Jan. 19, 2004 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2004-2651 USER INFORMATION: GE ACH*RO M EMPL#:28401 CA#: 0363 Addre UCSA2 Pho 43194 RANSMITTAL INFORMATION: TO: b lb. 01/19/2004 LOCATION: DOCUMENT CONTROL DESK "ROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER :NUCSA-2) \_'JHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU: 101 - 101 - EMERGENCY DIRECTOR (ED)-TSC EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 11/12/2003 ADD MANUAL TABLE OF CONTENTS DATE: 01/16/2004 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-101 ADD: PCAF 2004-1034 REV: N/A REMOVE: PCAF 2003-1642 REV: N/A ADD: PCAF 2004-1033 REV: N/A REMOVE: PCAF 2004-1034 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX. ; i. ~ ~ ~ ~ ~ ~ ~ II

Upload: others

Post on 22-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

Jan. 19, 2004

Page 1 of 1

MANUAL HARD COPY DISTRIBUTION

DOCUMENT TRANSMITTAL 2004-2651

USER INFORMATION:

GE ACH*RO M EMPL#:28401 CA#: 0363

Addre UCSA2

Pho 43194

RANSMITTAL INFORMATION:

TO: b lb. 01/19/2004LOCATION: DOCUMENT CONTROL DESK"ROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER:NUCSA-2)

\_'JHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPYOR ELECTRONIC MANUAL ASSIGNED TO YOU:

101 - 101 - EMERGENCY DIRECTOR (ED)-TSC EMERGENCYPLAN-POSITION SPECIFIC PROCEDURE

REMOVE MANUAL TABLE OF CONTENTS DATE: 11/12/2003

ADD MANUAL TABLE OF CONTENTS DATE: 01/16/2004

CATEGORY: PROCEDURES TYPE: EPID: EP-PS-101ADD: PCAF 2004-1034 REV: N/A

REMOVE: PCAF 2003-1642 REV: N/A

ADD: PCAF 2004-1033 REV: N/A

REMOVE: PCAF 2004-1034 REV: N/A

UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTEDWITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENTPROCEDURES. PLEASE MAKE ALL CHANGES ANDACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPONRECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS,ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS ANDACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

; i. ~ ~ ~ ~ ~ ~ ~ II

Page 2: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

IF - .

Tab 5EP-PS-1 01 -5

TURNOVER CHECKLISTCONTROL ROOM -TSC - EOF

1. Affected Units

2. Classification/EAL # 1.

3. Protective Action recommendations issued

4. Emergency Actions Implemented: AccountabilityLocal area evacuationSite evacuationIssuance of KIPersonal injury responseOther

5. Plant Conditions: Reactor Shutdown: Rx Pressure*Cooldown I/P Rx Power*Fuel Damaged Rx Level*Plant Stable Cont. Pressure*Rad Issues _ _ _ _ Cont. Rad*Decay Heat Removal Path ;

.Available from PICSY (STA Overview Screen)

6. Sequence of Events, Mitigating Actions, and Equipment Out-of-Service:

7. Release in progress and flow path (if known)Refer to EP-PS-1 00 Tab H OR EP-PS-1 01/200 Tab I

8. Priorities: (Control Room / TSC / EOF) (circle one):

9. Status of News Release review and approval and Status of Offsite Notifications:

10. Functions transferred:

Control Room to TSC:* Classification* Notification* Dose Assessment* Protective Action* In-Plant Team Control

TSC to EOF:* Classification* Notification (Except ENS communications)* Dose Assessment0 Protective Action

11. Turnover accepted Time:

EP-AD-000-096, Revision 2, Page 1 of 1

Page 3: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

Tab 5EP-PS-1 01-5

TURNOVER CHECKLISTCONTROL ROOM - TSC - EOF

1. Affected Units

2. Classification/EAL # I

3. Protective Action recommendations issued

4. Emergency Actions Implemented: AccountabilityLocal area evacuationSite evacuationIssuance of KIPersonal injury responseOther

5. Plant Conditions: Reactor Shutdown: Rx Pressure*Cooldown I/P Rx Power*Fuel Damaged Rx Level*Plant Stable Cont. Pressure*Rad Issues Cont. Rad*Decay Heat Removal Path

* Available from PICSY (STA Overview Screen)

6. Sequence of Events, Mitigating Actions, and Equipment Out-of-Service:

7. Release in progress and flow path (if known)Refer to EP-PS-100 Tab H OR EP-PS-101/200 Tab I

8. Priorities: (Control Room I TSC / EOF) (circle one):

9. Status of News Release review and approval and Status of Offsite Notifications:

10. Functions transferred:

Control Room to TSC:* Classification* Notification* Dose Assessment* Protective Action* In-Plant Team Control

11. Turnover accepted

TSC to EOF:* Classification* Notification (Except ENS communications)* Dose Assessment* Protective Action

Time: m

EP-AD-000-447, Revision 7, Page 1 of 1

Page 4: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

TAB 5EP-PS-1 01-5

TSC/EOF BRIEFING CHECKLIST

Date:Time:

Event classification:EAL:

1. Changes in Plant Conditions since last Briefing:

2. RCS Heal Removal Flowpath:

3. Release Information:

a. Release Rate: _iCilmin.

b. Field Dose. Rates: (TEDE-whole body)/ (CDE-thyroid)

c. Dose Projection Calcs: (TEDE-whole body)/ (CDE thyroidj

4. Rad Release Flowpath:

5. Proiected Time of Release Termination:, . _ _ _

6. Protective Actions: Status:

a. Accountabilityb. Site Evacuationc. KI

7. Plant Priorities: (Stabilize Plant/Terminate Release/etc.): Status:

8. EOF Support Activities: Status:

EP-AD-000-095, Revision 1, Page 1 of I

Page 5: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

/43 PROCEDURE CHANGE PROCESS FORM

1. PCAF NO.,Wy 12. PAGE 1 OF J4 -3PROC. NO. EP-PS-101 REV. 19

4. FORMSREVISED - A Ri% /- B R10 -C R8 , -- R -- R

5. PROCEDURE TITLEEmergency Plan Position Specific Instruction: TSC Emergency Director

_ i i6. REQUESTED CHANGE

PERIODIC REVIEW 3 NO Ml YES

w..�wI,01, VMV�110

INCORPORATE PCAFS La NO 3 YES # 2003-1642 # _ - _#

REVISION DI PCAF Z DELETION LI (CHECK ONE ONLY)

7. SUMMARY OF / REASON FOR CHANGEIncorporate PCAF 2003-1642Adds guidance on issues that consistute significant events that should be reported to the offsite agencies.Provides guidance on events and issues that should be announced to plant personnel.Deletes a listing of items transferred from the Control Room to the TSC and adds a statement to referencethe same list of items that are contained in the Turnover sheetDeletes the step to have the ED-TSC notify senior PPL Management. The step is incorporated in EP-PS-200for the Recovery Manager to perform.This is an administrative change in that it clarifies existing requirements.

Continued

8. DETERMINE COMMITTEE REVIEW REQUIREMENTS(Refer to Section 6.1.4)PORC REVIEW REQ'D? 12 NO L YES 9. PORC MTG# N/A

BLOCKS 11 THRU 16ARE ON PAGE 2 OF FORM

17. T.C. Dalpiaz / 3227 I 01/07/2004 18. COMMUNICATION OF CHANGE REQUIRED?PREPARER ETN DATE El NO M YES (TYPE) E mail notification

(Print or Type) and personaldiscussion

19. SIGNATURE ATTESTS THAT RESPONSIBLE SUPERVISOR HASCONDUCTED QADR AND TECHNICAL REVIEW UNLESS OTHERWISE

( o, e/}lo 9 DOCUMENTED IN BLOCK 16 OR ATTACHED REVIEW FORMS.DBEnDATE CROSS DISCIPLINE REVIEW (IF REQUIRED) HAS BEEN COMPLETED

vRFSv 1E SUPERxV ISOR s DATE . cBY SIGNATURE IN BLOCK 16 OR ATTACHED REVIEW FORMS.

20. II,.sf1 APPROVAL DATE

21. RESPONSIBLE APPROVER ENTER N/A IF FUM HAS APPROVAL AUTHORITY

N/A __ _

INITIALS DATE

FORM NDAP-QA-0002-8, Rev. 9, Page 1 of 2 (Electronic Form)

Page 6: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

, .- .-

N/d9gROCEDURE CHANGE PROCESS FORM

-1. PCAF NO. 4;$ 12. PAGE 2 OF Ill 13. PROC. NO. EP-PS-101 REV. 19

11. This question documents the outcome of the 50.59 and 72.48 Review required by NDAP-QA-0726.Either I la or b must be checked 'YES' and the appropriate form attached or referenced.a. This change is an Administrative Correction for which 50.59 and 72.48 are not YES Jj N/A

applicable.b. This change requires a 50.59/72.48 Applicability/Screen/Evaluation. s YES El N/A

(Attach if not previously issued).ReferenceApplicability/ScreeninglEvaluation No. A-01-1543

12. This change is consistent with the FSAR or an FSAR change is required. YES

Change Request No.

13. Should this change be reviewed for potential effects on Training NWeds or Material? YES jj NOIf YES, enter an Action Item @ NIMS/Action/Gen Work Mech/PICN. PICN #

14. Is a Surveillance Procedure Review Checklist required per NDAP-QA-0722? 0 YES 3 NO

15. Is a Special, Infrequent or Complex TestlEvolution Analysis Form required per J YES Z NONDAP-QA-0320? (SICT/E form does not need to be attached.)

16. Reviews may be documented below or by attaching Document Review Forms NDAP-QA-0101-1.

REVIEWED BY WITH DATEREVIEW NO COMMENTS

QADR

TECHNICAL REVIEW

REACTOR ENGINEERING/NUCLEAR FUELS *ISI * * -_ _ _ _ _ _ _ _ -_ _ _ _

OPERATIONS --

STATION ENGINEERING

EMERGENCY PLANNING __________//______

MAINTENANCE

RADIATION PROTECTION

NUCLEAR MODIFICATIONS

NUCLEAR DESIGN

CHEMISTRY

OTHER 1OCFR 50.54Q _xed__e__a__

* Required for changes that affect, or have potential for affecting core reactivity, nuclear fuel, core power levelindication or impact the thermal power heat balance. (58)

Required for changes to Section Xi Inservice Test Acceptance Criteria.

FORM NDAP-QA-0002-8, Rev. 9, Page 2 of 2 (Electronic Form)*.

Page 7: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

- - -

PU~~~~~~~~~~k ~ ~ 9 -5<

AI-PAGE 3OF.1EP-PS-101Revision 19Page 2of4

EMERGENCY DIRECTOR IEPMTSC: Emergency Plan-Positon Specific Procedure

WHEN: Emergency Support Center (TSC) Is aetivated

HOW NOTIFIED: Phoned by Station OperatorAfter hours: Paged.

REPORTTO: Vice President-Nutcear Operations

WHERE TO REPORT: Control Room/SC

OVERALL DUTY:

Manage the Technical Support Center (TSC) so that the plant responds to theemergency. people are protected, and the center processes information to those whoneed to know. Once the EOF has taken over these comrnunications and radiologicalfunctions, concentrate exclusively on returning the plant to a safe condition.

MAJOR TASKS:' TAB: REVISION:

Assemble and brief TSC staff, then take over*the task of managing the emergency.

Reclassify the emergency as conditionschange-.

Make sure Information Is being communicatedto company, public, and governmentpersonnel.

Mtake protective action recommendations tosafeguard public and measures to protectpersonnel workdig In or near the plant.

RevieW Severe Accident Management (SAM),strategis

Manage turnover to the next shift.

Turn over Emergency Manasemnent to theEOF.

When emergency Is terminated, disband theTSC staff.

Determilne there Is a non-routineRacliological Release In Progress.

TAB A

TAB B 8 -!jo °

TAB C

TAB D

TAB E

TAB F

TAB G

TAB H

10

4

4

0

TAB I

Page 8: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

P&'AF , EP-PS-101

PAGE.- oF R~son 19

SUPPORTING INFORMATION: TAB:

Emergcncy Telephone Instnictions TAB I

EmergencY Organiation TAB 2

Logkecping TAB3

Brief Non-Technical Descriptions of EAL TAB 4

TunovedBricetng Checkdists: TAB S

* Control Room/TSC Turnover Checklist* TSCIEOF Turnover Checklist* TSEOF Briefing Checklist

Emergency Classification TAB 6

Public Protective Action Reconmendation Guide TAB 7

PPL EBnergency Personnel Dose Assessment and ' TAB 8

Protective Action Recomrnendation (PAR) Guide

TSC StaffResponsibilities TAB 9

Restoration Organization Guidelines TAB 10

Emergency Fonns TAB 11

* TSC Data Sheet* Potassiun Iodine (KI) Tracking Form* Emergency Exposwue Extensions* Emergency Exposure Extension Request* PAR State Notification Form

Primary Containment and RVP Venting Strategy TAB 12

Page 9: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

.r

FCAF -gPA GEL~QFJ 9, j

TAB AEP-PS-101-ARevision a jIPage I of 7

MAJOR TASK:

Assemble and brief TSC staff, then take over the task of managing the emergency.

-

SPECIFIC _TASKS: * . HOW:

NOTE: When the NERO Is calledout, the TSC should be activatedregardless of the classification leveL

NOTE:The activation process Is thesame regardless of classificationlevel

NOTE (1):The Operations Coordinator mayperform Steps I through 3b (asdefined by parenthesis) if the-TSCEmergency Director has assumedthe role of the ED In the ControlRoom;

iLA.kC_

NOTE (2):If the ED did NOT take overControl of the Emergency proceed-with Step 1.

-. Determirie plant status la. Report to Control Room.

lb. Receive urnover fromShift Manager.

HELPCONTROL ROOMITSC

TURNOVER CHECKLISTSee TAB S

2. Assume overall management of theemergency.

Ic. Dcterine: -

(1) Resources or actionsrequired by Operations.

(2) In progress plant activities.

2a. Verify key Coordinators are readyto assume emergency functionsrequired for activation:

(I) Operations Coordinator(2) Damage Control Team

coordinator

Page 10: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

-- 7-*1 -

TABA. EP-PS-101-A

Revision1: jfPage 20f7

vZ%

SPECIFIC TASKS: .. HOW:(3) Rad Protection Coordinator(4) TSC Coordinator

(5) TSC NRC Communicator

(6) Security Coordinator

HELPEmergency Organization

See TAB 2

NOTE:The Operations Coordinator mayperform step Zb as dellned In ().However, only a qualified-ED canrelieve the Control Room ED ofoverall management of theemergency.

NOTE:1 AN EALDECLARATION HAS JUST BEENMADE IN THE CONTROLROOM, ENSURE THE CONTROLROOM ALSO MAKES THEOFFSITE NOTIFICATIONS ANDPAR NOTIFICATIONS Qf aGeneral Emergency was declared)

2b. Contact the Shift Manager and relieveControl Room of overall management ofemergency.

- (Ops Coordinator nofif Control RoomED of readim of TSC totaketurnoer.)

2c. Refer to the Control Room-TSCTurnover sheet for listing ofresponsibilities transferred

I

Page 11: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

~-'~A ;~ .~ I. I* - I

-) PAGL 2OF EP-PS-101-APage 3 of 7

SPECIFIC TASKS: HOW:

2c. If thc Operations Coordinatorprepared the TSC for activationwhile you were filling te role ofControl Room ED, activate the71SC '

2d. Make a Plant PA armouncementwhen the ' T SC is in control of the

- . . c~~~~~~~~m erg ency. -

NOTE (1):The Plant Page located on

- the ED Desk s Loal to the- - TSC. The Plant-wide PA Is

located on elther wall In theTSC.

NOTE (2):This responsibility can bedelegated to the TSCCommunicator.

2e. Brief TSCpersonnrclonemergency situation.

2f. Review classification ofemergency (TAB B).

2g. Review radiological conditionsand dose proiections if applicable

3. Perform extenia! n~ations. (TAB D and TAB I) -

3.- perform extermal notifictions . 3a. Notify Public InformationManager of plant status. -

¼~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 12: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

CAF # TM A

PAG uF-1,J.J Revisioni/Page 4 of r f

SPECIFIC TASKS: HOW:

4. Direct the Security or AdminCoordinators to verify 60 and 90mrunute NERO members respond.

5. Manage the emergency. - 5a Reclassify the emergency asconditions change (TAB B).

Sb. Communicate infonnationconcerning emergency (TAB C).

Sc. Initiate radioactive releasemonitoring to support PublicProtective ActionRecommendation (TAB D).

Sd. Make Protective ActionRecommendation as required(TAB D).

5e- Notify the Control Room toinitiate accountability.

NOTE (1):Aiccountability required at SiteAres Emergency or higherclassification (consider habitabilityof accountability locations). RidProtection and SecurityCoordinators responsible toimplement.

NOTE (2):Once accountability Is ordered,it..must be maintalned until either theevent is terminated or anevacuation Is ordered.

Sf. Initiate RCA Evacuation when.plant conditions dictate or:

(I) When accountability isinitiated.

Page 13: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

I

: ) PAGEL.40F 'TAB AEP-P$-101.ARevision-J- ifPage 5 of 7

.%1

SPECIFIC TASKS: HOW:

- Sg& Initiate Site Evacuation ofnon-essential personnel when siteconditions dictate or when a Siteor General Eniergency is declared*AND accountability is complete.

NOTE:Essential personnel:* Opeations* Maintenance* Health Physics* Chtmistry* Security.* NERO Members

(I) Instuct SecinityCoordinator to perform siteevacuation.

K)(2) If the TSC is in control of.

the Emergency, direct both.TSC Communicators tonotify oftsite agencies of theevacuation initiation.

(3) If the *EOF is in control ofthe emergency, direct theTSC E-Plan Communicatorto notify the EOFCommunicator of theevacuation so that the EOFcan notify offsite agencies..

(4) Dircat the TSC NRCCommunicator to notify theNRC of the evacuationinitiation.

Monitor plant status.

I

Sh.

NOTE:Ops Coordinator responsible tomaintain.

Page 14: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

PAGE.Ji-Of-J.~ 1JTAB AEP-PS-101-ARevision e IyPage 6of7

LL.

I ±

SPECIFIC TASKS: HOW:

Si. Establish plant priorities.

NOTE:Ops Coordinator responsibility.

Sj. Initiate corrective actions for plantpriorities.

NOTE:Damage Control Team Coordinatorresponsible to'implement actions.

51 Ensure proper resources armavailable to combat emergency.

; NOTE:-Damage Control Team and Admin.Coordinators responsibilities

51. Initiate core dianage assessmnLt

NOTE:Tech Support Coordinatorresponsibility. Requires PASSsample - Chemistry Coordinator.

Sm. Initiate i4-hour shift coverage foremergency positions.

NOTE:Admnin. Coordinator responsible.

Sn. Support emergency medicalresponse, search/rescue.

NOTE:Reference SP-00-308, (EmergencyMedical Response, SearchlRescue)

6. Request Federal assistance to augmentNERO.

6a. When federal assistance isrequired, requests should becoordinated with PEMA andlorDEP/BRP.

Page 15: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

iI(2)I ) 9 ..li-;-�

TABAEP-PS-1O1-ARevision 1J .fPage 7 of 7

LL.

SPECIRC TASKS:

7. lfreqwred' invoke the provisions ofIOCFR 50.54X.

BOW:

7a. In accordance with IOCFR50.54X, operation outside the.Technical Specifications shall ornlybe taken in an cmergency.

(I) Wihen action is immediatelyneeded o protect the publichealth and safety and no actionconsistent with license conditionsand Technical Specifications thatcan provide adequate orequivalent protection isimmediately apparent.

(2) Direct the Operations Coordinatorto have the ShiftManagerimplement the provisions ofOP-AD-001 Section 62.6.

Ni .

Page 16: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

- S~~~

PAGE 1 OFF..LSJ

TAB BEP-PS-101-BRevisloni IoPage I of 4

IL41.i-- a -, ..t.MAJUK 1Ado; Z .

Reclassify the emergency as conditions change.

SPECIFIC TASKS: HOW: I

1. Evaluate latest information. la. Cons~it lead Coordinators for updatedinformation.(1) Radiation Protection

Coordinator for radiologicalrelease.

(2) Operations Coordinator onplant status.

(3) Technical SupportCoordinator over status ofproblem identification/resolution.

(4) Security Coordinator forsecurity event.

(5) Damage Control TeamCoordinator for repairstatus.

2 Assess if there is a non-routineRadiological release in progress.

2a. Refer to Tab I for assistance indetermining if there is a non-routine Radiological release inprogress.

2b.. If there is a non-routineRadiological release in progress,insure the TSC E PlanCommunicator indicates that onthe ENR fonn.

2c Insure that information iscommunicated to TSC personneland the Recovery Manager.

LI-

b.-

3. If significant changes have occurred,review EAL classifications.

3a. Review EAL classifications.

Page 17: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

PAGL OL-OJLLL.. .~~~~~~~~~~~~~~~~~~~~~~~~TAB B'EP-PS-101-BRevision.9-11

p

Page 2of 4. 'a

'3' A CWQ. UnW.

.HELPEmergency Classification

See TAB 6

3b. Find emergency action levels onmatrix closest to actual plantcondition.

CAULION:If you upgrade to. a GeneralEmergency, you must make aProtective Action Recommendationwithin 15 minutes (see TAB D).

3c. Refer to EAL bases document foradditional guidance.

3d. If no EAL's are applicable to thecurrent situation be sure to reviewthe General Criteria EAL 4.

4. Choose the most appropriateemergency action level.

4a. If upgrading, go to Specific Task #4of this tab, "Document andcommunicate the newclassification."

4b. If downgrading from a Site AreaEmergency or General Emergencyyou must get concurrence from:(1) NRC(2) DEPIBRP(3) PPL Sr. VP or

VP-Nuclear Operations

4c. If terminating the emergency, go toTAB G.

5. Document and communicate the newclassification.

Document in log.

Page 18: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

.Z I~~~~~~~

'-

TAB BEP-PS-1 01-BRevisioaAA'/?tPage 3of 4

U.

. . I --k1 4ml- -

SPECIFIC TASKS: HOW: (I)

(2)(3)

Time -

'Date _Emergency level

5b. Instruct either TSC Communicatorto announce classification overpage.

Sc. Instruct both TSC Communicatorsto initiate notifications (Local/State,NRC).

NOTE:PEMA, LCEMA and CCDPSmust be notified within ISminutes after classification.

NRC should be notified as'soon as possible, but within 60minutes.

Sd. At Site Area or GeneralEmergency, contact the ShiftManager to initiate accountabilityactions if not already done.

NOTE (1):- Accountability Is optional at

the alert level. It Is requiredat the SlteArea Emergency or-

- General Emergency.

:3,-

NOTE (2):Once accountability is'initiated it must bemaintained 'until the event isterminated or a site'evacuation is Initiated. '

I6a. Go to TAB D.6. Review PAR Guidance in anticipation

of escalation to a General Emergency.

&

Page 19: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

PGAF ff-2064'4'PAGEW. O FJ.LJ,

TAB 8EP-PS-101-BRevisfort.8j7Page 4of 4

. U.

.A-

S.PECIFIC TASKS: HOW:

7. When conditions warrant, declare aGeneral Energency.

7a. Within 15 minutes of declaration ofa General Emergency, perform thefollowing

(1) Ensure notifications via ENRform to PEMA, LCEMA, andCCDPS are Initiated by theTSC Communicator.

(2) Determine appropriate PAR.: Go to TAB D.

8. Continua to evaluate current PAR andrevise as appropriate based onincreasing dose levels.

8a.*- Go toTAB D.

I

Page 20: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

F'(;At *_ S)TAB C

PAGE I; OF TL),.,-,J1 EPage losts- * Page Iof 3

MAJOR TASK:

Make sure information is being communicated to company, public, and governmentpersonnel. This includes calls you make directly.

SPECIFIC TASKS: HOW:

1. Assure offsite agencies and internalmanagement are notified.

la. Direct the TSC E-PlanCommunicator to complete theEmergency Notification Reportusing guidance provided in the'Emergency Action LevelReference ManuaL"

HELPBrief Non-TechnicalDescriptions of EAL

See TAB 4

lb. If the TSC is in control of theEmergency, direct both of the TSCCommunicators to notify offsiteorganizations when a siteevacuation of non-essentialpersonnel is initiated.

Ic. If the EOF is in control, direct theE-Plan Communicator to notifythe EOF Communicator to notifyoffsite organizations when a siteevacuation is initiated.

Id. If the EOF is in control, the TSCNRC Communicator will informthe NRC when a site evacuation isinitiated.

HELPEmergency Telephone

InstructionsSee TAB 1

Page 21: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

-.;, . -1

PAGE 4OFJ.Lj

. .

TAB CEP-PS-101-C ,Revisionk 9Page 2 of 3

.I

SPECIFIC TASKS: HOW:

2. Evaluate if there is a non-routineRadiological Release in progress

2a. Refer to Tab I for additionalguidance in making thisdetermination.

2b. If offsite radiological release is inprogress, the Rad ProtectionCoordinator informs DEP/BRPwith Protective ActionIRecomrnmendation Form.

2c. If offsite radiological release is inprogress, insure the TSCCommunicator provides thatinformation on the ENR form(Block 4)

3. Provide static updates on the,emergency to TSC staff.

4. Periodically meet with lead TSCCoordinators to discuss informationabout the emergency.

4a. Conduct routine meetingsapproximately every 30 to 60minutes to:,(1)' Set up action items.(2) Set priorities.(3) Clarify responsibilities.(4) Discuss long-range

requirements.(5) Allocate resources.

HELPTSC Staff Responsibilities

See TAB 11

HELP.TSC/EOF BRIEFING CHECKLIST

See TAB 5

Sa. Set conference call by dialing 199on your CTN phone.

5. Present emergency status and TSC: priorities diring EOF conference call.

)...

Page 22: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

i-'*' ./otPGAG4L ff .. L'

PAGE 0t FTJ1TAB CEP-PS-101-CRevision.8 &Page 3 of 3

tL.41,

06..

SPECFC TASKS: BOW:

NOTE:Emergency Telephone DIrectoryCentrex System Conferencing.

Sb. Provide information concerning:(1) Plant status.(2) Radiological conditions.

* (3) Classification level.

* . 6. Approve news releases before beingissued by PIM-

. 7. Approve Emergency NotificationReports prior to transmission.

8. Approve Protective ActionRecommendation Forms pribr totransmission.

Insure emergency information is provided tothe offsite agencies

9

8a Approval by Emergency Directorrequired only if Public Protective ActionRecommendation is made.

9a: Direct the TSC Emergency PlanCom.mnicator to generate an ENR form forsignificant events:

* When the TSC has taken control ofthe Emergency.

* Initiation of a site evacuation* Emergency classification at the

current level but due to anunrelated EAL

* Change in radiological releasestatus

* Medicai transport of a.* contaminated individual

* Fire requiring assistance fromoffsite fire companies

- Othersignificant events as. determined by the Emergency,Director.

lOa. Announce the following items via the plantPA system

NOTE: THIS ACTION CAN BEASSIGNED TO THE TSC E PLANCOMMUNICATOR.• Emergency. Classification arid EAL.o Public Protective Actionb

recommendations.On-site protective actions

°- Initiation of accountabilityInitiation of site evacuation

o Local Area evacuationso Other items of significance as

determined by the Emergency Director

kLI.-. , .

10. Insure cmergeocy infomlation is provided to* . plant pexsonnd

.

..

.. .

.

. .

..

,_. :

V .i- - *s

.. .

. .

. . . .

. . .

z= 1111-

Page 23: Susquehanna, Units 1 and 2 - Revision 19 to EP-PS-101 ... · to: b lb. 01/19/2004 location: document control desk "rom: nuclear records document control center:nucsa-2) \_'jhe following

KUAF f . TAT B G.

PAGL~~fLOLILJ EtP-PS.1014G

-.. Pagel1of I

ILl k.

MAJOR TASK:

Turn over Emergency Management to EOF, but continue to assess plant conditions andevaluate reclassification based on plant parameters.

SPECIFIC TASKS: HOW:

1. Collect turnover infornation fromdesignated sourcs

la. Use turnover checklist.

. . HELPTSCIEOF TURNOVER CHECKLIST

See TAB 5

2. Turnover ofcontrol of overallmanagement of emergency activitiesfrom the TSC to the EOF.

2a. . Review turnover checklist withRecovery Manager.

NOTE: IF AN EAL DECLARATIONHAS JUST BEEN MADE IN THETSC, INSURE THAT OFFSITENOTIFICATIONS ARE MADE BYTHE TSC PRIOR TO TURNOVERTO THE EOF.

NOTE: IFA GENERAL.EMERGENCY WAS JUSTDECLARED IN THE TSC INSURETHAT THE PAR AND PARNOTIFICATIONS ARE MADE BYTHE TSC PRIOR TO TURNOVERTO THE EOP..

3CL

A~a-

3. Continue to assess plant conditions and* evaluate reclassification plant

paramctenS.

NOTE: . .- The Emergency Director Is

responsible to notify the .Recovery Manager whenIn-plant conditions associated

. with an Emergency ActionLevel have been reached.