18
Subject to technical changes © FRAKO GmbH 273 Main Catalogue 2015 - EM System Components Central Unit A network-compatible central unit for data acquisition and data management of the Energy Management devices connected. Description The well-established FRAKO Energy Management System has been steadily and systematically developed. The Central Unit EMIS® 1500 is a further example and represents state-of- the-art data collector technology. In addition to the widespread Ethernet technology with TCP/IP, the Linux operating system is used within EMIS® 1500. The Energy Management units are connected via the FRAKO Bus® to the EMIS® 1500 Central Unit, but can also be connec- ted through one or more Gateways EMG 1500-PN. Several PCs can be connected online to the EMIS® 1500 simul- taneously. Data collection an storage with the following devices: Maximum Controller EM-MC 2200 Maximum Demand Controller EML 1101 Power Quality Analyzer EM-PQ 2300 Mains Monitoring unit EMA 1101 Mains Monitoring unit EM-PQ 1500 Cost Centre and Alarm Unit EMF 1102 Power Factor Conrol Relay EMR 1100 Modbus devices via Modbus coupler or Modbus TCP M-Bus devices via separate coupler JM transducer PL sensor EMIS ® 1500 Central Unit The comprehensive alarm functionality allows: that upper and/or lower alarm limits can be defined for all measured data points, accessed by EMIS® 1500 from instruments that individual alarms or groups of alarms can be linked to the following signalling methods: contacts at the EMIS® 1500 Central Unit or the EMD 1101 Switching Module, network printer, SMS-, Telefax- and E-Mail messages, alarm reports Energy Management devices can be integrated in two ways: via Ethernet standard (TCP/IP) to a Gateway device with FRAKO Starkstrombus® interface or via the internal FRAKO Starkstrombus® interface With a PC there are different ways to have access to the Central Unit: Connection via Ethernet (TCP/IP-Protocol) via a modem using a dial-up network The Linux operating system installed allows simultaneous online connection to the Central Units via several PCs. The Central Unit EMIS ® 1500 is configured with the FRAKO- NET software package (included in delivery).

Upload: lyphuc

Post on 09-Mar-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH 273Main Catalogue 2015 - EM

System ComponentsCentral Unit

A network-compatible central unit for data acquisition and data management of the Energy Management devices connected.

DescriptionThe well-established FRAKO Energy Management System has been steadily and systematically developed. The Central Unit EMIS® 1500 is a further example and represents state-of-the-art data collector technology.

In addition to the widespread Ethernet technology with TCP/IP, the Linux operating system is used within EMIS® 1500.

The Energy Management units are connected via the FRAKO Bus® to the EMIS® 1500 Central Unit, but can also be connec-ted through one or more Gateways EMG 1500-PN.

Several PCs can be connected online to the EMIS® 1500 simul-taneously.

Data collection an storage with the following devices: ■ Maximum Controller EM-MC 2200 ■ Maximum Demand Controller EML 1101 ■ Power Quality Analyzer EM-PQ 2300 ■ Mains Monitoring unit EMA 1101 ■ Mains Monitoring unit EM-PQ 1500 ■ Cost Centre and Alarm Unit EMF 1102 ■ Power Factor Conrol Relay EMR 1100 ■ Modbus devices via Modbus coupler or Modbus TCP ■ M-Bus devices via separate coupler ■ JM transducer PL sensor

EMIS® 1500Central Unit

The comprehensive alarm functionality allows: ■ that upper and/or lower alarm limits can be defined for all

measured data points, accessed by EMIS® 1500 from instruments

■ that individual alarms or groups of alarms can be linked to the following signalling methods: contacts at the EMIS® 1500 Central Unit or the EMD 1101 Switching Module, network printer, SMS-, Telefax- and E-Mail messages, alarm reports

Energy Management devices can be integrated in two ways: ■ via Ethernet standard (TCP/IP) to a Gateway device with

FRAKO Starkstrombus® interfaceor

■ via the internal FRAKO Starkstrombus® interface

With a PC there are different ways to have access to the Central Unit:

■ Connection via Ethernet (TCP/IP-Protocol) ■ via a modem using a dial-up network

The Linux operating system installed allows simultaneous online connection to the Central Units via several PCs.

The Central Unit EMIS® 1500 is configured with the FRAKO-NET software package (included in delivery).

Page 2: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH274 Main Catalogue 2015 - EM

Each Energy Management device requires a certain number of system points. The devices can be used in any combination, provided that the maximum number of system points will not be exceeded.

Technical Data

Power SupplySupply voltage 230 V AC +/- 10 %

or (switchable): 110 V AC +/- 10 %

Frequency 45 up to 65 HzPower consumption Max. 50 VAInterfaces1 Ethernet RJ45, connection of LAN network

Protocol: TCP/IP Tramsmission: 100BaseTx full duplex

2 Serial interfaces 9 pole Sub-D connector (male), RS-232 for dial-up or direct connection Transfer rate: up to 115.200 Baud

Connection to FRAKO Starkstrombus®

Electric connection: according to EIA RS-485 standard Transfer rate: 76.8 kbit/sec Protocol: FRAKO Starkstrombus®

Display-/operating elements

3 LEDs, 4 buttons, lit LC-Display

Outputs

3 Alarm signalling contacts

Potential-free normal open contacts, freely programmable Loading: max. 48 V AC/DC, max.1 A

Mechanical constructionDimensions 300 x 75 x 220 mm (W x H x D)Ingress protection Housing IP40, Terminals IP20Housing material Metal housingInstallation position Standing / verticalWeight 3.4 kgAmbient temperature

0 up to +50 °C

PC requirements for FRAKO-NET software packageHardware ● Min. Intel Core I5

● Main memory min. 4 GB RAM● 10 GB free hard drive space● Ethernet 10/100 MB network connection or/and one free serial interface● DVD drive● SVGA graphics adapter● Colour screen with minimum resolution of 1024 x 768

Software ● Microsoft® Windows® 7 (x32/x64)● Microsoft® Windows® Server 2008 R2● Microsoft® Windows® Server 2003 R2● Microsoft® Internet Explorer 5.5* Registered trademarks of Microsoft Corporation

Versions

Article-No. Type Number of system points

20-10081 EMIS® 1500 S 5020-10082 EMIS® 1500 M 10020-10083 EMIS® 1500 L 20020-10084 EMIS® 1500 XL 35020-10085 EMIS® 1500 XXL 550

Optional accessories

Article-No. Type Description20-10079 EMIS® 1500

19" installation kitEMIS® 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws

20-10481 EMIS® 1500 software upgrade (S auf M)

Upgrade of the EMIS® 1500 S Central Unit (50 system points) to an EMIS® 1500 M (100 system points)

20-10482 EMIS® 1500 software upgrade (M auf L)

Upgrade of the EMIS® 1500 M Central Unit (100 system points) to an EMIS® 1500 L (200 system points)

20-10483 EMIS® 1500 software upgrade (L auf XL)

Upgrade of the EMIS® 1500 L Central Unit (200 system points) to an EMIS® 1500 XL (350 system points)

20-10484 EMIS® 1500 software upgrade (XL auf XXL)

Upgrade of the EMIS® 1500 XL Central Unit (350 system points) to an EMIS® 1500 XXL (550 system points)

20-10058 Flash Card Flash Card 256 MB, industrial version, prepared for EMIS® 1500

20-10493 EMIS® 1500 System points upgrading package

Upgrade of the EMIS® 1500 Central Unit (50 system points)

29-20064 EM-PC modem Telephone modem for remote data transmission (serial interface) between PC and EMIS® 1500, EML or EMP. Analogue connection to the telephone network.

Page 3: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH 275Main Catalogue 2015 - EM

Dimensions

System ComponentsCentral Unit

Dimensional drawing EMIS® 1500

All dimensions in mm

FRAKO-NET ■ The "operating system" ■ Contains all the tools needed to configure FRAKO instru-

ments ■ Also contains a monitoring function for all instruments, for

example to verify measurement readings ■ Monitors all functions of the FRAKO EM System ■ Backup tools for saving data and saving the configura-

tions of all instruments and the FRAKO EM System ■ Informs the user, by e mail for example, if a fault occurs or

an irregularity is detected in the system ■ Contains an OPC client for importing data from outside the

system ■ Also makes it possible to import data in CSV format ■ An enabling license (10 or 50 data points) is required

Page 4: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH276 Main Catalogue 2015 - EM

Page 5: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH 297Main Catalogue 2015 - EM

Maximum Demand ControlMaximum Controller

EM-MC 2200Maximum Controller

The contemporary styling of the EM-MC 2200 Maximum Controller accentuates its user-friendly energy management technology. It reduces power demand peaks with new additional functions. The self-adapting target demand function provides dynamic adjustment to the site’s monthly operating characteristics. Reducing target demand at the beginning of the accounting period, together with automatic self-adaptation, enables additional savings to be made in months with lower demand peaks. Designed to work as a stand-alone unit, the EM-MC 2200 is the ideal solution for small to medium-sized industrial and commercial operations, office buildings and hotels. It is also suitable for larger facilities and for integrating into a FRAKO Energy Management System with the FRAKO Starkstrombus®. Switching off loads by intelligent terminals (Modbus over IP) or by KNX/EIB actuators and timers is only one of the helpful new features of the EM-MC 2200. This is an investment with a short payback time even in the deregulated energy market, since exceeding the specified power peak limit still results in extra costs that can be avoided.

DescriptionSpecial contract customers whose demand exceeds the agreed maximum (subscribed demand) will face increased costs through entering a higher demand category.

Do you know how many measurement intervals there are in a year? There are some 35,000 measurement intervals in a year, or about 2900 in a month. As a rule, the calculation determining the price paid for power in a given month is based on the measurement interval with the greatest demand in that month.

With the EM-MC 2200 Maximum Controller you can stay within the set limits, since this unit lops demand peaks by shedding those loads assigned a low priority or not considered absolutely essential. Loads are switched off for a short time whenever the subscribed demand appears likely to be exceeded. An individual order of priorities for switching loads off ensures that normal operation can continue without disruption despite this load shedding. The result: Instead of having to pay a higher maximum demand charge, the subscribed demand can even be reduced!

The modular construction of the EM-MC 2200 makes it both simple and inexpensive to install. It is upgradable at any time by software updates and connecting local EMD 1101 Add-on Units.

Operation is of proven simplicity with a clear, menu-driven operator dialogue in plain language at the EM-FD 2500 Display or by accessing the instrument from a PC.

The scope of supply includes the Device Manager software. This is used to enter and modify parameters and to display—or when needed print out—daily demand curves, load operating times and all basic and load-specific settings.

Page 6: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH298 Main Catalogue 2015 - EM

■ Control of demand to limit the average power consumption in a given interval to the set target demand. This is achieved by temporarily switching off individual loads

■ Monitoring of demand peaks: if demand is too high, loads are immediately switched off to prevent the circuit breaker tripping

■ Power-dependent control application point to prevent unnecessary load shedding at the start of the measurement

■ Individual adjustment of the connected loads to suit operating conditions by setting priorities, min./max. OFF times and min. ON times per channel

■ 4 profiles can be activated. Target demand and peak power, together with the load parameters priority, power, min./max. OFF times, min. ON times and priority type (time or power priority), can be set for each profile

■ To make best use of seasonal demand fluctuations, the self-adapting target demand adjusts itself dynamically to suit the operating conditions of the month concerned. Re-ducing the target demand at the beginning of the accoun-ting period combined with automatic self-adaptation makes additional savings possible in months with low peak loads

■ Formation of switching channel groups for strict compliance with the set priorities

■ 'Traffic light' function: 3 switching channels can be used for signal lamps as a visual guide to demand conditions

■ Emergency load-shedding mode for keeping within maximum demand even with critical load constellations

■ Connection of intelligent terminals (Wago) to switch off loads

■ Connection of KNX/EIB components via FRAKO NK1 Network Coupler to switch off loads

■ Timer for switching loads to a time schedule or to set time-scheduled target demands or profiles

■ Storage of the following data in a ring memory: - Average values per interval over 20,000 intervals

including the target power applicable at the end of the interval and time stamp

- Daily maximum values over 500 days including time stamp

- Monthly maximum values over 48 months - 10,000 switching cycles

■ Configuration and presentation of momentary and historical measurement readings using the Device Manager software (included in scope of supply)

■ Display of measurement readings and the power factor triangle (trend curve) via an integrated web interface or an EM-FD 2500 Display, an optional graphic display instrument connected to the EM-MC 2200 Maximum Controller by a 4-core cable. Up to 7 additional EM devices can be viewed at one EM-FD 2500 Display.

FRA

KO

Sta

rkst

rom

bus®

Analogue outputs tocontrol loads

or generators

Intelligentterminals

Intranet TCP / IP

EIB�/�KNX

Sensor Actuator

Up to 80 additional loads switched via

EMD 1101Add-on Units

. . .

85

Power pulsese.g. 80 pulses per kWh

5 loads switched via EM-MC 2200

e.g. heating

. . .

Ethernet

Load-dependent„traffic-light“ signal lamps

Time pulsee.g. 15 min

Energy Management

NK 1 Network Coupler

Page 7: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH 299Main Catalogue 2015 - EM

Maximum Demand ControlMaximum Controller

■ Inputs: - 3 inputs for active energy pulses or 2 for active and 1 for

reactive energy pulses. These can be added, subtracted or used as meters. The self-adapting target demand function can be reset via a volt-free contact

- 1 input for time pulse; interval duration adjustable from 1 to 1440 minutes

- 2 inputs for activating the 4 profiles. These adjust the target demand and/or the settings of the connected loads to suit site- specific factors such as regular and off-peak tariffs. Profile switching can be by the internal timer or an input to the EMF 1102 Cost Centre and Alarm Unit

■ Outputs: - 5 switching and 1 emergency load-shedding channel

in the basic instrument (decentralized extendability: up to 85 switching channels possible by means of EMD 1101 Add-on Units, each with 8 relay contacts)

- 1 alarm contact to signal faults (alarm signal also possible at any desired output)

- 2 analogue outputs for 2 measurement readings (momentary, trend, target or corrective power, capacity utilization or remaining time) as 0/4–20 mA or 0–10 V signals, or for infinitely variable control of loads; fed by internal power supply

■ Interfaces: - RS-485 bus, FRAKO Starkstrombus® protocol to

connect to the FRAKO Energy Management System - RS-485 extension bus to connect EMD 1101 Add-on

Units - Ethernet (RJ 45 jack) with the following functions:

– Communication with the EMD 1101 Add-on Unit or the EMF 1102 Cost Centre and Alarm Unit via the EMG 1500-PN Gateway – Output of switching commands also via Modbus TCP – Output of switching commands via KNX/EIB (NK1 EIB Network Coupler required) – Communication with the EMIS® 1500 Central Unit – Communication with the configuration software at the PC

■ The software (Device Manager) for configuring and displaying the saved measurement readings via Ethernet is included with the instrument

Easy installation with the DIN rail-mounted enclosureThe EM-MC 2200 is housed in an enclosure with a pin strip underneath it.

This system, consisting of pin and socket strips and DIN rail bus connectors, enables the individual modules to be easily fitted and connected to one another.

All connections are also available at external terminals for conventional wiring. Use of the 16-pin DIN rail bus connector provides automatic contact from instrument to instrument.

The bus connector enables the FRAKO Starkstrombus®, exten-sion bus and display bus to be connected. The pin and socket strips on the DIN rail ensure quick and easy installation of the instruments in parallel.

It is possible to plug individual instruments in or remove them without dismantling the modular assembly.

Easy installation with the DIN rail-mounted enclosure

Page 8: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH300 Main Catalogue 2015 - EM

Data display on the EM-FD 2500The EM-FD 2500 Display has been developed as a physically separate LCD display and operator panel to work with all FRAKO Energy Management devices of the new generation that require this, such as the EM-PQ 2300 and EM-MC 2200 instruments. The Display is connected to the EM instrument via 4 terminals: two wires for the instrument power supply and two for data trans-fer. A maximum of 8 instruments can be connected to a common display bus, with a bus length of up to 40 m to the Display. The Display is mounted on the control cabinet door or wall through a ∅ 22.5 mm hole, thus greatly simplifying installation. Its orien-tation is fixed by a screw through the wall into a threaded bush. Alternatively, the Display can also be mounted in any available 144 x 144 mm cut-out.

Data display via the integrated web interface

■ Web server for the configuration and online display of all measurement readings

■ Every user at any PC can view the most important mea-surement data via the intranet.

Device Manager – Clear overview and straightforward programming

■ Configuration Configuration of the EM-MC 2200 is divided into two areas termed Setting and Configuration to distinguish them: - Setting:

Setting covers all those adjustments that are necessary when commissioning the instrument itself or introducing Add-on Units. - Configuration:

Configuration covers those adjustments that may have to be changed during ongoing operation.

The loads can be configured in a table giving a clear overview. Settings for the individual profiles can be hidden if desired to simplify this overview. Channels can be copied and their settings adopted in total or per channel for all profiles.

■ Trend display Device Manager is a convenient tool for displaying real-time parameters such as momentary power, cumulative power, the remaining time in the current measurement interval and the power triangle. In addition, the statuses of the loads, the current profile (regular/off-peak tariff) and the limit settings are displayed. Any alarms or faults present are immediately apparent.

Page 9: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH 301Main Catalogue 2015 - EM

Maximum Demand ControlMaximum Controller

■ Switched status log The switched status log offers a graphical display of the last 10,000 changes in the switched status of up to 85 controlled switching channels.

■ Documentation The power demand in every measurement interval over the past 200 days is displayed as a chart and documented. Similarly, the demand peaks of the past 500 days and the past 48 months are saved, as are the switched statuses of up to 10,000 switching cycles. It is also no problem to export these recorded data to a spreadsheet program such as Excel.

■ Timer A weekly timer function is incorporated in the EM-MC 2200. This makes up to 400 switching times available, in order to change the status of switching channels to ‘Permanently ON’, ‘Permanently OFF’ or ‘Controlled’ at scheduled times. In the ‘Controlled’ condition, the EM-MC 2200 controls the actual condition of the load through the target demand control function and the peak demand monitoring function.

In addition, the profile and the target demand can be controlled by the timer.

Technical DataPower supplySupply voltage 100 V – 253 V AC or

100 V – 230 V DCFrequency 45 up to 65 HzPower consumption 7 W / 18 VAOvercurrent protection

Max. 2 A external fuse required

Inputs General ● S0 interfaces (DIN 43864)

to connect volt-free contacts ● Voltage with contact open: 15 V● Max. line resistance: 800 Ohm● Short circuit current: 18 mA● Pulse frequency: 0.1 to 20 Hz

3 Pulse inputs To acquire the power data from 3 meters with pulse outputs. Input 3 can also be used for the acquisition of reactive power data.

1 Time pulse input 1...1440 minutes2 Profile switch inputs

To select from 4 profiles

Measurement data storage256 MB onboard flash memory

Outputs 5 Relay contacts (switching channels)

Bistable, 250 V / 2 A AC or 30 V / 2 A DC

1 Relay contact (emergency load shedding)

Bistable, 250 V / 2 A AC or 30V / 2A DC

1 Alarm contact NC 250 V / 2 A AC or 30 V / 2 A DC1 Extension bus interface

● To connect up to 10 EMD 1101● Modbus TCP output instruments (fieldbus instruments, function code 5)● EIB actuators/output instruments

2 Analogue outputs 0-10 V / 0-20 mA / 4-20 mA + Steuerung-Verbraucher

‘Traffic light’ signal lamps

Visual guide to demand conditions

Page 10: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH302 Main Catalogue 2015 - EM

Technical DataInterfaces1 FRAKO Starkstrombus® interface

To connect to the FRAKO Energy Management System

1 Display bus interface

Optional connection of to up to 2 external EM-FD 2500 Display instruments

Web server / e-mail / SNMP

• / • / •

Display and operation, connectionsUser interface Operation via external EM-FD 2500

Display instrumentAlarm system •Timer function •Annunciators 15 LEDsConnections Pin and socket strips; max. core cross

section: max. 1.5 mm²Mechanical constructionDimensions 161.6 x 89.7 x 60.5 mm (W x H x D)Ingress protection IP30 (enclosure), IP10 (terminals)Weight Approx. 0.4 kgProtection class Class II to EN 61010Enclosure Flame retardant UL 94-V0Mounting On standard 35 mm DIN rail to

EN 50022Operating conditionsAmbient temperature

0 °C up to +45 °C

Article No. 20-20071

Technical DataPC requirements to run Device ManagerHardware ● PC: CPU mit with at least 2 GHz

● 1 Gbyte RAM● 200 Mbyte free hard disc space

Software ● Microsoft® Windows®* XP, SP 2 with installed .NET-Framework 3.5● Microsoft® Windows®* 7 (32 or 64 Bit)● Microsoft® Windows® 2008 Server R2* Registered trademark of Microsoft Corporation

Dimensions

All dimensions in mm

Page 11: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH 303Main Catalogue 2015 - EM

Maximum Demand ControlSwitching Module

EMD 1101Switching Module

The extension module with 8 switching channels can be connected selectively to: ■ Maximum Controller EM-MC 2200 or Maximum Demand Controller EML 1101 ■ System Timer EMT 1101 via FRAKO Starkstrombus®

Description ■ Display of the switching status via LED ■ LED display for bus access ■ Definition of the switching status (on/off) of the individual switching channels in case of a failure.

Page 12: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH304 Main Catalogue 2015 - EM

Technical DataPower supplyMains voltage 230 V AC -15 % up to +10 %Frequency 45 up to 65 HzPower consumption 4 VAFuse protection Max. 2 A external prescribedOutputs 8 switching channels Normal open contact 250 V AC / 4 A1 extension bus / FRAKO Starkstrombus®

2-wire-fieldbus, RS-485

Operating elements 8-fold DIP switching series, 10-level rotary switch

Display elements 9 LEDsConnections Via plug-in connector blocks within

housing; conductor cross-section: max. 2.5 mm²

Mechanical constructionDimensions 158 x 75 x 120 mm (W x H x D)Ingress protection IP40Version Protection class 2 according to

DIN/EN 61010Housing Flammability to UL94-V0

(according to the manufacturer)Installation Screw mounting or on standard rail

35 mm according to DIN EN 50022Weight Approx. 0.8 kgOperating conditions Ambient temperature

0 up to +45 °C

Storage temperature

-20 up to +60 °C

Article-No. 20-21002

Dimensions

All dimensions in mm

Dimensional drawing EMD 1101

Page 13: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH 333Main Catalogue 2015 - EM

SoftwareVisualization Software

EMVIS 3000System visualization

The FRAKO Energy Management System is used to acquire measurement readings, statuses and events from the entire internal utilities supply of a company. These data are processed centrally and saved, and can be displayed and evaluated using the EMVIS 3000 visualization software.

DescriptionThe EMVIS 3000 software is a powerful tool for displaying and docu-menting all the measurement data from the instruments connected to it. It comprises the following functional modules:

EMVIS 3000 ProjectThe project planning tool ...

■ Unrestricted configuration and compilation of evaluations of all data processed by the system

■ Calculation of performance figures Performance figures are virtual data points calculated from other data points, an arithmetic computation from measured or imported data, e.g.: „Active energy A x factor + Water quantity B x factor + Compressed air volume C x factor / No. of items D“

■ Creation of benchmarking charts Benchmarking makes a direct comparison of measurement data or performance figures possible, e.g. energy costs of products or company sites

■ Creation of Sankey diagrams A Sankey diagram gives a clear overview of any type of flow, e.g. the flow of utilities. The width of each stream into and out of a location is proportional to the quantity flowing, absolute and percentage values also being stated

■ Easy Customizing - individual planning of views - simple and intuitive (the basic package includes 3 views with up to 20 online data points in total)

EMVIS 3000 ReportThe reporting tool ...

■ To simplify navigation, a clear overview of the entire system is displayed in two system trees, either of which can be selected: - Physical: standard evaluations of all the instruments

and channels registered with the system - Organizational: all evaluations that have been com-

piled with EMVIS 3000 Project ■ Presentation of historical data for analysis and comparison

purposes, e.g. different locations or different periods of time

■ The historical data can be exported directly from the chart or consumption table for further processing

■ Direct access to the momentary readings of the connected instruments

■ Readout of the events that have occurred

EMVIS 3000 Live ■ Views created individually - from site layout drawings

right down to the distribution board ■ Display of the momentary measurement readings and

statuses

The EMVIS 3000 license enables the software to be installed on several PCs (server and clients) and an EMIS® 1500 Central Unit to be accessed.

Page 14: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH334 Main Catalogue 2015 - EM

EMVIS 3000 Extension packagesArticle-No. Type Description20-10485 Extension license

Central UnitAllows EMVIS 3000 the access to an additional Central Unit EMIS 1500

20-10650 EasyCustomizing-S Individually designed views with up to 100 data points

20-10651 EasyCustomizing-M Individually designed views with up to 200 data points

20-10652 EasyCustomizing-L Individually designed views with up to 350 data points

20-10653 EasyCustomizing-XL Individually designed views with up to 550 data points

20-10654 EasyCustomizing-XXL

Individually designed views with up to 1000 data points

Technical DataPC requirements for small and medium systemsHardware ● Min. Intel Core I3-Processor

● User memory: 4 GB RAM● 1 GB free hard disk space● Graphics adapter: min. DirectX 9.0c support and 512 MB video memory

Software ● Microsoft® Windows®* 7 (x32/x64) Microsoft® Windows®* 8 (x32/x64)● Microsoft® Windows®* Server 2008 R2● Microsoft® Windows®* Server 2003 R2● .NET 4.0 FULL● .NET 3.5● FRAKO-NET V1.26.0001 (or higher)● SQL data base Firebird 2.0 (included in FRAKO-NET)* Registered trademark of Microsoft Corporation

Article-No. 20-10649

In the physical system tree prepared standard evaluations are deposited for all Energy Management devices. This allows the user to visualize the recorded historical data.

Via physical system tree the actually measured data of all EM devices can readily be accessed.

Within the organizational system tree business specific structures are deposited. The business specific structures are projected in form of individual evaluation in the organizational system tree by the customer.

Page 15: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH 335Main Catalogue 2015 - EM

SoftwareSoftware for Cost Centre Analysis

EMIS® ReportSoftware for Cost Centre Analysis

Energy analysis with EMIS® Report.Software for automated analysis of energy consumption based on Microsoft® Excel*.

DescriptionThe consumption data recorded with the FRAKO Energy Management System can be imported to an Excel workbook from the SQL databases FRAKO-NET or FRAKO EMIS-DB.

The reporting period can be set as required.

Individual loads or metering units can be combined to load groups (e.g. cost centers) and evaluated with different time pro-files.Customer-specific reports can easily be generated by linking to appropriate cells.By means of that you achieve an optimum transparency of the energy flows within the company.

With EMIS® report, data from the FRAKO database can be imported to an Excel sheet and are available for a customer specific analysis. This makes it a very useful tool for the alloca-tion of costs of the different company divisions and/or energy transfer media (electricity, gas, oil, etc.). It is also a useful data source for the financial controlling of a company.

Transparency of energy costs ■ Assigning costs to the originators ■ Transparency of all energy flows within the company ■ Achieve the utmost efficiency ■ Automatic evaluation through e-mail notification - also

available as CSV-file

To achieve an optimized reduction of the energy costs it is essential to have information on how much energy was consumed when and where.

The knowledge of the energy consumption per cost center is necessary to determine the potential for savings.

EMIS® Report provides a structured overview of the consump-tion of all types of energy of your company such as current, water, gas, compressed air etc. This enables you to financially evaluate those consumptions.

Individual loads or metering units can be combined into load groups or cost centers and evaluated according to different time schedules.

Page 16: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH336 Main Catalogue 2015 - EM

Technical DataPC requirementsHardware ● Pentium, min. 2 GHz clock frequency

● User memory: min. 1 GB RAM● 6 GB free hard disk space● Ethernet 10/100 MB network connection or/and one free serial interface● CD-ROM drive● SVGA graphics adapter● Colour screen, minimum resolution: 1024 x 768 Pixel

Software ● Database FRAKO-NET DB or FRAKO EMIS-DB ● Microsoft® Windows®* 2000 pro (SP3 or higher) ● Microsoft® Windows®* XP pro (SP1 or higher) ● Microsoft® Windows®* 2003 Server (SP1 or higher) ● Micosoft® Internet Explorer 5.5* ● Microsoft® Excel* (Version 2000 or newer)* Registered trademark of Microsoft Corporation

Article-No. 20-10488

Optional AccessoriesArticle-No. Type Description20-10494 Software

expansion for EMIS® Report

Software update for cost center and analysis software EMIS® Report

Thus, optimal transparency of energy flows is achieved in the company.Functions:

■ Automatic evaluation and notification by e-mail ■ Period covered by the report is freely definable (date,

day, etc.) ■ Determination of consumption (kWh, l, m3, ...) ■ Consumption peaks within the reporting period ■ Time of maximum demand (e.g. kWh) ■ Demand by a load or a load group at the time of peak

consumption of a reference unit ■ Interval values (e. g. 15 minutes) of the reporting period

for consumption or consumption rate (e.g. kW) ■ Sum of the interval values of the reporting period ■ Evaluation according to different time profiles

Page 17: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH 337Main Catalogue 2015 - EM

SoftwareEMG-OPC-Server

EMG-OPC-Server

Software interface with the current OPC server.

DescriptionOPC is an open software interface standard that enables a simple standardized interchange of data to take place bet-ween automation and control applications, SCADA systems (process visualization) and office applications (e.g. Microsoft® Excel*, Access*).

FRAKO EMG-OPC Server has been developed for visualization purposes on the basis of the OPC Data Access Specifications 1.0, 2.0 and 3.0, and uses the Microsoft® DCOM standard.

This enables the client and server to be separated at various PCs in a network. It is recommended, however, to use client and server on the same PC.

 Benefits of the OPC interface ■ Easy linking of FRAKO mesurement devices, provided

with the FRAKO Starkstrombus® protocol, to PC software such as visualization systems or office applications

■ Data interchange between applications from various suppliers through a common interface

Operating principleOPC works on the client / server principle. EMG OPC Server ‘serves up’ data from the FRAKO mesurement devices, provi-ded with the FRAKO Starkstrombus® protocol, i.e. makes these available externally. The PC application as ‘client’ receives and processes the data.

Communication with the FRAKO Energy Management System is via an EMG 1500-PN Gateway or the internal gateway in the EMIS® 1500. Access to the gateways is via the site’s own Ethernet network (TCP / IP).

The OPC-SW software creates the configuration files, which contain the data points for the namespace. This supplies a preselection of data points per gateway that can be provided by EMG-OPC-Server. These configura-tion files are loaded when EMG-OPC-Server is started. The OPC client then selects the data points to be provided by EMG-OPC-Server from the specified namespace.

Up to 8 EMG 1500 PN Gateways or internal gateways of the EMIS® 1500 and a maximum number of 5000 data points can be registered per EMG-OPC-Server. The same system requi-rements apply as for the FRAKO EMVIS 3000 visualization system.

Page 18: System Components - FRAKO installation kit EMIS 1500 Installation kit 2RU for installation in 19" rack, consisting of mounting frame, cage nuts and fixing screws 20-10481 EMIS

Subject to technical changes © FRAKO GmbH338 Main Catalogue 2015 - EM

 Configuration

Technical DataPC requirementsHardware ● 2 GHz Dual-Core processor

● User memory: 2 GB RAM● 1 GB free hard disk sapce● Ethernet 10/100 MB network connection

Software ● Microsoft® Windows®* XP SP3● Microsoft® Windows®* 7 (x32/x64)● Microsoft® Windows® Server (2003 R2 / 2008 R2)● .NET 1.1● .NET 4.0 Client oder FULL* Registered trademark of Microsoft Corporation

Article-No. 20-10491