System Development Project“A project is a series of activities directed towards
accomplishment of a desired objective.”
“A project is a temporary endeavour undertaken to create a "unique product or service”
Network analysis
Network analysis is the general name given to certain specific techniques, which can be used for the planning, management and control of projects.
CPM, PERT are the two most used techniques.
Plan your work first…..then work your plan
History
PERT was developed by the US Navy for the planning and control of the Polaris missile program and the emphasis was on completing the program in the shortest possible time. In addition PERT had the ability to cope with uncertain activity completion times (e.g. for a particular activity the most likely completion time is 4 weeks but it could be anywhere between 3 weeks and 8 weeks).
CPM was developed by Du Pont and the emphasis was on the trade-off between the cost of the project and its overall completion time (e.g. for certain activities it may be possible to decrease their completion times by spending more money - how does this affect the overall completion time of the project?)
CPM - Critical Path Method Uses Deterministic activity times
used in: Production management - for the jobs that are of repetitive nature , where the activity time estimates can be predicted with considerable certainty due to the existence of past experience.
PERT - Project Evaluation & Review TechniquesUses Probabilistic activity times
used in : Project management - for non-repetitive jobs (information system development work), where the time and cost estimates tend to be quite uncertain. This technique uses probabilistic time estimates.
CPM/PERT
o Use networks, that contain nodes and activities
o Over time CPM and PERT became one technique
o Networks indicate precedence relationships
o Can be used effectively in case of large projects
The Project Network
Use of nodes and arrows
Arrows Indicate ACTIVITY, a time consuming effort that is required to
perform a part of the work. An arrow leads from tail to head directionally
Nodes A node is represented by a circle
- Indicate EVENT or STATE , a point in time where one or more activities start and/or finish.
PERT/ CPMActivityTime(week) activity time1-2 4 5-6 41- 3 1 5 -7 82- 4 1 6- 8 13- 4 1 7- 8 23- 5 6 8- 9 14 -9 5 8- 10 8
9- 10 7
PERT/ CPMPERT network
1
2
3
4
1
4
5
6 8
7
9
10
1
111
11
11
61
4
1111
21
81
81
71
E1=0
E2=4
E3=1
E4=5
E5=7
E6=11
E7=15
E8=17
E9=18
E10=25
L10LL10 =25
L9 =18
L8=17
L7 =15
L6=16
L5= 7
L4 = 13
L3=1
L2 =12
L1 =0
PERT /CPMActivitytime (week) activity time1-2 2 4- 7 41- 3 2 5- 8 21- 4 2 6- 8 42- 5 4 7- 9 53- 6 5 8- 9 33- 7 8 9 -10 4
Network
1
2
3
5
6
4
8
7
9 10
2
5
42 34
8
5
2
2
4
4
PERT/ CPMActv 1-2 1-3 1-4 2-5 2-6 3-6 4-7 5-7 6-7
T(o) 5 18 26 16 15 6 7 7 3T(p) 10 22 40 20 25 12 12 9 5T(m) 8 20 33 18 20 9 10 8 4
Times are in days T(o)= Optimistic timeT(p)= pessimistic timeT(m) = most likely time
Expected time T(e)={T(o)+4T(m)+T(p)}/ 6
T(e)= 7.8 20 33 18 20 9 9.8 8 4