swp-12 excavation daiman

Upload: hassan-abdullah

Post on 04-Jun-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 SWP-12 Excavation Daiman

    1/3

    Ryobi Kiso (S) Pte Ltd SWP-12

    Safe Work Practices (SWP) for Excavation and Tunnelling Works

    Procedures check for minimum requirements (Please tick):

    Permit-to-Work Procedure in place where applicable

    Logout/ Tag out !stem where applicable

    PP" requirements

    "mergenc! #esponse Plan("#P) $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ The following WP shall be followed for all personnel e%posed to ha&ards in the course of e%ca'ationand tunnelling works When implementing e%ca'ation works the following procedures must be strictl!adhered

    Preparation prior to e%ca'ation

    ite uper'isor and afet! uper'isor to conduct a site inspection

    *e'elop the la!out plans+ section plans of e%ca'ation and methods of construction

    ,dentif! and assess the plant and equipment required for the ob eg hand tools+ mechanical equipment+traffic management signage etc.

    "nsure appropriate training has been pro'ided to all staff.

    inimise the disruption to traffic and the general communit! b! ha'ing the materials and manpowerfor the work to be undertaken on hand or to be deli'ered as required.

    "nsure that traffic management signage is a'ailable and in good condition.

    "nsure adequate public protection (bunting+ barrier tape+ netting) and shoring is a'ailable where

    appropriate.

    "nsure that an! trench that the workers are to perform work in is of sufficient width to allow adequatesafe access and egress

    0 1ccess to e%ca'ation

    Every excavation and trench excavation exceeding more than 1.2m de th!

    Workers must wear hard hats whilst in trench.

    1ccess ladders/stairwa!s/ must be pro'ided to furnish safe access.

    Workers must compl! with 2onfined pace "ntr!

    3 Trench "%ca'ation

    "%ca'ation e%ceeded more than 4 meters depth+

    The materials used for piling+ shoring and bracing acti'ities must be well protected from falling

    against to workers

    The protection must be constructed in line with P" design+

    ,f trenching is more than 5 meters depth+ it must be done b! mechanical digger

    Potholing needs to be undertaken with care and emplo!ing techniques least likel! to damage theser'ice:

    6se hand tools+ sho'els and trowels (insulated if working near electrical ser'ices) and machiner! with proper handling

    Page 1 of 2

  • 8/13/2019 SWP-12 Excavation Daiman

    2/3

    Ryobi Kiso (S) Pte Ltd SWP-12

    "%amine the natural surface for ob'ious signs of trenching etc.

    4 Protection of both ser'ices and the public

    7o unauthori&ed person shall be permitted to enter 'icinit! of e%ca'ation areas and to operatemachiner!

    2heck and inform all site personnel including contractors of the location of the ser'ices.

    ark all e%posed ser'ices with flags or de'ices which can be readil! seen.

    "rect safet! barriers+ fencing+ webbing+ bunting etc around e%posed ser'ices.

    "nsure all marked ser'ices continue to be 'isible for the duration of the work

    5 "%ca'ation upport

    8nce the e%ca'ation is completed the most appropriate method of ground support must be adopted.

    horing if required shall be in accordance with Workplace afet! and 9ealth ("%ca'ation)

    ,t is important that the support s!stem be implemented as soon as possible.

    7o person should not work alone in a trench.

    1ll support s!stems should be regularl! inspected.

    7o support should be remo'ed from a section of a trench where persons are working.

    When using cage support s!stems a minimum of two module lengths must be used at all times.

    1t no time should a person work outside of the caged area.

    2ages must be installed and remo'ed from the trench+ assembled

    *uring e%ca'ation the toe of the spoil heap should ne'er be less than 5 m from the edge of the trench.

    ,f the trench runs across sloping ground+ spoil to be put on downhill side of the e%ca'ation.

    1ll pipes+ tools etc should ne'er be less than 5 m from the edge of the trench or bench and must bechocked

    Trench walls and support s!stems should be frequentl! inspected b! the team leader or other competentand trained person to ensure that:

    The e%ca'ating bucket is not undercutting the trench sides. supports are not being o'erstressed.

    The ground is not fretting or beginning to collapse into the trench.

    Tension cracks do not appear along trench top.

    Trench walls do not sag under the pressure of the machiner!.

    lumps are not appearing in the surface near the e%ca'ation.

    "nsure worksite is safe/ secure before lea'ing.

    Page 2 of 2

  • 8/13/2019 SWP-12 Excavation Daiman

    3/3

    Ryobi Kiso (S) Pte Ltd SWP-12

    Locations of new or e%isting ser'ices are to be recorded on construction drawings or site plans b! staffresponsible for undertaking the construction work

    Page 3 of 2

    Prepared ;!: r *aiman #e'iewed ;!: r 7g 2hoon 9uat

    *esignation: W 98 *esignation: enior Pro ect anager

    *ate: 4