![Page 1: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/1.jpg)
![Page 2: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/2.jpg)
SWAT - STORM WATER ACTION TEAMGOAL: Reduce localized drainage problems throughout the City not directly subject to riverine/ bayou overbank flooding by rehabbing/ upgrading the existing drainage system to improve conveyance of day-to-day storm events and expanding maintenance capabilities.
Project locations will be determined by reviewing 311 calls, nonriverinestructural flooding locations, and known areas with drainage concerns. Projects will be developed by investigating and inspecting the system and developing an assessment/work plan for addressing the area(s) of highest need.
STORM SEWERS AND OUTFALLS:Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re-establish roadway curbs and gutters for re-establishment of flow paths.
ROADSIDE DITCH:Projects will include regrading of ditches, replacement of culverts not set to proper flowline and clearing.
OFF-ROAD DITCH AND DETENTION PONDS:Projects will include clearing and grubbing, regrading and desilting, minor erosion repairs, and mowing.
SUPPORT CONTRACTS REQUIRED:* Surveying Contracts Professional Engineering Services Contract Roadside Ditch Rehab Work Order Contract Storm Sewer Work Order Contract Clearing and Grubbing Work Order Contract Small Contractor Rotation Program
(*Some contracts are existing and some to be modified/ created and awarded.)
Revised
![Page 3: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/3.jpg)
SWAT Project Map
Revised
![Page 4: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/4.jpg)
1. 10058 Briarwild Ln.
Drainage Issues:Culverts undersized, collapsed or not set to proper flow line Silted ditch flow lines and culverts
District A
2. 2113 Woodvine Dr.
Drainage Issues:Needs Clear & Grubbing/ Re-establishmentDitch ID: W138-00-00-A & B
![Page 5: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/5.jpg)
District A – Project 1
10058 Briarwild Ln.(N - Warwana Rd.; S - Briarwild Ln.; E - Gessner Rd.; W - Witte Rd.)
Drainage Issues: Culverts undersized, collapsed or not set to proper flow line Silted ditch flow lines and culverts
![Page 6: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/6.jpg)
District A – Project 2
2113 Woodvine Dr.(from Long Point Rd. to Turquoise Ln.)
Drainage Issues:Needs Clear and Grubbing/ Re-establishmentDitch ID: W138-00-00-A & B
![Page 7: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/7.jpg)
SWAT - STORM WATER ACTION TEAMGOAL: Reduce localized drainage problems throughout the City not directly subject to riverine/ bayou overbank flooding by rehabbing/ upgrading the existing drainage system to improve conveyance of day-to-day storm events and expanding maintenance capabilities.
Project locations will be determined by reviewing 311 calls, nonriverinestructural flooding locations, and known areas with drainage concerns. Projects will be developed by investigating and inspecting the system and developing an assessment/work plan for addressing the area(s) of highest need.
STORM SEWERS AND OUTFALLS:Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re-establish roadway curbs and gutters for re-establishment of flow paths.
ROADSIDE DITCH:Projects will include regrading of ditches, replacement of culverts not set to proper flowline and clearing.
OFF-ROAD DITCH AND DETENTION PONDS:Projects will include clearing and grubbing, regrading and desilting, minor erosion repairs, and mowing.
SUPPORT CONTRACTS REQUIRED:* Surveying Contracts Professional Engineering Services Contract Roadside Ditch Rehab Work Order Contract Storm Sewer Work Order Contract Clearing and Grubbing Work Order Contract Small Contractor Rotation Program
(*Some contracts are existing and some to be modified/ created and awarded.)
Revised
![Page 8: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/8.jpg)
SWAT Project Map
Revised
![Page 9: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/9.jpg)
District B
1. Greater Fifth Ward
Drainage Issues:Culverts undersized, collapsed or not set to proper flow line Silted ditch flow lines and culverts
2. Trinity/Houston Gardens
Drainage Issues:Culverts undersized, collapsed or not set to proper flow line Silted ditch flow lines and culverts
![Page 10: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/10.jpg)
District B – Project 1Greater Fifth Ward (N- Farmer St.; S- Chisum St.; E - Wipprecht St. & W - Yates St.) Drainage Issues: Culverts undersized, collapsed or not set to proper flow line Silted ditch flow lines and culverts
![Page 11: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/11.jpg)
District B – Project 2Trinity/Houston Gardens (N - Weaver Rd.; S - Crosstimbers St.; E - Lavender St.; W - Painter St.)Drainage Issues: Culverts undersized, collapsed or not set to proper flow line Silted ditch flow lines and culverts
![Page 12: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/12.jpg)
SWAT - STORM WATER ACTION TEAMGOAL: Reduce localized drainage problems throughout the City not directly subject to riverine/ bayou overbank flooding by rehabbing/ upgrading the existing drainage system to improve conveyance of day-to-day storm events and expanding maintenance capabilities.
Project locations will be determined by reviewing 311 calls, nonriverinestructural flooding locations, and known areas with drainage concerns. Projects will be developed by investigating and inspecting the system and developing an assessment/work plan for addressing the area(s) of highest need.
STORM SEWERS AND OUTFALLS:Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re-establish roadway curbs and gutters for re-establishment of flow paths.
ROADSIDE DITCH:Projects will include regrading of ditches, replacement of culverts not set to proper flowline and clearing.
OFF-ROAD DITCH AND DETENTION PONDS:Projects will include clearing and grubbing, regrading and desilting, minor erosion repairs, and mowing.
SUPPORT CONTRACTS REQUIRED:* Surveying Contracts Professional Engineering Services Contract Roadside Ditch Rehab Work Order Contract Storm Sewer Work Order Contract Clearing and Grubbing Work Order Contract Small Contractor Rotation Program
(*Some contracts are existing and some to be modified/ created and awarded.)
Revised
![Page 13: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/13.jpg)
SWAT Project Map
Revised
![Page 14: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/14.jpg)
District C
1. 5942 Greenmont Dr.
Drainage Issues:36-inch outfall has collapsed and caused cave-in
2. 3600 Flora St.
Drainage Issues:Existing culvert/grate failure blocking proper drainage
![Page 15: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/15.jpg)
District C – Project 15942 Greenmont Dr.Drainage Issues: 36-inch outfall has collapsed and caused cave-in
![Page 16: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/16.jpg)
District C – Project 23600 Flora St.Drainage Issues: Existing culvert/grate failure blocking proper drainage
![Page 17: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/17.jpg)
SWAT - STORM WATER ACTION TEAMGOAL: Reduce localized drainage problems throughout the City not directly subject to riverine/ bayou overbank flooding by rehabbing/ upgrading the existing drainage system to improve conveyance of day-to-day storm events and expanding maintenance capabilities.
Project locations will be determined by reviewing 311 calls, nonriverinestructural flooding locations, and known areas with drainage concerns. Projects will be developed by investigating and inspecting the system and developing an assessment/work plan for addressing the area(s) of highest need.
STORM SEWERS AND OUTFALLS:Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re-establish roadway curbs and gutters for re-establishment of flow paths.
ROADSIDE DITCH:Projects will include regrading of ditches, replacement of culverts not set to proper flowline and clearing.
OFF-ROAD DITCH AND DETENTION PONDS:Projects will include clearing and grubbing, regrading and desilting, minor erosion repairs, and mowing.
SUPPORT CONTRACTS REQUIRED:* Surveying Contracts Professional Engineering Services Contract Roadside Ditch Rehab Work Order Contract Storm Sewer Work Order Contract Clearing and Grubbing Work Order Contract Small Contractor Rotation Program
(*Some contracts are existing and some to be modified/ created and awarded.)
Revised
![Page 18: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/18.jpg)
SWAT Project Map
Revised
![Page 19: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/19.jpg)
District D
1. 7300 Calais Rd.
Drainage Issues:Needs Clear and Grubbing/ Re-establishment Ditch ID: DUNK-00-05-A, B
2. 4007 Botany Ln.
Drainage Issues:Needs Clear and Grubbing/ Re-establishmentDitch ID: C127-01-00-A
![Page 20: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/20.jpg)
District D – Project 17300 Calais Rd. (from Calais Rd. to St. Lo Rd.)Drainage Issues: Needs Clear and Grubbing/ Re-establishment Ditch ID: DUNK-00-05-A, B
![Page 21: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/21.jpg)
District D – Project 24007 Botany Ln.Drainage Issues: Needs Clear and Grubbing/ Re-establishmentDitch ID: C127-01-00-A
![Page 22: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/22.jpg)
SWAT - STORM WATER ACTION TEAMGOAL: Reduce localized drainage problems throughout the City not directly subject to riverine/ bayou overbank flooding by rehabbing/ upgrading the existing drainage system to improve conveyance of day-to-day storm events and expanding maintenance capabilities.
Project locations will be determined by reviewing 311 calls, nonriverinestructural flooding locations, and known areas with drainage concerns. Projects will be developed by investigating and inspecting the system and developing an assessment/work plan for addressing the area(s) of highest need.
STORM SEWERS AND OUTFALLS:Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re-establish roadway curbs and gutters for re-establishment of flow paths.
ROADSIDE DITCH:Projects will include regrading of ditches, replacement of culverts not set to proper flowline and clearing.
OFF-ROAD DITCH AND DETENTION PONDS:Projects will include clearing and grubbing, regrading and desilting, minor erosion repairs, and mowing.
SUPPORT CONTRACTS REQUIRED:* Surveying Contracts Professional Engineering Services Contract Roadside Ditch Rehab Work Order Contract Storm Sewer Work Order Contract Clearing and Grubbing Work Order Contract Small Contractor Rotation Program
(*Some contracts are existing and some to be modified/ created and awarded.)
Revised
![Page 23: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/23.jpg)
SWAT Project Map
Revised
![Page 24: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/24.jpg)
District E
1. 2440 Albright Dr.
Drainage Issues:Needs Clear and Grubbing/ Re-establishmentDitch ID: C106-05-00-A
2. 531 Keith Ave.
Drainage Issues:Needs Clear and Grubbing/ Re-establishmentDitch ID: C106-08-04-A
![Page 25: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/25.jpg)
District E – Project 12440 Albright Dr. (from Leprechaun St. to Martinville Dr.)Drainage Issues: Needs Clear and Grubbing/ Re-establishmentDitch ID: C106-05-00-A
![Page 26: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/26.jpg)
District E – Project 2
531 Keith Ave. (From S. Shaver St. to Mize Rd.)
Drainage Issues:Needs Clear and Grubbing/ Re-establishmentDitch ID: C106-08-04-A
![Page 27: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/27.jpg)
SWAT - STORM WATER ACTION TEAMGOAL: Reduce localized drainage problems throughout the City not directly subject to riverine/ bayou overbank flooding by rehabbing/ upgrading the existing drainage system to improve conveyance of day-to-day storm events and expanding maintenance capabilities.
Project locations will be determined by reviewing 311 calls, nonriverinestructural flooding locations, and known areas with drainage concerns. Projects will be developed by investigating and inspecting the system and developing an assessment/work plan for addressing the area(s) of highest need.
STORM SEWERS AND OUTFALLS:Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re-establish roadway curbs and gutters for re-establishment of flow paths.
ROADSIDE DITCH:Projects will include regrading of ditches, replacement of culverts not set to proper flowline and clearing.
OFF-ROAD DITCH AND DETENTION PONDS:Projects will include clearing and grubbing, regrading and desilting, minor erosion repairs, and mowing.
SUPPORT CONTRACTS REQUIRED:* Surveying Contracts Professional Engineering Services Contract Roadside Ditch Rehab Work Order Contract Storm Sewer Work Order Contract Clearing and Grubbing Work Order Contract Small Contractor Rotation Program
(*Some contracts are existing and some to be modified/ created and awarded.)
Revised
![Page 28: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/28.jpg)
SWAT Project Map
Revised
![Page 29: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/29.jpg)
District F
1. Tanglewilde - Westmont Area
Drainage Issues:Needs Clear and Grubbing/ Re-establishmentDitch ID: W147-00-00-A
2. Bellaire West Detention Pond
Drainage Issues:Needs Clear and Grubbing/ Re-establishment
![Page 30: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/30.jpg)
District F – Project 1Tanglewilde - Westmont Area (from Jeanetta St. to Westerland Dr.)Drainage Issues: Needs Clear and Grubbing/ Re-establishmentDitch ID: W147-00-00-A
![Page 31: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/31.jpg)
District F – Project 2Bellaire West Detention PondDrainage Issues: Needs Clear and Grubbing/ Re-establishment
![Page 32: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/32.jpg)
SWAT - STORM WATER ACTION TEAMGOAL: Reduce localized drainage problems throughout the City not directly subject to riverine/ bayou overbank flooding by rehabbing/ upgrading the existing drainage system to improve conveyance of day-to-day storm events and expanding maintenance capabilities.
Project locations will be determined by reviewing 311 calls, nonriverinestructural flooding locations, and known areas with drainage concerns. Projects will be developed by investigating and inspecting the system and developing an assessment/work plan for addressing the area(s) of highest need.
STORM SEWERS AND OUTFALLS:Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re-establish roadway curbs and gutters for re-establishment of flow paths.
ROADSIDE DITCH:Projects will include regrading of ditches, replacement of culverts not set to proper flowline and clearing.
OFF-ROAD DITCH AND DETENTION PONDS:Projects will include clearing and grubbing, regrading and desilting, minor erosion repairs, and mowing.
SUPPORT CONTRACTS REQUIRED:* Surveying Contracts Professional Engineering Services Contract Roadside Ditch Rehab Work Order Contract Storm Sewer Work Order Contract Clearing and Grubbing Work Order Contract Small Contractor Rotation Program
(*Some contracts are existing and some to be modified/ created and awarded.)
Revised
![Page 33: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/33.jpg)
SWAT Project Map
Revised
![Page 34: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/34.jpg)
District G
2. 1209 S Dairy Ashford Rd.
Drainage Issues:36-inch outfall has collapsed at Terry Hershey Park and caused a cave-in
1. 614 Woodbend Ln.
Drainage Issues:120-inch storm sewer line has eroded at bottom and caused multiple small cave-ins
![Page 35: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/35.jpg)
District G – Project 1614 Woodbend Ln.Drainage Issues: 120-inch storm sewer line has eroded at bottom and caused multiple small cave-ins
![Page 36: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/36.jpg)
District G – Project 21209 S Dairy Ashford Rd.Drainage Issues: 36-inch outfall has collapsed at Terry Hershey Park and caused a cave-in
![Page 37: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/37.jpg)
SWAT - STORM WATER ACTION TEAMGOAL: Reduce localized drainage problems throughout the City not directly subject to riverine/ bayou overbank flooding by rehabbing/ upgrading the existing drainage system to improve conveyance of day-to-day storm events and expanding maintenance capabilities.
Project locations will be determined by reviewing 311 calls, nonriverinestructural flooding locations, and known areas with drainage concerns. Projects will be developed by investigating and inspecting the system and developing an assessment/work plan for addressing the area(s) of highest need.
STORM SEWERS AND OUTFALLS:Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re-establish roadway curbs and gutters for re-establishment of flow paths.
ROADSIDE DITCH:Projects will include regrading of ditches, replacement of culverts not set to proper flowline and clearing.
OFF-ROAD DITCH AND DETENTION PONDS:Projects will include clearing and grubbing, regrading and desilting, minor erosion repairs, and mowing.
SUPPORT CONTRACTS REQUIRED:* Surveying Contracts Professional Engineering Services Contract Roadside Ditch Rehab Work Order Contract Storm Sewer Work Order Contract Clearing and Grubbing Work Order Contract Small Contractor Rotation Program
(*Some contracts are existing and some to be modified/ created and awarded.)
Revised
![Page 38: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/38.jpg)
SWAT Project Map
Revised
![Page 39: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/39.jpg)
District H1. Northside/ Northline Area Roadside Ditch Project 1
Drainage Issues:Culverts undersized, collapsed or not set to proper flow line Silted ditch flow lines and culverts
2. Northside/ Northline Area Roadside Ditch Project 2
Drainage Issues:Culverts undersized, collapsed or not set to proper flow line Silted ditch flow lines and culverts
![Page 40: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/40.jpg)
District H – Project 1
Northside/ Northline Area Roadside Ditch Project 1(N - Turner Dr.; S - Luther St.; E - Clark Rd.; W - Fulton St.)
Drainage Issues: Culverts undersized, collapsed or not set to proper flow line Silted ditch flow lines and culverts
![Page 41: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/41.jpg)
District H – Project 2Northside/ Northline Area Roadside Ditch Project 2(N - Wellington St.; S - Keel Rd.; E - O'Donnell Dr.; W - Fulton St.)
Drainage Issues:Culverts undersized, collapsed or not set to proper flow line Silted ditch flow lines and culverts
![Page 42: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/42.jpg)
SWAT - STORM WATER ACTION TEAMGOAL: Reduce localized drainage problems throughout the City not directly subject to riverine/ bayou overbank flooding by rehabbing/ upgrading the existing drainage system to improve conveyance of day-to-day storm events and expanding maintenance capabilities.
Project locations will be determined by reviewing 311 calls, nonriverinestructural flooding locations, and known areas with drainage concerns. Projects will be developed by investigating and inspecting the system and developing an assessment/work plan for addressing the area(s) of highest need.
STORM SEWERS AND OUTFALLS:Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re-establish roadway curbs and gutters for re-establishment of flow paths.
ROADSIDE DITCH:Projects will include regrading of ditches, replacement of culverts not set to proper flowline and clearing.
OFF-ROAD DITCH AND DETENTION PONDS:Projects will include clearing and grubbing, regrading and desilting, minor erosion repairs, and mowing.
SUPPORT CONTRACTS REQUIRED:* Surveying Contracts Professional Engineering Services Contract Roadside Ditch Rehab Work Order Contract Storm Sewer Work Order Contract Clearing and Grubbing Work Order Contract Small Contractor Rotation Program
(*Some contracts are existing and some to be modified/ created and awarded.)
Revised
![Page 43: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/43.jpg)
SWAT Project Map
Revised
![Page 44: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/44.jpg)
District I
1. Plum Creek Clean Up (Part A)
Drainage Issues:Needs Clear and Grubbing/ Re-establishmentDitch ID: C102-00-00-M
2. Plum Creek Clean Up (Part B)
Drainage Issues:Needs Clear and Grubbing/ Re-establishmentDitch ID: C102-00-00-L
![Page 45: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/45.jpg)
District I – Project 1Plum Creek Clean Up (Part A) (from I-610 E. to Coral St.)Drainage Issues: Needs Clear and Grubbing/ Re-establishmentDitch ID: C102-00-00-M
![Page 46: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/46.jpg)
District I – Project 2
Plum Creek Clean Up (Part B) (Coral St. to Office City Dr.)
Drainage Issues:Needs Clear and Grubbing/ Re-establishmentDitch ID: C102-00-00-L
![Page 47: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/47.jpg)
SWAT - STORM WATER ACTION TEAMGOAL: Reduce localized drainage problems throughout the City not directly subject to riverine/ bayou overbank flooding by rehabbing/ upgrading the existing drainage system to improve conveyance of day-to-day storm events and expanding maintenance capabilities.
Project locations will be determined by reviewing 311 calls, nonriverinestructural flooding locations, and known areas with drainage concerns. Projects will be developed by investigating and inspecting the system and developing an assessment/work plan for addressing the area(s) of highest need.
STORM SEWERS AND OUTFALLS:Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re-establish roadway curbs and gutters for re-establishment of flow paths.
ROADSIDE DITCH:Projects will include regrading of ditches, replacement of culverts not set to proper flowline and clearing.
OFF-ROAD DITCH AND DETENTION PONDS:Projects will include clearing and grubbing, regrading and desilting, minor erosion repairs, and mowing.
SUPPORT CONTRACTS REQUIRED:* Surveying Contracts Professional Engineering Services Contract Roadside Ditch Rehab Work Order Contract Storm Sewer Work Order Contract Clearing and Grubbing Work Order Contract Small Contractor Rotation Program
(*Some contracts are existing and some to be modified/ created and awarded.)
Revised
![Page 48: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/48.jpg)
SWAT Project Map
Revised
![Page 49: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/49.jpg)
District J
1. 9238 Tooley Dr.
Drainage Issues:60-inch outfall has collapsed and caused a cave-in
2. Bedford Project
Drainage Issues:Culverts undersized, collapsed or not set to proper flow line Silted ditch flow lines and culverts
![Page 50: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/50.jpg)
District J – Project 19238 Tooley Dr.Drainage Issues: 60-inch outfall has collapsed and caused a cave-in
![Page 51: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/51.jpg)
District J – Project 2
Bedford Project (N - Beltway 8; S - Dorrance Rd.; E - Bedford Dr.; W - Dover St.)
Drainage Issues:Culverts undersized, collapsed or not set to proper flow line Silted ditch flow lines and culverts
![Page 52: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/52.jpg)
SWAT - STORM WATER ACTION TEAMGOAL: Reduce localized drainage problems throughout the City not directly subject to riverine/ bayou overbank flooding by rehabbing/ upgrading the existing drainage system to improve conveyance of day-to-day storm events and expanding maintenance capabilities.
Project locations will be determined by reviewing 311 calls, nonriverinestructural flooding locations, and known areas with drainage concerns. Projects will be developed by investigating and inspecting the system and developing an assessment/work plan for addressing the area(s) of highest need.
STORM SEWERS AND OUTFALLS:Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re-establish roadway curbs and gutters for re-establishment of flow paths.
ROADSIDE DITCH:Projects will include regrading of ditches, replacement of culverts not set to proper flowline and clearing.
OFF-ROAD DITCH AND DETENTION PONDS:Projects will include clearing and grubbing, regrading and desilting, minor erosion repairs, and mowing.
SUPPORT CONTRACTS REQUIRED:* Surveying Contracts Professional Engineering Services Contract Roadside Ditch Rehab Work Order Contract Storm Sewer Work Order Contract Clearing and Grubbing Work Order Contract Small Contractor Rotation Program
(*Some contracts are existing and some to be modified/ created and awarded.)
Revised
![Page 53: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/53.jpg)
SWAT Project Map
Revised
![Page 54: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/54.jpg)
District K
1. 11507 Bowlan Ln.
Drainage Issues:24-inch outfall collapse
2. Cambridge Village Park
Drainage Issues:Culverts undersized, collapsed or not set to proper flow line Silted ditch flow lines and culverts
![Page 55: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/55.jpg)
District K – Project 1
11507 Bowlan Ln. (Westbury Pkg. 2)
Drainage Issues: 24-inch outfall collapse
![Page 56: SWAT- - Houston Public Works _rev...Projects will include replacing collapsed outfalls and storm sewer components, upsizing inlets, replacing inlet plates with grates, re - establish](https://reader033.vdocuments.us/reader033/viewer/2022043002/5f8043c946ab3f2edf2c3ed0/html5/thumbnails/56.jpg)
District K – Project 2Cambridge Village Park (N - Allum St.; S - Lotus St.; E - Nitida St.; W - S. Post Oak Rd.)Drainage Issues: Culverts undersized, collapsed or not set to proper flow lineSilted ditch flow lines and culverts