ES&H Dept Head Meeting, July 9, 2003 S. Rokni 1 Synching up with VIWG” Synching up with VIWG” “Each Department Head will present the programs under their purview, regulations that apply, any potential roles, responsibilities or requirements issues.Then each SME will identify programs that they are responsible for, the goals of the program, requirements associated with the program, gap analysis and future plansDepartment Head Meeting, 6/18/03

Upload: chana

Post on 31-Jan-2016

26 views

Category:

Documents


0 download

DESCRIPTION

“Synching up with VIWG”. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 1

““Synching up with VIWG”Synching up with VIWG”

“Each Department Head will present the programs under their purview, regulations that apply, any potential roles, responsibilities or requirements issues.Then each SME will identify programs that they are responsible for, the goals of the program, requirements associated with the program, gap analysis and future plans”

Department Head Meeting, 6/18/03

Page 2: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 2

OutlineOutline

• Mission• Staff• Radiation Safety Program

– Engineering Controls– Administrative Controls

• Roles and Responsibilities• Design• Operations• Plans• Challenges

Page 3: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 3

Radiation Physics DepartmentRadiation Physics Department

• Mission

The Radiation Physics (RP) Department provides oversight for safe operation of the existing beam lines and experiments, and expertise for design of shielding and radiation safety systems for new experiments, beam lines and facilities. RP also performs applied research in radiation physics in support of SLAC research efforts.

Page 4: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 4

The Mission of Radiation PhysicsThe Mission of Radiation Physics

• “A Health Physics group associated with a pioneering machine must remain in intimate contact with the research program using such a machine..” and “Judgments that have to be made..require intimate knowledge of the

experimental arrangement” W. Panofsky May 2, 1963

Page 5: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 5

Radiation PhysicistsRadiation Physicists

• Alberto Fasso, Hesham Khater, James Liu, Stan Mao, Alyssa Prinz, Heinz Vincke.

• Staff deal with mission critical, as well as mission important issues

• Decisions routinely make significant impact on projects• Customers include physicists and engineers at key

positions at SLAC as well as safety coordinators and others

• Members of ALARA, RSC, TTSP, ARR at SLAC. Serve on a variety of professional committees (ANSI, HPS, ARR, Radiation Safety program reviews), collaborate with peers internationally, supervise students,….

Page 6: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 6

Radiation Safety Program at SLACRadiation Safety Program at SLAC

• Ensure ALARA– Provide sufficient shield for facilities, beam lines and

experimental areas– Control access to areas where beam could be present – Incorporate dose reduction, contamination reduction, and

waste minimization features in planning stage – –

• Prevent any person from receiving more radiation exposure than limits

Page 7: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 7

Radiation Safety at SLACRadiation Safety at SLAC

• Engineering and administrative systems to implement the

program – SLAC Radiological Control Manual – Radiation Safety Systems, Technical Basis Document – Guidelines for Operations–

• Implemented by Radiation Physics, Operational Health Physics, in collaboration with Safety Officers, Controls Departments– External and Internal Reviews of parts of the program:

• Radiation Protection Program Review (1 per 3 y)• Accelerator Safety Order Audit (1 per 5 y)• Accelerator Readiness Reviews

Page 8: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 8

Engineering ControlsEngineering Controls

• Passive– Bulk Shielding, local shielding: attenuate radiation– Protection collimators: limiting apertures prevent beams from striking

shielding

• Active Devices (Interlocks)– Beam Containment System (BCS): Interlocked sensors that turn beams

off when parameters, or radiation levels exceed pre-set limits: Ion chambers, Torroids, Meter-Relays

• Access Control System (Interlocks)– Prevents access to areas where potential for beam operations

exist:• Personnel Protection System (PPS)• Hutch Protection System (HPS)

Page 9: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 9

Design of Engineering ControlsDesign of Engineering Controls

• Radiation Physics Department staff are involved in design of shielding, BCS and PPS specifications for many projects from the start: – Design Study Reports

– Environmental Assessments

– Conceptual Design Reports

– Safety Analysis Documents (Safety Envelope)

– Radiation Safety Analysis Packages• Peer Review

• Review and Approval by RSO/RSC

Page 10: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 10

ROLES & RESPONSIBILITIES

Page 11: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 11

  Project Leader MembersAccelerator A. Prinz S. MaoDamp. Rings/Pos. Source A. Prinz H. Vincke/S.MaoASTA S. Mao H. KhaterPEP-II Extraction Lines S. Mao A. PrinzPEP II Ring/BABAR J. Liu S. MaoPEP II RF Cavity A. Prinz J. LiuBSY S. Rokni S. Mao/H. VinckeESA S. Mao A. PrinzFFTB S. Rokni H. Vincke/S. MaoGun Test Lab H. Vincke S. MaoHV Test Facility H. Vincke S. MaoKlystron Test Lab J. Liu H. KhaterLCLS S. Mao H. Vincke/S. RokniLCLS Injector S. Mao A. PrinzNLC S. Rokni J. LiuNLCTA/ESB H. Khater H. VinckeSPPS H. Vincke S. Mao/S. RokniSSRL J. Liu H. KhaterSPEAR3 J. Liu H. Khater/S. Mao/A. Prinz

Radiation Physics TeamsRadiation Physics Teams

Page 12: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 12

Radiation PhysicistRadiation Physicist

1. To perform calculations related to shielding and other radiological aspects (activation etc) and provide specifications for the design of new facilities and experiments.

2. To ensure safe beam containment by a. assisting in beam-line design, b. calculating radiation dose rates due to beam mis-steering, and c. calculating heat loads for critical collimators and other devices.

3. To assist in the design of the Personnel Protection System (PPS) and Beam Containment System (BCS).

4. To supervise initial radiation measurements and establish area monitoring at new beam lines.

5. To consult with experimenters on detector design and accelerator physicists on machine design.

6. To assist experimenters in determining causes of their radiation backgrounds and in designing shields to minimize the problem.

7. To provide assistance to engineers and physicists in avoiding or minimizing radiation damage problems (e.g., perform calculations and provide high-dose dosimetry in the megarad range).

Page 13: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 13

Radiation Physicists-Cont.Radiation Physicists-Cont.

8. To provide assistance to engineers and physicists in avoiding or minimizing radiation damage problems (e.g., perform calculations and provide high-dose dosimetry in the megarad range).

9. To develop and maintain radiation transport codes to be used for detector design, machine development, radioactivation, shielding, and dosimetry.

10. To ensure safe operation of beam lines by creating procedures (e.g., Beam Authorization Sheets), in conjunction with the Accelerator Department Safety office.

11. Participate in the development of the Radiation Safety Program at SLAC ,involves Radiation Safety Work Control forms and commenting on DOE orders, regulations and internal policies and procedures, and writing technical basis documents.

12. Participate in committees (internal and external) that review the radiation safety program.

13. Perform and publish research in Radiation Physics related to the overall SLAC mission and participate in professional development.

Page 14: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 14

Radiation Safety CommitteeRadiation Safety Committee

• Act as an advisory group on radiation safety matters to the Radiation Safety Officer.

• Review new facilities and experiments for compliance with radiation safety policy.

• Recommend changes in existing radiation safety policy and recommend new policies.

• Study accidents involving radiation to ascertain causes and recommend remedial action.

• Approve plans to protect personnel from radiation during emergencies and during normal beam operation.

• Keep informed of current radiation information and ensure that those concerned are informed of Committee plans and activities.

Page 15: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 15

Radiation Safety OfficerRadiation Safety Officer

• Is an ex officio member of the RSC.• Advises the SLAC Director on radiation safety topics.• Recommends SLAC radiation safety policies to the SLAC

Director and the ES&H Coordinating Council (ES&HCC) for their review.

• Approves minor changes in the Personnel Protection System (PPS), sees that major changes are reviewed by the RSC, and decides which changes are minor and which ones are major.

• Is authorized to stop any operation for which he or she perceives the radiation safety to be inadequate. The RSO can be overruled only by the SLAC Director.

Page 16: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 16

ES&H Division ES&H Division andand Radiation Safety Radiation Safety ManagementManagement

Radiation Physics(RSO)

Know ledge Managem ent

W aste M anagem ent

Environmental Protectionand Restoration

F ire De p a rtm e nt

M e d ica l De p a rtm e nt

Safety, Health,and Assurance

Operational Health Physics(RCM )

ES&H DivisionA sso c ia te D ire c to r

SLACD ire c to r

Page 17: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 17

DESIGN

Page 18: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 18

DesignDesign

• Process– Discussions– Acquiring Tools– Calculations– Discussions– Consensus– Peer Review– RSO/RSC Approval

• Challenges– Multiple programs – High beam energy, power– Some tools not available

Project Customer

SPPS J. Hastings

E158 S. Williams

SPEAR3-Ring B. Hettel

SPEAR3-Beam Lines

T. Rabedeau

LCLS J. Galayda

E-164 D. Walz

Page 19: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 19

R&D NeedsR&D Needs

• To address some of the challenges Radiation Physics need to perform applied research

– Develop and maintain computer codes (EGS4, FLUKA, ..)

– Experimental verification of computer codes and models

– Experimental development and test of instrumentation

• Provides staff with the right tools to support research and operation of new experiments and beam lines at SLAC

– SHIELD11 (Experiments in ESA, BDE)

• Results used to design facilities at SLAC, KEK, ALS, APS, JLAB

– MUON89 (Experiments ESB)

• Results used to design facilities at SLAC, KEK

Page 20: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 20

Supporting SLAC’s MissionSupporting SLAC’s Mission

• RP has been asked to assist in:

– Design of beam line components for SLC dumps, SPEAR3, LCLS stoppers, NLC positron target

– Temperature rise in beam line components for NLC , E158

– Radiation environment inside the accelerator for NLC, Damping Ring

– Radiation background in detectors for Luminosity Monitors in PEP-II

– Radiation damage to electronic components for PEP-II, BABAR, Damping Rings

– Shielding effectiveness of different materials for SPEAR3, CID

– Activation of beam line components, soil and water outside the tunnels for NLC, Damping Rings

Page 21: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 21

OPERATIONS

Page 22: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 22

Radiation Safety at SLAC- OperationsRadiation Safety at SLAC- Operations

• Radiation physicists have oversight for beam operations in conjunction

with: Operations Departments and Accelerator Safety Offices.

• Requirements: DOE 420.2A, ASO-,Radiological Control Manual, and

internal shielding and Beam Containment policy, ….

• Administrative controls:

– Conduct of Operations:• Guidelines for Operations (e.g. PPS certification requirements)• Beam Authorization Sheets (BAS- Define the operations envelope)• Accelerator safety inspection check-lists

– Configuration Control• Beam Authorization Sheets (BAS)• Radiation Safety Work Control Forms (RSWCF)

Page 23: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 23

Operations-Cont.Operations-Cont.

• Establish Check and Balance:

– Inspection of BAS items, Walk-through

– OHP’s Passive and Active fixed Area radiation Monitoring

– OHP’s Radiation survey program

– RP’s Passive fixed Area radiation Monitoring

– Radiation Measurements as part of the Initial Beam Checkouts

• Combined efforts of RP, OHP, Operations, Safety Officers

Page 24: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 24

PLANS

Page 25: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 25

Plans- Customer ServicePlans- Customer Service

• Increase involvement in the assigned projects. Increase communications and oversight for beam operations by conducting regular walk-through, holding regular meeting with cognizant physicists, safety officers, area managers, performing safety inspection of the facilities in areas of assigned responsibility, attending information meetings. Frequency of these activities is to be agreed upon with customers and the Department Head.

• Increase knowledge of ES&H policies, especially Radiation Safety policies, systems, practices and procedures. Inform clients about these policies, and assist them in adhering to the policies in an efficient manner.

• Enhance the format and the content of the department web page; add links to photos of the radiation safety items for individual Beam Authorization Sheets on the RP web page.

• Demonstrate flexibility to take up new operation, design and special assignments as need arises.

Page 26: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 26

Plans- Maintain ExcellencePlans- Maintain Excellence

• Identify and add new features to the FLUKA Monte Carlo Code.

• Continue to enhance proficiency of using Monte Carlo and Analytical Computer codes (e.g. FLUKA, MCNPX, MUCARLO, SATC8) for SLAC-related problems.

• Devote sufficient effort to research activities related to the mission of SLAC be active in performing experiments, publishing scientific reports in journals and participation in scientific activities.

• Continue to increase knowledge of accelerator, and health physics- CHP staff should keep theirs current, other staff should start preparing for the HP certification exam per individual goals.

• Keep ES&H training current at all times

Page 27: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 27

• Continue to work on improving radiation safety policies by working out examples of application of policy to different cases at SLAC, compare with policies of other labs.

• Continue to work on individual goals set for improving effectiveness and efficiency.

Plans-Plans-Improve Effectiveness and Efficiency:

Page 28: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 28

Plans-Plans-Transfer of Knowledge: 

• Cross training of staff members assigned to the various projects in issues related to the design and operation, and in other areas of assigned responsibilities.

• Work closely with OHP in conducting surveys and radiation measurements, develop a program to integrate the current RP and OHP plans for radiation survey, Area/Event monitoring programs and various health physics operational projects as need arises

• Increase and improve communication with OHP technicians and other staff.

• Work with OHP on improving the moderated BF3/GM active area monitoring systems.

• -Increase contribution to SLAC mission; when assigned to be a member of committee (e.g. Tritium Task Force, RSC, ALARA) by giving summary reports to the group.

Page 29: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 29

ChallengesChallenges

• Personnel– 3 new staff physicists– Need to train new staff coming from other fields

• More projects due to new mode of operation– Design of SPEAR3, E158, LCLS, SPPS, FFTB (E164,

Test Beams) NLCTA, Eight-Pack, E163, E165– Oversight and support of operation in existing facilities

in the 2-Mile Accelerator Complex, SSRL, NLCTA, KTLAB.

• To better serve customers need advance notice, and coordination

Page 30: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 30

Challenges-cont.Challenges-cont.

• Technical – Need new computer models, techniques and methodologies– R&D and collaboration with other labs is needed to expedite

transfer of knowledge

• Policies– Need to updating policies and requirements– Consistent with other labs– Deliberate and systematic review– Requirements are in several documents with different owners

• Oversight duties occasionally requires one to take unpopular positions to maintain a safe workplace

Page 31: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 31

• END

Page 32: “Synching up with VIWG”

ES&H Dept Head Meeting, July 9, 2003

S. Rokni 32

Radiological Safety at SLAC-ContRadiological Safety at SLAC-Cont

– Training– Instrumentation– Radiological Postings – Dosimetry – Radiological Surveys

& Monitoring– Radiological Hygiene

– Radioactive Material Inventory Control

– Radioactive Waste Management

– Radiological Environmental Protection

– Emergency Preparedness

OHP administers the following services: