STATEMENT OF WORK ACCOMPLISHMENT AS OF MARCH 13, 2014 CONTRACTOR : KA BUILDERS AND SUPPLY DATE STARTED: FEBRUARY 28, 2014 CONTRACT DURATION : 45 C.D. ITEM DESCRIPTION QUANTITY AMOUNT WT ACCOMPLISHMENT TOTAL COST PREV THIS TO DATE PREV THIS TO DATE PREV TO DATE PREV THIS BILLING BILLING BILLING I. IMPROVEMENT OF DRAINAGE SYSTEM (Magsayasay St. ,Poblacion ) A STRUCTURE EXCAVATION 104.00 CU.M 130.88 ### 2.13% - - - - 0% 0% 0.00% 0.00% 0.00% - - B 6" CHB LINED CANAL 100.00 L.M 2,714.95 ### 42.53% - - - - 0% 0% 0.00% 0.00% 0.00% - - TOTAL ### 44.66% 0.00% 0.00% 0.00% - - II. IMPROVEMENT OF DRAINAGE SYSTEM ( Sinawingan Barangay Road ) A. STRUCTURE EXCAVATION 104.00 CU.M 130.88 ### 2.13% - 104.00 ### - 100% 100% 0.00% 2.13% 2.13% - 13,611.52 200 6" CHB LINED CANAL 100.00 LM 2,714.77 ### 42.53% - 95.00 95.00 - 95% 95% 0.00% 40.40% 40.40% - 257,903.32 TOTAL ### 44.66% - - 0.00% 42.53% 42.53% - 271,514.84 III. IMPROVEMENT OF DRAINAGE CANAL COVER CONC. CANAL COVER 50.00 SQ.M 1,363.40 ### 10.68% - 50.00 50.00 - 100% 100% 0.00% 10.68% 10.68% - 68,170.00 TOTAL ### 10.68% - 0.00% 10.68% 10.68% - 68,170.00 GRAND TOTAL ### 100.00% 0.00% 53.21% 53.21% - ### UNIT COST ACTUAL ACCOMPLISHMENT 53.21% PLANNED ACCOMPLISHMENT 0.00% SLIPPAGE (+) 53.21% PREPARED BY : REVIEWED BY: APPROVED: ENRIQUEE C. YEE, JR JERRY T. LICAYAN MANUEL T. DELA SERNA ENGINEER II Municipal Engineer Municipal May UNIT COST ITEM ACCOMP. % TOTAL ACCOMP % THIS BILLING

Upload: jeric-israel

Post on 28-Dec-2015

16 views

Category:

Documents


0 download

DESCRIPTION

UYYUG

TRANSCRIPT

Page 1: Swa of Drainage Pob-sin

STATEMENT OF WORK ACCOMPLISHMENT

AS OF MARCH 13, 2014

CONTRACTOR : KA BUILDERS AND SUPPLY

DATE STARTED: FEBRUARY 28, 2014

CONTRACT DURATION : 45 C.D.

ITEM DESCRIPTION QUANTITY AMOUNT WT

ACCOMPLISHMENT TOTAL COST

PREVTHIS

TO DATE PREVTHIS

PREV TO DATE PREVTHIS

TO DATEBILLING BILLING BILLING

I. IMPROVEMENT OF DRAINAGE SYSTEM (Magsayasay St. ,Poblacion )

A STRUCTURE EXCAVATION 104.00 CU.M 130.88 13,611.18 2.13% - - - - 0% 0% 0.00% 0.00% 0.00% - - -

B 6" CHB LINED CANAL 100.00 L.M 2,714.95 271,494.50 42.53% - - - - 0% 0% 0.00% 0.00% 0.00% - - -

TOTAL 285,105.68 44.66% 0.00% 0.00% 0.00% - - -

II. IMPROVEMENT OF DRAINAGE SYSTEM ( Sinawingan Barangay Road )

A. STRUCTURE EXCAVATION 104.00 CU.M 130.88 13,611.52 2.13% - 104.00 104.00 - 100% 100% 0.00% 2.13% 2.13% - 13,611.52 13,611.52

200 6" CHB LINED CANAL 100.00 LM 2,714.77 271,477.18 42.53% - 95.00 95.00 - 95% 95% 0.00% 40.40% 40.40% - 257,903.32 257,903.32

TOTAL 285,088.70 44.66% - - 0.00% 42.53% 42.53% - 271,514.84 271,514.84

III. IMPROVEMENT OF DRAINAGE CANAL COVER

CONC. CANAL COVER 50.00 SQ.M 1,363.40 68,170.00 10.68% - 50.00 50.00 - 100% 100% 0.00% 10.68% 10.68% - 68,170.00 68,170.00

TOTAL 68,170.00 10.68% - 0.00% 10.68% 10.68% - 68,170.00 68,170.00

GRAND TOTAL 638,364.38 100.00% 0.00% 53.21% 53.21% - 339,684.84 339,684.84

UNIT COST

ACTUAL ACCOMPLISHMENT 53.21%

PLANNED ACCOMPLISHMENT 0.00%

SLIPPAGE (+) 53.21%

PREPARED BY : REVIEWED BY: APPROVED:

ENRIQUEE C. YEE, JR JERRY T. LICAYAN MANUEL T. DELA SERNA

ENGINEER II Municipal Engineer Municipal Mayor

UNIT COST

ITEM ACCOMP. % TOTAL ACCOMP %

TO DATE

THIS BILLING

Page 2: Swa of Drainage Pob-sin

STATEMENT OF WORK ACCOMPLISHMENT

AS OF APRIL 4, 2014CONTRACTOR : KA BUILDERS AND SUPPLYDATE STARTED: FEBRUARY 28, 2014CONTRACT DURATION : 45 C.D.

ITEM DESCRIPTION QUANTITY AMOUNT WT

ACCOMPLISHMENT TOTAL COST

PREVTHIS

TO DATE PREVTHIS

PREV TO DATE PREVTHIS

TO DATEBILLING BILLING BILLING

I. IMPROVEMENT OF DRAINAGE SYSTEM (Magsayasay St. ,Poblacion )A STRUCTURE EXCAVATION 104.00 CU.M 130.88 13,611.18 2.13% - 104.00 104.00 - 100% 100% 0.00% 2.13% 2.13% - 13,611.18 13,611.18

B 6" CHB LINED CANAL 100.00 L.M 2,714.95 271,494.50 42.53% - 82.00 82.00 - 82% 82% 0.00% 34.87% 34.87% - 222,625.49 222,625.49

TOTAL 285,105.68 44.66% 0.00% 37.01% 37.01% - 236,236.67 236,236.67

II. IMPROVEMENT OF DRAINAGE SYSTEM ( Sinawingan Barangay Road )A. STRUCTURE EXCAVATION 104.00 CU.M 130.88 13,611.52 2.13% 104.00 - 104.00 1.00 0% 100% 2.13% 0.00% 2.13% 13,611.52 - 13,611.52

200 6" CHB LINED CANAL 100.00 LM 2,714.77 271,477.18 42.53% 95.00 2.00 97.00 0.95 2% 97% 40.40% 0.85% 41.25% 257,903.32 5,429.54 263,332.86

TOTAL 285,088.70 44.66% 43.38% 271,514.84 5,429.54 276,944.38

III. IMPROVEMENT OF DRAINAGE CANAL COVERCONC. CANAL COVER 50.00 SQ.M 1,363.40 68,170.00 10.68% - 50.00 50.00 - 100% 100% 0.00% 10.68% 10.68% - 68,170.00 68,170.00

TOTAL 68,170.00 10.68% - 0.00% 10.68% 10.68% - 68,170.00 68,170.00

GRAND TOTAL 638,364.38 100.00% 0.00% 47.69% 91.07% 271,514.84 309,836.21 581,351.05 UNIT COST

ACTUAL ACCOMPLISHMENT 91.07%

PLANNED ACCOMPLISHMENT 0.00%

SLIPPAGE (+) 91.07%

PREPARED BY : REVIEWED BY: APPROVED:

ENRIQUEE C. YEE, JR JERRY T. LICAYAN MANUEL T. DELA SERNA

ENGINEER II Municipal Engineer Municipal Mayor

UNIT COST

ITEM ACCOMP. % TOTAL ACCOMP %

TO DATE

THIS BILLING

Page 3: Swa of Drainage Pob-sin

13,611.18

271,494.50

285,105.68

13,611.16

271,494.50

285,105.66

68,170.00

Page 4: Swa of Drainage Pob-sin

UNIT COST DERIVATION: IMPROVEMENT OF SENIOR CITIZEN'S BLDG

Item No. : 9.1Description 1- Gang Switch with plate, flush mounted, ANAM brand or approve equalUnit : Sets

Quantity 6

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

B. Labor Electrician 1 2 300.00 600.00 sub-total 600.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials 1- gang switch assembly Anam 6 sets 140.00 840.00

sub-total 1,440.00

D. Total Direct Cost 2,040.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 20.40 F. OCM 5 % of Direct Cost 102.00 G. Profit 10 % of Direct Cost 204.00 H. Total Indirect Cost 326.40

2,366.40 111.17

SUBTOTAL 2,477.57 COST PER SET 412.93

UNIT COST DERIVATION: IMPROVEMENT OF SENIOR CITIZEN'S BLDG

Item No. : 9.2Description 2- Gang Switch with plate, flush mounted, ANAM brand or approve equalUnit : Sets

Quantity 2

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

B. Labor Electrician 1 2 300.00 600.00 sub-total 600.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 5: Swa of Drainage Pob-sin

2 sets 240.00 480.00

sub-total 1,080.00

D. Total Direct Cost 1,680.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 16.80 F. OCM 5 % of Direct Cost 84.00 G. Profit 10 % of Direct Cost 168.00 H. Total Indirect Cost 268.80

1,948.80 104.26

SUBTOTAL 2,053.06 COST PER SET 1,026.53

UNIT COST DERIVATION: IMPROVEMENT OF SENIOR CITIZEN'S BLDG

Item No. : 9.3Description 3- Gang Switch with plate, flush mounted, ANAM brand or approve equalUnit : Sets

Quantity 1

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

B. Labor Electrician 1 2 300.00 600.00 sub-total 600.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials

1 sets 300.00 300.00

2- Gang Switch with plate, flush mounted, ANAM brand or approve equal

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

3- Gang Switch with plate, flush mounted, ANAM brand or approve equal

Page 6: Swa of Drainage Pob-sin

sub-total 900.00

D. Total Direct Cost 1,500.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 15.00 F. OCM 5 % of Direct Cost 75.00 G. Profit 10 % of Direct Cost 150.00 H. Total Indirect Cost 240.00

1,740.00 100.80

SUBTOTAL 1,840.80 COST PER SET 1,840.80

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 7: Swa of Drainage Pob-sin

UNIT COST DERIVATION: IMPROVEMENT OF SENIOR CITIZEN'S BLDG

Item No. : 9.4

Description Aircon Outlet with plate, flush mounted, 15A, ANAM brand or approved equal

Unit : Set

Quantity 1

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

B. Labor Electricians 1 15 300.00 4,500.00

sub-total 4,500.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials

Aircon Outlet with plate, flush mounted, 15A, ANAM b 1 sets 240.00 240.00 -

sub-total 240.00

D. Total Direct Cost 4,740.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 47.40 F. OCM 5 % of Direct Cost 237.00 G. Profit 10 % of Direct Cost 474.00 H. Total Indirect Cost 758.40

5,498.40 631.01

SUBTOTAL 6,129.41 COST PER SET 6,129.41

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 8: Swa of Drainage Pob-sin

UNIT COST DERIVATION: IMPROVEMENT OF SENIOR CITIZEN'S BLDG

Item No. : 9.5Description Universal Convenience Outlet, flush mounted, 15A, ANAM brand or approved equal

Unit : Set

Quantity 9

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

B. Labor

Electrician 1 8 300.00 2,400.00

sub-total 2,400.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials 2- gang convenience outlet assembly, Anam or - its equivalent-universal 9 sets 180.00 1,620.00 sub-total 1,620.00

D. Total Direct Cost 4,020.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 40.20 F. OCM 5 % of Direct Cost 201.00 G. Profit 10 % of Direct Cost 402.00 H. Total Indirect Cost 643.20

4,663.20 365.18

SUB -TOTAL 5,028.38 COST PER SET 558.71

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 9: Swa of Drainage Pob-sin

UNIT COST DERIVATION: IMPROVEMENT OF SENIOR CITIZEN'S BLDG

Item No. : 9.6Description 25W Energy Saver CFL bulb with diffuser in 4"dia. PVC Receptacle, Philips or

approve equalUnit : Sets

Quantity 7

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

B. Labor Electrician 2 7 300.00 4,200.00 sub-total 4,200.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials 4" dia. Plastic receptacle 7 pcs 45.00 315.00 25w philips energy saver bulb 7 pcs 250.00 1,750.00

sub-total 2,065.00

D. Total Direct Cost 6,265.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 62.65 F. OCM 5 % of Direct Cost 313.25 G. Profit 10 % of Direct Cost 626.50 H. Total Indirect Cost 1,002.40

7,267.40 624.29

SUB-TOTAL 7,891.69 COST PER SET 1,127.38

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 10: Swa of Drainage Pob-sin

UNIT COST DERIVATION: IMPROVEMENT OF SENIOR CITIZEN'S BLDG

Item No. : 9.7Description Rough-in Materials ( Wires, Conduits, Consummables, etc.)Unit lot

Quantity 1.00

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

B. Labor Electrician 2 7 300.00 4,200.00 Helper 2 7 200.00 2,800.00 sub-total 7,000.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php ) C. Materials 3.5mm2 THNN stranded wire 2 rolls 5,000.00 10,000.00 2.0mm2 THNN stranded wire 2 rolls 3,800.00 7,600.00 5.5mm2 THNN stranded wire 30 m 80.00 2,400.00 12mm dia. fllexible electrical conduit 1 roll 880.00 880.00 25mm dia. Fllexible electrical conduit 25 m 15.00 375.00 4"x4" plastic junction box 7 pcs 35.00 245.00 2"x4" plastic utility box 23 pcs 35.00 805.00 Electrical tape (big) 4 rolls 30.00 120.00 sub-total 22,425.00

D. Total Direct Cost 29,425.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 294.25 F. OCM 5 % of Direct Cost 1,471.25 G. Profit 10 % of Direct Cost 2,942.50 H. Total Indirect Cost 4,708.00

34,133.00 1,404.96

SUBTOTAL 35,537.96 COST PER LOT 35,537.96

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 11: Swa of Drainage Pob-sin

UNIT COST DERIVATION: IMPROVEMENT OF SENIOR CITIZEN'S BLDG

Item No. : 9.8

Description

Unit : Sets

Quantity 13

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

B. Labor Electrician 2 10 350.00 7,000.00 Helper 2 10 150.00 3,000.00 sub-total 10,000.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php ) C. Materials Panel board, 6-branches, koten 1 set 1,000.00 1,000.00 Circuit breaker, 60 Amp, koten 1 set 400.00 400.00 Circuit breaker, 30 Amp, koten 1 set - 300.00 300.00 Circuit breaker, 20 Amp, koten 2 set - 240.00 480.00 Circuit breaker, 15-Amp, koten 2 set - 240.00 480.00 sub-total 2,660.00

D. Total Direct Cost 12,660.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 126.60 F. OCM 5 % of Direct Cost 633.00 G. Profit 10 % of Direct Cost 1,266.00 H. Total Indirect Cost 2,025.60

14,685.60 1,443.07

SUBTOTAL 16,128.67 COST PER SET 1,240.67

Panelboard 6 branches Flush mounted, Koten brand or approved equal, Main: 1-60AT, 2P, 240V Branches: See Electrical Plan, Plug-in type

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 12: Swa of Drainage Pob-sin

Page 12 of 43

BILL OF QUANTITIESProject Title: COMPLETION OF MARKET STALLS (BUILDING 1)Location : Libungan, North CotabatoDuration : 180 Calendar Days

ITEM NO. DESCRIPTION QTY. UNIT UNIT COST TOTAL COST

A MARKET BUILDING

#REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

sub total

#REF! #REF!

#REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

2500 psi (including rebar and formworks)

#REF! #REF! #REF! #REF!

sub total

#REF! #REF!

3.1 #REF! #REF! #REF!

#REF!

sub total

4.0 ROOFING WORKS / METAL WORKS

4.1 #REF! #REF! #REF!

4.2 #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

4.3 #REF! #REF! #REF!

4.4 #REF! #REF! #REF!

sub total

5.0 #REF!

5.1 #REF! #REF! #REF!

5.2 #REF! #REF! #REF!

sub total

#REF! #REF!

#REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

sub total

#REF! #REF!

7.1 FLOOR FINISH

#REF! #REF! #REF!

#REF! #REF! #REF!

7.2 #REF!

#REF! #REF! #REF! #REF!

7.3 #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

sub-total

8.0 #REF!

8.1 #REF! #REF! #REF!

8.2 #REF! #REF! #REF!

Page 13: Swa of Drainage Pob-sin

Page 13 of 43

ITEM NO. DESCRIPTION QTY. UNIT UNIT COST TOTAL COST

8.3 #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

8.4 #REF! #REF! #REF!

sub total

9.0 #REF!

9.1 #REF! #REF! #REF!

9.2 #REF! #REF! set

9.3 #REF! #REF! set

9.4 #REF! #REF! #REF!

9.5 #REF! #REF! #REF!

9.6 #REF! #REF! set

9.7 #REF! #REF! #REF!

9.8 #REF! #REF! #REF!

9.9 #REF! #REF! #REF!

9.10 #REF! #REF! #REF!

9.11 #REF! #REF! #REF!

9.12 #REF! #REF! #REF!

sub total

SUBTOTAL A

ITEM NO. DESCRIPTION QTY. UNIT UNIT COST TOTAL COST

B. IMPROVEMENT OF MARKET DRAINAGE SYSTEM1.0 SITEWORKS

1.1 Demolition/Removal of Structures and Obstructions 1.00 lot1.2 Excavation 404.00 cu.m.

sub total

3.0 CONCRETE WORKS

3.1 RCCP ( 0.61 m diameter ) 33.00 l.m.

sub total

4.0 MASONRY

Including rebar and formworks

4.1 Lined Canal

a. CHB Lined Canal A ( Line 1,2,3 ) 191.50 l.m.

b. CHB Lined Canal B ( Line 4-A, 4-B, 5,6 ) 144.00 l.m.

c. CHB Lined Canal C ( Line 7,8 ) 108.50 l.m.

4.2 Catch Basin (with Steel Grating Cover) 19.00 units

sub total

SUBTOTAL B

ITEM NO. DESCRIPTION QTY. UNIT UNIT COST TOTAL COST

C. CONCRETING OF PUV PARKING AREA1.0 SITEWORKS

1.1 Excavation 170.00 cu.m.

sub total

3.0 CONCRETE WORKS

3.1 PCCP 845.00 sq.m.

sub total

10.0 OTHER ITEMS

10.1 Sub-Grade Preparation 845.00 sq.m.

sub total

10.2 Aggregate Sub-Base Coarse 169.00 cu.m.

sub total

SUBTOTAL C

ITEM NO. DESCRIPTION QTY. UNIT UNIT COST TOTAL COST

D. CONCRETING OF ACCESS ROAD

Page 14: Swa of Drainage Pob-sin

Page 14 of 43

ITEM NO. DESCRIPTION QTY. UNIT UNIT COST TOTAL COST

1.0 SITEWORKS1.1 Excavation 286.00 cu.m.

sub total

2.0 CONCRETE WORKS

2.1 PCCP 948.00 sq.m.

sub total

10.0 OTHER ITEMS

10.1 Sub-Grade Preparation 1422.00 sq.m.

sub total

10.2 Aggregate Sub-Base Coarse 286.00 cu.m.

sub total

SUBTOTAL D

TOTAL SUBPROJECT COST Php

NOTE:

The cost for the following are included in the above indicated UNIT COST ( Refer to

attached Detailed Cost Estimate/Unit Cost Analysis).

1.0 Direct Cost

1.1 Material Cost

1.2 Labor Cost

1.3 Equipment Expenses

1.4 Mobilization/Demobilization & Temporary Facilities

2.0 Indirect Cost

2.1 Overhead Expenses

a. Supervision

b. Transport Allowances

c. Office Expenses

2.2 Contingencies (allotment for potential cost overrun)

2.3 Miscellaneous Expenses

a. Premium for Insurances

b. Permits

c. Taxes

d. Material Testing

2.4 Contractor's Profit

3.0 Contractor's Taxes (VAT)

Page 15: Swa of Drainage Pob-sin

Page 15 of 43

BILL OF QUANTITIESProject Title: COMPLETION OF MARKET STALLS (BUILDING 1)Location : Libungan, North CotabatoDuration : 180 Calendar Days

ITEM NO. DESCRIPTION QTY. UNIT UNIT COST TOTAL COST

#REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

1.6 Lay-out and Staking #REF! sq.m #REF! #REF!

sub total #REF!

#REF! #REF!

#REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

2500 psi (including rebar and formworks)

#REF! #REF! #REF! #REF! #REF! #REF!

sub total #REF!

#REF! #REF!

3.1 #REF! #REF! #REF! #REF! #REF!

#REF!

sub total #REF!

4.0 ROOFING WORKS / METAL WORKS

4.1 #REF! #REF! #REF! #REF! #REF!

4.2 #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

4.3 #REF! #REF! #REF! #REF! #REF!

10.1 #REF! #REF! #REF! #REF! #REF!

10.2 #REF! #REF! #REF! #REF! #REF!

sub total #REF!

5.0 #REF!

5.1 #REF! #REF! #REF! #REF! #REF!

5.2 #REF! #REF! #REF! #REF! #REF!

sub total #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

sub total #REF!

#REF! #REF!

7.1 FLOOR FINISH

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

7.2 #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

7.3 #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

sub-total #REF!

8.0 #REF!

8.1 #REF! #REF! #REF! #REF! #REF!

8.2 #REF! #REF! #REF! #REF! #REF!

8.3 #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

Page 16: Swa of Drainage Pob-sin

Page 16 of 43

ITEM NO. DESCRIPTION QTY. UNIT UNIT COST TOTAL COST

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

8.4 #REF! #REF! #REF! #REF! #REF!

sub total #REF!

9.0 #REF!

9.1 #REF! #REF! #REF! #REF! #REF!

9.2 #REF! #REF! set #REF! #REF!

9.3 #REF! #REF! set #REF! #REF!

9.4 #REF! #REF! #REF! #REF! #REF!

9.5 #REF! #REF! #REF! #REF! #REF!

9.6 #REF! #REF! set #REF! #REF!

9.7 #REF! #REF! #REF! #REF! #REF!

9.8 #REF! #REF! #REF! #REF! #REF!

9.9 #REF! #REF! #REF! #REF! #REF!

9.10 #REF! #REF! #REF! #REF! #REF!

9.11 #REF! #REF! #REF! #REF! #REF!

9.12 #REF! #REF! #REF! #REF! #REF!

sub total #REF!

SUBTOTAL #REF!

NOTE:

The cost for the following are included in the above indicated UNIT COST ( Refer to

attached Detailed Cost Estimate/Unit Cost Analysis).

1.0 Direct Cost

1.1 Material Cost

1.2 Labor Cost

1.3 Equipment Expenses

1.4 Mobilization/Demobilization & Temporary Facilities

2.0 Indirect Cost

2.1 Overhead Expenses

a. Supervision

b. Transport Allowances

c. Office Expenses

2.2 Contingencies (allotment for potential cost overrun)

2.3 Miscellaneous Expenses

a. Premium for Insurances

b. Permits

c. Taxes

d. Material Testing

2.4 Contractor's Profit

3.0 Contractor's Taxes (VAT)

Prepared by:

JERRY T. LICAYAN Municipal Engineer

Page 17: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 1.1Description : EXCAVATION ( Column & Wall Footing )Unit : cu.m

Quantity 5Item Duration. 2 Calendar Days

Rate Direct

Description Quantity Unit Days Per Day Cost ( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Foreman 1 1 350.00 350.00 Laborer 2 1 200.00 400.00 sub-total 750.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials NONE

sub-total -

D. Total Direct Cost 750.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 7.50 F. OCM 5% of Direct Cost 37.50 G. Profit 10 % of Direct Cost 75.00 H. Total Indirect Cost 120.00

870.00 104.40

SUBTOTAL FOR EXCAVATION 974.40 COST PER CUBIC METER 194.88

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 18: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 1.2Description : BACKFILL (Footing and slab on fill)Unit : Cu.m

Quantity 10.00Item Duration. 1 Calendar Days

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Foreman 1 1 350.00 350.00 Laborer 2 1 200.00 400.00 sub-total 750.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials Filling materials 10 cu.m 250 2,500.00

sub-total 2,500.00

D. Total Direct Cost 3,250.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 32.50 F. OCM 5 % of Direct Cost 162.50 G. Profit 10 % of Direct Cost 325.00 H. Total Indirect Cost 520.00

3,770.00 152.40

SUBTOTAL FOR BACKFILL 3,922.40 COST PER CUBIC METER 392.24

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 19: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 1.3Description : COMPACTIONUnit : Square Meter (sqm)

Quantity 7Item Duration. 1 Calendar Day

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Foreman 1 1 350.00 350.00 Laborer 1 1 200.00 200.00 sub-total 550.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials NONE

sub-total -

D. Total Direct Cost 550.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 5.50 F. OCM 5 % of Direct Cost 27.50 G. Profit 10 % of Direct Cost 55.00 H. Total Indirect Cost 88.00

638.00 76.56

SUBTOTAL FOR COMPACTION 714.56 COST PER SQUARE METER 102.08

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 20: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 1.4Description : GRAVEL BASE (Footing and Slab on-flll)Unit : Cubic Meter (cu.m.)

Quantity 2Item Duration. 1 Calendar Day

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Foreman 1 1 350.00 350.00 Laborer 1 1 200.00 200.00 sub- total 550.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials Gravel base 1 cu.m 300 300.00

sub-total 300.00

D. Total Direct Cost 850.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 8.50 F. OCM 5 % of Direct Cost 42.50 G. Profit 10 % of Direct Cost 85.00 H. Total Indirect Cost 136.00

986.00 82.32

SUBTOTAL FOR GRAVEL BASE 1,068.32 COST PER CUBIC METER 534.16

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 21: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 1.5Description : SOIL POISONINGUnit : Square Meter (Sq.m.)

Quantity 80Item Duration. 1 Calendar Days

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment Chemical Sprayer 1 1 200.00 200.00 sub-total 200.00 B. Labor Foreman 1 1 350.00 350.00 Pest controller 1 1 300.00 300.00 sub-total 650.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials Chlordrex 1 gal 1500 1,500.00

sub-total 1,500.00

D. Total Direct Cost 2,350.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 23.50 F. OCM 5 % of Direct Cost 117.50 G. Profit 10 % of Direct Cost 235.00 H. Total Indirect Cost 376.00

2,726.00 147.12

SUBTOTAL FOR SOIL POISONING 2,873.12 COST PER SQUARE METER 35.91

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 22: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 1.6Description : LAYOUT & STAKING WORKSUnit : Square Meter (Sq.m.)

Quantity 80Item Duration. Calendar Day

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Foreman 1 1 350.00 350.00 Laborer 4 1 200.00 800.00 sub-total 1,150.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials Lumber 100 bd ft 22.00 2,200.00 Assorted CW nails 10 kg 70.00 700.00 sub-total 2,900.00

D. Total Direct Cost 4,050.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 40.50 F. OCM 5 % of Direct Cost 202.50 G. Profit 10 % of Direct Cost 405.00 H. Total Indirect Cost 648.00

4,698.00 469.80

SUBTOTAL FOR LAYOUT AND STAKING WORKS 5,167.80 COST PER SQUARE METER

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 23: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 2..1Description : COLUMN FOOTINGSUnit : Cu.m.

Quantity 0.26Item Duration. 1 Calendar Day

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Foreman 1 1 350.00 350.00 Mason 1 1 300.00 300.00 Steelman/carpenter 1 1 300.00 300.00 Laborer 1 1 200.00 200.00 sub-total 1,150.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. MaterialsConcrete Cement 3 bags 240.00 720.00 Sand 1 cu.m 450.00 450.00 Gravel 1 cu.m 550.00 550.00 Reinforcing Bar - 12mm dia deformed stl bar 2 lenghts 230.00 460.00

3 kg 85.00 255.00 sub-total 2,435.00

D. Total Direct Cost 3,585.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 35.85 F. OCM 5 % of Direct Cost 179.25 G. Profit 10 % of Direct Cost 358.50 H. Total Indirect Cost 573.60

4,158.60 206.83

SUBTOTAL FOR FOOTINGS 4,365.43 COST PER CUBIC METER 16,790.12

#16 G.I. Tire Wire

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 24: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 2.2Description : COLUMNSUnit : Cu.m.

Quantity 0.76Item Duration. 4 Calendar Days

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Foreman 1 3 350.00 1,050.00 Mason 1 3 250.00 750.00 Carpenter 1 3 250.00 750.00 Steelman 1 4 250.00 1,000.00 Laborers 2 4 150.00 1,200.00 sub-total 4,750.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. MaterialsConcrete Cement 10 bags 230.00 2,300.00 Sand 1 cu.m 450.00 450.00 Gravel 1 cu.m 550.00 550.00 Reinforcing Bar - 16mm dia deformed stl bar 6 lenghts 440.00 2,640.00 10mm dia column ties 10 lenghts 165.00 1,650.00 #16 G.I. Tire Wire 10 kg 85.00 850.00 Formworks - Lumber 40 bd ft 22.00 880.00 1/2" x 4' x 8' Ordinary Plywood 4 pcs 270.00 1,080.00 Nails 4 kg 70.00 280.00 Formoil(used oil) 4 ltrs 5.00 20.00 sub-total 10,700.00

D. Total Direct Cost 15,450.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 154.50 F. OCM 5 % of Direct Cost 772.50 G. Profit 10 % of Direct Cost 1,545.00 H. Total Indirect Cost 2,472.00

17,922.00 866.64

SUBTOTAL FOR COLUMNS 18,788.64 COST PER CUBIC METER 24,721.89

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 25: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTERItem No. : 2.4Description : BEAM Unit : Cu.m.

Quantity 0.7Item Duration. 3 Calendar Days

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Foremen 1 3 350.00 1,050.00 Carpenter 1 3 250.00 750.00 Mason 2 3 250.00 1,500.00 Steelman 2 3 250.00 1,500.00 Laborer 3 3 150.00 1,350.00 sub-total 6,150.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials Concrete Cement 10 bags 230.00 2,300.00 Sand 1 cu.m 450.00 450.00 Gravel 1 cu.m 550.00 550.00 Reinforcing bar 16mm dia def stl bar 8 lengths 440.00 3,520.00 10mm dia def stl bar 10 lengths 165.00 1,650.00 #16 G. I wires 5 kg 85.00 425.00 Formworks Lumber 100 bd ft 22.00 2,200.00 1/4"x4'x8' ordinary 4 pcs 270.00 1,080.00 Nails 10 kg 70.00 700.00 Formoil 5 ltrs 5.00 25.00 sub-total 12,900.00

D. Total Direct Cost 19,050.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 190.50 F. OCM 5 % of Direct Cost 952.50 G. Profit 10 % of Direct Cost 1,905.00 H. Total Indirect Cost 3,048.00

22,098.00 1,103.76

SUBTOTAL FOR BEAMS 23,201.76 COST PER CUBIC METER 33,145.37

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 26: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTERItem No. : 2.6Description : SLAB ON FILLUnit : Cu.m.

Quantity 3.60Item Duration. 4 Calendar Days

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Foreman 1 3 350.00 1,050.00 Mason 4 4 250.00 4,000.00 Steelman 1 4 250.00 1,000.00 Laborer 8 4 150.00 4,800.00 sub-total 10,850.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials Concrete Cement 36 bags 230.00 8,280.00 Sand 3 cu.m 450.00 1,350.00 Gravel 4 cu.m 550.00 2,200.00 Temperature bars - 10mm dia def stl bars 15 lenghts 165.00 2,475.00 #16 G I tie wires 10 kg 85.00 850.00 sub-total 15,155.00

D. Total Direct Cost 26,005.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 260.05 F. OCM 5 % of Direct Cost 1,300.25 G. Profit 10 % of Direct Cost 2,600.50 H. Total Indirect Cost 4,160.80

30,165.80 1,801.30

SUBTOTAL FOR SLAB ON FILL 31,967.10 COST PER CUBIC METER 8,879.75

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 27: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 5.1Description : INTERIOR CEILINGUnit : Sq.m.

Quantity 75.6

Item Duration. 3 Calendar Days Rate Direct

Description Quantity Unit Days Per Day Cost ( Php ) ( Php )

DIRECT COST

B. Labor Foreman 1 3 350.00 1,050.00 Carpenter 4 3 300.00 3,600.00 Laborer 2 3 200.00 1,200.00 sub-total 5,850.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials Ceiling boards 1/4"X4'X8' ord. plywood 30 pcs 270.00 8,100.00 Joist & hangers 2"x2" hardwood 200 bd ft 22.00 4,400.00 Assorted CW nails 15 kg 70.00 1,050.00 sub-total 13,550.00

D. Total Direct Cost 19,400.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 194.00 F. OCM 5 % of Direct Cost 970.00 G. Profit 10 % of Direct Cost 1,940.00 H. Total Indirect Cost 3,104.00

22,504.00 1,074.48

SUBTOTAL FOR INTERIOR CEILING 23,578.48 COST PER SQUARE METER 311.88

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 28: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 5.2Description : EXTERIOR CEILINGUnit : Sq.m.

Quantity 28

Item Duration. 2 Calendar Days Rate Direct

Description Quantity Unit Days Per Day Cost ( Php ) ( Php )

DIRECT COST

B. Labor Foreman 1 2 350.00 700.00 Carpenter 2 2 300.00 1,200.00 Laborer 2 2 200.00 800.00 sub-total 2,700.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials Ceiling boards 1/4"X4'X8' marine plywood 10 pcs 350.00 3,500.00 Joist & hangers 2"x2" hardwood 100 bd ft 22.00 2,200.00 Assorted CW nails 10 kg 70.00 700.00 sub-total 6,400.00

D. Total Direct Cost 9,100.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 91.00 F. OCM 5 % of Direct Cost 455.00 G. Profit 10 % of Direct Cost 910.00 H. Total Indirect Cost 1,456.00

10,556.00 498.72

SUBTOTAL FOR INTERIOR CEILING 11,054.72 COST PER SQUARE METER 394.81

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 29: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 6Description : FLUSH DOORUnit : Set

Quantity 2

Item Duration. 1 Calendar Days

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

B. Labor

Foreman 1 1 350.00 350.00 Carpenter 2 1 300.00 600.00 sub-total 950.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials Hollow core flush door (2.10mx0.90m) 2 sets 5,000.00 10,000.00 Including jamb 4"x4" loose pin hinges 2 sets 120.00 240.00 Lockset (kwikset) 1 sets 1,500.00 1,500.00 sub-total 11,740.00

D. Total Direct Cost 12,690.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 126.90 F. OCM 5 % of Direct Cost 634.50 G. Profit 10 % of Direct Cost 1,269.00 H. Total Indirect Cost 2,030.40

14,720.40 357.65

SUBTOTAL FOR D2 15,078.05 COST PER SET 7,539.02

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 30: Swa of Drainage Pob-sin

Item No. : 7.3aDescription : PAINTING ( CONCRETE SURFACE )Unit : sq. m

Quantity 181.00

Item Duration. 5 Calendar Day

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Foreman 1 4 350.00 1,400.00 Painter 3 5 300.00 4,500.00 Helper 2 5 200.00 2,000.00 sub-total 7,900.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials Latex flat 6 gal 650.00 3,900.00 Latex gloss 12 gal 650.00 7,800.00 Masonry puttty 2 gal 450.00 900.00 Concrete neutralizer 1 gal 350.00 350.00 Tinting colors 12 qrts 150.00 1,800.00 Paint brush 3" 2 pcs 90.00 180.00 Pain tbrush 2" 2 pcs 65.00 130.00 Paint roller w/ pan # 7 2 set 250.00 500.00 sub-total 15,560.00

D. Total Direct Cost 23,460.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 234.60 F. OCM 5 % of Direct Cost 1,173.00 G. Profit 10 % of Direct Cost 2,346.00 H. Total Indirect Cost 3,753.60

27,213.60 1,398.43

SUBTOTAL FOR PAINTING (CONCRETE SURFACE) 28,612.03 COST PER SQ. METER 158.08

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 31: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. :7.3bDescription : PAINTING ( WOOD SURFACE )Unit : sq. m

Quantity 103

Item Duration. 3 Calendar Day

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Foreman 1 3 350.00 1,050.00 Paintor 2 3 250.00 1,500.00 Helper 1 3 150.00 450.00 sub-total 3,000.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials Enamel Flatwall 4 gal 650.00 2,600.00 Enamel Quick dry 8 gal 650.00 5,200.00 Glazing putty 1 gal 850.00 850.00 Paint thinner 2 gal 450.00 900.00 Tinting color 8 qrts 150.00 1,200.00 Paint brush 3" 2 pcs 90.00 180.00 Paint brush 2" 2 pcs 65.00 130.00 Paint Roller w/ pan 2 pcs 250.00 500.00 Sand paper 2 doz. 100.00 200.00 sub-total 11,760.00

D. Total Direct Cost 14,760.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 147.60 F. OCM 5 % of Direct Cost 738.00 G. Profit 10 % of Direct Cost 1,476.00 H. Total Indirect Cost 2,361.60

17,121.60 643.39

SUBTOTAL FOR PAINTING ( WOOD SURFACE ) 17,764.99 COST PER SQ. METER 172.48

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. :7.3bDescription : PAINTING ( METAL SURFACE )Unit : sq. m

Quantity 130

Item Duration. 3 Calendar Day

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Foreman 1 3 350.00 1,050.00

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 32: Swa of Drainage Pob-sin

Paintor 3 3 250.00 2,250.00 Helper 2 3 150.00 900.00 sub-total 4,200.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials Red Oxide 5 gal 650.00 3,250.00 Roof paints 10 gal 650.00 6,500.00 Roof Sealant 1 gal 850.00 850.00 Paint brush 3" 2 pcs 90.00 180.00 Paint brush 2" 2 pcs 65.00 130.00 sub-total 10,910.00

D. Total Direct Cost 15,110.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 151.10 F. OCM 5 % of Direct Cost 755.50 G. Profit 10 % of Direct Cost 1,511.00 H. Total Indirect Cost 2,417.60

17,527.60 794.11

SUBTOTAL FOR PAINTING ( METAL SURFACE ) 18,321.71 COST PER SQ. METER 140.94

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 7.2 WALL FINISHDescription : 8"X8" GLAZED CERAMIC WALL TILESUnit : sq. m.

Quantity 8.78

Item Duration. 2 Calendar Day

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Foreman 1 2 350.00 700.00 Mason 2 2 300.00 1,200.00 Helper 1 2 200.00 400.00 sub-total 2,300.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php ) C. Materials 8"X8" glazed ceramic tiles 220 pcs 18.00 3,960.00 Tile grout 2 packs 180.00 360.00 Tile trim 2 lenghts 185.00 370.00 Portland cement 1 bags 250.00 250.00 sub-total 4,940.00

D. Total Direct Cost 7,240.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 72.40 F. OCM 5 % of Direct Cost 362.00 G. Profit 10 % of Direct Cost 724.00 H. Total Indirect Cost 1,158.40

8,398.40 415.01

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 33: Swa of Drainage Pob-sin

SUBTOTAL FOR GLAZED CERAMIC TILES 8,813.41 UNIT COST PER SQUARE METER 1,003.81

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 7.1A FLOOR FINISHDescription : 12"X12" UNGLAZED CERAMIC FLOOR TILESUnit : sq. m.

Quantity 1.44

Item Duration. 5 Calendar Day

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor

Mason 1 1 300.00 300.00 Helper 1 1 200.00 200.00 sub-total 500.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php ) C. Materials 8"X8" Unglazed ceramic tiles 40 pcs 18.00 720.00 Tile grout 1 packs 180.00 180.00 Portland cement 1 bags 250.00 250.00 sub-total 1,150.00

D. Total Direct Cost 1,650.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 16.50 F. OCM 5 % of Direct Cost 82.50 G. Profit 10 % of Direct Cost 165.00 H. Total Indirect Cost 264.00

1,914.00 91.68

SUBTOTAL FOR GLAZED CERAMIC TILES 2,005.68 UNIT COST PER SQUARE METER 1,392.83

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 7.1B FLOOR FINISHDescription : FLOOR TOPPINGUnit : sq. m.

Quantity 86.87

Item Duration. 3 Calendar Day

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 34: Swa of Drainage Pob-sin

Mason 3 3 300.00 2,700.00 Helper 2 3 200.00 1,200.00 sub-total 3,900.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php ) C. Materials washed sand 3 cu.m 450.00 1,350.00 Portland cement 10 bags 250.00 2,500.00 sub-total 3,850.00

D. Total Direct Cost 7,750.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 77.50 F. OCM 5 % of Direct Cost 387.50 G. Profit 10 % of Direct Cost 775.00 H. Total Indirect Cost 1,240.00

8,990.00 616.80

SUBTOTAL FOR FLOOR TOPPING 9,606.80 UNIT COST PER SQUARE METER 110.59

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 35: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 8.1Description : WATERLINE (Including Connections and Fittings)Unit : L.M.

Quantity 10Item Duration. 1 Calendar Days

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Foremen 1 1 350.00 350.00 Plumber 1 1 300.00 300.00 Helper 1 1 200.00 200.00 sub-total 850.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php ) C. Materials 1/2" sch. 40 GI pipe 2 lenghts 460.00 920.00 1/2" GI elbow 5 pcs 25.00 125.00 1/2" GI coupling 4 pcs 25.00 100.00 1/2'" GI TEE 3 pcs 25.00 75.00 Tapelon 3 rolls 35.00 105.00 sub-total 1,325.00

D. Total Direct Cost 2,175.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 21.75 F. OCM 5 % of Direct Cost 108.75 G. Profit 10 % of Direct Cost 217.50 H. Total Indirect Cost 348.00

2,523.00 143.76

SUBTOTAL FOR WATER LINE 2,666.76 COST PER LINEAR METER 10.00

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 36: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 8.2Description : SANITARY / SEWER LINE (Including Connections and Fittings)Unit L.M.

Quantity 12Item Duration. 2 Calendar Day

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Plumber 1 2 300.00 600.00 Helper 1 2 200.00 400.00 sub-total 1,000.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php ) C. Materials 75 mm dia. PVC pipe 4 lenghts 120.00 480.00 75 mm dia. PVC elbow 5 pcs 30.00 150.00 75mm dia PVC coupling 2 pcs 20.00 40.00 75 mm PVC P- trap 5 pcs 85.00 425.00 3"x3" stailnless floor drain 1 pcs 160.00 160.00 Solven t cement 200cc 2 cans 140.00 280.00 sub-total 1,535.00 D. Total Direct Cost 2,535.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 25.35 F. OCM 5 % of Direct Cost 126.75 G. Profit 10 % of Direct Cost 253.50 H. Total Indirect Cost 405.60

2,940.60 168.67

SUBTOTAL FOR SANITARY / SEWER LINE 3,109.27 COST PER LINEAR METER 259.11

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. :8.3Description : SINK (with counter)Unit : SetQuantity 1Item Duration. 2 Calendar Day

Rate Direct

Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST

A. Equipment

sub-total -

B. Labor

Foreman 1 1 350.00 350.00 Plumber 2 2 300.00 1,200.00 Helper 2 2 200.00 800.00 sub-total 2,350.00

Unit Direct

Description Quantity Unit Cost Cost

( Php ) ( Php )

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 37: Swa of Drainage Pob-sin

C. Materials

sink 1 sets 1,000.00 1,000.00 Cement 5 bags 250.00 1,250.00 sand 1 cu.m 450.00 450.00 Gravel 1 cu.m 550.00 550.00 Tiles 60 pcs 15.00 900.00 Tile trim 3 pcs 130.00 390.00 tile grout 1 packs 180.00 180.00 sub-total 4,720.00

D. Total Direct Cost 2,350.00

INDIRECT COST

E. Mob./Demob 1.00 % of Direct Cost 23.50 F. OCM 5 % of Direct Cost 117.50 G. Profit 10 % of Direct Cost 235.00 H. Total Indirect Cost 376.00

2,726.00

327.12

SUBTOTAL FOR SCRUB SINK/CLEAN UP 3,053.12

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 38: Swa of Drainage Pob-sin

COST PER SET 3,053.12

Item No. : 8.3dDescription : TISSUE HOLDERUnit : Sets

Quantity 2Item Duration. 1 Calendar Day

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Plumber 1 1 300.00 300.00 sub-total 300.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials Tissue holder 2 set 320.00 640.00 sub-total 640.00

D. Total Direct Cost 940.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 9.40 F. OCM 5 % of Direct Cost 47.00 G. Profit 10 % of Direct Cost 94.00 H. Total Indirect Cost 150.40

1,090.40 54.05

SUBTOTAL FOR TISSUE HOLDER 1,144.45 COST PER SET 572.22

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 39: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 8.3eDescription : SOAP HOLDER Unit : UNIT

Quantity 2Item Duration. 1 Calendar Days

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Plumber 1 1 300.00 300.00 sub-total 300.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials

Soap holder 2 300.00 600.00 sub-total 600.00

D. Total Direct Cost 900.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 9.00 F. OCM 5 % of Direct Cost 45.00 G. Profit 10 % of Direct Cost 90.00 H. Total Indirect Cost 144.00

1,044.00 53.28

SUBTOTAL FOR SOAP HOLDER 1,097.28 COST PER SET 548.64

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 40: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 8.3fDescription : FAUCETUnit : UNIT

Quantity 3Item Duration. 1 Calendar Days

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment

sub-total - B. Labor Plumber 1 1 300.00 300.00 sub-total 300.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials

Faucet ( US ) 3 350.00 1,050.00

sub-total 1,050.00

D. Total Direct Cost 1,350.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 13.50 F. OCM 5 % of Direct Cost 67.50 G. Profit 10 % of Direct Cost 135.00 H. Total Indirect Cost 216.00

1,566.00 61.92

SUBTOTAL FOR FAUCET 1,627.92 COST PER UNIT 542.64

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 41: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 4.1Description : C-PURLINS 100mm x 50mmUnit : L.m.Quantity 7Item Duration. 3 Calendar Day

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment Welding machine 1 1 600.00 600.00 sub-total 600.00 B. Labor Foreman 1 2 350.00 700.00 Welder 1 1 300.00 300.00 Steelman 1 3 300.00 900.00 Laborer 1 3 200.00 600.00 sub-total 2,500.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials 100mmx50mm ga. 14 C-purlins 7 lenghts 550.00 3,850.00 50mmx50mmx6mm angle bar 1 lenghts 1,200.00 1,200.00 Welding rod 5 kg 110.00 550.00 Red oxide paint 1 gal 350.00 350.00 sub-total 5,950.00

D. Total Direct Cost 9,050.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 90.50 F. OCM 5 % of Direct Cost 452.50 G. Profit 10 % of Direct Cost 905.00 H. Total Indirect Cost 1,448.00

10,498.00 545.76

SUBTOTAL FOR C-PURLINS 11,043.76 COST PER LINEAR METER 1,577.68

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 42: Swa of Drainage Pob-sin

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 4.2Description : TRUSS Unit : SetsQuantity 2Item Duration. 2 Calendar Days

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment Welding machine 1 2 600.00 1,200.00 sub-total 1,200.00 B. Labor Foreman 1 2 350.00 700.00 Steelman 1 2 300.00 600.00 Welder 1 2 300.00 600.00 Helper 3 2 200.00 1,200.00 sub-total 3,100.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials 50mmX50mmx6mm angle bar 2 lenghts 1,200.00 2,400.00 38mmx38mmx6mm angle bar 2 lenghts 1,030.00 2,060.00 16mm dia.x 250mm anchor bolt w/ nuts & wsher 16 lenghts 75.00 1,200.00 6mm x200mmx200mm base plate 4 pcs 230.00 920.00 Welding rod E-70 10 kg 110.00 1,100.00 sub-total 7,680.00

D. Total Direct Cost 11,980.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 119.80 F. OCM 5 % of Direct Cost 599.00 G. Profit 10 % of Direct Cost 1,198.00 H. Total Indirect Cost 1,916.80

13,896.80 746.02

SUBTOTAL FOR TRUSS 14,642.82 COST PER SET 7,321.41

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. : 4.3Description : ROOF SHEETS ( INCLUDING FLUSHING )Unit : sq. mQuantity 19.2Item Duration. 1 Calendar Days

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment Electric hand rail 1 1 250.00 250.00 sub-total 250.00 B. Labor

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)

Page 43: Swa of Drainage Pob-sin

Foreman 1 1 350.00 350.00 Roof shts installer 2 1 300.00 600.00 sub-total 950.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials

Ga. 26, 7" corr GI roofing 7 l.m. 220.00 1,540.00 TEK screw 50 pcs 5.00 250.00 Roof cement 1 ltrs 250.00 250.00 sub-total 2,040.00

D. Total Direct Cost 3,240.00 INDIRECT COST E. Mob./Demob 1.00 % of Direct Cost 32.40 F. OCM 5 % of Direct Cost 162.00 G. Profit 10 % of Direct Cost 324.00 H. Total Indirect Cost 518.40

3,758.40 206.21

SUBTOTAL FOR ROOF SHEETS 3,964.61 COST PER SQ. METRE 206.49

UNIT COST DERIVATION: EXPANSION OF HEALTH CENTER

Item No. 4.4Description : HORIZONTAL STEEL GRILLSUnit : sq. mQuantity 15.84Item Duration. 1 Calendar Days

Rate Direct Description Quantity Unit Days Per Day Cost

( Php ) ( Php )

DIRECT COST A. Equipment Electric hand rail 1 1 250.00 250.00 sub-total 250.00 B. Labor Foreman 1 1 350.00 350.00 window grillls installer 2 1 300.00 600.00 sub-total 950.00

Unit Direct Description Quantity Unit Cost Cost

( Php ) ( Php )

C. Materials

Steel horizontal grills 22 sets 500.00 11,000.00

I.TOTAL (Direct Cost+Indirect Cost) J. VAT / EWT 12% of (Equipment+Labor+Indirect Cost)