synchronized position hold engage and reorient experimental … · 2013. 12. 5. · version 6/25/12...

16
NASA MIT SSL UMD SPPL – DARPA NLO US Air Force STP AFS FIT Synchronized Position Hold Engage and Reorient Experimental Satellites Andres Martinez / Mark Micire SPHERES National Laboratory NASA Ames Research Center [email protected] Andres Martinez / Mark Micire SPHERES National Laboratory NASA Ames Research Center [email protected]

Upload: others

Post on 17-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

Synchronized Position Hold Engage and Reorient Experimental Satellites

Andres Martinez / Mark Micire

SPHERES National Laboratory

NASA Ames Research Center

[email protected]

Andres Martinez / Mark Micire

SPHERES National Laboratory

NASA Ames Research Center

[email protected]

Page 2: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

SPHERES

Synchronized Position Hold Engage

Reorient Experimental Satellites

• IVA free-flyers developed at MIT with

DARPA funding

� 22 cm across, 4 kg

� Cold-gas thruster propulsion

� Sonar beacon localization

� Powered by 16 AA batteries

• Testbed for distributed satellite & free-

flying control algorithms

• Installed on ISS in 2006

• ISS Facility managed by ARC

� Coordination & scheduling

� Flight operations

� Engineering

Scott Kelly working with SPHERES in the Kibo lab

SPHERES ISS Facility

•Program Executive: Jason Crusan (HQ)

• Program Manager: Bruce Yost (ARC / R)

• Project Manager: Andres Martinez (ARC / R)

• Operations Manager: Steve Ormsby (ARC / PX)

• Engineering Manager: Mark Micire (ARC / TI)

SPHERES ISS Facility

•Program Executive: Jason Crusan (HQ)

• Program Manager: Bruce Yost (ARC / R)

• Project Manager: Andres Martinez (ARC / R)

• Operations Manager: Steve Ormsby (ARC / PX)

• Engineering Manager: Mark Micire (ARC / TI)

Page 3: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

History of SPHERES

Launches

‘99 ‘00 ‘01 ‘02 ‘03 ‘04 ‘05 ‘06 ‘07 ‘08 ‘09 ‘10

Prototype development

(undergraduate class)

AF-SERB

(2 of 26)

DoD-SERB

(5 of 44)

DoD-SERB

(29 of 62)

ISS Ops

ISS Nat. Lab.

Original

STS-116

Columbia

Tragedy

DARPA System F6Ground Test Program

In-SPIRE

CDIO Capstone Class

Terrestrial Laboratory

ISS Laboratory

Slide Courtesy of MIT SSL

Page 4: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

Supported Projects and Orgs

SPHERES Facility(NASA Ames)

SPHERES Facility(NASA Ames)

RINGS(Flight SpaceX1)

VERTIGO(Flight 32S)

CSAC (Flight 45P)

Smartphone(Smartphone - Flight ULF7)

Interact(SPHERES GUI Flight 46P)

US Air Force STPProject Manager:

(TDO)

MITProject Manager: Alvar

Saenz-Otero

(NLO)

Zero Robotics(on-going)

Human Exploration

Telerobotics (HET)Project Manager: Terry Fong

(TDO)

SLOSH(TBD)

KSC Project Manager: Paul

Schallhorn

Page 5: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

Ames SPHERES Testing Facility

Operations:

• Increment planning and coordination

• Consumables management and resupply

• Procedure validation and astronaut training

Equipment:

• One SPHERES engineering design unit and one avionics stack

• New expansion port engineering design unit

• Polished granite air-bearing table for 2D validation of flight programs

• Mock-up of SPHERES work volume with beacons and support hardware

Work In-Progress:

• Open source SPHERES core software release

• Additional SPHERES satellites and avionics stacks

• Mission specific operations center supporting SPHERES operations at Ames

• Full operations simulations through Ames operations center and granite lab

• Real-time command and data handling from ISS payload LAN to Ames

Page 6: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

Inc 31/32Inc 31/32

FacilityFacility

SLOSHSLOSH

RINGSRINGS

VERTIGOVERTIGO

CSACCSAC

SmartphoneSmartphone

ZRZR

SPHERES Calendar

Inc 33/34Inc 33/34Inc 29/30Inc 29/30

2012

S O N D J F M A M J J A S O N D J F M A M J

InteractInteract

ISS Test Sessions

J A

Exp. Port

GUI c/o

S

SWG

Unit Test

Science

Upmass

32S45P SpX-246P

CSAC VERTIGO

V ERT GUI

RINGSSPHERES GUI

31S

Smartphone Cables

(2)

2011

S/W Test

Version 6/25/12

Comm Test Video Survey Sim EVAInterview

MatLab c/o

33S

CO2 Tanks (13)

VERTIGO

Dongle

Decent

SpX-1

CO2 Tanks (30)

Inc 35/36Inc 35/36

2013

Algorithm

Comp

TroubleshootScience

ZR Finals

SpX-3

SLOSH

ATV-4

CO2 Tanks (24)

Batteries (66)

(TBR)

30S

CO2 Tanks (10)

47 Test Sessions (Over 200 hrs), 50 Crew training sessions (Over 100 hrs), and 11 presentations

here at the 1st ISS R&D Conference

One of the most used and popular ISS National Lab Facilities

Page 7: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

SPHERES

Page 8: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

SPHERES Components

Slide Courtesy of MIT SSL

Page 9: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

SPHERES Propulsion

Slide Courtesy of MIT SSL

Page 10: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

SPHERES Hardware

SSC with SPHERES LPTX

(shown on laptop lid)

SPHERES Satellite (up to 3)

Beacon (with mount)

Battery Pack (2 per

sat)CO2

Tanks

(1 per sat)

Page 11: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

SPHERES Node 2 Work Volume

Page 12: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

SPHERES

Page 13: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

Modularity-Enabled Projects

VISION-BASED NAVIGATION

(Vertigo launch 2012)

Chip-scale Atomic Clock

(CSAC)

ELECTRO-MAGNETIC ACTUATION

(Rings launch 2012)

FLUID SLOSH

Smartphone

EXPANSION PORT ENABLED

• Upgrade IVA hardware

• Prepare for EVA hardware

• Robotics competition

Page 14: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

Zero Robotics Overview

• Zero Robotics is a competition designed to

allow Middle & High School Students

unprecedented access to the International

Space Station.

• Based on the FIRST Robotics model, teams of

students work together to program the

SPHERES Satellites to complete a set of tasks.

• Once the programming phase is complete, the

teams’ code is put through several rounds

before the final “best” teams are invited to MIT

to upload their program to the International

Space Station to be tested by the astronauts.

Page 15: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

Page 16: Synchronized Position Hold Engage and Reorient Experimental … · 2013. 12. 5. · Version 6/25/12 Comm Test Video Survey Sim EVA Interview MatLab c/o 33S CO2 Tanks (13) VERTIGO

NASA – MIT SSL – UMD SPPL – DARPA – NLO – US Air Force STP – AFS – FIT

Points of Contact

Andres Martinez

NASA Ames Research Center

(650) 604-0530

[email protected]

Steve Ormsby

NASA Ames Research Center

(650) 604-0592

[email protected]

Bruce Yost

NASA Ames Research Center

(650) 604-0681

[email protected]

Mark Micire

NASA Ames Research Center

(650) 604-4337

[email protected]

spheres.arc.nasa.gov