MANAGEMENT & OPERATION SUNGAIMANAGEMENT & OPERATION SUNGAI
(254154-U)
SELANGOR PHASE 1 WATER TREATMENT PLANT(SSP1)
SELANGOR PHASE 1 WATER TREATMENT PLANT(SSP1)
The views expressed in this paper/presentation are the views of the author and do not necessarilyreflect the views or policies of the Asian Development Bank (ADB), or its Board of Governors, or thegovernments they represent. ADB does not guarantee the accuracy of the data included in this paper
and accepts no responsibility for any consequence of their use. Terminology used may not necessarilybe consistent with ADB official terms.
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 2/51
CONTENTS SUNGAI HARMONI SDN BHD
Sungai Selangor Phase 1 Water Treatment Plant
2.0 Raw Water Sources
3.0 Treatment Works
3.1 Intake
3.2 Treatment Plant. eservo rs
4.0 Water Quality Monitoring
4.1 Raw Water
4.2 Along Treatment Process Train
5.0 Studies Conducted
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 3/51
1.0 INTRODUCTION
SUNGAI HARMONI SDN BHD
Sungai Selangor Phase 1 Water Treatment Plant
• Sungai Selangor Water Supply Scheme Phase 1 (SSP1) wasdeveloped in 2 stages. The Phase 1 Stage 1 (Stream B) was
completed in early 1993 and stage 2 (Stream A) wascompleted in Sep tember 1995.
• Eac h Stream is capable of prod uc ing 475 MLD of potablewa ter.With the total nominal c apability of 950 MLD, SungaiSelangor Water Supply Scheme Phase 1 is c urrently one of the
biggest water supp ly scheme in Ma laysia
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 4/51
• SSP1 is c urrently supplying approximately 30 % of Klang Valley and State
SUNGAI HARMONI SDN BHD
Sungai Selangor Phase 1 Water Treatment Plant
.
• Distribution Areas inc lude Petaling Jaya Utara, Kuala Lumpur Utara,som e areas in Gombak, Hulu Selangor, Kelang & Kuala Selangor
• The c onc ession ho lder of SSP1 is Syarikat Pengeluar Air Sungai Selangor
(SPLASH) which has been awa rded a 30 years concession period in year.
• Sungai Harmoni Sdn Bhd (SHSB) is the operator of the SSP1, responsiblefor the management, operation and maintenanc e of the scheme.
• SHSB is the wholly-owned subsidiary o f Taliworks Corporation Berhad.
• o an a wor s orp are assoc a e su s arycompanies of Kumpulan Darul Ehsan Bhd.
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 5/51
OVERALL LAYOUT OFPicture no.1
2.0 Raw Water Sources
SUNGAI SELANGORWATER SUPPLY
SCHEME RAW WATERSOURCE.
DAMDAM
SG TINGGI DAMSG TINGGI DAM
SG.SELANGOR
INTAKESSSP3
SSP2
SSP1
SSP1,2 & 3WTP
BERJUNTAI
TOWN
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 6/51
Top Water Level = 220 meter, Total Storag e = 235 MCM
SUNGAI SELANGOR DAMPicture no.2
Dam Operator, SPLASH (Syarikat Pengeluar Air Sungai Selangor Sdn Bhd)
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 7/51
Overflow & Scour - Sungai Selangor Dam
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 8/51
Top Water Leve l = 59.50 meter, Total Storage = 122.50 MCM
SUNGAI TINGGI DAMPicture no.3
Dam Operator, SPLASH (Syarika t Pengeluar Air Sungai Selangor Sdn Bhd)
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 9/51
3.0 Raw Water Sources
3.1 Intake
,.
SSP1 Intake consists of sc reening systems (Trash Sc reens
and Band Sc reens), Automatic Sand Rem oval System andPumping System.
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 10/51
INTAKE, FIVE RIVER GATESPicture no.4
5 units of river gates installed at SSP1 Intake. The mainpurpose o f the struc ture is to maintain river level at m inimumof 3.0 meter.
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 11/51
RAW WATER PUMPING STATION (RWPS)Picture no.6
There a re 8 units Large pump with capac ity of 2361 L/ s and 2 units smaller pump withcapac ity of 1181 L/ s driven b y 810kW Motor and 410 KW pump motors respec tively
Raw Water is delivered to Treatment Plant via Twin p ipelines of 2100mm with length of5.0 km .
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 12/51
TREATMENT WORKS, OVERALL LAYOUTPicture no.7
3.2 Treatment Works
Pulsator
Filters Stream A
ChemicalBuilding
Pulsator
Filters Stream B
Aerator
Overall layout Trea tment Works. Stream A on the right side of the c hem ical build ing
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 13/51
AERATORPicture no.8
Aerator (cascade type)
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 14/51
CHEMICAL MIXING CHAMBERPicture no.9
Stream B Chemical Mixing Cham ber. Coagulant is mixedwith raw water at the inlets of the c ham ber.
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 15/51
POLYMER DOSING POINTSPicture no.10
Liquid Polymer is added before entering Pulsators /
Clarifiers.
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 16/51
Picture no.11 PULSATOR / CLARIFIER
6 units vertical flow Pulsators/ Clarifiers ava ilab le in eac hStream.
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 17/51
FILTERS
Coagulant PAC – Fi l t er – SSP1 Coagulant A lum – Fi l t er – SSP1
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 18/51
CLEAR WATER TANK (CWT)Picture no.13
142 ML Clear Water Tank.
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 19/51
TREATED WATER PUMPING STATION (TWPS)Picture no.14
8 pum p sets (6 nos. 2164 L/ s & 2 nos. of 1082 L/ s) ava ilab le for Matang Pagar reservoirDistribution System driven by 2900 kW and 1450 kW motors and 5 pump sets (3 nos. of 596 L/ s &2 nos. of 1192 L/ s) ava ilab le for Bukit Mayong Reservoir driven by 710 KW and 1300 KW motors.
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 20/51
BUKIT MAYONG BALANCING RESERVOIR
3.3 Reservoirs
.
Storage capac ity 50 ML. Two outlets, Kuala Selangor and Estate Lam Bee . Single p ipeline
of 9.3 km with d iameter of 1550mm is laid from Treatment Works to the reservoir.
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 21/51
MATANG PAGAR BALANCING RESERVOIRPicture no.16
Trea ted Water is delivered to Matang Pagar Reservoir (capac ity 182 ML) via twin 2100
mm pumping mains about 22.5km in length. Three outlets; Kuang, Kep ong and EffinghamEstate Servic e Reservo irs.
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 22/51
Bukit Frasier
4.0 Water Qua lity Monitoring
4.1 Raw Water
SAMPLING POINTS OFRIVER SURVEILLANCE
PROGRAM - UARTERLY
Kuala Kubu
Baru
Sg. SelangorDam
Sg. Tinggi
Dam Sg. Luit
4
3
2
1
Rasa
Batang Kali
Rasa
Sungai TinggiRPS
Intakes SSP1, 2 & 3
1110
9
8 7
6
5
KualaSelangor
Batang
SSP1,2,3 WTPRantau
Panjang WTP16
15
14
13
12
Description of Sampling Points
1-S Selan or at Pertak, Kuala Kubu Baru
BatuArang
Sg. Garing
Berjuntai
Bt. Badong
2-Sg Selangor before confluence with Sg.Kubu
3-Sg Kubu4-Sg Selangor before confluence with Sg Rening5-Sg Rening6-Sg Selangor before confluence Sg Batang Kali7-Sg Batang Kali8-Sg Selangor before confluence Sg Kerling9-Sg Kerling
Kuang
- g e angor e ore con uence g u o11-Sg Buloh12-Sg Selangor before confluence Sg Sembah13-Sg Sembah14-Sg Selangor before confluence Sg Air Hitam15-Sg Air Hitam16-Sg Selangor at Intake (SSP1)
Sampling Points (on main river, Sg Selangor)
Sampling Points (tributaries)
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 23/51
PERAKSUNGAI SELANGOR RIVER BASIN &ACTIVITIES UPSTREAM OF INTAKES
The Gap
Bukit Fraser
Legend
Orang Asli village
Factory Open Dumping
Aquaculture
KKBSg. Selangor
Dam
Sg. TinggiDam
Sg. Luit
Kem Khidmat Negara
NS Camp
Pig Abattoir
Cow Abattoir
IWK
Landfill
Pig Farm Sg. Rinting
Rasa
Batang Kali
Rasa
Bukit Tagar Landfill
Sungai TinggiRPS
KualaSelangor
Batang
SSP1,2,3 WTP
Kg. Timah
Pig Farm
RantauPanjang WTP
Kawasan PerindustrianSerendah
BatuArang
Sg.Garing
Berjuntai
Bt. Badong TIP TOP Meat
Bukit Tadun BR
Kundang Open Dumping
Perindustrian Rawang
Kuang
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 24/51
SamplingDescriptions
SP1 Sg. Sela ng or a t Perta k, Kua la Kubu Ba ru
SP2 Sg. Selangor be fore c onfluenc e w ith Sg. Kubu.
. .
SP4
Sg. Selangor be fore c onfluence w ith Sg. Rening .
SP5 Sg. Rening.
Sg. Selangor be fore c onfluenc e w ith Sg. Bata ng Ka li.
SP7 Sg. Ba ta ng Ka li.
SP8 Sg. Selangor befo re c onfluenc e w ith Sg. Kerling
SP9 Sg. Kerling.
SP10 Sg. Selangor be fore c onfluenc e w ith Sg. Buloh.
SP11 Sg. Buloh.
Sg. Selangor be fore co nfluenc e Sg. Sem bah.
SP13 Sg. Sem bah.
SP14 Sg. Selangor be fore c onfluenc e w ith Sg. Air Hita m.
g. r am
SP16 Sg. Sela ng or at Inta ke
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 25/51
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 26/51
to Sg Tengi
6-SAMPLING POINTS OF CRITICALLOCATIONS (BI-MONTHLY)
Bukit Tagar Landfill Flow Direction
to NKVE
D Sg. SelangorSg. Nyamuk
A
ESg. Air HitamRoad
Lim Tan
Mining Lake
Legends
B
C
F
SSP1,2&3 Intakes
Sg. Sembah
to K.Selangor
Batang Berjuntai
A - At Sungai Selangor, 50m after Lim Tan Mining Lake outlet.
B - Sungai Sembah-200m Before Confluence With Sungai Selangor.
C - 200 m (upstream) before confluence with Sungai Air Hitam.
D - Sungai Nyamok - After Bukit Tagar Landfill (Near the Bridge).
E - Sungai Air Hitam - 20m before Confluence With sungai selangor.
F - Intake - At river Gate.Tip Top
From Ijok
Town
Landfill
Pig Abattoir
Sand Mining
Cow Abattoir
Aquaculture
ea Sg. Garing
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 27/51
WATER RESOURCERIVER FLOW AT INTAKE
7000
8000
9000
4000
5000
6000
I L Y
F L O W ( M L D
2000
3000 A V G D
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
MONTH
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 28/51
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 29/51
A) PHYSICAL AND CHEMICAL ANALYSIS REPORT
On analysis of the sample(s) submitted, the results were obtained :
METHOD
REF. No. :
Sampling Points MOH
GuidelinesPARAMETERNo. UNIT
1 pH APHA 4500-H+B 6.6 5.3 6.3 6.2 4.9 6.2 5.5-9.0
2 Turbidity NTU APHA 2130B 112 393 376 94 297 388 1000
3 True Colour Hazen APHA 2120B 10 20 15 5 50 10 -
4 Apparent Colour Hazen APHA 2120B 200 500 500 120 600 600 300
5 Iron as Fe mg/L Hach No. 8008 1.16 2.11 3.12 1.10 4.04 2.96 1.0
6 Total Organic Carbon (TOC) mg/L**Hach No. 10129
4.9 13.4 9.2 3.9 13.7 9.3-
7 Manganese as Mn mg/L Hach No. 8149 0.10 0.40 0.58 0.13 0.49 0.60 0.2
8 Ammonia as N mg/L Hach No. 8038 0.02 0.17 0.09 0.02 0.18 0.11 1.5
**or e mg ac o. . . . . . .
Remarks
Sampling points :
A - At Sungai Selangor, 50m after Lim Tan Mining Lake outlet.
B - Sungai Sembah-200m Before Confluence With Sungai Selangor.
C - 200 m (upstream) before confluence with Sungai Air Hitam.
D - Sungai Nyamok - After Bukit Tagar Landfill (Near the Bridge)
E - Sungai Air Hitam - 20m before Confluence With sungai selangor
F - Intake - At river Gate.
B) MICROBIOLOGICAL ANALYSIS REPORT
METHOD
REF. No. : A B C D E F
1 Total Coliform
Sampling Points MOH
GuidelinesPARAMETERNo. UNIT
MPN /100
@ 35oC for 24 Hours
2 E-Coli
@ 35oC for 24 Hours
mL
MPN /100
mL APHA 9223B
APHA 9223B 37,900 125,000 93,200 25,600 166,400
6,300
5,000
2,000 11,900 9,600 1,000
122,300
7,400
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 30/51
SCHEMATIC DIAGRAM OF SSP1 WATER TREATMENT PROCESSESPicture no.17
4.2 Along The Trea tment Proc ess Train
AeratorClarifier Filter
Pre-Lime
Pre-Chlorine
Coagulant
Polymer
Mixing
Clear Water Tank
Band Sc reen
River Gate
(SUNGAI SELANGOR) Raw Water
PumpingStation
am er
Trea ted WaterPumping Station
(TO RESERVOIRS,
FluoridePost-Chlorine
Post-Lime
a t er r e c ov er y l i nTrash Screen
AND BUKITMAYONG)
eSa nd Ho pp er Suc tio n
Chamber
Sludge
Thic keningTank
Wash WaterRec ove ry
Tank
Sludg e Lag oon
DAILY WATER QUALITY MONITORING
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 31/51
Stream A Balancing
2-Hourly Sampling Points Locations
DAILY WATER QUALITY MONITORING
AeratorMixing
Chamber
TWPS
Reservoirs
Matang
Pagar
to Service
Reservoirs /
ungaSelangor
Aerator
Mixing
Chamber
Pulsator Filters
Bukit
Mayong
Consumer
Stream B
Type of Water : RAW WATER
Sampling Point : Laboratory
Dates & Time
0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500
1 pH 6.3 6.2 6.1 6.2 6.2 6.2 6.3 6.3 6.4 6.2 6.3 6.3 6.3
2 Turbidity (NTU) 214 192 132 131 92 82 86 71 70 70 68 63 106
Item
. . . .Average(hours)
Parameters
3 Colour (Hazen) 375 250 250 250 187 187 187 187 187 187 187 187 218
4 Iron as Fe (mg/L) 2.85 1.08 1.14 1.08 1.54
5 Ammonia as N (mg/L) 0.03 0.03 0.03 0.02 0.03
anganese as n mg . . . . .
7 Alkalinity (mg/L as CaCO3) 11.2 10.6 10.9
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 32/51
DAILY WATER QUALITY MONITORING
Stream A Balancing
2-Hourly Sampling Points Locations
AeratorMixing
Chamber
TWPS
Reservoirs
Matang
Pagar
to Service
Reservoirs /
ungaSelangor
Aerator
Mixing
Chamber
Pulsator Filters
Bukit
Mayong
Consumer
Type of Water : SETTLED WATER Stream : A
Stream B
Sampling Point : Laboratory
0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500
1 H 6.3 6.3 6.3 6.3 6.3 6.3 6.2 6.1 6.1 6.1 6.1 6.2 6.2 6.3
Item
Average(Raw
Water)
19.10.2007 20.10.2007Average
Parameters
Dates & Time
(hours)
2 Turbidity (NTU) 1.1 1.2 1.2 1.2 1.3 1.1 1.3 1.3 1.4 1.2 1.4 1.3 1.2 106
3 Colour (Hazen) 5 5 5 5 5 5 5 5 5 5 5 5 5 218
4 Aluminium (mg/L) 0.00 0.00 0.01 0.02 0.00 0.00 0.01 -
5 Iron as Fe (mg/L) 0.02 0.01 0.02 1.54
6 Manganese as Mn (mg/L) 0.01 0.03 0.02 0.20
DAILY WATER QUALITY MONITORING
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 33/51
DAILY WATER QUALITY MONITORING
Stream A Balancing
2-Hourly Sampling Points Locations
AeratorMixing
Chamber
TWPS
Reservoirs
Matang
Pagar
to Service
Reservoirs /
ungaSelangor
Aerator
Mixing
Chamber
Pulsator Filters
Bukit
Mayong
Consumer
Type of Water : SETTLED WATER : BStream
Stream B
:
0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500
1 pH 5.3 5.2 5.4 5.5 5.6 5.6 5.9 6.0 6.0 6.0 5.9 6.0 5.7 6.3
Item
Average(Raw
Water)
19.10.2007 20.10.2007Average
Parameters
Dates & Time
(hours)
2 Turbidity (NTU) 0.6 0.8 0.8 0.8 0.7 0.7 0.7 1.3 1.8 1.6 2.2 2.3 1.2 106
3 Colour (Hazen) 3 3 3 3 3 3 3 5 5 5 5 5 3.8 218
4 Aluminium (mg/L) 0.19 0.06 0.03 0.04 0.04 0.04 0.07 -
5 Iron as Fe (mg/L) 0.02 0.07 0.05 1.54
6 Manganese as Mn (mg/L) 0.09 0.06 0.07 0.20
DAILY WATER QUALITY MONITORING
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 34/51
DAILY WATER QUALITY MONITORING
Stream A Balancing
2-Hourly Sampling Points Locations
AeratorMixing
Chamber
TWPS
Reservoirs
Matang
Pagar
to Service
Reservoirs /
ungaSelangor
Aerator
Mixing
Chamber
Pulsator Filters
Bukit
Mayong
Consumer
Type of Water : FILTERED WATER : A
Sampling Point : Laboratory
Stream
Stream B
0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500
1 pH 6.1 6.3 6.3 6.3 6.3 6.3 6.4 6.3 6.3 6.4 6.3 6.4 6.3 6.3
Item
Average(Settled W.
A)
19.10.2007 20.10.2007Average
Parameters
Dates & Time
(hours)
. . . . . . . . . . . . . .
3 Colour (Hazen) 3 3 3 3 3 3 3 3 3 3 3 3 3 5
4 Aluminium (mg/L) -
5 Iron as Fe (mg/L) 0.00 0.01 0.01 0.02
6 Ammonia as N (mg/L) -
7 Manganese as Mn (mg/L) 0.00 0.00 0.00 0.02
DAILY WATERQUALITY MONITORING
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 35/51
DAILY WATER QUALITY MONITORING
Stream A Balancing
2-Hourly Sampling Points Locations
AeratorMixing
Chamber
TWPS
Reservoirs
Matang
Pagar
to Service
Reservoirs /
ungaSelangor
Aerator
Mixing
Chamber
Pulsator Filters
Bukit
Mayong
Consumer
Type of Water : FILTERED WATER : B
Sampling Point : Laboratory
Stream
Stream B
0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500
1 pH 5.3 5.1 5.1 5.1 5.2 5.3 5.2 5.2 5.3 5.5 5.5 5.4 5.3 5.7
Item
Average(Settled W.
B)
19.10.2007 20.10.2007Average
Parameters
Dates & Time
(hours)
. . . . . . . . . . . . . .
3 Colour (Hazen) 3 3 3 3 3 3 3 3 3 3 3 3 3 3.8
4 Aluminium (mg/L) -
5 Iron as Fe (mg/L) 0.01 0.01 0.01 0.05
6 Ammonia as N (mg/L) -
7 Manganese as Mn (mg/L) 0.01 0.03 0.02 0.07
DAILY WATERQUALITY MONITORING 2-Hourly Sampling Points Locations
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 36/51
DAILY WATER QUALITY MONITORING
Stream A
AeratorMixing
Chamber
Pulsator FiltersBalancing
ReservoirsSungai
Selangor
y p g
Pulsator Filters
RWPS TWPS
Matang
Pagar
to Service
Reservoirs /
ConsumerCWT
Stream B
Aerator
Chamber Bukit
Mayong
Sampling Point : Laboratory
0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500
1 pH 7.6 7.9 7.5 7.5 8.1 8.9 8.2 7.7 7.6 7.9 7.8 7.7 7.9
Item
19.10.2007 20.10.2007Average
Parameters
Dates & Time
(hours)
2 Turbidity (NTU) 0.4 0.4 0.4 0.3 0.5 0.4 0.5 0.5 0.5 0.4 0.5 0.6 0.4
3 Colour (Hazen) 3 3 3 3 3 3 3 3 3 3 3 3 3
4 Free Chlorine (mg/L) 1.7 1.7 1.9 1.7 1.7 1.4 1.5 1.7 1.7 1.8 1.7 1.7 1.7
5 Combined Chlorine (mg/L) 0.1 0.1 0.1 0.2 0.1 0.2 0.1 0.1 0.1 0.2 0.2 0.1 0.1
6 Total Chlorine (mg/L) 1.8 1.8 2.0 1.9 1.7 1.6 1.7 1.8 1.9 2.0 1.9 1.7 1.8
7 Fluoride (mg/L) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
8 Aluminium (mg/L) 0.00 0.02 0.01 0.00 0.06 0.08 0.01 0.00 0.01 0.01 0.01 0.02 0.02
9 Iron as Fe (mg/L) 0.00 0.01 0.01 0.01 0.00 0.01 0.01
mmon a as mg . . . . .
11 Manganese as Mn (mg/L) 0.00 0.01 0.01 0.01 0.01 0.01 0.01
12 Alkalinity (mg/L as CaCO3) 14.1 14.8 14.5
13 Odour UO UO UO UO UO UO UO UO UO UO UO UO UO
Remarks : UO means Unobjectionable
DAILY WATER QUALITY MONITORING
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 37/51
Stream A
Mixing
Pulsator FiltersBalancing
ReservoirsSungai
Selan or
2-Hourly Sampling Points Locations
erator Chamber
RWPS TWPS
Matang
Pagar
to Service
Reservoirs /
ConsumerCWT
Type of Water : TREATED WATERStream B
AeratorMixing
Chamber
Pulsator Filters
Bukit
Mayong
Sampling Point : Bukit Mayong Reservoir Outlet
0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500
1 pH 7.0 7.5 7.8 7.6 7.5 8.1 8.6 8.7 7.8 8.3 8.1 8.0 7.9
Item
19.10.2007 20.10.2007Average
Parameters
Dates & Time
(hours)
2 Turbidity (NTU) 0.6 0.6 0.6 0.6 0.6 0.8 0.7 0.7 0.6 0.5 0.5 0.5 0.6
3 Colour (Hazen) 3 3 3 3 3 3 3 3 3 3 3 3 3
4 Free Chlorine (mg/L) 1.8 1.7 1.5 1.7 1.8 1.8 1.4 1.4 1.5 1.5 1.6 1.5 1.6
5 Combined Chlorine (mg/L) 0.1 0.1 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.1
6 Total Chlorine (mg/L) 1.9 1.8 1.7 1.8 1.9 1.8 1.5 1.5 1.6 1.7 1.7 1.7 1.7
7 Fluoride (mg/L) 0.6 0.5 0.5 0.7 0.6 0.5 0.4 0.5 0.4 0.4 0.4 0.4 0.5
8 Aluminium (mg/L) 0.03 0.01 0.03 0.01 0.02 0.05 0.03 0.07 0.01 0.04 0.05 0.04 0.03
9 Iron as Fe (mg/L) 0.01 0.02 0.02
10 Manganese as Mn (mg/L) 0.02 0.01 0.02
11 Ammonia as N (mg/L)
12 Odour UO UO UO UO UO UO UO UO UO UO UO UO UO
Remarks : UO means Unobjectionable
DAILY WATER QUALITY MONITORING
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 38/51
Stream A
Mixing
Pulsator FiltersBalancing
ReservoirsSungai
Selan or
2-Hourly Sampling Points Locations
erator Chamber
RWPS TWPS
Matang
Pagar
to Service
Reservoirs /
ConsumerCWT
T e of Water : TREATED WATERStream B
AeratorMixing
Chamber
Pulsator Filters
Bukit
Mayong
Sampling Point : Matang Pagar Reservoir Outlet
0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500Item
19.10.2007 20.10.2007Average
Parameters
Dates & Time
(hours)
. . . . . . . . . . . . .
2 Turbidity (NTU) 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.4
3 Colour (Hazen) 3 3 3 3 3 3 3 3 3 3 3 3 3
4 Free Chlorine (mg/L) 1.2 1.1 1.2 1.2 1.3 1.3 1.4 1.3 1.4 1.4 1.4 1.3 1.3
5 Combined Chlorine (mg/L) 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.1 0.0 0.1
6 Total Chlorine (mg/L) 1.2 1.2 1.3 1.3 1.4 1.4 1.4 1.3 1.4 1.4 1.4 1.3 1.3
7 Fluoride (mg/L) 0.5 0.5 0.4 0.5 0.4 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.4
8 Aluminium (mg/L) 0.08 0.07 0.05 0.05 0.01 0.02 0.02 0.01 0.02 0.02 0.03 0.04 0.04
9 Iron as Fe (mg/L) 0.02 0.02 0.01 0.02
10 Manganese as Mn (mg/L) 0.03 0.03 0.02 0.02
11 Ammonia as N (mg/L) 0.01 0.06 0.00 0.02
12 Odour UO UO UO UO UO UO UO UO UO UO UO UO UO
Remarks : UO means Unobjectionable
Supervisory Control And Data Acquisition (SCADA)
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 39/51
Supervisory Control And Data Acquisition (SCADA)
Certification and Ac c red ita tion
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 40/51
Certification and Ac c red ita tion
In Oc tober 2000, the SSP1 Laboratory was awarded theIn Oc tober 2000, the SSP1 Laboratory was awarded theSea l of Acc red itation (ISO/ IEC Guide 25) by the JabatanSea l of Acc red itation (ISO/ IEC Guide 25) by the Jabatan
Ma laysia (SAMM) scheme. The SSP1 Laboratory wasMa laysia (SAMM) scheme. The SSP1 Laboratory was
subsequently eleva ted to the ISO 17025 acc red itation insubsequently eleva ted to the ISO 17025 acc red itation inOc tober 2002.Oc tober 2002.
SIRIM had carried out the c omplianc e audit on the SSP1SIRIM had carried out the c omplianc e audit on the SSP1
operations in November 2002 and we are p roud to informoperations in November 2002 and we are p roud to inform
tha t SSP1 was conferred with the ISO 9001:2000tha t SSP1 was conferred with the ISO 9001:2000acc red itation on 21acc red itation on 21stst March 2003. The effort to achieveMarch 2003. The effort to achieveISO 9001:2000 c ertification was undertaken entirely inISO 9001:2000 c ertification was undertaken entirely in--house and the c ertification is a testimony to the staffhouse and the c ertification is a testimony to the staff
, ., .
Partic ipa te in Profic ienc y Testing organized by JKM annually.Partic ipa te in Profic ienc y Testing organized by JKM annually.
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 41/51
Sta ff Training
,Mechanical, Production, Security Safety & Health and Risk Management,Lab & QC, Electrical & Instrumentation, IT & Telemetry, Civil Maintenance,Civil Maintenance, Quality Assurance and Administration.
• – Internal Training; conducted by Senior Staff
– In-House Training; by outside certified trainer conducted at site – Public Training; conducted by certified organizations/related agencies
• Course content may vary depending on target groups. Training formatinclude class room training and on site trainings.
• Staff category includes Plant Operators, Controllers/Technicians,, , ,Staffs, Civil Workers and Patrolmen and Officers/Managers
• Discussion on studies carried out, participated by all staff involved in theparticular study, irrespective of rank. This promotes dissemination ofknowled e and exchan e of views amon the staff and enhance teamwork
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 42/51
Security, Safety & Health
• SSP1 is classified as Major Hazard installation due to storage of chlorine atsite and is subjected to CIMAH Act
• SSP1’s has 28 members Emergency Response Team (ERT) consist ofstaffs from various sections.
• The ER team will act as first responder to any emergency (chlorine leak, fire
etc) at site• Trainings and refresher trainings are continuously provided to EmergencyRes onse Team members b Chlorine su liers and also b JabatanBomba & Penyelamat
• Safety and Health Committee represented by SSP1 staff from all rank andfile hold meeting every three months to discuss various safety & health
issues• Safety & Health Awareness Trainings/Courses are also provided to all
SSP1 staffs. The trainings are either by SSP1’s Safety Officer or certifiedtrainers from National Institute of Occupational Safety & Health (NIOSH) orMalaysian Society for Occupational Safety & Health (MSOSH)
• or ne an re r s are con uc e rom me o me
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 43/51
5.0 Studies Conducted
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 44/51
b) Limnological Survey of Impounded Water
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 45/51
b) Limnological Survey of Impounded WaterConclusion :Iron and manganese are in the soluble form in the Hypolimnion. With intake further downstream
of the dam releases from the hypolimnion will not pose treatment problem.
WATER QUALITY IN DEEP RESERVOIRS
30%
Epilimnion: Upper layer ofwell-mixed warm water
Thermocline: Intermediate/boundary
temperature and density
Hypoliminion: Lower layer,poorly mixed cool water.ow an anaero c
28.5%Lake
Thermal Stratification
(2) Potential Enhancement and Economy of Treatment Processes
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 46/51
ya) Selection of Coagulants
Aluminium Sulphate (Alum) and Polyaluminium Chloride (PAC)
Coagulant PAC – Fi l t er – SSP1 Coagulant Alum – Fi l t er – SSP1
Conclusion :PAC more effective in removal of iron and manganese.(i) PAC does not depress pH as much as Alum.(ii) Due to the catalytic action of PAC.
b) Removal of Iron (Fe) and Manganese (Mn)Use of Potassium Permanganate (KmNO4)
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 47/51
g ( )
The chemical converts the soluble form of Fe and Mn
o e nso u e orm.
c) Dissolved Oxygen (DO) Concentration Variation in a Sludge Blanket
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 48/51
c) Dissolved Oxygen (DO) Concentration Variation in a Sludge Blanket
Conclusion :
. . .(ii) The rate of D.O. concentration varies with the length of time of retaining the sludge.The sludge could turn anaerobic, changing the form of Fe and Mn from insoluble to soluble.
(iii) The study indicates the appropriate time for washing the clarifier.
STUDY OF D.O. IN SLUDGE
Water LevelA
2.50 M Max.
Water LevelA
2.50 M Max.
Cross-Section of Clarifier
A
3.00 M
3.50 M Min.
D.O. ConcentrationCross-Section of Clarifier
A
3.00 M
3.50 M Min.
D.O. Concentration
B
. . . . . . . . . . .
B
. . . . . . . . . . .
View -AA- View -BB-View -AA- View -BB-
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 49/51
d) Study on the Effect of Prechlorination on Bacteria, Iron and Manganese
Results of Study
-
Sample
Coliform
E. ColiSample
Filtered Sample
MPN/100mL
MPN/100mL
Iron Manganese Iron Manganese
Raw Water >100,000 3000 1.77 0.269 0.17 0.082
Raw Water +0.5 ppm C12
. . . .
Raw Water +1.0 ppm C12
0 0 1.71 0.26 0.16 0.073
Raw Water +1.5 ppm C12
. . . .
e) Study on Effectiveness of Specific Treatment Processes
8/6/2019 SWMA 2a Presentation
http://slidepdf.com/reader/full/swma-2a-presentation 50/51
Specific Treatment Processes :
• •
Sg. Selangor Source – Microbiological Water Quality,Sg. Selangor Treatment Plant, Phase 1
Streams
Sampling LocationSampling TypeSampling Time
AeratorRaw Water0900 Hours
Pulsator No. 3Settled Water1100 Hours
Filter No. 10Filtered Water1400 Hours
acter a ount : m
Stream A
(475 MLD)
SAMPLING DATE : 16.02.2005
Total Coliform 52,000 0 5
E. Coli 0 0 0
Filter running : 60.7 hours
Stream B475 MLD
SAMPLING DATE : 07.02.2005
Total Coliform 40,800 0 2
.
Filter running hours : 12.4 hours
8/6/2019 SWMA 2a Presentation