411ART320W 355.3

1.030

11237AMRAD_B

1.041

16101GREENLEE

350.61.016

11038

CALIENTE

1.029

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02713399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.046

16104SPRINGR 354.8

1.028

11017ARROYO

1.027

11111NEWMAN

355.51.030

11420WA300POI

1.028

11423ARR___PS1

1.018

11421

WA300_C

1.040

11047MACHO_SPRNGS

1.027

11424

WA300_C2

1.042

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

011 1

1

1

6013 14013 2

011 1

75 8 175 8 2

75 9 175 9 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-34.01.000

1.000

105 13

105 55

408 53

413 59

405 48

408 53

146 3

146 3

100

9

9913

7450

7460

100

9

88

6

011

570

2

554 64

105 13

105 55

408 53

413 59

405 48

408 53

146 3

146 3

100

9

9913

7450

7460

100

9

88

6

011

209 0

209 12

570

2

554 64

142 0

141

25

11 2

11

7

299 17

294

17

0 00 0

291

20

290

105

291

20

294

17324

42

315 42

364 39

363144

149 18

150 3

150 3

150 16

150 18

150 1

Page 99: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_19 Line WA300POI 345.0 to WA300_C 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:30:44 2012 temp.wrk

11080

354.11.026

11093LUNA

356.51.033

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

352.21.021

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 349.6

1.013

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.044

16104SPRINGR 355.7

1.031

HIDALGO

354.11.026

11093LUNA

356.51.033

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

352.21.021

11038

CALIENTE

1.034

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.03713399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.044

16104SPRINGR 355.7

1.031

11017ARROYO

1.037

11111NEWMAN

358.21.038

11420WA300POI

1.041

11423ARR___PS1

1.026

11421

WA300_C

1.030

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.030

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

07 1

1

1

6013 14013 2

07 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

6.41.000

1.000

34 9

3454

324 43

328 67

323 29

324 43

156 23

156 17

100

9

9913

245

253

100

9

88

27

07

528

11

514 51

34 9

3454

324 43

328 67

323 29

324 43

156 23

156 17

100

9

9913

245

253

100

9

88

27

07

225 21

225 10

528

11

514 51

33 8

33

20

1118

11

13

146

5

146

5

148

74

149

1

148

74

147

80265

26

259 26

309 27

308127

147

80

146

5

145 0

145 21

148 10

148 29

149 29

148 10

Page 100: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_20 Line WA300_C 345.0 to WA300_C2 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:30:55 2012 temp.wrk

11080

354.71.028

11093LUNA

357.51.036

11217AFTON

359.21.041

13411ART320W 355.3

1.030

11237AMRAD_B

1.049

16101GREENLEE

352.71.022

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 350.5

1.016

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.044

16104SPRINGR 356.0

1.032

HIDALGO

354.71.028

11093LUNA

357.51.036

11217AFTON

359.21.041

13411ART320W 355.3

1.030

11237AMRAD_B

1.049

16101GREENLEE

352.71.022

11038

CALIENTE

1.035

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.03613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.044

16104SPRINGR 356.0

1.032

11017ARROYO

1.036

11111NEWMAN

358.61.039

11420WA300POI

1.047

11423ARR___PS1

1.030

11421

WA300_C

1.046

11047MACHO_SPRNGS

1.039

11424

WA300_C2

1.030

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

010 1

1

1

6013 14013 2

010 1

75 7 175 7 2

75 6 175 6 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-6.71.000

1.000

43 5

4351

239 25

240 63

238 5

239 25

163 25

164 20

100

9

9913

8337

8347

100

9

88

30

010

495

17

484 40

43 5

4351

239 25

240 63

238 5

239 25

163 25

164 20

100

9

9913

8337

8347

100

9

88

30

010

236 23

237 12

495

17

484 40

7214

72

42

1221

12

16

150 8

148

25

285

25

285

25

144

83

144

7

144

83

143

89209

16

205 12

255 15

254111

292

64

285

25

148 10

148 29

150 11

150 8

Page 101: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

tran_21 Tran ARR___PS 345.00 to ARROYO 345.00 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:31:00 2012 temp.wrk

11080

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.026

11111NEWMAN

356.81.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

463

20

453 28

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

246 6

246 5

463

20

453 28

174 65

174

88

12 8

12

3

299 15

294

15

419

87

419

87

140

49

140

25

140

49

139

56151

10

149 1

199 2

198 95

434

41

419

87

149 17

150 5

150 5

150 14

150 17

150 2

Page 102: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

tran_22 Tran ARR___PS1 345.00 to WA300POI 345.00 Circuit 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:31:06 2012 temp.wrk

11080

354.91.029

11093LUNA

358.01.038

11217AFTON

360.51.045

13411ART320W 355.3

1.030

11237AMRAD_B

1.054

16101GREENLEE

352.61.022

11266PICANTE

1.040

11038

CALIENTE

1.038

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.0

1.009

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.043

16104SPRINGR 355.9

1.032

HIDALGO

354.91.029

11093LUNA

358.01.038

11217AFTON

360.51.045

13411ART320W 355.3

1.030

11237AMRAD_B

1.054

16101GREENLEE

352.61.022

11038

CALIENTE

1.038

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.04613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.043

16104SPRINGR 355.9

1.032

11017ARROYO

1.046

11111NEWMAN

360.31.044

11420WA300POI

1.083

11423ARR___PS1

1.011

11421

WA300_C

1.068

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.066

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

021 1

1

1

6013 14013 2

021 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

48 8

4853

236 34

237 72

235 13

236 34

164 39

164 34

100

9

9913

8938

8949

100

9

87

43

021

497

17

485 41

48 8

4853

236 34

237 72

235 13

236 34

164 39

164 34

100

9

9913

8938

8949

100

9

87

43

021

236 39

237 28

497

17

485 41

7514

75

14

1235

12

30

299 41

295

35

288

12

288

12

0 0 0

70

207

14

203 13

253 16

252113

295

35

288

12

149 9

150 31

150 31

150 12

150 13

150 33

Page 103: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_23 Gen AMRAD_A 13.2 Unit ID 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:31:11 2012 temp.wrk

11080

354.51.027

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.037

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.41.036

13397AA100W_P1

11238AMRAD_A

1.044

16104SPRINGR 356.1

1.032

HIDALGO

354.51.027

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.037

13400ARTESIA

345.01.000

11014

ARR___PS

1.02513399AA100W

357.41.036

13397AA100W_P1

11238AMRAD_A

1.044

16104SPRINGR 356.1

1.032

11017ARROYO

1.025

11111NEWMAN

356.71.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

1

1

1

6013 14013 2

1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 44

153 0

154 47

153 25

153 0

169 11

169 5

100

9

9914

163 25

164 41

100

9

87

18

00

463

20

453 28

119 2

119 44

153 0

154 47

153 25

153 0

169 11

169 5

100

9

9914

163 25

164 41

100

9

87

18

00

246 6

246 4

463

20

453 28

174 65

174

88

12 9

12

4

299 15

294

15

419

87

419

87

140

49

140

25

140

49

139

56151

11

149 1

199 2

198 95

434

41

419

87

149 17

150 5

150 5

150 15

150 17

150 2

Page 104: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_24 Gen NEWMANG3 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:31:17 2012 temp.wrk

11080

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.026

11111NEWMAN

356.81.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

463

20

453 28

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

246 6

246 5

463

20

453 28

174 65

174

88

12 8

12

3

299 15

294

15

419

87

419

87

140

49

140

25

140

49

139

56151

10

149 1

199 2

198 95

434

41

419

87

149 17

150 5

150 5

150 14

150 17

150 2

Page 105: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_25 Gen NEWMN4S1 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:31:22 2012 temp.wrk

11080

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.026

11111NEWMAN

356.81.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

463

20

453 28

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

246 6

246 5

463

20

453 28

174 65

174

88

12 8

12

3

299 15

294

15

419

87

419

87

140

49

140

25

140

49

139

56151

10

149 1

199 2

198 95

434

41

419

87

149 17

150 5

150 5

150 14

150 17

150 2

Page 106: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_26 Gen NEWMN5G1 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:31:30 2012 temp.wrk

11080

354.51.027

11093LUNA

357.51.036

11217AFTON

358.11.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.027

11093LUNA

357.51.036

11217AFTON

358.11.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02513399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.025

11111NEWMAN

356.61.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

03 1

1

1

6013 14013 2

03 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-20.61.000

1.000

119 2

118 44

160 0

161 47

159 24

160 0

168 8

168 3

100

9

9913

163 25

163 41

100

9

88

14

03

463

20

453 28

119 2

118 44

160 0

161 47

159 24

160 0

168 8

168 3

100

9

9913

163 25

163 41

100

9

88

14

03

246 5

247 6

463

20

453 28

174 65

174

87

12 6

12

1

299 15

294

15

417

86

417

86

138

49

139

25

138

49

138

56152

11

150 1

199 2

199 95

432

41

417

86

149 17

150 5

150 5

150 14

150 17

150 2

Page 107: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_27 Gen NEWMN5G2 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:31:36 2012 temp.wrk

11080

354.51.027

11093LUNA

357.51.036

11217AFTON

358.11.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.027

11093LUNA

357.51.036

11217AFTON

358.11.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02513399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.025

11111NEWMAN

356.61.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

03 1

1

1

6013 14013 2

03 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-20.61.000

1.000

119 2

118 44

160 0

161 47

159 24

160 0

168 8

168 3

100

9

9913

163 25

163 41

100

9

88

14

03

463

20

453 28

119 2

118 44

160 0

161 47

159 24

160 0

168 8

168 3

100

9

9913

163 25

163 41

100

9

88

14

03

246 5

247 6

463

20

453 28

174 65

174

87

12 6

12

1

299 15

294

15

417

86

417

86

138

49

139

25

138

49

138

56152

11

150 1

199 2

199 95

432

41

417

86

149 17

150 5

150 5

150 14

150 17

150 2

Page 108: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_28 Gen NEWMN5S1 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:31:41 2012 temp.wrk

11080

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.026

11111NEWMAN

356.81.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

463

20

453 28

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

246 6

246 5

463

20

453 28

174 65

174

88

12 8

12

3

299 15

294

15

419

87

419

87

140

49

140

25

140

49

139

56151

10

149 1

199 2

198 95

434

41

419

87

149 17

150 5

150 5

150 14

150 17

150 2

Page 109: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_29 Gen NEWMN6G1 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:31:47 2012 temp.wrk

11080

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.026

11111NEWMAN

356.81.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

463

20

453 28

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

246 6

246 5

463

20

453 28

174 65

174

88

12 8

12

3

299 15

294

15

419

87

419

87

140

49

140

25

140

49

139

56151

10

149 1

199 2

198 95

434

41

419

87

149 17

150 5

150 5

150 14

150 17

150 2

Page 110: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_30 Gen NEWMN6G2 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:31:52 2012 temp.wrk

11080

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.026

11111NEWMAN

356.81.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

463

20

453 28

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

246 6

246 5

463

20

453 28

174 65

174

88

12 8

12

3

299 15

294

15

419

87

419

87

140

49

140

25

140

49

139

56151

10

149 1

199 2

198 95

434

41

419

87

149 17

150 5

150 5

150 14

150 17

150 2

Page 111: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_31 Gen NEWMN6S1 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:31:58 2012 temp.wrk

11080

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.026

11111NEWMAN

356.81.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

463

20

453 28

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

246 6

246 5

463

20

453 28

174 65

174

88

12 8

12

3

299 15

294

15

419

87

419

87

140

49

140

25

140

49

139

56151

10

149 1

199 2

198 95

434

41

419

87

149 17

150 5

150 5

150 14

150 17

150 2

Page 112: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_32 Gen ART320W_G1 34.5 Unit ID 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:32:04 2012 temp.wrk

11080

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.026

11111NEWMAN

356.81.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

463

20

453 28

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

246 6

246 5

463

20

453 28

174 65

174

88

12 8

12

3

299 15

294

15

419

87

419

87

140

49

140

25

140

49

139

56151

10

149 1

199 2

198 95

434

41

419

87

149 17

150 5

150 5

150 14

150 17

150 2

Page 113: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_33 Gen ART320W_G2 34.5 Unit ID 1

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:32:09 2012 temp.wrk

11080

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 348.3

1.010

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

HIDALGO

354.51.028

11093LUNA

357.61.036

11217AFTON

358.21.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

352.41.022

11038

CALIENTE

1.031

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.02613399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.045

16104SPRINGR 356.1

1.032

11017ARROYO

1.026

11111NEWMAN

356.81.034

11420WA300POI

1.031

11423ARR___PS1

1.018

11421

WA300_C

1.041

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.043

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-21.01.000

1.000

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

463

20

453 28

119 2

119 44

153 0

154 48

153 25

153 0

169 10

169 4

100

9

9913

163 25

164 41

100

9

87

16

02

246 6

246 5

463

20

453 28

174 65

174

88

12 8

12

3

299 15

294

15

419

87

419

87

140

49

140

25

140

49

139

56151

10

149 1

199 2

198 95

434

41

419

87

149 17

150 5

150 5

150 14

150 17

150 2

Page 114: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_34 Gen WA300W 34.5 ALL UNITS

MARCH 31, 2010 2014_op_ap1.SAV

MW/MVAR

Rating = 2

wa300w_2014_s1.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:32:15 2012 temp.wrk

11080

355.11.029

11093LUNA

358.71.040

11217AFTON

361.11.047

13411ART320W 355.3

1.030

11237AMRAD_B

1.056

16101GREENLEE

352.71.022

11266PICANTE

1.041

11038

CALIENTE

1.039

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 353.2

1.024

13399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.043

16104SPRINGR 356.1

1.032

HIDALGO

355.11.029

11093LUNA

358.71.040

11217AFTON

361.11.047

13411ART320W 355.3

1.030

11237AMRAD_B

1.056

16101GREENLEE

352.71.022

11038

CALIENTE

1.039

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.04713399AA100W

357.61.037

13397AA100W_P1

11238AMRAD_A

1.043

16104SPRINGR 356.1

1.032

11017ARROYO

1.047

11111NEWMAN

360.91.046

11420WA300POI

1.070

11423ARR___PS1

1.045

11421

WA300_C

1.079

11047MACHO_SPRNGS

1.043

11424

WA300_C2

1.080

11425WA300_G2

1.029

11422WA300_G

1.027

1

1

6013 14013 2

023 1

1

1

6013 14013 2

023 1

1

2

1

2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-3.71.000

1.000

123 7

123 50

218 30

219 71

217 8

218 30

120 50

120 44

100

9

9913

167 28

168 44

100

9

86

46

023

462

22

452 28

123 7

123 50

218 30

219 71

217 8

218 30

120 50

120 44

100

9

9913

167 28

168 44

100

9

86

46

023

167 53

167 40

462

22

452 28

2727

27

1

1338

13

33

026

0

70

141

31

141

31

143

124

144

46

143

124

142

131149

8

147 1

197 6

196 99

142

61

141

31

026

00

00

00

00

00

Page 115: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

Base Case

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 1

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:18:02 2012 temp.wrk

11080

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.029

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.037

11111NEWMAN

358.31.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

532

9

518 52

1013

10

8

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

228 17

228 6

532

9

518 52

19 4

19

25

145

3

145

8

299 8

297

10

150

70

149

7

150

70

150

70262

25

256 26

306 26

305126

147

79

145

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 116: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_1 Line ART320W 345.0 to ARTESIA 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:18:08 2012 temp.wrk

11080

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.029

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.037

11111NEWMAN

358.31.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

532

9

518 52

1013

10

8

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

228 17

228 6

532

9

518 52

19 4

19

25

145

3

145

8

299 8

297

10

150

70

149

7

150

70

150

70262

25

256 26

306 26

305126

147

79

145

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 117: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_2 Line CALIENTE 345.0 to AMRAD 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:18:14 2012 temp.wrk

11080

354.11.026

11093LUNA

356.71.034

11217AFTON

358.91.040

13411ART320W 355.3

1.030

11237AMRAD_B

1.045

16101GREENLEE

352.01.020

11038

CALIENTE

1.038

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.030

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.5

1.030

HIDALGO

354.11.026

11093LUNA

356.71.034

11217AFTON

358.91.040

13411ART320W 355.3

1.030

11237AMRAD_B

1.045

16101GREENLEE

352.01.020

11266PICANTE

1.039

11038

CALIENTE

1.038

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04313399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.5

1.030

11017ARROYO

1.039

11111NEWMAN

359.11.041

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

05 1

1

1

6013 14013 2

05 1

75 5 175 5 2

75 6 175 6 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

2310

2356

318 46

321 72

316 32

318 46

167 8

167 3

100

8

9912

1346

1354

100

8

99

12

05

532

9

518 53

2310

2356

318 46

321 72

316 32

318 46

167 8

167 3

100

8

9912

1346

1354

100

8

99

12

05

235 9

235 3

532

9

518 53

16 1

16

27

145

1

145

7

299 7

297

10

150

71

149

6

150

71

150

71262

24

256 26

306 27

305127

147

81

145

7

149 13

150 8

150 8

150 11

150 13

150 6

Page 118: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_3 Line LUNA 345.0 to DIABLO 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:18:20 2012 temp.wrk

11080

352.11.021

11093LUNA

353.31.024

11217AFTON

353.31.024

13411ART320W 355.3

1.030

11237AMRAD_B

1.035

16101GREENLEE

351.01.017

11038

CALIENTE

1.026

11010AMRAD

1.039

13400ARTESIA

345.01.000

10369WESTMESA 354.6

1.028

13399AA100W

358.01.038

13397AA100W_P1

11238AMRAD_A

1.049

16104SPRINGR 355.2

1.030

HIDALGO

352.11.021

11093LUNA

353.31.024

11217AFTON

353.31.024

13411ART320W 355.3

1.030

11237AMRAD_B

1.035

16101GREENLEE

351.01.017

11266PICANTE

1.026

11038

CALIENTE

1.026

11010AMRAD

1.039

13400ARTESIA

345.01.000

11014

ARR___PS

1.03213399AA100W

358.01.038

13397AA100W_P1

11238AMRAD_A

1.049

16104SPRINGR 355.2

1.030

11017ARROYO

1.025

11111NEWMAN

354.21.027

11420WA300POI

1.044

11423ARR___PS1

1.044

11421

WA300_C

1.043

11047MACHO_SPRNGS

1.027

11424

WA300_C2

1.045

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

025 1

1

1

6013 14013 2

025 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

17.8

1.000

1.000

22 6

2239

509 68

517 48

505 78

509 68

219 16

219 21

100

8

9913

1236

1244

100

8

94

11

025

531

5

518 49

619

6

24

22 6

2239

509 68

517 48

505 78

509 68

219 16

219 21

100

8

9913

1236

1244

100

8

94

11

025

323 21

324 28

531

5

518 49

4410

44

17

145

9

145

15

299 10

297

7

150

64

149

13

150

64

150

64260

32

254 18

304 15

303113

147

71

145

15

149 15

150 7

150 7

150 13

150 15

150 4

Page 119: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_4 Line LUNA 345.0 to HIDALGO 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:18:25 2012 temp.wrk

11080

346.31.004

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

348.31.009

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.1

1.029

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.1

1.029

HIDALGO

346.31.004

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

348.31.009

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.1

1.029

11017ARROYO

1.036

11111NEWMAN

358.31.038

11420WA300POI

1.046

11423ARR___PS1

1.046

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.034

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

00 1

1

1

6013 14013 2

00 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.8

1.000

1.000

314 42

317 68

313 27

314 42

159 18

159 13

100

8

9912

31 4

3111

100

8

89

20

00

518

7

505 31

1013

10

8

314 42

317 68

313 27

314 42

159 18

159 13

100

8

9912

31 4

3111

100

8

89

20

00

228 17

228 6

518

7

505 31

17 3

17

26

147

2

147

8

299 8

297

9

148

70

147

7

148

70

148

70278

27

271 31

321 32

320133

149

79

147

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 120: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_5 Line LUNA 345.0 to AFTON 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:18:31 2012 temp.wrk

11080

351.11.018

11093LUNA

351.61.019

11217AFTON

358.01.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

350.41.016

11038

CALIENTE

1.032

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 354.4

1.027

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.050

16104SPRINGR 355.1

1.029

HIDALGO

351.11.018

11093LUNA

351.61.019

11217AFTON

358.01.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.044

16101GREENLEE

350.41.016

11266PICANTE

1.033

11038

CALIENTE

1.032

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.03813399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.050

16104SPRINGR 355.1

1.029

11017ARROYO

1.031

11111NEWMAN

357.31.036

11420WA300POI

1.044

11423ARR___PS1

1.044

11421

WA300_C

1.043

11047MACHO_SPRNGS

1.023

11424

WA300_C2

1.045

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

010 1

1

1

6013 14013 2

010 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

27.0

1.000

1.000

2415

2430

028

00

7327

7321

100

8

9912

633

641

100

8

74

11

010

534

2

520 48

25 4

25

1

2415

2430

028

00

7327

7321

100

8

9912

633

641

100

8

74

11

010

9735

9721

534

2

520 48

7224

72

52

147

1

148

9

299 10

297

7

147

70

147

7

147

70

147

70263

37

257 15

306 10

305108

149

77

148

9

149 15

150 7

150 7

150 12

150 14

150 5

Page 121: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_6 Line NEWMAN 345.0 to ARROYO 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:18:37 2012 temp.wrk

11080

353.81.026

11093LUNA

356.31.033

11217AFTON

358.11.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.047

16101GREENLEE

351.91.020

11038

CALIENTE

1.034

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 354.4

1.027

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.81.026

11093LUNA

356.31.033

11217AFTON

358.11.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.047

16101GREENLEE

351.91.020

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.02813399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.020

11111NEWMAN

358.01.038

11420WA300POI

1.043

11423ARR___PS1

1.043

11421

WA300_C

1.042

11047MACHO_SPRNGS

1.034

11424

WA300_C2

1.044

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

03 1

1

1

6013 14013 2

03 1

75 7 175 7 2

75 8 175 8 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

21 8

2154

309 40

312 67

308 25

309 40

164 16

164 10

100

8

9912

1544

1553

100

8

92

17

03

531

9

517 52

710

7 5

21 8

2154

309 40

312 67

308 25

309 40

164 16

164 10

100

8

9912

1544

1553

100

8

92

17

03

235 15

236 4

531

9

517 52

149

13

150

18

299 12

297

5

145

61

145

15

145

61

145

61260

25

254 25

304 25

303125

151

66

150

18

149 16

150 6

150 6

150 13

150 16

150 4

Page 122: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_7 Line NEWMAN 345.0 to AFTON 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:18:43 2012 temp.wrk

11080

352.31.021

11093LUNA

353.61.025

11217AFTON

356.11.032

13411ART320W 355.3

1.030

11237AMRAD_B

1.040

16101GREENLEE

351.01.018

11038

CALIENTE

1.029

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 354.3

1.027

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.051

16104SPRINGR 355.2

1.030

HIDALGO

352.31.021

11093LUNA

353.61.025

11217AFTON

356.11.032

13411ART320W 355.3

1.030

11237AMRAD_B

1.040

16101GREENLEE

351.01.018

11266PICANTE

1.029

11038

CALIENTE

1.029

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.03513399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.051

16104SPRINGR 355.2

1.030

11017ARROYO

1.027

11111NEWMAN

355.71.031

11420WA300POI

1.044

11423ARR___PS1

1.044

11421

WA300_C

1.043

11047MACHO_SPRNGS

1.028

11424

WA300_C2

1.044

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

019 1

1

1

6013 14013 2

019 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

26.5

1.000

1.000

22 5

2240

00

053

7313

73 7

100

8

9912

838

846

100

8

74

0

019

533

5

520 50

26 8

26

13

22 5

2240

00

053

7313

73 7

100

8

9912

838

846

100

8

74

0

019

9719

97 5

533

5

520 50

7318

73

46

149

3

150

11

299 11

297

6

145

68

145

9

145

68

145

68263

32

257 19

306 17

305115

152

74

150

11

149 15

150 6

150 6

150 13

150 15

150 4

Page 123: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_8 Line CALIENTE 345.0 to PICANTE 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:18:49 2012 temp.wrk

11080

354.01.026

11093LUNA

356.51.033

11217AFTON

358.91.040

13411ART320W 355.3

1.030

11237AMRAD_B

1.040

16101GREENLEE

351.91.020

11038

CALIENTE

1.029

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.030

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.050

16104SPRINGR 355.4

1.030

HIDALGO

354.01.026

11093LUNA

356.51.033

11217AFTON

358.91.040

13411ART320W 355.3

1.030

11237AMRAD_B

1.040

16101GREENLEE

351.91.020

11266PICANTE

1.039

11038

CALIENTE

1.029

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04213399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.050

16104SPRINGR 355.4

1.030

11017ARROYO

1.038

11111NEWMAN

359.01.041

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

017 1

1

1

6013 14013 2

017 1

75 5 175 5 2

75 6 175 6 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

25 9

2555

294 43

297 73

293 27

294 43

100

8

9912

1145

1154

100

8

55

1

017

532

9

519 53

45 7

45

12

25 9

2555

294 43

297 73

293 27

294 43

100

8

9912

1145

1154

100

8

55

1

017

131 13

132 1

532

9

519 53

50 1

50

27

142

3

143

8

299 7

297

10

153

70

152

7

153

70

153

70263

25

257 26

307 27

306127

144

80

143

8

149 13

150 8

150 8

150 11

150 13

150 6

Page 124: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_9 Line PICANTE 345.0 to NEWMAN 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:18:55 2012 temp.wrk

11080

353.81.025

11093LUNA

356.21.033

11217AFTON

358.61.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.038

16101GREENLEE

351.81.020

11038

CALIENTE

1.027

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.030

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.051

16104SPRINGR 355.4

1.030

HIDALGO

353.81.025

11093LUNA

356.21.033

11217AFTON

358.61.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.038

16101GREENLEE

351.81.020

11266PICANTE

1.027

11038

CALIENTE

1.027

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.051

16104SPRINGR 355.4

1.030

11017ARROYO

1.036

11111NEWMAN

358.61.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.034

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

022 1

1

1

6013 14013 2

022 1

75 6 175 6 2

75 6 175 6 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

26 8

2654

266 38

268 72

265 20

266 38

18 0

18 6

100

8

9912

945

953

100

8

47

5

022

533

9

519 53

5212

52

17

26 8

2654

266 38

268 72

265 20

266 38

18 0

18 6

100

8

9912

945

953

100

8

47

5

022

533

9

519 53

82 2

82

25

139

5

139

9

299 7

297

10

156

69

156

8

156

69

156

69264

26

259 26

308 26

307126

141

79

139

9

149 14

150 8

150 8

150 11

150 13

150 6

Page 125: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_10 Line HIDALGO 345.0 to GREENLEE 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:18:59 2012 temp.wrk

11080

360.11.044

11093LUNA

358.41.039

11217AFTON

359.51.042

13411ART320W 355.3

1.030

11237AMRAD_B

1.050

16101GREENLEE

347.31.007

11038

CALIENTE

1.036

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.3

1.030

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 355.1

1.029

HIDALGO

360.11.044

11093LUNA

358.41.039

11217AFTON

359.51.042

13411ART320W 355.3

1.030

11237AMRAD_B

1.050

16101GREENLEE

347.31.007

11266PICANTE

1.038

11038

CALIENTE

1.036

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04313399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 355.1

1.029

11017ARROYO

1.039

11111NEWMAN

359.11.041

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.045

11047MACHO_SPRNGS

1.039

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

06 1

1

1

6013 14013 2

06 1

75 5 175 5 2

75 6 175 6 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

3640

36 7

320 34

323 61

318 20

320 34

158 24

158 19

100

8

9912

100

8

90

27

06

534

15

520 32

1019

10

14

3640

36 7

320 34

323 61

318 20

320 34

158 24

158 19

100

8

9912

100

8

90

27

06

227 24

228 12

534

15

520 32

24 4

24

25

140

3

140

8

299 7

297

10

155

71

155

7

155

71

155

71255

18

249 29

299 32

298132

142

81

140

8

149 13

150 8

150 8

150 11

150 13

150 6

Page 126: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_11 Line LUNA 345.0 to LEF 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:19:05 2012 temp.wrk

11080

347.21.006

11093LUNA

348.11.009

11217AFTON

353.31.024

13411ART320W 355.3

1.030

11237AMRAD_B

1.039

16101GREENLEE

347.41.007

11038

CALIENTE

1.028

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 354.3

1.027

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.050

16104SPRINGR 353.9

1.026

HIDALGO

347.21.006

11093LUNA

348.11.009

11217AFTON

353.31.024

13411ART320W 355.3

1.030

11237AMRAD_B

1.039

16101GREENLEE

347.41.007

11266PICANTE

1.029

11038

CALIENTE

1.028

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.03513399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.050

16104SPRINGR 353.9

1.026

11017ARROYO

1.028

11111NEWMAN

355.11.029

11420WA300POI

1.044

11423ARR___PS1

1.044

11421

WA300_C

1.043

11047MACHO_SPRNGS

1.008

11424

WA300_C2

1.044

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

020 1

1

1

6013 14013 2

020 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

22.8

1.000

1.000

211 17

212 49

306 77

309100

304 63

306 77

156 5

156 11

100

8

9912

187 39

186 57

100

8

89

4

020

609

24

590 69

1112

11

17

211 17

212 49

306 77

309100

304 63

306 77

156 5

156 11

100

8

9912

187 39

186 57

100

8

89

4

020

225 8

225 19

609

24

590 69

13 7

13

21

149

4

149

11

299 11

297

6

146

68

145

9

146

68

146

68396

77

383 57

432 47

430156

151

74

149

11

149 15

150 6

150 6

150 13

150 15

150 4

Page 127: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_12 Line WESTMESA 345.0 to ARR___PS 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:19:10 2012 temp.wrk

11080

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.029

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.037

11111NEWMAN

358.31.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

532

9

518 52

1013

10

8

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

228 17

228 6

532

9

518 52

19 4

19

25

145

3

145

8

299 8

297

10

150

70

149

7

150

70

150

70262

25

256 26

306 26

305126

147

79

145

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 128: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_13 Line MACHO_SPRNGS 345.0 to LUNA 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:19:16 2012 temp.wrk

11080

352.01.020

11093LUNA

358.11.038

11217AFTON

359.21.041

13411ART320W 355.3

1.030

11237AMRAD_B

1.049

16101GREENLEE

347.71.008

11038

CALIENTE

1.036

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 354.3

1.027

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 354.6

1.028

HIDALGO

352.01.020

11093LUNA

358.11.038

11217AFTON

359.21.041

13411ART320W 355.3

1.030

11237AMRAD_B

1.049

16101GREENLEE

347.71.008

11266PICANTE

1.037

11038

CALIENTE

1.036

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04213399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 354.6

1.028

11017ARROYO

1.037

11111NEWMAN

358.71.040

11420WA300POI

1.045

11423ARR___PS1

1.045

11421

WA300_C

1.043

11047MACHO_SPRNGS

1.054

11424

WA300_C2

1.045

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

04 1

1

1

6013 14013 2

04 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

26.3

1.000

1.000

313 96

316115

314 33

317 61

312 19

314 33

159 22

159 16

100

8

9912

297 86

294122

100

8

89

24

04

708

51

683110

1016

10

12

313 96

316115

314 33

317 61

312 19

314 33

159 22

159 16

100

8

9912

297 86

294122

100

8

89

24

04

228 21

229 9

708

51

683110

16 1

16

30

148

3

149

4

299 10

297

8

146

74

146

2

146

74

146

7449

0

5010

150

82

149

4

149 15

150 7

150 7

150 12

150 14

150 5

Page 129: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_14 Line MACHO_SPRNGS 345.0 to SPRINGR 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:19:21 2012 temp.wrk

11080

351.31.018

11093LUNA

355.41.030

11217AFTON

357.61.037

13411ART320W 355.3

1.030

11237AMRAD_B

1.046

16101GREENLEE

348.21.009

11038

CALIENTE

1.034

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 354.4

1.027

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 354.8

1.028

HIDALGO

351.31.018

11093LUNA

355.41.030

11217AFTON

357.61.037

13411ART320W 355.3

1.030

11237AMRAD_B

1.046

16101GREENLEE

348.21.009

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04013399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 354.8

1.028

11017ARROYO

1.035

11111NEWMAN

357.71.037

11420WA300POI

1.045

11423ARR___PS1

1.045

11421

WA300_C

1.043

11047MACHO_SPRNGS

1.033

11424

WA300_C2

1.045

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

03 1

1

1

6013 14013 2

03 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

24.0

1.000

1.000

264 64

266 91

314 45

317 71

312 31

314 45

159 14

159 9

100

8

9912

244 74

242100

100

8

89

16

03

677

41

655 97

10 9

10

4

264 64

266 91

314 45

317 71

312 31

314 45

159 14

159 9

100

8

9912

244 74

242100

100

8

89

16

03

228 13

229 1

677

41

655 97

15 1

15

28

147

0

148

7

299 10

297

8

147

72

147

5

147

72

147

72

50 0

5087

150

80

148

7

149 15

150 7

150 7

150 12

150 14

150 5

Page 130: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_15 Line AMRAD 345.0 to AA100W 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:19:29 2012 temp.wrk

11080

353.11.023

11093LUNA

355.31.030

11217AFTON

356.71.034

13411ART320W 355.3

1.030

11237AMRAD_B

1.035

16101GREENLEE

351.31.018

11038

CALIENTE

1.032

11010AMRAD

1.039

13400ARTESIA

345.01.000

10369WESTMESA 354.9

1.029

13399AA100W

358.81.040

13397AA100W_P1

11238AMRAD_A

1.049

16104SPRINGR 355.1

1.029

HIDALGO

353.11.023

11093LUNA

355.31.030

11217AFTON

356.71.034

13411ART320W 355.3

1.030

11237AMRAD_B

1.035

16101GREENLEE

351.31.018

11266PICANTE

1.033

11038

CALIENTE

1.032

11010AMRAD

1.039

13400ARTESIA

345.01.000

11014

ARR___PS

1.03813399AA100W

358.81.040

13397AA100W_P1

11238AMRAD_A

1.049

16104SPRINGR 355.1

1.029

11017ARROYO

1.033

11111NEWMAN

357.01.035

11420WA300POI

1.045

11423ARR___PS1

1.045

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.030

11424

WA300_C2

1.045

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

025 1

1

1

6013 14013 2

025 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

17.0

1.000

1.000

7512

7656

374 51

379 65

372 42

374 51

228 2

228 3

4348

4357

100

7

74

11

025

554

3

539 59

74 5

74

11

7512

7656

374 51

379 65

372 42

374 51

228 2

228 3

4348

4357

100

7

74

11

025

292 1

292 7

554

3

539 59

14 2

14

26

146

4

147

10

299 9

297

8

148

68

148

8

148

68

148

68300

35

293 35

342 34

341137

149

77

147

10

149 14

150 7

150 7

150 12

150 14

150 5

Page 131: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_16 Line AA100W 345.0 to ARTESIA 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:19:34 2012 temp.wrk

11080

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.029

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.037

11111NEWMAN

358.31.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

532

9

518 52

1013

10

8

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

228 17

228 6

532

9

518 52

19 4

19

25

145

3

145

8

299 8

297

10

150

70

149

7

150

70

150

70262

25

256 26

306 26

305126

147

79

145

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 132: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_17 Line WESTMESA 345.0 to ARR___PS1 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:19:40 2012 temp.wrk

11080

354.61.028

11093LUNA

357.51.036

11217AFTON

359.11.041

13411ART320W 355.3

1.030

11237AMRAD_B

1.049

16101GREENLEE

352.51.022

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 353.0

1.023

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 355.9

1.031

HIDALGO

354.61.028

11093LUNA

357.51.036

11217AFTON

359.11.041

13411ART320W 355.3

1.030

11237AMRAD_B

1.049

16101GREENLEE

352.51.022

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04013399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 355.9

1.031

11017ARROYO

1.035

11111NEWMAN

358.51.039

11420WA300POI

1.072

11423ARR___PS1

1.072

11421

WA300_C

1.059

11047MACHO_SPRNGS

1.039

11424

WA300_C2

1.059

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 2 175 2 2

75 2 175 2 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

34.0

1.000

1.000

53 5

5351

228 23

230 63

227 2

228 23

167 19

167 13

100

8

9912

9336

9447

100

8

90

22

02

495

16

484 40

1015

10

10

53 5

5351

228 23

230 63

227 2

228 23

167 19

167 13

100

8

9912

9336

9447

100

8

90

22

02

241 17

241 6

495

16

484 40

9023

90

50

287

31

290

4

299 24

297

39

0 00 0

203

15

200 11

249 14

249110

297

39

290

4

149 1

150 23

150 23

150 4

150 4

150 23

Page 133: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_19 Line WA300POI 345.0 to WA300_C 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:19:46 2012 temp.wrk

11080

354.01.026

11093LUNA

356.41.033

11217AFTON

358.01.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.047

16101GREENLEE

352.21.021

11038

CALIENTE

1.034

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 350.8

1.017

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.7

1.031

HIDALGO

354.01.026

11093LUNA

356.41.033

11217AFTON

358.01.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.047

16101GREENLEE

352.21.021

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.03613399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.7

1.031

11017ARROYO

1.034

11111NEWMAN

357.81.037

11420WA300POI

1.032

11423ARR___PS1

1.032

11421

WA300_C

1.030

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.030

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

02 1

1

1

6013 14013 2

02 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

6.3

1.000

1.000

31 8

3154

320 40

323 65

318 26

320 40

159 15

159 9

100

8

9912

444

452

100

8

90

17

02

527

10

513 51

10 9

10

5

31 8

3154

320 40

323 65

318 26

320 40

159 15

159 9

100

8

9912

444

452

100

8

90

17

02

228 13

228 2

527

10

513 51

22 4

22

32

143

8

143

3

145

88

145

12

145

88

145

88264

26

258 25

307 26

306126

145

88

143

3

144 0

144 21

148 10

148 29

148 29

148 10

Page 134: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

line_20 Line WA300_C 345.0 to WA300_C2 345.0 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:19:51 2012 temp.wrk

11080

354.01.026

11093LUNA

356.51.033

11217AFTON

358.31.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

352.11.021

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 353.7

1.025

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.6

1.031

HIDALGO

354.01.026

11093LUNA

356.51.033

11217AFTON

358.31.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

352.11.021

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04013399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.6

1.031

11017ARROYO

1.036

11111NEWMAN

358.21.038

11420WA300POI

1.043

11423ARR___PS1

1.043

11421

WA300_C

1.038

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.030

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

00 1

1

1

6013 14013 2

00 1

75 6 175 6 2

75 10 175 10 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

9.5

1.000

1.000

26 9

2654

317 41

320 67

315 27

317 41

159 18

159 12

100

8

9912

1045

1053

100

8

90

20

00

529

10

515 51

1012

10

8

26 9

2654

317 41

320 67

315 27

317 41

159 18

159 12

100

8

9912

1045

1053

100

8

90

20

00

228 17

229 5

529

10

515 51

19 2

19

26

147

0

147

5

150 0

149

6

087

0

13

0

87

0

87262

25

256 25

306 26

305126

149

81

147

5

148 10

148 29

150 20

150 0

Page 135: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

tran_21 Tran ARR___PS 345.00 to ARROYO 345.00 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:19:56 2012 temp.wrk

11080

352.41.021

11093LUNA

354.41.027

11217AFTON

355.51.030

13411ART320W 355.3

1.030

11237AMRAD_B

1.041

16101GREENLEE

350.71.016

11038

CALIENTE

1.030

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 357.1

1.035

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.049

16104SPRINGR 354.8

1.028

HIDALGO

352.41.021

11093LUNA

354.41.027

11217AFTON

355.51.030

13411ART320W 355.3

1.030

11237AMRAD_B

1.041

16101GREENLEE

350.71.016

11266PICANTE

1.030

11038

CALIENTE

1.030

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.07613399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.049

16104SPRINGR 354.8

1.028

11017ARROYO

1.027

11111NEWMAN

355.81.031

11420WA300POI

1.056

11423ARR___PS1

1.056

11421

WA300_C

1.050

11047MACHO_SPRNGS

1.027

11424

WA300_C2

1.051

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

015 1

1

1

6013 14013 2

015 1

75 3 175 3 2

75 3 175 3 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

103 13

103 56

404 54

410 61

402 49

404 54

149 0

149 5

100

8

9912

7351

7360

100

8

89

2

015

570

2

554 64

10 6

10

11

103 13

103 56

404 54

410 61

402 49

404 54

149 0

149 5

100

8

9912

7351

7360

100

8

89

2

015

213 2

213 14

570

2

554 64

132 0

132

26

299 4

297

21

297

85

295

3

297

85

297

85323

41

314 42

364 39

362144

0

106

0 0

149 8

150 14

150 14

150 5

150 7

150 12

Page 136: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

tran_22 Tran ARR___PS1 345.00 to WA300POI 345.00 Circuit 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:20:02 2012 temp.wrk

11080

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.029

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.037

11111NEWMAN

358.31.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

532

9

518 52

1013

10

8

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

228 17

228 6

532

9

518 52

19 4

19

25

145

3

145

8

299 8

297

10

150

70

149

7

150

70

150

70262

25

256 26

306 26

305126

147

79

145

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 137: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_23 Gen AMRAD_A 13.2 Unit ID 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:20:07 2012 temp.wrk

11080

354.01.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.029

13399AA100W

358.31.039

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

354.01.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.31.039

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.037

11111NEWMAN

358.31.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6012 14012 2

1

1

1

6012 14012 2

1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

23 9

2355

316 42

320 68

315 28

316 42

159 18

159 12

100

8

9912

1345

1354

100

8

89

20

00

532

9

518 52

1012

10

8

23 9

2355

316 42

320 68

315 28

316 42

159 18

159 12

100

8

9912

1345

1354

100

8

89

20

00

228 17

228 6

532

9

518 52

19 4

19

25

145

3

145

8

299 8

297

10

150

70

149

7

150

70

150

70262

25

256 26

306 26

305126

147

79

145

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 138: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_24 Gen NEWMANG3 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:20:12 2012 temp.wrk

11080

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.029

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.037

11111NEWMAN

358.31.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

532

9

518 52

1013

10

8

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

228 17

228 6

532

9

518 52

19 4

19

25

145

3

145

8

299 8

297

10

150

70

149

7

150

70

150

70262

25

256 26

306 26

305126

147

79

145

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 139: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_25 Gen NEWMN4S1 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:20:18 2012 temp.wrk

11080

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.029

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.037

11111NEWMAN

358.31.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

532

9

518 52

1013

10

8

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

228 17

228 6

532

9

518 52

19 4

19

25

145

3

145

8

299 8

297

10

150

70

149

7

150

70

150

70262

25

256 26

306 26

305126

147

79

145

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 140: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_26 Gen NEWMN5G1 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:20:23 2012 temp.wrk

11080

353.91.026

11093LUNA

356.41.033

11217AFTON

358.11.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.047

16101GREENLEE

351.91.020

11038

CALIENTE

1.034

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.030

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.41.033

11217AFTON

358.11.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.047

16101GREENLEE

351.91.020

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.036

11111NEWMAN

358.01.038

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.034

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

14.0

1.000

1.000

26 9

2654

326 42

329 67

324 29

326 42

157 17

157 11

100

8

9912

1045

1054

100

8

90

18

01

533

9

519 53

910

9 6

26 9

2654

326 42

329 67

324 29

326 42

157 17

157 11

100

8

9912

1045

1054

100

8

90

18

01

228 16

228 5

533

9

519 53

23 5

23

24

139

5

140

10

299 8

297

10

155

69

155

8

155

69

155

69264

25

258 26

308 27

307126

141

79

140

10

149 14

150 8

150 8

150 11

150 13

150 6

Page 141: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_27 Gen NEWMN5G2 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:20:29 2012 temp.wrk

11080

353.91.026

11093LUNA

356.41.033

11217AFTON

358.11.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.047

16101GREENLEE

351.91.020

11038

CALIENTE

1.034

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.030

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.41.033

11217AFTON

358.11.038

13411ART320W 355.3

1.030

11237AMRAD_B

1.047

16101GREENLEE

351.91.020

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.036

11111NEWMAN

358.01.038

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.034

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

14.0

1.000

1.000

26 9

2654

326 42

329 67

324 29

326 42

157 17

157 11

100

8

9912

1045

1054

100

8

90

18

01

533

9

519 53

910

9 6

26 9

2654

326 42

329 67

324 29

326 42

157 17

157 11

100

8

9912

1045

1054

100

8

90

18

01

228 16

228 5

533

9

519 53

23 5

23

24

139

5

140

10

299 8

297

10

155

69

155

8

155

69

155

69264

25

258 26

308 27

307126

141

79

140

10

149 14

150 8

150 8

150 11

150 13

150 6

Page 142: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_28 Gen NEWMN5S1 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:20:34 2012 temp.wrk

11080

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.029

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.037

11111NEWMAN

358.31.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

532

9

518 52

1013

10

8

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

228 17

228 6

532

9

518 52

19 4

19

25

145

3

145

8

299 8

297

10

150

70

149

7

150

70

150

70262

25

256 26

306 26

305126

147

79

145

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 143: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_29 Gen NEWMN6G1 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:20:39 2012 temp.wrk

11080

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.029

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.037

11111NEWMAN

358.31.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

532

9

518 52

1013

10

8

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

228 17

228 6

532

9

518 52

19 4

19

25

145

3

145

8

299 8

297

10

150

70

149

7

150

70

150

70262

25

256 26

306 26

305126

147

79

145

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 144: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_30 Gen NEWMN6G2 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:20:45 2012 temp.wrk

11080

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.029

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.037

11111NEWMAN

358.31.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

532

9

518 52

1013

10

8

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

228 17

228 6

532

9

518 52

19 4

19

25

145

3

145

8

299 8

297

10

150

70

149

7

150

70

150

70262

25

256 26

306 26

305126

147

79

145

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 145: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_31 Gen NEWMN6S1 13.8 Unit ID 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:20:50 2012 temp.wrk

11080

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.029

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.037

11111NEWMAN

358.31.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

532

9

518 52

1013

10

8

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

228 17

228 6

532

9

518 52

19 4

19

25

145

3

145

8

299 8

297

10

150

70

149

7

150

70

150

70262

25

256 26

306 26

305126

147

79

145

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 146: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_32 Gen ART320W_G1 34.5 Unit ID 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:20:55 2012 temp.wrk

11080

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.029

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.037

11111NEWMAN

358.31.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

532

9

518 52

1013

10

8

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

228 17

228 6

532

9

518 52

19 4

19

25

145

3

145

8

299 8

297

10

150

70

149

7

150

70

150

70262

25

256 26

306 26

305126

147

79

145

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 147: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_33 Gen ART320W_G2 34.5 Unit ID 1

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:21:01 2012 temp.wrk

11080

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 355.2

1.029

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

HIDALGO

353.91.026

11093LUNA

356.51.033

11217AFTON

358.31.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.048

16101GREENLEE

351.91.020

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.048

16104SPRINGR 355.4

1.030

11017ARROYO

1.037

11111NEWMAN

358.31.039

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.044

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.046

11425WA300_G2

1.000

11422WA300_G

1.000

1

1

6013 14013 2

01 1

1

1

6013 14013 2

01 1

75 6 175 6 2

75 7 175 7 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

13.2

1.000

1.000

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

532

9

518 52

1013

10

8

23 9

2355

316 42

320 68

315 28

316 42

159 19

159 13

100

8

9912

1345

1354

100

8

89

21

01

228 17

228 6

532

9

518 52

19 4

19

25

145

3

145

8

299 8

297

10

150

70

149

7

150

70

150

70262

25

256 26

306 26

305126

147

79

145

8

149 14

150 8

150 8

150 11

150 13

150 6

Page 148: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2014.SAV

gen_34 Gen WA300W 34.5 ALL UNITS

MARCH 31, 2010 2014_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2014_s2.drw

General Electric International, Inc. PSLF Program Tue Jan 17 14:21:06 2012 temp.wrk

11080

354.91.029

11093LUNA

358.31.038

11217AFTON

360.21.044

13411ART320W 355.3

1.030

11237AMRAD_B

1.052

16101GREENLEE

352.61.022

11038

CALIENTE

1.037

11010AMRAD

1.040

13400ARTESIA

345.01.000

10369WESTMESA 353.2

1.024

13399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 356.1

1.032

HIDALGO

354.91.029

11093LUNA

358.31.038

11217AFTON

360.21.044

13411ART320W 355.3

1.030

11237AMRAD_B

1.052

16101GREENLEE

352.61.022

11266PICANTE

1.039

11038

CALIENTE

1.037

11010AMRAD

1.040

13400ARTESIA

345.01.000

11014

ARR___PS

1.04313399AA100W

358.21.038

13397AA100W_P1

11238AMRAD_A

1.047

16104SPRINGR 356.1

1.032

11017ARROYO

1.040

11111NEWMAN

359.61.042

11420WA300POI

1.044

11423ARR___PS1

1.044

11421

WA300_C

1.046

11047MACHO_SPRNGS

1.042

11424

WA300_C2

1.047

11425WA300_G2

0.997

11422WA300_G

0.996

1

1

6013 14013 2

09 1

1

1

6013 14013 2

09 1

1

2

1

2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-4.5

1.000

1.000

128 5

127 47

210 23

212 65

209 1

210 23

123 34

123 28

100

8

9912

172 26

173 43

100

8

88

30

09

460

21

450 27

1123

11

18

128 5

127 47

210 23

212 65

209 1

210 23

123 34

123 28

100

8

9912

172 26

173 43

100

8

88

30

09

171 37

171 24

460

21

450 27

13 2

13

27

142

1

142

3

024

0

37

144

121

145

44

144

121

144

121146

8

144 1

193 3

193 96

144

84

142

3

024

00

00

00

00

00

Page 149: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

Base Case

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 1

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:05:21 2012 temp.wrk

11080

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

HIDALGO

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03013399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

11017ARROYO

1.030

11456CORONA

1.037

11111NEWMAN

357.91.037

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

475 6

469 15

249 25

247 12

252 40

251 21

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

573 58

584 12

100

9

105 4

105 13

92

2

01

7935

79 8

157 12

157

45

157 12

157

45

130 35

130 29

275

23

271 39

475 6

469 15

249 25

247 12

252 40

251 21

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

573 58

584 12

100

9

105 4

105 13

92

2

01

7935

79 8

157 12

157

45

157 12

157

45

130 35

130 29

275

23

271 39

147 53

147

78

299 15

297

23

425

73

425

73

144

43

144

72

144

43

143

53146

15

148 35

9919

9911

440

29

425

73

149 3

150 19

150 19

150 0

150 0

150 19

Page 150: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_1 Line ART320W 345.0 to ARTESIA 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:05:28 2012 temp.wrk

11080

357.01.035

11093LUNA

359.01.041

11217AFTON

361.11.047

13411ART320W 355.3

1.030

11237AMRAD_B

1.069

16101GREENLEE

352.41.021

11266PICANTE

1.043

11038

CALIENTE

1.042

11010AMRAD

1.043

13400ARTESIA

371.41.077

10369WESTMESA 353.5

1.025

13399AA100W

368.41.068

13397AA100W_P1

11238AMRAD_A

1.041

16104SPRINGR 356.7

1.034

HIDALGO

357.01.035

11093LUNA

359.01.041

11217AFTON

361.11.047

13411ART320W 355.3

1.030

11237AMRAD_B

1.069

16101GREENLEE

352.41.021

11266PICANTE

1.043

11038

CALIENTE

1.042

11010AMRAD

1.043

13400ARTESIA

371.41.077

11014

ARR___PS

1.03713399AA100W

368.41.068

13397AA100W_P1

11238AMRAD_A

1.041

16104SPRINGR 356.7

1.034

11017ARROYO

1.037

11456CORONA

1.044

11111NEWMAN

360.51.045

11420WA300POI

1.048

11423ARR___PS1

1.032

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.044

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 2 140 2 2

050 1

160 11 1160 11 1

60 2 140 2 2

050 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-33.91.000

1.000

309 22

306 2

5110

5143

6133

61 5

158

6

158

6

3134

3127

100

41

9913

0

62

0 0

406 4

411 2

100

21

8015

8024

69

68

050

6127

6117

1511

15

27

1511

15

27

111 10

111 4

342

30

336 12

309 22

306 2

5110

5143

6133

61 5

158

6

158

6

3134

3127

100

41

9913

0

62

0 0

406 4

411 2

100

21

8015

8024

69

68

050

6127

6117

1511

15

27

1511

15

27

111 10

111 4

342

30

336 12

181 64

181

87

299 18

297

21

431

81

431

81

150

45

151

74

150

45

149

562343

2326

26 7

2623

446

34

431

81

149 2

150 20

150 20

150 1

150 1

150 20

Page 151: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_2 Line LUNA 345.0 to DIABLO 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:05:34 2012 temp.wrk

11080

351.51.019

11093LUNA

354.21.027

11217AFTON

357.01.035

13411ART320W 359.9

1.043

11237AMRAD_B

1.033

16101GREENLEE

349.21.012

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.3

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.8

1.031

HIDALGO

351.51.019

11093LUNA

354.21.027

11217AFTON

357.01.035

13411ART320W 359.9

1.043

11237AMRAD_B

1.033

16101GREENLEE

349.21.012

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.02913399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.8

1.031

11017ARROYO

1.029

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.047

11423ARR___PS1

1.032

11421

WA300_C

1.056

11047MACHO_SPRNGS

1.031

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

08 1

160 11 1160 11 1

60 4 140 4 2

08 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

470 16

464 24

291 18

288 12

292 30

290 14

319

19

315

38

160

10

160

10

3428

3421

412

15

407

88

312

6

315

38

568 63

579 18

100

9

90 4

9013

91

7

08

6835

68 8

157 7

158

40

157 7

158

40

156 27

156 22

277

21

273 40

470 16

464 24

291 18

288 12

292 30

290 14

319

19

315

38

160

10

160

10

3428

3421

412

15

407

88

312

6

315

38

568 63

579 18

100

9

90 4

9013

91

7

08

6835

68 8

157 7

158

40

157 7

158

40

156 27

156 22

277

21

273 40

144 50

144

75

299 16

297

22

417

68

417

68

135

43

136

73

135

43

134

52143

11

145 39

9626

96 5

431

30

417

68

149 3

150 19

150 19

150 1

150 0

150 19

Page 152: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_3 Line LUNA 345.0 to HIDALGO 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:05:41 2012 temp.wrk

11080

347.51.007

11093LUNA

352.01.020

11217AFTON

356.31.033

13411ART320W 359.9

1.043

11237AMRAD_B

1.030

16101GREENLEE

348.21.009

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 352.9

1.023

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.038

16104SPRINGR 353.1

1.023

HIDALGO

347.51.007

11093LUNA

352.01.020

11217AFTON

356.31.033

13411ART320W 359.9

1.043

11237AMRAD_B

1.030

16101GREENLEE

348.21.009

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.02813399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.038

16104SPRINGR 353.1

1.023

11017ARROYO

1.028

11456CORONA

1.035

11111NEWMAN

357.21.035

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.012

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

014 1

160 11 1160 11 1

60 4 140 4 2

014 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-65.31.000

1.000

223 0

222 39

230 18

229 3

319

19

315

38

160

10

160

10

3828

3821

412

15

407

88

312

6

315

38

213 12

215 50

100

9

103 3

103 11

96

14

014

7836

78 7

155 4

155

37

155 4

155

37

129 17

129 11

478

10

467 29

223 0

222 39

230 18

229 3

319

19

315

38

160

10

160

10

3828

3821

412

15

407

88

312

6

315

38

213 12

215 50

100

9

103 3

103 11

96

14

014

7836

78 7

155 4

155

37

155 4

155

37

129 17

129 11

478

10

467 29

125 51

125

76

299 15

297

24

417

68

417

68

136

44

136

73

136

44

135

52445

122

464 13

415 18

417 71

432

29

417

68

149 3

150 19

150 19

150 0

150 1

150 18

Page 153: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_4 Line LUNA 345.0 to AFTON 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:05:48 2012 temp.wrk

11080

351.31.018

11093LUNA

353.61.025

11217AFTON

357.91.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.031

16101GREENLEE

349.21.012

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.038

16104SPRINGR 355.8

1.031

HIDALGO

351.31.018

11093LUNA

353.61.025

11217AFTON

357.91.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.031

16101GREENLEE

349.21.012

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.02813399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.038

16104SPRINGR 355.8

1.031

11017ARROYO

1.028

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.047

11423ARR___PS1

1.031

11421

WA300_C

1.056

11047MACHO_SPRNGS

1.030

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

011 1

160 11 1160 11 1

60 4 140 4 2

011 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-55.61.000

1.000

458 20

453 26

2425

24 3

319

19

315

38

160

10

160

10

5828

5822

412

15

407

88

312

6

315

38

561 63

571 20

100

9

157 5

156 13

107

11

011

117 35

117 8

149 5

150

38

149 5

150

38

2423

2417

280

21

276 39

458 20

453 26

2425

24 3

319

19

315

38

160

10

160

10

5828

5822

412

15

407

88

312

6

315

38

561 63

571 20

100

9

157 5

156 13

107

11

011

117 35

117 8

149 5

150

38

149 5

150

38

2423

2417

280

21

276 39

8850

88

76

299 16

297

23

417

67

417

67

135

43

136

73

135

43

135

52137

11

139 41

8928

89 2

431

29

417

67

149 3

150 19

150 19

150 0

150 0

150 19

Page 154: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_5 Line NEWMAN 345.0 to ARROYO 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:05:55 2012 temp.wrk

11080

352.41.022

11093LUNA

355.81.031

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.042

16101GREENLEE

349.51.013

11266PICANTE

1.037

11038

CALIENTE

1.036

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 352.3

1.021

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

HIDALGO

352.41.022

11093LUNA

355.81.031

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.042

16101GREENLEE

349.51.013

11266PICANTE

1.037

11038

CALIENTE

1.036

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

0.99113399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

11017ARROYO

0.991

11456CORONA

1.038

11111NEWMAN

358.61.039

11420WA300POI

1.033

11423ARR___PS1

1.026

11421

WA300_C

1.047

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.049

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

09 1

160 11 1160 11 1

60 4 140 4 2

09 1

75 4 175 4 2

75 5 175 5 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-52.41.000

1.000

468 8

462 15

221 22

220 19

189 21

189 2

319

19

315

38

160

10

160

10

3430

3423

412

15

407

88

312

6

315

38

567 57

578 13

100

9

87 9

8717

69

18

09

6632

6611

168 21

169

53

168 21

169

53

184 61

184 56

278

23

274 38

468 8

462 15

221 22

220 19

189 21

189 2

319

19

315

38

160

10

160

10

3430

3423

412

15

407

88

312

6

315

38

567 57

578 13

100

9

87 9

8717

69

18

09

6632

6611

168 21

169

53

168 21

169

53

184 61

184 56

278

23

274 38

299 1

297

38

417

44

417

44

136

24

136

54

136

24

135

32142

15

143 35

9420

9410

432

5

417

44

149 11

150 11

150 11

150 8

150 9

150 10

Page 155: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_6 Line NEWMAN 345.0 to AFTON 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:06:01 2012 temp.wrk

11080

352.31.021

11093LUNA

355.51.030

11217AFTON

356.81.034

13411ART320W 359.9

1.043

11237AMRAD_B

1.026

16101GREENLEE

349.51.013

11266PICANTE

1.033

11038

CALIENTE

1.032

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.038

16104SPRINGR 355.9

1.032

HIDALGO

352.31.021

11093LUNA

355.51.030

11217AFTON

356.81.034

13411ART320W 359.9

1.043

11237AMRAD_B

1.026

16101GREENLEE

349.51.013

11266PICANTE

1.033

11038

CALIENTE

1.032

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.02613399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.038

16104SPRINGR 355.9

1.032

11017ARROYO

1.026

11456CORONA

1.034

11111NEWMAN

356.81.034

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.034

11424

WA300_C2

1.055

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

023 1

160 11 1160 11 1

60 4 140 4 2

023 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-52.91.000

1.000

464 10

458 16

6820

6832

319

19

315

38

160

10

160

10

5427

5420

412

15

407

88

312

6

315

38

564 57

575 14

100

9

147 2

147 10

109

25

023

110 37

110 6

149 2

149

31

149 2

149

31

40 3

40 3

279

22

275 38

464 10

458 16

6820

6832

319

19

315

38

160

10

160

10

5427

5420

412

15

407

88

312

6

315

38

564 57

575 14

100

9

147 2

147 10

109

25

023

110 37

110 6

149 2

149

31

149 2

149

31

40 3

40 3

279

22

275 38

3948

39

75

299 15

297

24

418

66

418

66

136

42

137

71

136

42

135

50139

15

141 36

9221

92 9

432

26

418

66

149 4

150 19

150 19

150 0

150 1

150 18

Page 156: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_7 Line CALIENTE 345.0 to PICANTE 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:06:07 2012 temp.wrk

11080

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.035

16101GREENLEE

349.51.013

11266PICANTE

1.037

11038

CALIENTE

1.033

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

HIDALGO

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.035

16101GREENLEE

349.51.013

11266PICANTE

1.037

11038

CALIENTE

1.033

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03013399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

11017ARROYO

1.030

11456CORONA

1.037

11111NEWMAN

357.81.037

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

03 1

160 11 1160 11 1

60 4 140 4 2

03 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

475 6

469 15

249 26

248 11

252 40

251 21

319

19

315

38

160

10

160

10

412

15

407

88

312

6

315

38

573 58

584 12

100

9

6916

69 7

92

1

03

113 13

113 31

157 10

157

43

157 10

157

43

131 36

131 30

275

23

271 39

475 6

469 15

249 26

248 11

252 40

251 21

319

19

315

38

160

10

160

10

412

15

407

88

312

6

315

38

573 58

584 12

100

9

6916

69 7

92

1

03

113 13

113 31

157 10

157

43

157 10

157

43

131 36

131 30

275

23

271 39

146 53

147

78

299 15

297

23

424

73

424

73

143

43

144

72

143

43

143

52146

15

148 35

9919

9911

439

29

424

73

149 3

150 19

150 19

150 0

150 0

150 19

Page 157: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_8 Line HIDALGO 345.0 to GREENLEE 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:06:15 2012 temp.wrk

11080

351.91.020

11093LUNA

348.51.010

11217AFTON

354.31.027

13411ART320W 359.8

1.043

11237AMRAD_B

1.023

16101GREENLEE

345.11.000

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 352.0

1.020

13399AA100W

360.71.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 349.1

1.012

HIDALGO

351.91.020

11093LUNA

348.51.010

11217AFTON

354.31.027

13411ART320W 359.8

1.043

11237AMRAD_B

1.023

16101GREENLEE

345.11.000

11266PICANTE

1.032

11038

CALIENTE

1.031

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.02413399AA100W

360.71.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 349.1

1.012

11017ARROYO

1.024

11456CORONA

1.033

11111NEWMAN

356.11.032

11420WA300POI

1.043

11423ARR___PS1

1.028

11421

WA300_C

1.054

11047MACHO_SPRNGS

0.981

11424

WA300_C2

1.054

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

025 1

160 11 1160 11 1

60 4 140 4 2

025 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-84.91.000

1.000

8352

83 9

243 15

241 51

248 1

247 18

319

19

315

38

160

9

160

9

3726

3719

412

13

407

86

312

5

315

38

100

8

100 0

100 9

94

28

025

7538

75 5

156 4

156

29

156 4

156

29

137 3

136 9

599

12

581 81

8352

83 9

243 15

241 51

248 1

247 18

319

19

315

38

160

9

160

9

3726

3719

412

13

407

86

312

5

315

38

100

8

100 0

100 9

94

28

025

7538

75 5

156 4

156

29

156 4

156

29

137 3

136 9

599

12

581 81

132 57

132

81

299 12

297

26

420

68

420

68

139

43

139

72

139

43

138

52653

320

702127

652119

658213

435

26

420

68

149 5

150 17

150 17

150 2

150 2

150 17

Page 158: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_9 Line LUNA 345.0 to LEF 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:06:22 2012 temp.wrk

11080

359.01.041

11093LUNA

361.61.048

11217AFTON

360.51.045

13411ART320W 359.9

1.043

11237AMRAD_B

1.044

16101GREENLEE

353.11.024

11266PICANTE

1.038

11038

CALIENTE

1.037

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.3

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.9

1.034

HIDALGO

359.01.041

11093LUNA

361.61.048

11217AFTON

360.51.045

13411ART320W 359.9

1.043

11237AMRAD_B

1.044

16101GREENLEE

353.11.024

11266PICANTE

1.038

11038

CALIENTE

1.037

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03213399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.9

1.034

11017ARROYO

1.032

11456CORONA

1.039

11111NEWMAN

358.91.040

11420WA300POI

1.047

11423ARR___PS1

1.031

11421

WA300_C

1.056

11047MACHO_SPRNGS

1.050

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

016 1

160 11 1160 11 1

60 4 140 4 2

016 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-37.51.000

1.000

293 15

291 12

256 59

254 22

258 71

257 53

319

19

315

38

160

10

160

10

4029

4023

412

15

407

88

312

6

315

38

393 19

397 9

100

9

106 6

106 14

92

23

016

8034

80 9

157 22

158

55

157 22

158

55

128 60

128 54

348

33

342 8

293 15

291 12

256 59

254 22

258 71

257 53

319

19

315

38

160

10

160

10

4029

4023

412

15

407

88

312

6

315

38

393 19

397 9

100

9

106 6

106 14

92

23

016

8034

80 9

157 22

158

55

157 22

158

55

128 60

128 54

348

33

342 8

156 57

156

81

299 16

297

23

430

78

430

78

149

43

150

72

149

43

148

541251

1219

38 3

3834

445

31

430

78

149 3

150 19

150 19

150 0

150 0

150 19

Page 159: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_10 Line WESTMESA 345.0 to ARR___PS 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:06:28 2012 temp.wrk

11080

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

HIDALGO

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03013399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

11017ARROYO

1.030

11456CORONA

1.037

11111NEWMAN

357.91.037

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

475 6

469 15

249 25

247 12

252 40

251 21

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

573 58

584 12

100

9

105 4

105 13

92

2

01

7935

79 8

157 12

157

45

157 12

157

45

130 35

130 29

275

23

271 39

475 6

469 15

249 25

247 12

252 40

251 21

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

573 58

584 12

100

9

105 4

105 13

92

2

01

7935

79 8

157 12

157

45

157 12

157

45

130 35

130 29

275

23

271 39

147 53

147

78

299 15

297

23

425

73

425

73

144

43

144

72

144

43

143

53146

15

148 35

9919

9911

440

29

425

73

149 3

150 19

150 19

150 0

150 0

150 19

Page 160: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_11 Line CALIENTE 345.0 to PICANTE 345.0 Circuit 2

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:06:34 2012 temp.wrk

11080

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

HIDALGO

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03013399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

11017ARROYO

1.030

11456CORONA

1.037

11111NEWMAN

357.91.037

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

475 6

469 15

249 25

247 12

252 40

251 21

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

573 58

584 12

100

9

105 4

105 13

92

2

01

7935

79 8

157 12

157

45

157 12

157

45

130 35

130 29

275

23

271 39

475 6

469 15

249 25

247 12

252 40

251 21

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

573 58

584 12

100

9

105 4

105 13

92

2

01

7935

79 8

157 12

157

45

157 12

157

45

130 35

130 29

275

23

271 39

147 53

147

78

299 15

297

23

425

73

425

73

144

43

144

72

144

43

143

53146

15

148 35

9919

9911

440

29

425

73

149 3

150 19

150 19

150 0

150 0

150 19

Page 161: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_12 Line MACHO_SPRNGS 345.0 to LUNA 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:06:40 2012 temp.wrk

11080

350.91.017

11093LUNA

355.81.031

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

348.51.010

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.3

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 356.4

1.033

HIDALGO

350.91.017

11093LUNA

355.81.031

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

348.51.010

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03113399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 356.4

1.033

11017ARROYO

1.031

11456CORONA

1.037

11111NEWMAN

357.91.038

11420WA300POI

1.047

11423ARR___PS1

1.032

11421

WA300_C

1.056

11047MACHO_SPRNGS

1.049

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

00 1

160 11 1160 11 1

60 4 140 4 2

00 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-49.71.000

1.000

559 11

551 19

243 23

242 15

247 39

246 19

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

655 89

670 10

100

9

104 4

104 13

93

3

00

7835

78 8

156 12

157

45

156 12

157

45

131 36

131 31

226

16

223 58

559 11

551 19

243 23

242 15

247 39

246 19

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

655 89

670 10

100

9

104 4

104 13

93

3

00

7835

78 8

156 12

157

45

156 12

157

45

131 36

131 31

226

16

223 58

140 50

140

75

299 17

297

22

418

69

418

69

136

44

137

73

136

44

136

534946

4922

432

31

418

69

149 3

150 20

150 20

150 1

150 0

150 19

Page 162: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_13 Line MACHO_SPRNGS 345.0 to SPRINGR 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:06:46 2012 temp.wrk

11080

347.81.008

11093LUNA

353.71.025

11217AFTON

357.01.035

13411ART320W 359.9

1.043

11237AMRAD_B

1.033

16101GREENLEE

346.81.005

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.6

1.031

HIDALGO

347.81.008

11093LUNA

353.71.025

11217AFTON

357.01.035

13411ART320W 359.9

1.043

11237AMRAD_B

1.033

16101GREENLEE

346.81.005

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.02913399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.6

1.031

11017ARROYO

1.029

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.047

11423ARR___PS1

1.032

11421

WA300_C

1.056

11047MACHO_SPRNGS

1.026

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

08 1

160 11 1160 11 1

60 4 140 4 2

08 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-51.91.000

1.000

605 25

595 20

242 11

240 27

246 27

245 7

319

19

315

38

160

10

160

10

3928

3921

412

15

407

88

312

6

315

38

699119

716 18

100

9

103 3

103 12

93

6

08

7836

78 7

156 8

157

41

156 8

157

41

132 26

132 20

200

11

198 67

605 25

595 20

242 11

240 27

246 27

245 7

319

19

315

38

160

10

160

10

3928

3921

412

15

407

88

312

6

315

38

699119

716 18

100

9

103 3

103 12

93

6

08

7836

78 7

156 8

157

41

156 8

157

41

132 26

132 20

200

11

198 67

138 50

138

75

299 16

297

23

417

68

417

68

135

43

136

73

135

43

135

52

5011

4941

432

30

417

68

149 3

150 19

150 19

150 0

150 0

150 19

Page 163: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_14 Line CALIENTE 345.0 to CORONA 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:06:53 2012 temp.wrk

11080

352.61.022

11093LUNA

356.21.032

11217AFTON

358.51.039

13411ART320W 359.9

1.043

11237AMRAD_B

1.045

16101GREENLEE

349.51.013

11266PICANTE

1.039

11038

CALIENTE

1.039

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 355.9

1.032

HIDALGO

352.61.022

11093LUNA

356.21.032

11217AFTON

358.51.039

13411ART320W 359.9

1.043

11237AMRAD_B

1.045

16101GREENLEE

349.51.013

11266PICANTE

1.039

11038

CALIENTE

1.039

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03213399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 355.9

1.032

11017ARROYO

1.032

11456CORONA

1.039

11111NEWMAN

358.61.039

11420WA300POI

1.047

11423ARR___PS1

1.031

11421

WA300_C

1.056

11047MACHO_SPRNGS

1.036

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

018 1

160 11 1160 11 1

60 4 140 4 2

018 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

475 5

469 14

251 22

249 15

254 37

253 18

319

19

315

38

160

10

160

10

111 1

111 5

412

15

407

88

312

6

315

38

573 57

584 11

100

9

177 20

177 12

93

25

018

156 24

157

56

156 24

157

56

135 27

135 22

275

23

271 39

475 5

469 14

251 22

249 15

254 37

253 18

319

19

315

38

160

10

160

10

111 1

111 5

412

15

407

88

312

6

315

38

573 57

584 11

100

9

177 20

177 12

93

25

018

156 24

157

56

156 24

157

56

135 27

135 22

275

23

271 39

146 55

146

80

299 16

297

23

425

75

425

75

144

44

144

73

144

44

143

53146

15

148 35

9919

9912

440

31

425

75

149 3

150 19

150 19

150 0

150 0

150 19

Page 164: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_15 Line AMRAD 345.0 to AA100W 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:06:58 2012 temp.wrk

11080

357.61.036

11093LUNA

359.11.041

11217AFTON

360.51.045

13411ART320W 355.3

1.030

11237AMRAD_B

1.063

16101GREENLEE

352.81.023

11266PICANTE

1.040

11038

CALIENTE

1.039

11010AMRAD

1.038

13400ARTESIA

345.01.000

10369WESTMESA 353.6

1.025

13399AA100W

358.81.040

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.8

1.034

HIDALGO

357.61.036

11093LUNA

359.11.041

11217AFTON

360.51.045

13411ART320W 355.3

1.030

11237AMRAD_B

1.063

16101GREENLEE

352.81.023

11266PICANTE

1.040

11038

CALIENTE

1.039

11010AMRAD

1.038

13400ARTESIA

345.01.000

11014

ARR___PS

1.03413399AA100W

358.81.040

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.8

1.034

11017ARROYO

1.034

11456CORONA

1.041

11111NEWMAN

359.51.042

11420WA300POI

1.047

11423ARR___PS1

1.033

11421

WA300_C

1.056

11047MACHO_SPRNGS

1.044

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

050 1

160 11 1160 11 1

60 4 140 4 2

050 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-29.71.000

1.000

259 26

258 5

1011

1043

334

36

312

90

308

68

158

6

158

6

2731

2725

279

153

283

179

355 16

360 1

99

5

7110

7119

60

67

050

5430

5413

30 4

30

33

30 4

30

33

185 15

185 9

362

30

356 5

259 26

258 5

1011

1043

334

36

312

90

308

68

158

6

158

6

2731

2725

279

153

283

179

355 16

360 1

99

5

7110

7119

60

67

050

5430

5413

30 4

30

33

30 4

30

33

185 15

185 9

362

30

356 5

190 62

191

85

299 17

297

22

430

79

430

79

149

45

150

74

149

45

148

5513

47

1323

62 3

6227

445

32

430

79

149 3

150 20

150 20

150 1

150 0

150 19

Page 165: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_16 Line AA100W 345.0 to ARTESIA 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:07:04 2012 temp.wrk

11080

356.71.034

11093LUNA

358.61.039

11217AFTON

359.91.043

13411ART320W 355.3

1.030

11237AMRAD_B

1.054

16101GREENLEE

352.31.021

11266PICANTE

1.038

11038

CALIENTE

1.037

11010AMRAD

1.035

13400ARTESIA

345.01.000

10369WESTMESA 353.3

1.024

13399AA100W

360.51.045

13397AA100W_P1

11238AMRAD_A

1.033

16104SPRINGR 356.6

1.034

HIDALGO

356.71.034

11093LUNA

358.61.039

11217AFTON

359.91.043

13411ART320W 355.3

1.030

11237AMRAD_B

1.054

16101GREENLEE

352.31.021

11266PICANTE

1.038

11038

CALIENTE

1.037

11010AMRAD

1.035

13400ARTESIA

345.01.000

11014

ARR___PS

1.03213399AA100W

360.51.045

13397AA100W_P1

11238AMRAD_A

1.033

16104SPRINGR 356.6

1.034

11017ARROYO

1.032

11456CORONA

1.039

11111NEWMAN

358.81.040

11420WA300POI

1.047

11423ARR___PS1

1.031

11421

WA300_C

1.056

11047MACHO_SPRNGS

1.043

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 5 140 5 2

037 1

160 11 1160 11 1

60 5 140 5 2

037 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-34.11.000

1.000

311 24

308 0

5319

5334

6242

6214

312

90

308

68

158

6

158

6

3130

3123

100

8

9935

408 2

413 4

100

8

80 7

8016

68

49

037

6033

6010

16 5

16

42

16 5

16

42

109 27

109 21

341

30

336 13

311 24

308 0

5319

5334

6242

6214

312

90

308

68

158

6

158

6

3130

3123

100

8

9935

408 2

413 4

100

8

80 7

8016

68

49

037

6033

6010

16 5

16

42

16 5

16

42

109 27

109 21

341

30

336 13

180 60

181

83

299 16

297

23

430

78

430

78

149

43

150

72

149

43

148

542542

2527

24 8

2422

445

31

430

78

149 3

150 19

150 19

150 0

150 0

150 19

Page 166: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_17 Line CORONA 345.0 to AMRAD 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:07:10 2012 temp.wrk

11080

352.41.021

11093LUNA

355.91.031

11217AFTON

357.61.036

13411ART320W 359.7

1.043

11237AMRAD_B

1.022

16101GREENLEE

349.51.013

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.033

13400ARTESIA

361.91.049

10369WESTMESA 353.1

1.024

13399AA100W

360.51.045

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 355.9

1.032

HIDALGO

352.41.021

11093LUNA

355.91.031

11217AFTON

357.61.036

13411ART320W 359.7

1.043

11237AMRAD_B

1.022

16101GREENLEE

349.51.013

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.033

13400ARTESIA

361.91.049

11014

ARR___PS

1.02813399AA100W

360.51.045

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 355.9

1.032

11017ARROYO

1.028

11456CORONA

1.035

11111NEWMAN

357.31.036

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.055

11425WA300_G2

1.000

11422WA300_G

1.000

160 12 1160 12 1

60 5 140 5 2

025 1

160 12 1160 12 1

60 5 140 5 2

025 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

474 7

468 16

247 29

245 9

249 43

248 24

319

18

315

37

160

9

160

9

3927

3920

412

13

407

86

312

5

315

37

573 58

583 12

100

8

103 1

103 10

104

31

025

7737

77 5

300 34

302

55

120 41

120 35

275

23

271 39

474 7

468 16

247 29

245 9

249 43

248 24

319

18

315

37

160

9

160

9

3927

3920

412

13

407

86

312

5

315

37

573 58

583 12

100

8

103 1

103 10

104

31

025

7737

77 5

300 34

302

55

120 41

120 35

275

23

271 39

151 52

152

76

299 15

297

24

424

72

424

72

143

42

144

71

143

42

143

52146

14

148 35

9820

9811

439

28

424

72

149 3

150 19

150 19

150 0

150 1

150 18

Page 167: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_18 Line CORONA 345.0 to AMRAD 345.0 Circuit 2

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:07:17 2012 temp.wrk

11080

352.41.021

11093LUNA

355.91.031

11217AFTON

357.61.036

13411ART320W 359.7

1.043

11237AMRAD_B

1.022

16101GREENLEE

349.51.013

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.033

13400ARTESIA

361.91.049

10369WESTMESA 353.1

1.024

13399AA100W

360.51.045

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 355.9

1.032

HIDALGO

352.41.021

11093LUNA

355.91.031

11217AFTON

357.61.036

13411ART320W 359.7

1.043

11237AMRAD_B

1.022

16101GREENLEE

349.51.013

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.033

13400ARTESIA

361.91.049

11014

ARR___PS

1.02813399AA100W

360.51.045

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 355.9

1.032

11017ARROYO

1.028

11456CORONA

1.035

11111NEWMAN

357.31.036

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.055

11425WA300_G2

1.000

11422WA300_G

1.000

160 12 1160 12 1

60 5 140 5 2

025 1

160 12 1160 12 1

60 5 140 5 2

025 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

474 7

468 16

247 29

245 9

249 43

248 24

319

18

315

37

160

9

160

9

3927

3920

412

13

407

86

312

5

315

37

573 58

583 12

100

8

103 1

103 10

104

31

025

7737

77 5

300 34

302

55

120 41

120 35

275

23

271 39

474 7

468 16

247 29

245 9

249 43

248 24

319

18

315

37

160

9

160

9

3927

3920

412

13

407

86

312

5

315

37

573 58

583 12

100

8

103 1

103 10

104

31

025

7737

77 5

300 34

302

55

120 41

120 35

275

23

271 39

151 52

152

76

299 15

297

24

424

72

424

72

143

42

144

71

143

42

143

52146

14

148 35

9820

9811

439

28

424

72

149 3

150 19

150 19

150 0

150 1

150 18

Page 168: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_19 Line CORONA 345.0 to PICANTE 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:07:23 2012 temp.wrk

11080

352.51.022

11093LUNA

356.01.032

11217AFTON

357.91.037

13411ART320W 359.9

1.043

11237AMRAD_B

1.035

16101GREENLEE

349.51.013

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

HIDALGO

352.51.022

11093LUNA

356.01.032

11217AFTON

357.91.037

13411ART320W 359.9

1.043

11237AMRAD_B

1.035

16101GREENLEE

349.51.013

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03013399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

11017ARROYO

1.030

11456CORONA

1.037

11111NEWMAN

357.81.037

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

04 1

160 11 1160 11 1

60 4 140 4 2

04 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

475 6

469 15

252 26

250 11

255 41

254 22

319

19

315

38

160

10

160

10

5718

5711

412

15

407

88

312

6

315

38

573 58

584 12

100

9

93

2

04

171 28

171 16

156 10

157

43

156 10

157

43

141 36

141 30

275

23

271 39

475 6

469 15

252 26

250 11

255 41

254 22

319

19

315

38

160

10

160

10

5718

5711

412

15

407

88

312

6

315

38

573 58

584 12

100

9

93

2

04

171 28

171 16

156 10

157

43

156 10

157

43

141 36

141 30

275

23

271 39

144 53

145

77

299 15

297

23

424

73

424

73

143

43

144

72

143

43

142

52146

15

148 35

9819

9911

439

29

424

73

149 3

150 19

150 19

150 0

150 0

150 19

Page 169: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_20 Line CORONA 345.0 to NEWMAN 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:07:29 2012 temp.wrk

11080

352.61.022

11093LUNA

356.31.033

11217AFTON

359.11.041

13411ART320W 359.9

1.043

11237AMRAD_B

1.026

16101GREENLEE

349.51.013

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.038

16104SPRINGR 355.9

1.032

HIDALGO

352.61.022

11093LUNA

356.31.033

11217AFTON

359.11.041

13411ART320W 359.9

1.043

11237AMRAD_B

1.026

16101GREENLEE

349.51.013

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03313399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.038

16104SPRINGR 355.9

1.032

11017ARROYO

1.033

11456CORONA

1.035

11111NEWMAN

359.31.041

11420WA300POI

1.047

11423ARR___PS1

1.031

11421

WA300_C

1.056

11047MACHO_SPRNGS

1.036

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

021 1

160 11 1160 11 1

60 4 140 4 2

021 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

477 5

471 13

221 16

220 25

222 32

221 11

319

19

315

38

160

10

160

10

5526

5520

412

15

407

88

312

6

315

38

575 57

586 11

100

9

164 0

164 8

121

24

021

121 39

121 4

142 2

143

32

142 2

143

32

274

23

270 39

477 5

471 13

221 16

220 25

222 32

221 11

319

19

315

38

160

10

160

10

5526

5520

412

15

407

88

312

6

315

38

575 57

586 11

100

9

164 0

164 8

121

24

021

121 39

121 4

142 2

143

32

142 2

143

32

274

23

270 39

183 65

184

88

299 16

297

23

429

78

429

78

148

44

148

73

148

44

147

54147

15

149 34

100 18

100 12

444

32

429

78

149 3

150 19

150 19

150 0

150 0

150 19

Page 170: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_22 Line WA300POI 345.0 to ARR___PS 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:07:37 2012 temp.wrk

11080

357.51.036

11093LUNA

359.01.041

11217AFTON

360.51.045

13411ART320W 359.9

1.043

11237AMRAD_B

1.050

16101GREENLEE

352.61.022

11266PICANTE

1.039

11038

CALIENTE

1.038

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 354.9

1.029

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.033

16104SPRINGR 356.4

1.033

HIDALGO

357.51.036

11093LUNA

359.01.041

11217AFTON

360.51.045

13411ART320W 359.9

1.043

11237AMRAD_B

1.050

16101GREENLEE

352.61.022

11266PICANTE

1.039

11038

CALIENTE

1.038

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03913399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.033

16104SPRINGR 356.4

1.033

11017ARROYO

1.039

11456CORONA

1.040

11111NEWMAN

359.51.042

11420WA300POI

1.046

11423ARR___PS1

1.033

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.044

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

029 1

160 11 1160 11 1

60 4 140 4 2

029 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-120.01.000

1.000

253 26

251 6

20 9

2045

835

86

319

19

315

38

160

10

160

10

3131

3124

412

15

407

88

312

6

315

38

349 19

353 0

100

9

84 8

8417

92

38

029

6332

6411

157 30

157

63

157 30

157

63

165 80

165 75

377

30

370 0

253 26

251 6

20 9

2045

835

86

319

19

315

38

160

10

160

10

3131

3124

412

15

407

88

312

6

315

38

349 19

353 0

100

9

84 8

8417

92

38

029

6332

6411

157 30

157

63

157 30

157

63

165 80

165 75

377

30

370 0

155 3

154

22

299 15

297

23

0 00 0

294

13

292

6

294

13

297

232448

2421

74 1

7329

149 3

150 19

150 19

150 0

150 0

150 19

Page 171: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_23 Line WA300POI 345.0 to WA300_C 345.0 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:07:43 2012 temp.wrk

11080

356.91.034

11093LUNA

358.91.040

11217AFTON

361.11.047

13411ART320W 359.9

1.043

11237AMRAD_B

1.056

16101GREENLEE

352.21.021

11266PICANTE

1.041

11038

CALIENTE

1.040

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 354.8

1.028

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.031

16104SPRINGR 356.6

1.034

HIDALGO

356.91.034

11093LUNA

358.91.040

11217AFTON

361.11.047

13411ART320W 359.9

1.043

11237AMRAD_B

1.056

16101GREENLEE

352.21.021

11266PICANTE

1.041

11038

CALIENTE

1.040

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.04513399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.031

16104SPRINGR 356.6

1.034

11017ARROYO

1.045

11456CORONA

1.042

11111NEWMAN

360.31.044

11420WA300POI

1.057

11423ARR___PS1

1.039

11421

WA300_C

1.030

11047MACHO_SPRNGS

1.044

11424

WA300_C2

1.030

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

046 1

160 11 1160 11 1

60 4 140 4 2

046 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-19.11.000

1.000

320 22

318 1

6712

6741

8738

8711

319

19

315

38

160

10

160

10

3432

3425

412

15

407

88

312

6

315

38

417 1

423 3

100

9

9210

9219

94

56

046

6930

6913

156 39

156

72

156 39

156

72

150101

150 95

337

30

332 14

320 22

318 1

6712

6741

8738

8711

319

19

315

38

160

10

160

10

3432

3425

412

15

407

88

312

6

315

38

417 1

423 3

100

9

9210

9219

94

56

046

6930

6913

156 39

156

72

156 39

156

72

150101

150 95

337

30

332 14

5223

52

6

147

17

147

17

150

63

150

92

150

63

149

723242

3227

18 7

1822

149

72

147

17

142 0

142 21

147 10

147 29

147 29

147 10

Page 172: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

tran_25 Tran ARR___PS 345.00 to ARROYO 345.00 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:08:04 2012 temp.wrk

11080

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

HIDALGO

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03013399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

11017ARROYO

1.030

11456CORONA

1.037

11111NEWMAN

357.91.037

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

475 6

469 15

249 25

247 12

252 40

251 21

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

573 58

584 12

100

9

105 4

105 13

92

2

01

7935

79 8

157 12

157

45

157 12

157

45

130 35

130 29

275

23

271 39

475 6

469 15

249 25

247 12

252 40

251 21

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

573 58

584 12

100

9

105 4

105 13

92

2

01

7935

79 8

157 12

157

45

157 12

157

45

130 35

130 29

275

23

271 39

147 53

147

78

299 15

297

23

425

73

425

73

144

43

144

72

144

43

143

53146

15

148 35

9919

9911

440

29

425

73

149 3

150 19

150 19

150 0

150 0

150 19

Page 173: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

tran_26 Tran ARR___PS1 345.00 to WA300POI 345.00 Circuit 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:08:11 2012 temp.wrk

11080

354.81.028

11093LUNA

357.91.038

11217AFTON

360.71.045

13411ART320W 359.9

1.043

11237AMRAD_B

1.057

16101GREENLEE

350.91.017

11266PICANTE

1.041

11038

CALIENTE

1.040

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 352.9

1.023

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.030

16104SPRINGR 356.2

1.032

HIDALGO

354.81.028

11093LUNA

357.91.038

11217AFTON

360.71.045

13411ART320W 359.9

1.043

11237AMRAD_B

1.057

16101GREENLEE

350.91.017

11266PICANTE

1.041

11038

CALIENTE

1.040

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.04713399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.030

16104SPRINGR 356.2

1.032

11017ARROYO

1.047

11456CORONA

1.042

11111NEWMAN

360.41.045

11420WA300POI

1.091

11423ARR___PS1

1.026

11421

WA300_C

1.082

11047MACHO_SPRNGS

1.041

11424

WA300_C2

1.079

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

048 1

160 11 1160 11 1

60 4 140 4 2

048 1

75 13 175 13 2

75 15 175 15 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

402 10

398 3

161 13

160 35

172 37

171 12

319

19

315

38

160

10

160

10

3732

3725

412

15

407

88

312

6

315

38

500 28

508 7

100

9

9910

9919

94

57

048

7430

7413

156 40

156

72

156 40

156

72

139103

138 97

308

27

304 26

402 10

398 3

161 13

160 35

172 37

171 12

319

19

315

38

160

10

160

10

3732

3725

412

15

407

88

312

6

315

38

500 28

508 7

100

9

9910

9919

94

57

048

7430

7413

156 40

156

72

156 40

156

72

139103

138 97

308

27

304 26

5126

51

2

299 72

297

27

290

20

290

20

0 0 033

9031

9131

4113

4217

297

27

290

20

149 23

150 46

150 46

150 26

150 30

150 49

Page 174: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_27 Gen AMRAD_A 13.2 Unit ID 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:08:18 2012 temp.wrk

11080

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

360.91.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 355.9

1.032

HIDALGO

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03013399AA100W

360.91.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 355.9

1.032

11017ARROYO

1.030

11456CORONA

1.037

11111NEWMAN

357.81.037

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

1

160 11 1160 11 1

60 4 140 4 2

1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

475 6

469 15

249 26

247 11

252 40

251 21

319

19

315

38

160

10

160

10

3928

3921

412

14

407

87

312

6

315

38

573 58

584 12

100

8

105 4

104 12

92

3

00

7935

79 8

157 12

157

45

157 12

157

45

130 36

130 30

275

23

271 39

475 6

469 15

249 26

247 11

252 40

251 21

319

19

315

38

160

10

160

10

3928

3921

412

14

407

87

312

6

315

38

573 58

584 12

100

8

105 4

104 12

92

3

00

7935

79 8

157 12

157

45

157 12

157

45

130 36

130 30

275

23

271 39

147 53

147

78

299 15

297

23

425

73

425

73

144

43

144

72

144

43

143

53146

15

148 35

9919

9911

440

29

425

73

149 3

150 19

150 19

150 0

150 0

150 19

Page 175: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_28 Gen NEWMANG3 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:08:24 2012 temp.wrk

11080

352.51.022

11093LUNA

356.11.032

11217AFTON

358.11.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 355.9

1.032

HIDALGO

352.51.022

11093LUNA

356.11.032

11217AFTON

358.11.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03013399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 355.9

1.032

11017ARROYO

1.030

11456CORONA

1.037

11111NEWMAN

357.91.037

11420WA300POI

1.047

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.51.000

1.000

475 6

469 14

240 25

238 13

243 40

242 21

319

19

315

38

160

10

160

10

3828

3822

412

15

407

88

312

6

315

38

573 57

584 11

100

9

105 4

105 12

93

2

01

7835

78 8

156 12

157

45

156 12

157

45

129 35

129 30

275

23

271 39

475 6

469 14

240 25

238 13

243 40

242 21

319

19

315

38

160

10

160

10

3828

3822

412

15

407

88

312

6

315

38

573 57

584 11

100

9

105 4

105 12

93

2

01

7835

78 8

156 12

157

45

156 12

157

45

129 35

129 30

275

23

271 39

147 53

148

78

299 16

297

23

424

73

424

73

143

43

143

72

143

43

142

53146

15

148 35

9819

9811

439

30

424

73

149 3

150 19

150 19

150 0

150 0

150 19

Page 176: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_29 Gen NEWMN4S1 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:08:30 2012 temp.wrk

11080

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

HIDALGO

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03013399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

11017ARROYO

1.030

11456CORONA

1.037

11111NEWMAN

357.91.037

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.81.000

1.000

476 6

470 15

243 25

242 13

247 40

246 21

319

19

315

38

160

10

160

10

3828

3821

412

15

407

88

312

6

315

38

574 58

585 11

100

9

105 4

105 12

93

1

01

7835

79 8

156 11

157

44

156 11

157

44

130 34

129 29

275

23

271 39

476 6

470 15

243 25

242 13

247 40

246 21

319

19

315

38

160

10

160

10

3828

3821

412

15

407

88

312

6

315

38

574 58

585 11

100

9

105 4

105 12

93

1

01

7835

79 8

156 11

157

44

156 11

157

44

130 34

129 29

275

23

271 39

148 54

149

79

299 15

297

23

426

74

426

74

145

43

145

72

145

43

144

53147

15

149 35

9919

9911

441

29

426

74

149 3

150 19

150 19

150 0

150 1

150 18

Page 177: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_30 Gen NEWMN5G1 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:08:36 2012 temp.wrk

11080

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

HIDALGO

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03013399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

11017ARROYO

1.030

11456CORONA

1.037

11111NEWMAN

357.91.037

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.81.000

1.000

476 6

470 15

244 25

242 13

247 40

246 21

319

19

315

38

160

10

160

10

3828

3821

412

15

407

88

312

6

315

38

574 58

585 11

100

9

105 4

105 12

93

1

01

7835

79 8

157 11

157

44

157 11

157

44

130 34

129 29

275

23

271 39

476 6

470 15

244 25

242 13

247 40

246 21

319

19

315

38

160

10

160

10

3828

3821

412

15

407

88

312

6

315

38

574 58

585 11

100

9

105 4

105 12

93

1

01

7835

79 8

157 11

157

44

157 11

157

44

130 34

129 29

275

23

271 39

148 54

149

79

299 15

297

24

426

74

426

74

145

43

146

72

145

43

144

53147

15

149 35

9919

9911

441

29

426

74

149 3

150 19

150 19

150 0

150 1

150 18

Page 178: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_31 Gen NEWMN5G2 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:08:42 2012 temp.wrk

11080

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

HIDALGO

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03013399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

11017ARROYO

1.030

11456CORONA

1.037

11111NEWMAN

357.91.037

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.81.000

1.000

476 6

470 15

244 25

242 13

247 40

246 21

319

19

315

38

160

10

160

10

3828

3821

412

15

407

88

312

6

315

38

574 58

585 11

100

9

105 4

105 12

93

1

01

7835

79 8

157 11

157

44

157 11

157

44

130 34

129 29

275

23

271 39

476 6

470 15

244 25

242 13

247 40

246 21

319

19

315

38

160

10

160

10

3828

3821

412

15

407

88

312

6

315

38

574 58

585 11

100

9

105 4

105 12

93

1

01

7835

79 8

157 11

157

44

157 11

157

44

130 34

129 29

275

23

271 39

148 54

149

79

299 15

297

24

426

74

426

74

145

43

146

72

145

43

144

53147

15

149 35

9919

9911

441

29

426

74

149 3

150 19

150 19

150 0

150 1

150 18

Page 179: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_32 Gen NEWMN5S1 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:08:53 2012 temp.wrk

11080

352.61.022

11093LUNA

356.11.032

11217AFTON

358.11.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.61.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.3

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 355.9

1.032

HIDALGO

352.61.022

11093LUNA

356.11.032

11217AFTON

358.11.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.61.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03113399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 355.9

1.032

11017ARROYO

1.031

11456CORONA

1.037

11111NEWMAN

358.01.038

11420WA300POI

1.047

11423ARR___PS1

1.032

11421

WA300_C

1.056

11047MACHO_SPRNGS

1.036

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

00 1

160 11 1160 11 1

60 4 140 4 2

00 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-45.81.000

1.000

473 6

467 14

234 25

232 15

237 40

236 20

319

19

315

38

160

10

160

10

3728

3722

412

15

407

88

312

6

315

38

571 57

582 11

100

9

105 4

105 13

93

3

00

7835

78 8

156 12

157

45

156 12

157

45

129 36

129 31

276

23

272 39

473 6

467 14

234 25

232 15

237 40

236 20

319

19

315

38

160

10

160

10

3728

3722

412

15

407

88

312

6

315

38

571 57

582 11

100

9

105 4

105 13

93

3

00

7835

78 8

156 12

157

45

156 12

157

45

129 36

129 31

276

23

272 39

145 51

145

76

299 16

297

22

420

71

420

71

139

44

139

73

139

44

138

53145

15

146 35

9719

9712

435

30

420

71

149 3

150 19

150 19

150 1

150 0

150 19

Page 180: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_33 Gen NEWMN6G1 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:08:59 2012 temp.wrk

11080

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

HIDALGO

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03013399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

11017ARROYO

1.030

11456CORONA

1.037

11111NEWMAN

357.91.037

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

475 6

469 15

249 25

247 12

252 40

251 21

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

573 58

584 12

100

9

105 4

105 13

92

2

01

7935

79 8

157 12

157

45

157 12

157

45

130 35

130 29

275

23

271 39

475 6

469 15

249 25

247 12

252 40

251 21

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

573 58

584 12

100

9

105 4

105 13

92

2

01

7935

79 8

157 12

157

45

157 12

157

45

130 35

130 29

275

23

271 39

147 53

147

78

299 15

297

23

425

73

425

73

144

43

144

72

144

43

143

53146

15

148 35

9919

9911

440

29

425

73

149 3

150 19

150 19

150 0

150 0

150 19

Page 181: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_34 Gen NEWMN6G2 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:09:05 2012 temp.wrk

11080

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

HIDALGO

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03013399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

11017ARROYO

1.030

11456CORONA

1.037

11111NEWMAN

357.91.037

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

475 6

469 15

249 25

247 12

252 40

251 21

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

573 58

584 12

100

9

105 4

105 13

92

2

01

7935

79 8

157 12

157

45

157 12

157

45

130 35

130 29

275

23

271 39

475 6

469 15

249 25

247 12

252 40

251 21

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

573 58

584 12

100

9

105 4

105 13

92

2

01

7935

79 8

157 12

157

45

157 12

157

45

130 35

130 29

275

23

271 39

147 53

147

78

299 15

297

23

425

73

425

73

144

43

144

72

144

43

143

53146

15

148 35

9919

9911

440

29

425

73

149 3

150 19

150 19

150 0

150 0

150 19

Page 182: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_35 Gen NEWMN6S1 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:09:11 2012 temp.wrk

11080

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

10369WESTMESA 353.2

1.024

13399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

HIDALGO

352.51.022

11093LUNA

356.01.032

11217AFTON

358.01.038

13411ART320W 359.9

1.043

11237AMRAD_B

1.036

16101GREENLEE

349.51.013

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.035

13400ARTESIA

362.31.050

11014

ARR___PS

1.03013399AA100W

361.01.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 355.9

1.032

11017ARROYO

1.030

11456CORONA

1.037

11111NEWMAN

357.91.037

11420WA300POI

1.046

11423ARR___PS1

1.031

11421

WA300_C

1.055

11047MACHO_SPRNGS

1.035

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-46.71.000

1.000

475 6

469 15

249 25

247 12

252 40

251 21

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

573 58

584 12

100

9

105 4

105 13

92

2

01

7935

79 8

157 12

157

45

157 12

157

45

130 35

130 29

275

23

271 39

475 6

469 15

249 25

247 12

252 40

251 21

319

19

315

38

160

10

160

10

3928

3922

412

15

407

88

312

6

315

38

573 58

584 12

100

9

105 4

105 13

92

2

01

7935

79 8

157 12

157

45

157 12

157

45

130 35

130 29

275

23

271 39

147 53

147

78

299 15

297

23

425

73

425

73

144

43

144

72

144

43

143

53146

15

148 35

9919

9911

440

29

425

73

149 3

150 19

150 19

150 0

150 0

150 19

Page 183: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_36 Gen ART320W_G1 34.5 Unit ID 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:09:17 2012 temp.wrk

11080

352.71.022

11093LUNA

356.41.033

11217AFTON

358.71.040

13411ART320W 364.0

1.055

11237AMRAD_B

1.061

16101GREENLEE

349.61.013

11266PICANTE

1.038

11038

CALIENTE

1.037

11010AMRAD

1.036

13400ARTESIA

367.51.065

10369WESTMESA 353.6

1.025

13399AA100W

364.91.058

13397AA100W_P1

11238AMRAD_A

1.032

16104SPRINGR 355.9

1.032

HIDALGO

352.71.022

11093LUNA

356.41.033

11217AFTON

358.71.040

13411ART320W 364.0

1.055

11237AMRAD_B

1.061

16101GREENLEE

349.61.013

11266PICANTE

1.038

11038

CALIENTE

1.037

11010AMRAD

1.036

13400ARTESIA

367.51.065

11014

ARR___PS

1.03313399AA100W

364.91.058

13397AA100W_P1

11238AMRAD_A

1.032

16104SPRINGR 355.9

1.032

11017ARROYO

1.033

11456CORONA

1.039

11111NEWMAN

358.61.039

11420WA300POI

1.048

11423ARR___PS1

1.033

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.036

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

1160 3 1

60 1 140 1 2

050 1

1160 3 1

60 1 140 1 2

050 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-44.91.000

1.000

472 5

466 13

207 20

206 23

210 37

210 15

160

24

159

18

0 0 160

24

2830

2823

258

22

255

21

158

37

159

18

570 55

581 10

100

15

73 7

7316

81

65

050

5532

5511

87 7

87

43

87 7

87

43

4632

4626

276

23

273 38

472 5

466 13

207 20

206 23

210 37

210 15

160

24

159

18

0 0 160

24

2830

2823

258

22

255

21

158

37

159

18

570 55

581 10

100

15

73 7

7316

81

65

050

5532

5511

87 7

87

43

87 7

87

43

4632

4626

276

23

273 38

159 51

159

75

299 18

297

21

419

71

419

71

137

44

137

74

137

44

136

53144

16

146 34

9618

9612

433

32

419

71

149 2

150 20

150 20

150 1

150 1

150 20

Page 184: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_37 Gen ART320W_G2 34.5 Unit ID 1

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:09:23 2012 temp.wrk

11080

352.71.022

11093LUNA

356.41.033

11217AFTON

358.71.040

13411ART320W 364.0

1.055

11237AMRAD_B

1.061

16101GREENLEE

349.61.013

11266PICANTE

1.038

11038

CALIENTE

1.037

11010AMRAD

1.036

13400ARTESIA

367.51.065

10369WESTMESA 353.6

1.025

13399AA100W

364.91.058

13397AA100W_P1

11238AMRAD_A

1.032

16104SPRINGR 355.9

1.032

HIDALGO

352.71.022

11093LUNA

356.41.033

11217AFTON

358.71.040

13411ART320W 364.0

1.055

11237AMRAD_B

1.061

16101GREENLEE

349.61.013

11266PICANTE

1.038

11038

CALIENTE

1.037

11010AMRAD

1.036

13400ARTESIA

367.51.065

11014

ARR___PS

1.03313399AA100W

364.91.058

13397AA100W_P1

11238AMRAD_A

1.032

16104SPRINGR 355.9

1.032

11017ARROYO

1.033

11456CORONA

1.039

11111NEWMAN

358.61.039

11420WA300POI

1.048

11423ARR___PS1

1.033

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.036

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 3 1

1

60 1 140 1 2

050 1

160 3 1

1

60 1 140 1 2

050 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-44.91.000

1.000

472 5

466 13

207 20

206 23

210 37

210 15

160

24

159

18

160

24

0 0

2830

2823

258

22

255

21

158

37

159

18

570 55

581 10

100

15

73 7

7316

81

65

050

5532

5511

87 7

87

43

87 7

87

43

4632

4626

276

23

273 38

472 5

466 13

207 20

206 23

210 37

210 15

160

24

159

18

160

24

0 0

2830

2823

258

22

255

21

158

37

159

18

570 55

581 10

100

15

73 7

7316

81

65

050

5532

5511

87 7

87

43

87 7

87

43

4632

4626

276

23

273 38

159 51

159

75

299 18

297

21

419

71

419

71

137

44

137

74

137

44

136

53144

16

146 34

9618

9612

433

32

419

71

149 2

150 20

150 20

150 1

150 1

150 20

Page 185: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_38 Gen WA300W 34.5 ALL UNITS

AUGUST 2, 2011 2016_op_map1.SAV

MW/MVAR

Rating = 2

wa300w_2016_s1.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:09:30 2012 temp.wrk

11080

352.91.023

11093LUNA

357.01.035

11217AFTON

360.91.046

13411ART320W 360.1

1.044

11237AMRAD_B

1.060

16101GREENLEE

349.61.013

11266PICANTE

1.043

11038

CALIENTE

1.042

11010AMRAD

1.037

13400ARTESIA

362.61.051

10369WESTMESA 358.3

1.039

13399AA100W

361.41.048

13397AA100W_P1

11238AMRAD_A

1.032

16104SPRINGR 355.9

1.032

HIDALGO

352.91.023

11093LUNA

357.01.035

11217AFTON

360.91.046

13411ART320W 360.1

1.044

11237AMRAD_B

1.060

16101GREENLEE

349.61.013

11266PICANTE

1.043

11038

CALIENTE

1.042

11010AMRAD

1.037

13400ARTESIA

362.61.051

11014

ARR___PS

1.05313399AA100W

361.41.048

13397AA100W_P1

11238AMRAD_A

1.032

16104SPRINGR 355.9

1.032

11017ARROYO

1.053

11456CORONA

1.044

11111NEWMAN

361.21.047

11420WA300POI

1.103

11423ARR___PS1

1.059

11421

WA300_C

1.124

11047MACHO_SPRNGS

1.038

11424

WA300_C2

1.126

11425WA300_G2

1.072

11422WA300_G

1.071

160 11 1160 11 1

60 4 140 4 2

050 1

160 11 1160 11 1

60 4 140 4 2

050 1

1

2

1

2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-30.21.000

1.000

481 0

475 10

184 2

183 43

197 27

196 3

319

21

316

40

160

10

160

10

2134

2128

412

16

407

89

312

7

316

40

578 56

589 8

100

9

5517

5526

92

61

050

4225

4218

157 42

157

75

157 42

157

75

216119

216114

273

23

269 39

481 0

475 10

184 2

183 43

197 27

196 3

319

21

316

40

160

10

160

10

2134

2128

412

16

407

89

312

7

316

40

578 56

589 8

100

9

5517

5526

92

61

050

4225

4218

157 42

157

75

157 42

157

75

216119

216114

273

23

269 39

5160

51

32

028

0

103

147

66

147

66

150

119

151

147

150

119

149

133150

16

152 32

102 16

102 15

149

29

147

66

028

00

00

00

00

00

Page 186: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

Base Case

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 1

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:17:07 2012 temp.wrk

11080

354.61.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.61.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04113399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.035

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

343 26

340 9

8515

8537

108 30

107 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

01

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

343 26

340 9

8515

8537

108 30

107 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

01

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

3212

32

16

149

3

150

10

299 18

297

21

145

97

145

20

145

97

145

974534

4533

417

470

152

77

150

10

149 2

150 20

150 20

150 1

150 1

150 20

Page 187: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_1 Line ART320W 345.0 to ARTESIA 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:17:16 2012 temp.wrk

11080

357.31.036

11093LUNA

357.41.036

11217AFTON

359.51.042

13411ART320W 355.3

1.030

11237AMRAD_B

1.065

16101GREENLEE

352.91.023

11266PICANTE

1.039

11038

CALIENTE

1.038

11010AMRAD

1.039

13400ARTESIA

370.21.073

10369WESTMESA 354.5

1.028

13399AA100W

367.21.064

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 356.5

1.033

HIDALGO

357.31.036

11093LUNA

357.41.036

11217AFTON

359.51.042

13411ART320W 355.3

1.030

11237AMRAD_B

1.065

16101GREENLEE

352.91.023

11266PICANTE

1.039

11038

CALIENTE

1.038

11010AMRAD

1.039

13400ARTESIA

370.21.073

11014

ARR___PS

1.04313399AA100W

367.21.064

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 356.5

1.033

11017ARROYO

1.039

11456CORONA

1.040

11111NEWMAN

358.91.040

11420WA300POI

1.050

11423ARR___PS1

1.050

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.040

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 1 140 1 2

050 1

160 11 1160 11 1

60 1 140 1 2

050 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

0.6

1.000

1.000

172 37

171 2

116 10

116 60

8655

8612

158

6

158

6

2531

2524

100

43

9915

0

62

0 0

265 31

268 3

100

19

65 9

6518

70

67

050

5031

5012

1412

14

26

1412

14

26

86 2

86 7

406

28

399 10

172 37

171 2

116 10

116 60

8655

8612

158

6

158

6

2531

2524

100

43

9915

0

62

0 0

265 31

268 3

100

19

65 9

6518

70

67

050

5031

5012

1412

14

26

1412

14

26

86 2

86 7

406

28

399 10

58

5

20

149

3

149

8

299 19

297

20

146

99

145

21

146

99

146

998146

8118

130 0

130 90

151

79

149

8

149 1

150 21

150 21

150 2

150 2

150 21

Page 188: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_2 Line LUNA 345.0 to DIABLO 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:17:23 2012 temp.wrk

11080

353.61.025

11093LUNA

354.51.027

11217AFTON

357.31.036

13411ART320W 359.8

1.043

11237AMRAD_B

1.031

16101GREENLEE

350.81.017

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 356.1

1.032

HIDALGO

353.61.025

11093LUNA

354.51.027

11217AFTON

357.31.036

13411ART320W 359.8

1.043

11237AMRAD_B

1.031

16101GREENLEE

350.81.017

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04013399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 356.1

1.032

11017ARROYO

1.034

11456CORONA

1.035

11111NEWMAN

357.11.035

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.033

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

08 1

160 11 1160 11 1

60 4 140 4 2

08 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.2

1.000

1.000

342 36

339 18

72 4

7248

9540

95 3

319

19

315

38

160

9

160

9

3527

3521

412

14

407

87

312

5

315

38

439 23

445 19

100

8

95 2

9511

94

8

08

7136

72 6

156 6

156

39

156 6

156

39

145 22

145 16

337

25

331 18

342 36

339 18

72 4

7248

9540

95 3

319

19

315

38

160

9

160

9

3527

3521

412

14

407

87

312

5

315

38

439 23

445 19

100

8

95 2

9511

94

8

08

7136

72 6

156 6

156

39

156 6

156

39

145 22

145 16

337

25

331 18

3412

33

16

148

4

149

11

299 18

297

21

146

96

146

19

146

96

146

964530

4637

423

463

151

76

149

11

149 2

150 20

150 20

150 1

150 1

150 20

Page 189: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_3 Line LUNA 345.0 to HIDALGO 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:17:31 2012 temp.wrk

11080

351.61.019

11093LUNA

354.51.028

11217AFTON

357.41.036

13411ART320W 359.8

1.043

11237AMRAD_B

1.032

16101GREENLEE

350.21.015

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.3

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 354.7

1.028

HIDALGO

351.61.019

11093LUNA

354.51.028

11217AFTON

357.41.036

13411ART320W 359.8

1.043

11237AMRAD_B

1.032

16101GREENLEE

350.21.015

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04213399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 354.7

1.028

11017ARROYO

1.034

11456CORONA

1.035

11111NEWMAN

357.21.035

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.028

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

06 1

160 11 1160 11 1

60 4 140 4 2

06 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-25.8

1.000

1.000

61 2

6150

8741

87 1

319

19

315

38

160

9

160

9

3327

3320

412

14

407

87

312

5

315

38

179 16

180 28

100

8

90 2

9010

97

6

06

6837

68 6

154 7

155

41

154 7

155

41

151 23

151 17

484

11

473 31

61 2

6150

8741

87 1

319

19

315

38

160

9

160

9

3327

3320

412

14

407

87

312

5

315

38

179 16

180 28

100

8

90 2

9010

97

6

06

6837

68 6

154 7

155

41

154 7

155

41

151 23

151 17

484

11

473 31

5214

52

14

136

5

137

12

299 19

297

20

159

98

158

20

159

98

159

98263

24

269 27

219 15

220 78

138

78

137

12

149 2

150 21

150 21

150 2

150 1

150 20

Page 190: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_4 Line LUNA 345.0 to AFTON 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:17:38 2012 temp.wrk

11080

353.71.025

11093LUNA

354.51.028

11217AFTON

357.71.037

13411ART320W 359.8

1.043

11237AMRAD_B

1.032

16101GREENLEE

350.81.017

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 356.1

1.032

HIDALGO

353.71.025

11093LUNA

354.51.028

11217AFTON

357.71.037

13411ART320W 359.8

1.043

11237AMRAD_B

1.032

16101GREENLEE

350.81.017

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04113399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 356.1

1.032

11017ARROYO

1.035

11456CORONA

1.035

11111NEWMAN

357.21.035

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.033

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

06 1

160 11 1160 11 1

60 4 140 4 2

06 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-16.2

1.000

1.000

335 36

332 17

3043

30 1

319

19

315

38

160

9

160

9

4027

4020

412

14

407

87

312

5

315

38

434 21

440 19

100

8

109 2

109 10

99

5

06

8137

82 6

153 8

154

41

153 8

154

41

116 22

116 17

339

25

333 18

335 36

332 17

3043

30 1

319

19

315

38

160

9

160

9

4027

4020

412

14

407

87

312

5

315

38

434 21

440 19

100

8

109 2

109 10

99

5

06

8137

82 6

153 8

154

41

153 8

154

41

116 22

116 17

339

25

333 18

5314

53

14

143

5

143

12

299 19

297

20

152

97

151

19

152

97

152

974131

4137

822

864

145

77

143

12

149 2

150 21

150 21

150 2

150 1

150 20

Page 191: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_5 Line NEWMAN 345.0 to ARROYO 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:17:45 2012 temp.wrk

11080

354.41.027

11093LUNA

356.11.032

11217AFTON

357.81.037

13411ART320W 359.8

1.043

11237AMRAD_B

1.032

16101GREENLEE

351.11.018

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.1

1.026

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 356.2

1.032

HIDALGO

354.41.027

11093LUNA

356.11.032

11217AFTON

357.81.037

13411ART320W 359.8

1.043

11237AMRAD_B

1.032

16101GREENLEE

351.11.018

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.03413399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 356.2

1.032

11017ARROYO

1.026

11456CORONA

1.035

11111NEWMAN

357.11.035

11420WA300POI

1.047

11423ARR___PS1

1.047

11421

WA300_C

1.056

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.056

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

08 1

160 11 1160 11 1

60 4 140 4 2

08 1

75 0 175 0 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-12.5

1.000

1.000

344 27

340 10

9118

9033

121 30

121 14

319

19

315

38

160

9

160

9

3527

3520

412

14

407

87

312

5

315

38

440 18

446 14

100

8

95 1

9510

99

7

08

7237

72 6

153 7

154

40

153 7

154

40

139 21

139 15

336

26

331 17

344 27

340 10

9118

9033

121 30

121 14

319

19

315

38

160

9

160

9

3527

3520

412

14

407

87

312

5

315

38

440 18

446 14

100

8

95 1

9510

99

7

08

7237

72 6

153 7

154

40

153 7

154

40

139 21

139 15

336

26

331 17

150

10

150

17

299 16

297

23

145

91

144

15

145

91

145

914634

4634

417

469

152

69

150

17

149 3

150 19

150 19

150 0

150 0

150 19

Page 192: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_6 Line NEWMAN 345.0 to AFTON 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:17:52 2012 temp.wrk

11080

354.71.028

11093LUNA

356.41.033

11217AFTON

358.51.039

13411ART320W 359.8

1.043

11237AMRAD_B

1.043

16101GREENLEE

351.21.018

11266PICANTE

1.037

11038

CALIENTE

1.036

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.5

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.034

16104SPRINGR 356.2

1.032

HIDALGO

354.71.028

11093LUNA

356.41.033

11217AFTON

358.51.039

13411ART320W 359.8

1.043

11237AMRAD_B

1.043

16101GREENLEE

351.21.018

11266PICANTE

1.037

11038

CALIENTE

1.036

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04313399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.034

16104SPRINGR 356.2

1.032

11017ARROYO

1.037

11456CORONA

1.038

11111NEWMAN

358.51.039

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

016 1

160 11 1160 11 1

60 4 140 4 2

016 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-15.9

1.000

1.000

337 26

334 7

75

748

319

19

315

38

160

9

160

9

4029

4022

412

14

407

87

312

5

315

38

435 15

441 13

100

8

110 5

110 13

103

23

016

8235

82 8

151 22

152

55

151 22

152

55

111 56

111 51

339

26

333 16

337 26

334 7

75

748

319

19

315

38

160

9

160

9

4029

4022

412

14

407

87

312

5

315

38

435 15

441 13

100

8

110 5

110 13

103

23

016

8235

82 8

151 22

152

55

151 22

152

55

111 56

111 51

339

26

333 16

7710

76

18

143

3

144

9

299 19

297

20

151

99

151

21

151

99

151

994135

4233

816

871

146

79

144

9

149 1

150 21

150 21

150 2

150 2

150 21

Page 193: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_7 Line CALIENTE 345.0 to PICANTE 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:17:59 2012 temp.wrk

11080

354.51.028

11093LUNA

356.21.033

11217AFTON

358.11.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.034

16101GREENLEE

351.11.018

11266PICANTE

1.036

11038

CALIENTE

1.032

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.51.028

11093LUNA

356.21.033

11217AFTON

358.11.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.034

16101GREENLEE

351.11.018

11266PICANTE

1.036

11038

CALIENTE

1.032

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04113399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.035

11456CORONA

1.036

11111NEWMAN

357.41.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

02 1

160 11 1160 11 1

60 4 140 4 2

02 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

343 27

340 9

8515

8536

108 30

108 13

319

19

315

38

160

9

160

9

412

14

407

87

312

5

315

38

440 17

446 14

100

8

6117

61 8

94

1

02

9814

9829

156 10

156

43

156 10

156

43

152 32

152 26

337

26

331 17

343 27

340 9

8515

8536

108 30

108 13

319

19

315

38

160

9

160

9

412

14

407

87

312

5

315

38

440 17

446 14

100

8

6117

61 8

94

1

02

9814

9829

156 10

156

43

156 10

156

43

152 32

152 26

337

26

331 17

3212

32

16

149

3

150

10

299 18

297

21

145

97

145

20

145

97

145

974534

4533

417

470

152

76

150

10

149 2

150 20

150 20

150 1

150 1

150 20

Page 194: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_8 Line HIDALGO 345.0 to GREENLEE 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:18:08 2012 temp.wrk

11080

357.01.035

11093LUNA

354.51.028

11217AFTON

357.41.036

13411ART320W 359.8

1.043

11237AMRAD_B

1.032

16101GREENLEE

346.71.005

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.0

1.026

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 352.8

1.023

HIDALGO

357.01.035

11093LUNA

354.51.028

11217AFTON

357.41.036

13411ART320W 359.8

1.043

11237AMRAD_B

1.032

16101GREENLEE

346.71.005

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04213399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 352.8

1.023

11017ARROYO

1.034

11456CORONA

1.035

11111NEWMAN

357.11.035

11420WA300POI

1.048

11423ARR___PS1

1.048

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.020

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

07 1

160 11 1160 11 1

60 4 140 4 2

07 1

75 1 175 1 2

75 0 175 0 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-37.1

1.000

1.000

8242

82 2

67 3

6748

9241

92 2

319

19

315

38

160

9

160

9

3327

3320

412

14

407

87

312

5

315

38

100

8

89 2

8910

96

7

07

6737

67 6

155 7

155

40

155 7

155

40

153 21

153 16

583

17

567 62

8242

82 2

67 3

6748

9241

92 2

319

19

315

38

160

9

160

9

3327

3320

412

14

407

87

312

5

315

38

100

8

89 2

8910

96

7

07

6737

67 6

155 7

155

40

155 7

155

40

153 21

153 16

583

17

567 62

5112

51

16

136

3

136

11

299 18

297

21

159

99

158

22

159

99

159

99423

99

440 12

391 20

393128

138

78

136

11

149 2

150 20

150 20

150 1

150 1

150 20

Page 195: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_9 Line LUNA 345.0 to LEF 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:18:14 2012 temp.wrk

11080

359.31.041

11093LUNA

360.01.044

11217AFTON

359.91.043

13411ART320W 359.8

1.043

11237AMRAD_B

1.041

16101GREENLEE

353.61.025

11266PICANTE

1.037

11038

CALIENTE

1.036

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.5

1.028

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.034

16104SPRINGR 356.7

1.034

HIDALGO

359.31.041

11093LUNA

360.01.044

11217AFTON

359.91.043

13411ART320W 359.8

1.043

11237AMRAD_B

1.041

16101GREENLEE

353.61.025

11266PICANTE

1.037

11038

CALIENTE

1.036

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04213399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.034

16104SPRINGR 356.7

1.034

11017ARROYO

1.038

11456CORONA

1.037

11111NEWMAN

358.21.038

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.046

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

013 1

160 11 1160 11 1

60 4 140 4 2

013 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-2.8

1.000

1.000

156 29

155 13

8737

8715

109 10

109 34

319

19

315

38

160

9

160

9

3428

3422

412

14

407

87

312

5

315

38

251 46

253 10

100

8

92 4

9212

93

18

013

6935

69 8

156 20

157

53

156 20

157

53

151 51

151 45

413

30

405 14

156 29

155 13

8737

8715

109 10

109 34

319

19

315

38

160

9

160

9

3428

3422

412

14

407

87

312

5

315

38

251 46

253 10

100

8

92 4

9212

93

18

013

6935

69 8

156 20

157

53

156 20

157

53

151 51

151 45

413

30

405 14

3013

30

15

145

5

146

10

299 19

297

20

149

98

149

20

149

98

149

989452

93 9

142 11

142102

148

78

146

10

149 2

150 21

150 21

150 2

150 2

150 21

Page 196: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_10 Line WESTMESA 345.0 to ARR___PS 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:18:21 2012 temp.wrk

11080

354.61.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.61.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04113399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.035

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

343 26

340 9

8515

8537

108 30

107 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

01

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

343 26

340 9

8515

8537

108 30

107 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

01

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

3212

32

16

149

3

150

10

299 18

297

21

145

97

145

20

145

97

145

974534

4533

417

470

152

77

150

10

149 2

150 20

150 20

150 1

150 1

150 20

Page 197: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_11 Line CALIENTE 345.0 to PICANTE 345.0 Circuit 2

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:18:27 2012 temp.wrk

11080

354.61.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.61.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04113399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.035

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

343 26

340 9

8515

8537

108 30

107 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

01

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

343 26

340 9

8515

8537

108 30

107 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

01

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

3212

32

16

149

3

150

10

299 18

297

21

145

97

145

20

145

97

145

974534

4533

417

470

152

77

150

10

149 2

150 20

150 20

150 1

150 1

150 20

Page 198: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_12 Line MACHO_SPRNGS 345.0 to LUNA 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:18:34 2012 temp.wrk

11080

356.01.032

11093LUNA

358.61.039

11217AFTON

359.31.041

13411ART320W 359.8

1.043

11237AMRAD_B

1.039

16101GREENLEE

351.71.019

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.4

1.033

HIDALGO

356.01.032

11093LUNA

358.61.039

11217AFTON

359.31.041

13411ART320W 359.8

1.043

11237AMRAD_B

1.039

16101GREENLEE

351.71.019

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04213399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.4

1.033

11017ARROYO

1.037

11456CORONA

1.037

11111NEWMAN

357.91.037

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.049

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

08 1

160 11 1160 11 1

60 4 140 4 2

08 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.2

1.000

1.000

338 15

335 4

8529

8523

107 18

107 26

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

435 7

441 5

100

8

91 3

9112

94

12

08

6936

69 7

156 16

156

49

156 16

156

49

151 43

151 37

339

28

334 15

338 15

335 4

8529

8523

107 18

107 26

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

435 7

441 5

100

8

91 3

9112

94

12

08

6936

69 7

156 16

156

49

156 16

156

49

151 43

151 37

339

28

334 15

3212

32

16

148

3

149

9

299 19

297

20

146

98

146

21

146

98

146

984946

4922

151

78

149

9

149 2

150 21

150 21

150 2

150 1

150 20

Page 199: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_13 Line MACHO_SPRNGS 345.0 to SPRINGR 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:18:40 2012 temp.wrk

11080

353.51.025

11093LUNA

355.21.029

11217AFTON

357.71.037

13411ART320W 359.8

1.043

11237AMRAD_B

1.034

16101GREENLEE

350.61.016

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 355.7

1.031

HIDALGO

353.51.025

11093LUNA

355.21.029

11217AFTON

357.71.037

13411ART320W 359.8

1.043

11237AMRAD_B

1.034

16101GREENLEE

350.61.016

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04213399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 355.7

1.031

11017ARROYO

1.035

11456CORONA

1.035

11111NEWMAN

357.31.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.030

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

03 1

160 11 1160 11 1

60 4 140 4 2

03 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

373 28

369 15

76 8

7644

100 37

99 6

319

19

315

38

160

9

160

9

3427

3421

412

14

407

87

312

5

315

38

469 29

477 17

100

8

91 2

9111

94

2

03

6836

68 6

156 9

156

42

156 9

156

42

153 27

153 22

318

27

313 22

373 28

369 15

76 8

7644

100 37

99 6

319

19

315

38

160

9

160

9

3427

3421

412

14

407

87

312

5

315

38

469 29

477 17

100

8

91 2

9111

94

2

03

6836

68 6

156 9

156

42

156 9

156

42

153 27

153 22

318

27

313 22

4214

42

14

137

7

138

12

299 19

297

20

158

97

157

19

158

97

158

97

5013

49100

139

77

138

12

149 2

150 21

150 21

150 2

150 1

150 20

Page 200: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_14 Line CALIENTE 345.0 to CORONA 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:18:46 2012 temp.wrk

11080

354.61.028

11093LUNA

356.41.033

11217AFTON

358.71.040

13411ART320W 359.8

1.043

11237AMRAD_B

1.044

16101GREENLEE

351.21.018

11266PICANTE

1.038

11038

CALIENTE

1.038

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.034

16104SPRINGR 356.2

1.032

HIDALGO

354.61.028

11093LUNA

356.41.033

11217AFTON

358.71.040

13411ART320W 359.8

1.043

11237AMRAD_B

1.044

16101GREENLEE

351.21.018

11266PICANTE

1.038

11038

CALIENTE

1.038

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04213399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.034

16104SPRINGR 356.2

1.032

11017ARROYO

1.037

11456CORONA

1.038

11111NEWMAN

358.21.038

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

018 1

160 11 1160 11 1

60 4 140 4 2

018 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

343 26

340 8

8612

8640

109 34

109 10

319

19

315

38

160

9

160

9

97 0

97 7

412

14

407

87

312

5

315

38

440 16

446 13

100

8

154 22

154 14

95

25

018

155 23

156

56

155 23

156

56

156 23

156 18

337

26

331 17

343 26

340 8

8612

8640

109 34

109 10

319

19

315

38

160

9

160

9

97 0

97 7

412

14

407

87

312

5

315

38

440 16

446 13

100

8

154 22

154 14

95

25

018

155 23

156

56

155 23

156

56

156 23

156 18

337

26

331 17

3310

33

19

149

2

150

9

299 19

297

20

145

98

145

21

145

98

145

984535

4533

416

471

152

78

150

9

149 2

150 21

150 21

150 2

150 1

150 20

Page 201: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_15 Line AMRAD 345.0 to AA100W 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:18:52 2012 temp.wrk

11080

357.41.036

11093LUNA

357.01.035

11217AFTON

358.41.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.056

16101GREENLEE

353.01.023

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.034

13400ARTESIA

345.01.000

10369WESTMESA 354.4

1.027

13399AA100W

358.81.040

13397AA100W_P1

11238AMRAD_A

1.032

16104SPRINGR 356.5

1.033

HIDALGO

357.41.036

11093LUNA

357.01.035

11217AFTON

358.41.039

13411ART320W 355.3

1.030

11237AMRAD_B

1.056

16101GREENLEE

353.01.023

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.034

13400ARTESIA

345.01.000

11014

ARR___PS

1.04113399AA100W

358.81.040

13397AA100W_P1

11238AMRAD_A

1.032

16104SPRINGR 356.5

1.033

11017ARROYO

1.036

11456CORONA

1.037

11111NEWMAN

357.71.037

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.038

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

042 1

160 11 1160 11 1

60 4 140 4 2

042 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

4.6

1.000

1.000

121 39

121 4

177 13

178 58

145 60

145 15

312

90

309

68

158

6

158

6

2229

2222

279

153

283

179

213 40

214 1

99

5

55 5

5514

61

58

042

4234

42 9

31 8

31

29

31 8

31

29

159 3

159 9

428

26

419 17

121 39

121 4

177 13

178 58

145 60

145 15

312

90

309

68

158

6

158

6

2229

2222

279

153

283

179

213 40

214 1

99

5

55 5

5514

61

58

042

4234

42 9

31 8

31

29

31 8

31

29

159 3

159 9

428

26

419 17

29

2

20

146

6

147

11

299 19

297

20

148

97

148

20

148

97

148

97118

45

117 12

167 5

166 96

148

77

147

11

149 2

150 21

150 21

150 2

150 1

150 20

Page 202: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_17 Line CORONA 345.0 to AMRAD 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:19:14 2012 temp.wrk

11080

354.51.027

11093LUNA

356.11.032

11217AFTON

357.71.037

13411ART320W 359.6

1.042

11237AMRAD_B

1.021

16101GREENLEE

351.11.018

11266PICANTE

1.033

11038

CALIENTE

1.032

11010AMRAD

1.032

13400ARTESIA

361.81.049

10369WESTMESA 354.3

1.027

13399AA100W

360.31.044

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.51.027

11093LUNA

356.11.032

11217AFTON

357.71.037

13411ART320W 359.6

1.042

11237AMRAD_B

1.021

16101GREENLEE

351.11.018

11266PICANTE

1.033

11038

CALIENTE

1.032

11010AMRAD

1.032

13400ARTESIA

361.81.049

11014

ARR___PS

1.04013399AA100W

360.31.044

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.034

11456CORONA

1.034

11111NEWMAN

356.91.034

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 12 1160 12 1

60 5 140 5 2

025 1

160 12 1160 12 1

60 5 140 5 2

025 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

342 27

339 9

8318

8334

105 27

105 16

319

18

315

37

160

9

160

9

3326

3319

412

12

407

85

312

4

315

37

439 17

445 14

100

7

89 0

89 8

106

31

025

6738

67 4

299 33

300

54

142 37

142 32

337

26

331 17

342 27

339 9

8318

8334

105 27

105 16

319

18

315

37

160

9

160

9

3326

3319

412

12

407

85

312

4

315

37

439 17

445 14

100

7

89 0

89 8

106

31

025

6738

67 4

299 33

300

54

142 37

142 32

337

26

331 17

2713

27

15

149

4

150

11

299 18

297

21

145

96

144

19

145

96

145

9645

34

4533

417

470

152

75

150

11

149 2

150 20

150 20

150 1

150 1

150 20

Page 203: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_18 Line CORONA 345.0 to AMRAD 345.0 Circuit 2

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:19:20 2012 temp.wrk

11080

354.51.027

11093LUNA

356.11.032

11217AFTON

357.71.037

13411ART320W 359.6

1.042

11237AMRAD_B

1.021

16101GREENLEE

351.11.018

11266PICANTE

1.033

11038

CALIENTE

1.032

11010AMRAD

1.032

13400ARTESIA

361.81.049

10369WESTMESA 354.3

1.027

13399AA100W

360.31.044

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.51.027

11093LUNA

356.11.032

11217AFTON

357.71.037

13411ART320W 359.6

1.042

11237AMRAD_B

1.021

16101GREENLEE

351.11.018

11266PICANTE

1.033

11038

CALIENTE

1.032

11010AMRAD

1.032

13400ARTESIA

361.81.049

11014

ARR___PS

1.04013399AA100W

360.31.044

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.034

11456CORONA

1.034

11111NEWMAN

356.91.034

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 12 1160 12 1

60 5 140 5 2

025 1

160 12 1160 12 1

60 5 140 5 2

025 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

342 27

339 9

8318

8334

105 27

105 16

319

18

315

37

160

9

160

9

3326

3319

412

12

407

85

312

4

315

37

439 17

445 14

100

7

89 0

89 8

106

31

025

6738

67 4

299 33

300

54

142 37

142 32

337

26

331 17

342 27

339 9

8318

8334

105 27

105 16

319

18

315

37

160

9

160

9

3326

3319

412

12

407

85

312

4

315

37

439 17

445 14

100

7

89 0

89 8

106

31

025

6738

67 4

299 33

300

54

142 37

142 32

337

26

331 17

2713

27

15

149

4

150

11

299 18

297

21

145

96

144

19

145

96

145

964534

4533

417

470

152

75

150

11

149 2

150 20

150 20

150 1

150 1

150 20

Page 204: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_19 Line CORONA 345.0 to PICANTE 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:19:26 2012 temp.wrk

11080

354.51.028

11093LUNA

356.21.032

11217AFTON

358.11.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.034

16101GREENLEE

351.11.018

11266PICANTE

1.033

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.51.028

11093LUNA

356.21.032

11217AFTON

358.11.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.034

16101GREENLEE

351.11.018

11266PICANTE

1.033

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04113399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.035

11456CORONA

1.035

11111NEWMAN

357.41.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

03 1

160 11 1160 11 1

60 4 140 4 2

03 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

343 27

339 9

8716

8736

110 30

110 14

319

19

315

38

160

9

160

9

5019

5012

412

14

407

87

312

5

315

38

439 17

446 14

100

8

95

2

03

150 30

150 14

155 9

156

42

155 9

156

42

161 32

161 27

337

26

331 17

343 27

339 9

8716

8736

110 30

110 14

319

19

315

38

160

9

160

9

5019

5012

412

14

407

87

312

5

315

38

439 17

446 14

100

8

95

2

03

150 30

150 14

155 9

156

42

155 9

156

42

161 32

161 27

337

26

331 17

3412

34

16

149

4

150

10

299 18

297

21

146

97

145

20

146

97

146

974534

4533

417

470

151

76

150

10

149 2

150 20

150 20

150 1

150 1

150 20

Page 205: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_20 Line CORONA 345.0 to NEWMAN 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:19:33 2012 temp.wrk

11080

354.71.028

11093LUNA

356.51.033

11217AFTON

359.01.040

13411ART320W 359.8

1.043

11237AMRAD_B

1.027

16101GREENLEE

351.21.018

11266PICANTE

1.033

11038

CALIENTE

1.032

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 356.2

1.032

HIDALGO

354.71.028

11093LUNA

356.51.033

11217AFTON

359.01.040

13411ART320W 359.8

1.043

11237AMRAD_B

1.027

16101GREENLEE

351.21.018

11266PICANTE

1.033

11038

CALIENTE

1.032

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04313399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.037

16104SPRINGR 356.2

1.032

11017ARROYO

1.038

11456CORONA

1.034

11111NEWMAN

358.51.039

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.038

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

018 1

160 11 1160 11 1

60 4 140 4 2

018 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-12.9

1.000

1.000

342 25

339 7

49 6

4947

6740

67 3

319

19

315

38

160

9

160

9

5326

5319

412

14

407

87

312

5

315

38

439 16

445 13

100

8

161 1

161 7

128

21

018

117 40

118 3

139 1

140

33

139 1

140

33

337

27

331 17

342 25

339 7

49 6

4947

6740

67 3

319

19

315

38

160

9

160

9

5326

5319

412

14

407

87

312

5

315

38

439 16

445 13

100

8

161 1

161 7

128

21

018

117 40

118 3

139 1

140

33

139 1

140

33

337

27

331 17

45

4

24

149

2

150

8

299 19

297

20

146

99

145

21

146

99

146

994435

4533

516

571

151

79

150

8

149 2

150 21

150 21

150 2

150 2

150 21

Page 206: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_23 Line WA300POI 345.0 to WA300_C 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:19:42 2012 temp.wrk

11080

354.81.028

11093LUNA

356.31.033

11217AFTON

358.01.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.032

16101GREENLEE

351.41.019

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 349.8

1.014

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 356.4

1.033

HIDALGO

354.81.028

11093LUNA

356.31.033

11217AFTON

358.01.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.032

16101GREENLEE

351.41.019

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.03413399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 356.4

1.033

11017ARROYO

1.033

11456CORONA

1.035

11111NEWMAN

357.21.035

11420WA300POI

1.029

11423ARR___PS1

1.029

11421

WA300_C

1.030

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.030

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

06 1

160 11 1160 11 1

60 4 140 4 2

06 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-19.6

1.000

1.000

330 29

327 9

7517

7535

9929

9814

319

19

315

38

160

9

160

9

3427

3420

412

14

407

87

312

5

315

38

426 14

432 14

100

8

91 1

9110

94

5

06

6837

68 6

156 8

156

41

156 8

156

41

152 23

152 17

334

27

329 18

330 29

327 9

7517

7535

9929

9814

319

19

315

38

160

9

160

9

3427

3420

412

14

407

87

312

5

315

38

426 14

432 14

100

8

91 1

9110

94

5

06

6837

68 6

156 8

156

41

156 8

156

41

152 23

152 17

334

27

329 18

41 1

41

27

138

11

139

4

141

89

141

14

141

89

141

894035

4033

1017

1070

141

89

139

4

142 0

142 21

146 10

147 29

147 29

146 10

Page 207: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

line_24 Line WA300_C 345.0 to WA300_C2 345.0 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:19:49 2012 temp.wrk

11080

354.71.028

11093LUNA

356.31.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.31.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.2

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.3

1.033

HIDALGO

354.71.028

11093LUNA

356.31.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.31.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04213399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.3

1.033

11017ARROYO

1.036

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.050

11423ARR___PS1

1.050

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.030

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

00 1

160 11 1160 11 1

60 4 140 4 2

00 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-16.4

1.000

1.000

336 27

333 8

8015

7937

103 30

103 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

432 15

439 14

100

8

91 2

9111

94

2

00

6936

69 7

156 12

156

45

156 12

156

45

151 32

151 27

336

27

330 17

336 27

333 8

8015

7937

103 30

103 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

432 15

439 14

100

8

91 2

9111

94

2

00

6936

69 7

156 12

156

45

156 12

156

45

151 32

151 27

336

27

330 17

3713

37

15

144

4

145

11

150 20

149

41

3

118

343

3

118

3

1184235

4233

717

770

146

77

145

11

146 10

147 29

150 1

150 20

Page 208: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

tran_25 Tran ARR___PS 345.00 to ARROYO 345.00 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:20:04 2012 temp.wrk

11080

355.61.031

11093LUNA

356.61.034

11217AFTON

358.11.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.032

16101GREENLEE

351.91.020

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 356.7

1.034

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 356.2

1.033

HIDALGO

355.61.031

11093LUNA

356.61.034

11217AFTON

358.11.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.032

16101GREENLEE

351.91.020

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.08013399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 356.2

1.033

11017ARROYO

1.032

11456CORONA

1.035

11111NEWMAN

357.11.035

11420WA300POI

1.060

11423ARR___PS1

1.060

11421

WA300_C

1.063

11047MACHO_SPRNGS

1.038

11424

WA300_C2

1.063

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

07 1

160 11 1160 11 1

60 4 140 4 2

07 1

75 4 175 4 2

75 4 175 4 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

266 32

264 3

911

943

2234

22 8

319

19

315

38

160

9

160

9

3127

3120

412

14

407

87

312

5

315

38

361 5

366 11

100

8

83 2

8310

93

6

07

6337

63 6

156 7

157

40

156 7

157

40

167 22

167 17

372

27

365 4

266 32

264 3

911

943

2234

22 8

319

19

315

38

160

9

160

9

3127

3120

412

14

407

87

312

5

315

38

361 5

366 11

100

8

83 2

8310

93

6

07

6337

63 6

156 7

157

40

156 7

157

40

167 22

167 17

372

27

365 4

142 6

141

19

299 32

297

8

297

115

295

26

297

115

297

1151442

1428

6311

6377

0

107

0 0

149 5

150 27

150 27

150 8

150 9

150 28

Page 209: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

tran_26 Tran ARR___PS1 345.00 to WA300POI 345.00 Circuit 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:20:11 2012 temp.wrk

11080

354.61.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.61.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04113399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.035

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

343 26

340 9

8515

8537

108 30

107 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

01

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

343 26

340 9

8515

8537

108 30

107 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

01

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

3212

32

16

149

3

150

10

299 18

297

21

145

97

145

20

145

97

145

974534

4533

417

470

152

77

150

10

149 2

150 20

150 20

150 1

150 1

150 20

Page 210: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_27 Gen AMRAD_A 13.2 Unit ID 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:20:17 2012 temp.wrk

11080

354.51.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.71.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.51.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04113399AA100W

360.71.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.035

11456CORONA

1.036

11111NEWMAN

357.41.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 12 1160 12 1

60 4 140 4 2

1

160 12 1160 12 1

60 4 140 4 2

1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

343 26

340 9

8515

8536

108 30

107 13

319

19

315

38

160

9

160

9

3427

3421

412

13

407

86

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

00

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

343 26

340 9

8515

8536

108 30

107 13

319

19

315

38

160

9

160

9

3427

3421

412

13

407

86

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

00

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

3212

32

16

149

3

150

10

299 18

297

21

145

97

145

20

145

97

145

974534

4533

417

470

152

77

150

10

149 2

150 20

150 20

150 1

150 1

150 20

Page 211: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_28 Gen NEWMANG3 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:20:23 2012 temp.wrk

11080

354.71.028

11093LUNA

356.31.033

11217AFTON

358.31.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.21.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.71.028

11093LUNA

356.31.033

11217AFTON

358.31.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.21.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04213399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.036

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

00 1

160 11 1160 11 1

60 4 140 4 2

00 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-12.1

1.000

1.000

338 27

335 8

7114

7138

9431

9412

319

19

315

38

160

9

160

9

3228

3221

412

14

407

87

312

5

315

38

435 15

441 13

100

8

91 2

9111

95

3

00

6836

68 6

155 12

156

45

155 12

156

45

152 32

152 27

339

26

333 16

338 27

335 8

7114

7138

9431

9412

319

19

315

38

160

9

160

9

3228

3221

412

14

407

87

312

5

315

38

435 15

441 13

100

8

91 2

9111

95

3

00

6836

68 6

155 12

156

45

155 12

156

45

152 32

152 27

339

26

333 16

3814

38

14

140

6

141

12

299 19

297

20

154

97

154

20

154

97

154

974235

4233

816

871

142

77

141

12

149 2

150 21

150 21

150 2

150 1

150 20

Page 212: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_29 Gen NEWMN4S1 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:20:30 2012 temp.wrk

11080

354.71.028

11093LUNA

356.31.033

11217AFTON

358.31.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.21.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.71.028

11093LUNA

356.31.033

11217AFTON

358.31.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.21.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04213399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.036

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

00 1

160 11 1160 11 1

60 4 140 4 2

00 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-12.0

1.000

1.000

337 27

334 8

7214

7238

9631

9512

319

19

315

38

160

9

160

9

3328

3321

412

14

407

87

312

5

315

38

434 15

440 13

100

8

91 2

9111

95

3

00

6836

68 7

156 12

156

45

156 12

156

45

152 32

152 27

339

26

334 16

337 27

334 8

7214

7238

9631

9512

319

19

315

38

160

9

160

9

3328

3321

412

14

407

87

312

5

315

38

434 15

440 13

100

8

91 2

9111

95

3

00

6836

68 7

156 12

156

45

156 12

156

45

152 32

152 27

339

26

334 16

3914

39

14

139

6

140

12

299 19

297

20

155

97

155

20

155

97

155

974135

4133

816

871

142

77

140

12

149 2

150 21

150 21

150 2

150 1

150 20

Page 213: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_30 Gen NEWMN5G1 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:20:36 2012 temp.wrk

11080

354.71.028

11093LUNA

356.31.033

11217AFTON

358.31.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.21.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.71.028

11093LUNA

356.31.033

11217AFTON

358.31.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.21.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04213399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.036

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

00 1

160 11 1160 11 1

60 4 140 4 2

00 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-12.1

1.000

1.000

338 27

335 8

7314

7238

9631

9612

319

19

315

38

160

9

160

9

3328

3321

412

14

407

87

312

5

315

38

434 15

441 13

100

8

91 2

9111

95

3

00

6836

68 7

156 12

156

45

156 12

156

45

152 32

152 27

339

26

333 16

338 27

335 8

7314

7238

9631

9612

319

19

315

38

160

9

160

9

3328

3321

412

14

407

87

312

5

315

38

434 15

441 13

100

8

91 2

9111

95

3

00

6836

68 7

156 12

156

45

156 12

156

45

152 32

152 27

339

26

333 16

3814

38

14

140

6

140

12

299 19

297

20

155

97

154

20

155

97

155

974135

4133

816

871

142

77

140

12

149 2

150 21

150 21

150 2

150 1

150 20

Page 214: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_31 Gen NEWMN5G2 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:20:43 2012 temp.wrk

11080

354.71.028

11093LUNA

356.31.033

11217AFTON

358.31.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.21.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.71.028

11093LUNA

356.31.033

11217AFTON

358.31.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.21.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04213399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.036

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

00 1

160 11 1160 11 1

60 4 140 4 2

00 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-12.1

1.000

1.000

338 27

335 8

7314

7238

9631

9612

319

19

315

38

160

9

160

9

3328

3321

412

14

407

87

312

5

315

38

434 15

441 13

100

8

91 2

9111

95

3

00

6836

68 7

156 12

156

45

156 12

156

45

152 32

152 27

339

26

333 16

338 27

335 8

7314

7238

9631

9612

319

19

315

38

160

9

160

9

3328

3321

412

14

407

87

312

5

315

38

434 15

441 13

100

8

91 2

9111

95

3

00

6836

68 7

156 12

156

45

156 12

156

45

152 32

152 27

339

26

333 16

3814

38

14

140

6

140

12

299 19

297

20

155

97

154

20

155

97

155

974135

4133

816

871

142

77

140

12

149 2

150 21

150 21

150 2

150 1

150 20

Page 215: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_32 Gen NEWMN5S1 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:20:49 2012 temp.wrk

11080

354.71.028

11093LUNA

356.31.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.21.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.71.028

11093LUNA

356.31.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.21.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04213399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.036

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-11.9

1.000

1.000

338 27

335 8

6614

6639

9031

9012

319

19

315

38

160

9

160

9

3227

3221

412

14

407

87

312

5

315

38

435 15

441 13

100

8

91 2

9111

95

2

01

6836

68 7

155 11

156

44

155 11

156

44

151 31

151 26

339

26

333 16

338 27

335 8

6614

6639

9031

9012

319

19

315

38

160

9

160

9

3227

3221

412

14

407

87

312

5

315

38

435 15

441 13

100

8

91 2

9111

95

2

01

6836

68 7

155 11

156

44

155 11

156

44

151 31

151 26

339

26

333 16

3814

38

14

140

6

140

12

299 19

297

20

155

97

155

20

155

97

155

974135

4233

816

871

142

77

140

12

149 2

150 21

150 21

150 2

150 1

150 20

Page 216: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_33 Gen NEWMN6G1 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:20:56 2012 temp.wrk

11080

354.61.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.61.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04113399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.035

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

343 26

340 9

8515

8537

108 30

107 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

01

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

343 26

340 9

8515

8537

108 30

107 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

01

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

3212

32

16

149

3

150

10

299 18

297

21

145

97

145

20

145

97

145

974534

4533

417

470

152

77

150

10

149 2

150 20

150 20

150 1

150 1

150 20

Page 217: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_34 Gen NEWMN6G2 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:21:02 2012 temp.wrk

11080

354.61.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.61.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04113399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.035

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

343 26

340 9

8515

8537

108 30

107 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

01

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

343 26

340 9

8515

8537

108 30

107 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

01

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

3212

32

16

149

3

150

10

299 18

297

21

145

97

145

20

145

97

145

974534

4533

417

470

152

77

150

10

149 2

150 20

150 20

150 1

150 1

150 20

Page 218: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_35 Gen NEWMN6S1 13.8 Unit ID 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:21:09 2012 temp.wrk

11080

354.61.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.4

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

HIDALGO

354.61.028

11093LUNA

356.21.033

11217AFTON

358.21.038

13411ART320W 359.8

1.043

11237AMRAD_B

1.035

16101GREENLEE

351.11.018

11266PICANTE

1.035

11038

CALIENTE

1.034

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04113399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.035

16104SPRINGR 356.2

1.032

11017ARROYO

1.035

11456CORONA

1.036

11111NEWMAN

357.51.036

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.037

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 11 1160 11 1

60 4 140 4 2

01 1

160 11 1160 11 1

60 4 140 4 2

01 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-13.6

1.000

1.000

343 26

340 9

8515

8537

108 30

107 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

01

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

343 26

340 9

8515

8537

108 30

107 13

319

19

315

38

160

9

160

9

3428

3421

412

14

407

87

312

5

315

38

440 17

446 14

100

8

91 2

9111

94

2

01

6936

69 6

156 11

156

44

156 11

156

44

151 31

151 26

337

26

331 17

3212

32

16

149

3

150

10

299 18

297

21

145

97

145

20

145

97

145

974534

4533

417

470

152

77

150

10

149 2

150 20

150 20

150 1

150 1

150 20

Page 219: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_36 Gen ART320W_G1 34.5 Unit ID 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:21:19 2012 temp.wrk

11080

354.71.028

11093LUNA

356.51.033

11217AFTON

358.61.039

13411ART320W 363.8

1.054

11237AMRAD_B

1.059

16101GREENLEE

351.21.018

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.034

13400ARTESIA

367.11.064

10369WESTMESA 354.5

1.027

13399AA100W

364.41.056

13397AA100W_P1

11238AMRAD_A

1.031

16104SPRINGR 356.2

1.032

HIDALGO

354.71.028

11093LUNA

356.51.033

11217AFTON

358.61.039

13411ART320W 363.8

1.054

11237AMRAD_B

1.059

16101GREENLEE

351.21.018

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.034

13400ARTESIA

367.11.064

11014

ARR___PS

1.04313399AA100W

364.41.056

13397AA100W_P1

11238AMRAD_A

1.031

16104SPRINGR 356.2

1.032

11017ARROYO

1.037

11456CORONA

1.037

11111NEWMAN

357.91.037

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.038

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

1160 2 1

60 1 140 1 2

050 1

1160 2 1

60 1 140 1 2

050 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-11.4

1.000

1.000

338 26

335 7

41 9

4044

6335

63 7

160

23

159

17

0 0 160

23

2229

2222

258

23

255

20

158

37

159

17

435 15

441 13

100

14

59 5

5914

83

65

050

4534

45 9

86 6

86

42

86 6

86

42

6926

6820

339

27

333 16

338 26

335 7

41 9

4044

6335

63 7

160

23

159

17

0 0 160

23

2229

2222

258

23

255

20

158

37

159

17

435 15

441 13

100

14

59 5

5914

83

65

050

4534

45 9

86 6

86

42

86 6

86

42

6926

6820

339

27

333 16

2414

24

15

140

5

140

11

299 19

297

20

155

98

155

20

155

98

155

984235

4232

816

871

142

78

140

11

149 1

150 21

150 21

150 2

150 2

150 21

Page 220: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_37 Gen ART320W_G2 34.5 Unit ID 1

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:21:28 2012 temp.wrk

11080

354.71.028

11093LUNA

356.51.033

11217AFTON

358.61.039

13411ART320W 363.8

1.054

11237AMRAD_B

1.059

16101GREENLEE

351.21.018

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.034

13400ARTESIA

367.11.064

10369WESTMESA 354.5

1.027

13399AA100W

364.41.056

13397AA100W_P1

11238AMRAD_A

1.031

16104SPRINGR 356.2

1.032

HIDALGO

354.71.028

11093LUNA

356.51.033

11217AFTON

358.61.039

13411ART320W 363.8

1.054

11237AMRAD_B

1.059

16101GREENLEE

351.21.018

11266PICANTE

1.036

11038

CALIENTE

1.035

11010AMRAD

1.034

13400ARTESIA

367.11.064

11014

ARR___PS

1.04313399AA100W

364.41.056

13397AA100W_P1

11238AMRAD_A

1.031

16104SPRINGR 356.2

1.032

11017ARROYO

1.037

11456CORONA

1.037

11111NEWMAN

357.91.037

11420WA300POI

1.049

11423ARR___PS1

1.049

11421

WA300_C

1.057

11047MACHO_SPRNGS

1.038

11424

WA300_C2

1.057

11425WA300_G2

1.000

11422WA300_G

1.000

160 2 1

1

60 1 140 1 2

050 1

160 2 1

1

60 1 140 1 2

050 1

75 1 175 1 2

75 1 175 1 2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-11.4

1.000

1.000

338 26

335 7

41 9

4044

6335

63 7

160

23

159

17

160

23

0 0

2229

2222

258

23

255

20

158

37

159

17

435 15

441 13

100

14

59 5

5914

83

65

050

4534

45 9

86 6

86

42

86 6

86

42

6926

6820

339

27

333 16

338 26

335 7

41 9

4044

6335

63 7

160

23

159

17

160

23

0 0

2229

2222

258

23

255

20

158

37

159

17

435 15

441 13

100

14

59 5

5914

83

65

050

4534

45 9

86 6

86

42

86 6

86

42

6926

6820

339

27

333 16

2414

24

15

140

5

140

11

299 19

297

20

155

98

155

20

155

98

155

984235

4232

816

871

142

78

140

11

149 1

150 21

150 21

150 2

150 2

150 21

Page 221: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WECC PLAN_2016.SAV

gen_38 Gen WA300W 34.5 ALL UNITS

AUGUST 2, 2011 2016_op_ap2.SAV

MW/MVAR

Rating = 2

wa300w_2016_s2.drw

General Electric International, Inc. PSLF Program Wed Jan 18 12:21:35 2012 temp.wrk

11080

351.01.017

11093LUNA

354.01.026

11217AFTON

356.91.035

13411ART320W 359.8

1.043

11237AMRAD_B

1.031

16101GREENLEE

348.81.011

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

10369WESTMESA 354.5

1.027

13399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 355.7

1.031

HIDALGO

351.01.017

11093LUNA

354.01.026

11217AFTON

356.91.035

13411ART320W 359.8

1.043

11237AMRAD_B

1.031

16101GREENLEE

348.81.011

11266PICANTE

1.034

11038

CALIENTE

1.033

11010AMRAD

1.034

13400ARTESIA

362.11.050

11014

ARR___PS

1.04513399AA100W

360.81.046

13397AA100W_P1

11238AMRAD_A

1.036

16104SPRINGR 355.7

1.031

11017ARROYO

1.034

11456CORONA

1.035

11111NEWMAN

357.01.035

11420WA300POI

1.056

11423ARR___PS1

1.056

11421

WA300_C

1.077

11047MACHO_SPRNGS

1.030

11424

WA300_C2

1.078

11425WA300_G2

1.027

11422WA300_G

1.026

160 11 1160 11 1

60 4 140 4 2

09 1

160 11 1160 11 1

60 4 140 4 2

09 1

1

2

1

2

DCDC

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

-31.1

1.000

1.000

491 12

484 25

192 13

191 31

208 37

208 11

319

19

315

38

160

9

160

9

2028

2021

412

14

407

87

312

5

315

38

587 70

599 18

100

8

54 5

5414

92

9

09

4134

41 8

157 6

157

39

157 6

157

39

218 25

218 20

270

20

266 43

491 12

484 25

192 13

191 31

208 37

208 11

319

19

315

38

160

9

160

9

2028

2021

412

14

407

87

312

5

315

38

587 70

599 18

100

8

54 5

5414

92

9

09

4134

41 8

157 6

157

39

157 6

157

39

218 25

218 20

270

20

266 43

4115

41

13

138

9

138

17

026

095

140

168

141

88

140

168

140

168157

7

160 39

110 26

110 62

140

73

138

17

026

00

00

00

00

00

Page 222: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

Appendix D

Appendix D Dynamic Modeling Data

Page 223: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W models

wt4g 11422 "WA300_G " 34.50 "1 " : #9 mva=333.2000 "lvplsw" 1.000000 "rrpwr" 2.0000 "brkpt" 1.000000 "zerox" 0.000000 "lvpl1" 1.11000

wt4g 11422 "WA300_G " 34.50 "2 " : #9 mva=333.2000 "lvplsw" 1.000000 "rrpwr" 5.0000 "brkpt" 0.900000 "zerox" 0.100000 "lvpl1" 1.05000

wt4e 11422 "WA300_G " 34.50 "1 " : #9 "varflg" 1.0 "kqi" 1.000 "kvi" 125.0 "vmax" 1.1000 "vmin" 0.900000 "qmax" 0.4700 "qmin" -0.470000 "tr" 0.00000 "tc" 0.00000 "kpv" 15.000 "kiv" 2.000 "pfaflg" 0.0000 "fn" 1.00000 "tv" 0.05000 "tpwr" 0.05000 "iphl" 1.11000 "iqhl" 1.000 "pqflag" 0.000

wt4e 11422 "WA300_G " 34.50 "2 " : #9 "varflg" 1.0 "kqi" 0.100 "kvi" 120.0 "vmax" 1.1000 "vmin" 0.900000 "qmax" 0.3000 "qmin" -0.300000 "tr" 0.02000 "tc" 0.15000 "kpv" 18.000 "kiv" 5.000 "pfaflg" 0.0000 "fn" 1.00000 "tv" 0.05000 "tpwr" 0.05000 "iphl" 1.11000 "iqhl" 1.250 "pqflag" 0.000

Page 224: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

WA300W System Impact Study TRC March 2, 2012

Appendix G

Appendix G Project Schedule

Page 225: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

ID Task Name Duration Start Finish

1 WA300W POI Switching Station 530 days Mon 4/2/12 Fri 4/11/142 Preliiminary Engineering 4 wks Mon 4/2/12 Fri 4/27/123 Permitting 26 wks Mon 4/30/12 Fri 10/26/124 Engineering and Procurement 52 wks Mon 8/6/12 Fri 8/2/135 Construction 36 wks Mon 8/5/13 Fri 4/11/1467 Arroyo Substatiion 3rd 345/115 kV Transformer

Installation530 days Mon 4/2/12 Fri 4/11/14

8 Preliiminary Engineering 4 wks Mon 4/2/12 Fri 4/27/129 Permitting 26 wks Mon 4/30/12 Fri 10/26/1210 Engineering and Procurement 52 wks Mon 10/29/12 Fri 10/25/1311 Construction 36 wks Mon 8/5/13 Fri 4/11/141213 Recondoctor Arroyo- Las Cruces 115 kV line (4.1

Miles)320 days Mon 4/2/12 Fri 6/21/13

14 Preliiminary Engineering 4 wks Mon 4/2/12 Fri 4/27/1215 Permitting 26 wks Mon 4/30/12 Fri 10/26/1216 Engineering and Procurement 26 wks Mon 10/29/12 Fri 4/26/1317 Construction 40 days Mon 4/29/13 Fri 6/21/131819 Recondoctor Lane-Sol 115 kV line (2.1 Miles) 300 days Mon 4/2/12 Fri 5/24/13

20 Preliiminary Engineering 4 wks Mon 4/2/12 Fri 4/27/1221 Permitting 26 wks Mon 4/30/12 Fri 10/26/1222 Engineering and Procurement 26 wks Mon 10/29/12 Fri 4/26/1323 Construction 4 wks Mon 4/29/13 Fri 5/24/132425 Rebuild Luna-Hurley-MD (20.8 miles) 530 days Mon 4/2/12 Fri 4/11/1426 Preliiminary Engineering 6 wks Mon 4/2/12 Fri 5/11/1227 Permitting 26 wks Mon 4/30/12 Fri 10/26/1228 Engineering and Procurement 40 wks Mon 10/1/12 Fri 7/5/1329 Construction 48 wks Mon 5/13/13 Fri 4/11/14

Mar May Jul Sep Nov Jan Mar May Jul Sep Nov Jan Mar Mayst Quarter 3rd Quarter 1st Quarter 3rd Quarter 1st Quarter

Task

Task Progress

Critical Task

Critical Task Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

Deadline

Page 1

Project: RED Canyon Scenario 1Date: Fri 3/2/12

dgutierr
Typewritten Text
xxxxxxxxxx
dgutierr
Typewritten Text
dgutierr
Typewritten Text
xxxxxxxx
dgutierr
Typewritten Text
dgutierr
Typewritten Text
Page 226: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

ID Task Name Duration Start Finish

1 WA300W POI Switching Station 530 days Mon 4/2/12 Fri 4/11/14

2 Preliiminary Engineering 4 wks Mon 4/2/12 Fri 4/27/12

3 Permitting 26 wks Mon 4/30/12 Fri 10/26/12

4 Engineering and Procurement 52 wks Mon 8/6/12 Fri 8/2/13

5 Construction 36 wks Mon 8/5/13 Fri 4/11/14

6

7 Arroyo Substatiion Phase Shifting Transformer Replacement

530 days Mon 4/2/12 Fri 4/11/14

8 Preliiminary Engineering 4 wks Mon 4/2/12 Fri 4/27/12

9 Permitting 26 wks Mon 4/30/12 Fri 10/26/12

10 Engineering and Procurement 52 wks Mon 10/29/12 Fri 10/25/13

11 Construction 26 wks Mon 8/5/13 Fri 1/31/14

Mar May Jul Sep Nov Jan Mar May Jul Sep Nov Jan Mar Mayst Quarter 3rd Quarter 1st Quarter 3rd Quarter 1st Quarter

Task

Task Progress

Critical Task

Critical Task Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

Deadline

Page 1

Project: RED Canyon Scenario 2Date: Fri 3/2/12

dgutierr
Typewritten Text
XXXXXXx
dgutierr
Typewritten Text
xxxxxxxxx
dgutierr
Typewritten Text
dgutierr
Typewritten Text
dgutierr
Typewritten Text
dgutierr
Typewritten Text
dgutierr
Typewritten Text
dgutierr
Typewritten Text
XXXXXXX
dgutierr
Typewritten Text
Page 227: SYSTEM IMPACT RE-STUDY #2 FINAL REPORT - El Paso Electric

ID Task Name Duration Start Finish

1 WA300W POI Switching Station 530 days Mon 4/2/12 Fri 4/11/14

2 Preliiminary Engineering 4 wks Mon 4/2/12 Fri 4/27/12

3 Permitting 26 wks Mon 4/30/12 Fri 10/26/12

4 Engineering and Procurement 52 wks Mon 8/6/12 Fri 8/2/13

5 Construction 36 wks Mon 8/5/13 Fri 4/11/14

6

7 Arroyo Substatiion 3rd 345/115 kV Transformer In 530 days Mon 4/2/12 Fri 4/11/14

8 Preliiminary Engineering 4 wks Mon 4/2/12 Fri 4/27/12

9 Permitting 26 wks Mon 4/30/12 Fri 10/26/12

10 Engineering and Procurement 52 wks Mon 10/29/12 Fri 10/25/13

11 Construction 36 wks Mon 8/5/13 Fri 4/11/14

Mar May Jul Sep Nov Jan Mar May Jul Sep Nov Jan Mar Mayst Quarter 3rd Quarter 1st Quarter 3rd Quarter 1st Quarter

Task

Task Progress

Critical Task

Critical Task Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

Deadline

Page 1

Project: RED Canyon Scenario 3Date: Fri 3/2/12

dgutierr
Typewritten Text
xxxxxxxxxx
dgutierr
Typewritten Text
xxxxxxxxxx
dgutierr
Typewritten Text
dgutierr
Typewritten Text