SUSTAINABLE POLICIESPROJECTS AND ON GOING
EFFORTS
Noor‐E‐AlamExecutive Engineer
Roads and Highways DepartmentMinistry of Communication
• Policy initiatives• Policy initiatives1
• On going Projects and efforts
• On going Projects and efforts2
• BRT (Gazipur –Airport) • BRT (Gazipur –Airport) 3
Presentation Outline
Policy Initiatives
National Land Transport Policy’ 2004• Providing a safe and dependable transport service•Maintain an economic and environmental balance • Introduction of an integrated transport system and provision of alternate transport Systems
• Promoting the use of cleaner technologies for fuel and vehicle
• Creating awareness for better standards of safety in transport sector
Sustainable Initiatives
National Land Transport Policy’ 2004• Create better environment for pedestrian• Fostering safer non‐motorised vehicle operations• Encouraging the shifting from diesel based vehicle to more environmental friendly fuel, e.g, CNG
• Emphasizing banning of 2‐stroke engine from Dhaka
• Discourse private car use in Dhaka with a target to keep it below 30% of mechanised trips in by 2022
Policy Initiatives
National Integrated Multimodal Transport Policy’ 2013
• The Paradigm Shift: More investment towards the concept of sustainable mobility
• Improve safety and reduce accident rate• Reduce the worst environmental effects of transport• Ensure that transport meets social needs in terms of cost and accessibility to all sectors of society
• Improve integration of the overall transport network and foster measures to make interchange between modes easier
• Reduce the need for travel by better land use planning• Improve fuel and energy security
Sustainable Initiatives
National Integrated Multimodal Transport Policy’ 2013
• More investment in rail and waterway• Promote walking by ‘Pedestrian First’ program• Promote non‐motorized transport• Promote public transport and integration • Promote rural transport development • Integration with policies for education, health, economic growth, gender and social equity and poverty reduction
Policy Initiatives
Strategic Transport Plan (STP) for Dhaka
• Establish a sound policy framework to ensure the sustainability of the current and future investments in transport sector.
• 50 road projects focusing on developing more east west connections .
• Construction of 3 Bus Rapid Transit (BRT) and 3 rail based Mass rapid transit (MRT) system.
• Creation of a ‘Pedestrian First Priority’ system to enhance the provisions and protection for pedestrians.
• Creation of a clean environment by placing emphasis on noise and exhaust emissions controls.
Ongoing Major Projects
Road• Inter Urban Project• Urban Project
Rail• Inter Urban Project• Urban Project
Water• Inter Urban Project• Urban Project
Road Project
• Upgrading of 192.0 KM Highway• Expected to be completed by Dec 2015
Improvement of Dhaka‐Chittagong Road
• Upgrading of 90 KM National Highway• Expected to complete by June 2015
Improvement of Joydebpur‐Mymensing
Road
• Upgrading of 70 KM National Highway• Bid invited for Construction • Expected to complete by December 2018
Improvement of Joydebpur‐ Elenga Road
• 6.18 Kilo meter over the River Padma• Expected to Complete by 2018Padma Bridge
Road Project
• Uttara‐Mirpur 10 – Farmgate –Sonargaon ‐Press Club‐Paltan and Bangladesh Bank, 20 KM
• Expected to be completed by 2024.MRT Line‐6
• Hazrat Shahjalal International Airport to Gazipur, 20 KM
• Excepted to be completed by 2017
BRT Line ‐3(North)
• Hazrat Shahjalal International Airport to Jilmil (keranigong), 22KM
• Excepted to be completed by 2018
BRT Line‐3 (South)
Road Project
• Dhaka Elevated Expressway (23 KM)• Dhaka – Ashulia Elevated Expressway (34KM) • Shantinagar to Dhaka‐Mawa Road (Jhilmil) via 4th (New) Bridge over Buriganga river (11 KM)
Elevated Express way
• Jahangir gate –Rokeya Sarani tunnel• Tunnel under Kurnofuli river, ChittagongTunnel
• Focus on reducing conflict between motorized and non‐motorized transport (NMT) and congestion
• Better mobility for those who walk and use public transport, particularly, working women
• Bus route restructuring
CASE Project(DTCA, DoE,
DCC)
Road Project
• Pilot project for development of rural waterway at Titas Upazila
• Sustainable design of infrastructures considering climate change adaptation
Rural Transport Improvement Project‐II
• Sustainable design considering climate resilience
• Sustainable Maintenance Program (Considering toll road on pilot basis)
Sustainable Rural
Infrastructure Improvement
Project
Rail Project
• Construction of 22 Kilometre New rail Track• Convert to dual gauge 90 kilometre • Procure new locomotives, carriages and wagons for enhancing services
• Modernization of signalling system and remodelling of important stations
• Dhaka‐Chittagong Double line and Chittagong –Coxbazar line
National
• Construction of 3rd & 4th Dual Gauge Railway Track between Dhaka‐Tongi section
• Construction of a Dual Gauge Line in Dhaka‐Narayanganj and Joydebpur‐Mymensingh Section.
• commuters service with Demo Train
Urban
Waterway Project
• Construction of Sonadia deep sea port at cox bazar and Paira sea port at potuakhali
• Improvement of Inland container river port at Ashugang.• Inland Container Terminal (ICT) at Pangaon.• Dredging of 12 important river route and capital dreging of 53 river route in Inland waterways.
• BIWTA master Plan
National
• Circular Waterway (sadarghat‐Gabtoli‐Asulia)• BIWTA also running Water bus from Sodorghat –Aminbazar on pilot basis which also reduces pressure on road along this corridor.
Urban
Efforts
Towards a sustainable future
• Road safety improvement Projects• Reducing Black Carbon Emission from Heavy duty Diesel Vehicles(HDV) and Engines
• Inner circular road (Dhaka)• Circular railway around Dhaka• Institutional strengthening of DTCA • Regional Development Planning (RDP) Project Taken by RAJUK for greater Dhaka, 2016‐2035
• Provide well connectivity among
the potential centers
• Ring road concept
• TOD along the MRT/Commuter
corridor
• Future extension of BRT and MRT
• Provide East‐West connectivity
• Pedestrian & Bicycle friendly
environment
CONCEPT OF TRANSPORT PLANNING ‐RDPCONCEPT OF TRANSPORT PLANNING ‐RDP
m`iNvU - Avïwjqv = 30.00 wK.wg.;
Avïwjqv - UsMx -KvPucyi = 40.00wK.wg.
KvPucyi -gxiKvw`g -m`iNvU = 40.00 wK.wg.|
Avïwjqv
m`iNvU
UsMx
KvPucyi
gxiKvw`g
bvivqbMÄ
• Construction of dedicated lanes for bus • 15.5 kilometre at grade & 4.5kilometer elevated
• Two mixed traffic lanes in each direction• NMT lane and service lane
Features
Greater Dhaka Sustainable Urban Transport Project (GDSUTP)
Gazipur Centre
Joydebpur
Tongi
Airport
Railway
Uttara extension
Dhaka BRT corridor(WB project)
Intermodal Areas
Main trunk
Extensions
Railway
Gazipur Centre
Joydebpur
Tongi
Airport
Railway
Uttara extension
Dhaka BRT corridor(WB project)
Intermodal Areas
Main trunk
Extensions
Railway
• 20 km bus lanes and mixed lanes• Tongi Bridge and 4.5 elevated section• 31 stations, 2 terminals ,One depot• 141 access road and 10 kitchen market
Civil works
• Airport to Gazipur (20 kilometre)Route
• USD 255.0 million• 48 month
Project cost Implementation Period