SURVEY & TOWER SPOTTING FOR TRANSMISSION LINES

BY

G. EMMANUEL MADHUKAR

APTRANSCO

Page 2: surveytsforehvlines-130617030553-phpapp02

TRANSMISSION LINES

Page 3: surveytsforehvlines-130617030553-phpapp02

TRANSMISSION LINES

Page 4: surveytsforehvlines-130617030553-phpapp02

TRANSMISSION LINES

• Extra High Voltage – 110 kV, 132 kV, 220 kV, 400 kV

• Ultra High Voltage– 765kV

• High Voltage Direct Current– ±500kV

Page 5: surveytsforehvlines-130617030553-phpapp02

TRANSMISSION LINES

• Survey is the most important activity Survey is the most important activity

• Best possible routeBest possible route

• Right of WayRight of Way

• Techno-Economical ProjectTechno-Economical Project

• Timely completion of the projectTimely completion of the project

• Increasing DemandIncreasing Demand

Page 6: surveytsforehvlines-130617030553-phpapp02

PRELIMINARY SURVEY AND WALK OVER SURVEY

• Topographical map

• Bee line

• Identify possible routes

• Familiarize

• Indicate the feasibile routes

Page 7: surveytsforehvlines-130617030553-phpapp02

TOPO MAP

Page 8: surveytsforehvlines-130617030553-phpapp02

TOPO MAP

Sending end SSSending end SS

Receiving end SSReceiving end SS

AP 1AP 1

AP 2AP 2

AP 3AP 3

AP 4AP 4

Bee LineBee Line

Page 9: surveytsforehvlines-130617030553-phpapp02

PRELIMINARY SURVEY – SELECTION OF ROUTE

• Shortest possible route

• Less number of deviations

Page 10: surveytsforehvlines-130617030553-phpapp02

DETAILED SURVEY – TOOLS

• Theodolite & Ranging rods

• Dummpy level & Measuring staff

• Measuring chain

• Megger

Page 11: surveytsforehvlines-130617030553-phpapp02

DETAILED SURVEY – Theodolite

Page 12: surveytsforehvlines-130617030553-phpapp02

DETAILED SURVEY

• Fixing of Alignment

• Fixing of Line Points

• Fixing of Angles of deviation

• Fixing of Angle Points

• Fixing of Direction Points

• Measuring of distance between Angle Points

• Levels at every 10 M interval or where there is level difference of 30 Cm

Page 13: surveytsforehvlines-130617030553-phpapp02

DETAILED SURVEY

• Details of Roads

• Details of Villages

• P & T Lines Crossings

• All Power Lines Crossings – LT to 765 kV

• Railway Crossings

• River Crossings

• Agricultural wells, Field bunds & Earth bunds etc.

• Measuring Soil resistivity at 1 Km interval

• Trial Pits

• Crop & Tree enumeration

Page 14: surveytsforehvlines-130617030553-phpapp02

DETAILED SURVEY-OBLIGATORY POINTS

• Avoid

• Reserve Forest Area

• Military Firing Ranges

• Aerodromes

• Inhabited and thickly populated areas

• Hilly terrain

• Marshy, Low lying & Submersible areas

• Higher & 90 degrees angle turnings

• Oil & Gas storage areas

Page 15: surveytsforehvlines-130617030553-phpapp02

DETAILED SURVEY – CORRIDORS

• 132 kV Line 27 M

• 220 kV Line 35 M

• 400 kV Line 52 M

Page 16: surveytsforehvlines-130617030553-phpapp02

DETAILED SURVEY –LINE PROFILES

• Graphical representation

• Scale

X-axis 1 Cm = 20 M

Y-axis 1 Cm = 2 M

• Plot Plan of Alignment of Line from AP to AP

• Plot Distances

• Plot Levels with respect to distance

Page 17: surveytsforehvlines-130617030553-phpapp02

DETAILED SURVEY –LINE PROFILES

• Indicate all Power Lines crossings: LT to 765 kV

• Indicate all P & T Lines crossings

• Indicate all Railway crossings

• Indicate all River crossings

• Indicate all Roads: Cart Tracks to National Highways

• Indicate all Villages

Page 18: surveytsforehvlines-130617030553-phpapp02

DETAILED SURVEY –LINE PROFILES

• Indicate all Agricultural wells

• Indicate all Field bunds & Earth bunds

• Indicate all Boulders

• Indicate all Ponds & Lakes

• Indicate type of Soil

• Indicate Crops & Trees

Page 19: surveytsforehvlines-130617030553-phpapp02

DETAILED SURVEY –LINE PROFILES

Page 20: surveytsforehvlines-130617030553-phpapp02

DETAILED SURVEY –LINE PROFILES

Page 21: surveytsforehvlines-130617030553-phpapp02

DETAILED SURVEY –LINE PROFILES

Page 22: surveytsforehvlines-130617030553-phpapp02

DETAILED SURVEY –LINE PROFILES

Page 23: surveytsforehvlines-130617030553-phpapp02

TOWER SPOTTING –SAG TEMPLATE

Page 24: surveytsforehvlines-130617030553-phpapp02

TOWER SPOTTING

• Identify the position of Terminal Tower

• Start from Terminal Tower

• Match the tower footing curve with the position of TT

• Adjust the position of template

• Ensure Ground Clearance

• Identify the position of next tower

• Move the template to the next tower

• Repeat the procedure

Page 25: surveytsforehvlines-130617030553-phpapp02

TOWER SPOTTING

• NORMAL SPAN: It is the design span

• ACTUAL SPAN: It is the actual distance between two adjacent towers

• NULL POINT: It is a point in a span where the position of the conductor is lowest (or) It is a point in a span where the sag is maximum

• WEIGHT SPAN: The distance between two adjacent null points

• WIND SPAN: It is the distance between the two centre points of adjacent spans

Page 26: surveytsforehvlines-130617030553-phpapp02

TOWER SPOTTING –SPAN LIMITATIONS

SPAN 132 kV 220 kV 400 kV

NORMAL SPAN 320 M 350M 400 M

WIND SPAN

Both 320 M 350 M 400 M

Single 192 M 210 M 240 M

WEIGHT SPAN

Both 400 M 450 M 600/800 M

Single 240 M 270 M 300/400 M

Page 27: surveytsforehvlines-130617030553-phpapp02

TYPE OF TOWERS

ANGLE (in degrees)

132 kV

220 kV

400kV

0 to 2 P A DA

2 to 15

R

B DB

15 to 30 C DC

Above 30 S D DD

Page 28: surveytsforehvlines-130617030553-phpapp02

TYPE OF TOWERS

ANGLE (in degrees)

132 kV

220 kV

400 kV

0 to 2 K X MA

2 to 30 L Y MC

Above 30

M Z MD

Page 29: surveytsforehvlines-130617030553-phpapp02

132 kV TOWERS Suspension

3900

3860

3860

14653

4200

Tension

7200

3900

4000

12583

7750

Page 30: surveytsforehvlines-130617030553-phpapp02

220 kV TOWERS Suspension

4865

5050

5050

19380

6295

Tension

7795

5050

5082

17048

10800

Page 31: surveytsforehvlines-130617030553-phpapp02

400 kV TOWERS Suspension

3000

8000

8000

25800

12000

Tension

6800

8000

8100

22000

15000

Page 32: surveytsforehvlines-130617030553-phpapp02

RIVER CROSSING TOWERS JC

4729

5127

5268

6357

17670

AT/400 kV

6900

9000

9000

46570

25000

Page 33: surveytsforehvlines-130617030553-phpapp02

EHV TRANSMISSION LINES CROSSING

Page 34: surveytsforehvlines-130617030553-phpapp02

CLEARANCES

132 kV 220 kV 400 kV

Ground Clearance 6.1 M 8.5 M 9.0 M

LT to 132 kV and P& T Lines

3.1 M 4.6 M 5.5 M

220 kV 4.6 M 4.6 M 5.5 M

400 kV 5.5 M 5.5 M 5.5 M

Page 35: surveytsforehvlines-130617030553-phpapp02

CLEARANCES

132 kV 220 kV 400 kV

Highway Crossing 9 M 9 M 9M

Railway Crossing 14.6 M 15.4 M 17.9 M

Railway Crossing Span (Max)

2/3 of NS 2/3 of NS 2/3 of NS

Distance between Tower & Railway

Track (Min)TH+6 M TH+6 M TH+6 M

Page 36: surveytsforehvlines-130617030553-phpapp02

TOWER SCHEDULES

Location No.

Type of Tower

Angle of Deviation (degrees)

Span (M)

Left Wt. Span (M)

Right Wt. Span(M)

Total Wt. Span (M)

Remarks

SS Boom - - - - Boom at sending end SS

70

1 TT S 35 L - 75 -Terminal tower at sending

end SS

210

2 P - 135 150 285

300

3 R 22 R 150 130 280 Near village

280

4 P+3 - 150 125 255 33 kV Line crossing

250

Page 37: surveytsforehvlines-130617030553-phpapp02

CHECK SURVEY

• Marking of Tower Location

• Forward & Backward Line Points

• Pit Marking

• Excavation

Page 38: surveytsforehvlines-130617030553-phpapp02

MODERN TECHNIQUES

• Global Positioning System

• Total Station

• PLS CADD

Page 39: surveytsforehvlines-130617030553-phpapp02

GLOBAL POSITIONING SYSTEM

• Satellite dependent

• Latitude & Longitude coordinates of the position

• Starting coordinates and ending coordinates

• Map Source Software

• Google Earth

• Topo sheet can be generated

• Bee Line & Routes can be marked

Page 40: surveytsforehvlines-130617030553-phpapp02

GLOBAL POSITIONING SYSTEM

Page 41: surveytsforehvlines-130617030553-phpapp02

TOTAL STATION

• Similar to Theodolite

• Not dependent on satellite

• Arbitrary Coordinates of the position

• Coordinates of the position obtained from GPS

• Alignment, Distance & Levels are recoded simultaneously

• Horizontal & Vertical Angles can be recorded

Page 42: surveytsforehvlines-130617030553-phpapp02

TOTAL STATION

• Raw data

• Text

• Auto Plotter

• Auto CAD

• Line Profile can be generated

Page 43: surveytsforehvlines-130617030553-phpapp02

PLS CADD

• Data from Total Station

• Sag calculation data

• Tower Spotting

• 2-D Model can be generated

• 3-D Model can be generated

Page 44: surveytsforehvlines-130617030553-phpapp02

PLS CADD

Page 45: surveytsforehvlines-130617030553-phpapp02

PLS CADD

Page 46: surveytsforehvlines-130617030553-phpapp02

IMPORTANT POINTS- Survey

• Length of the line

• Levels in the corridors

• Crossings

• Markings in check survey

Page 47: surveytsforehvlines-130617030553-phpapp02

Thank You&

God Bless You