Page 1 of 12 CURRICULUM VITE PERSONAL INFORMATION Name: Ragab Atta Ragab Nationality: Egyptian Current address: Benha / Emam st. no16 Tel.no :01066010539 E.mail : ragab_ [email protected] Date of birth : 08/06/1973 Marital status : Married Military status : Finished Education : Zagazig University B.SC. Sciences (math & computer dep.) Languages: -Arabic (mother tongue) -English (good) SKILLS 1- User for total station (LEICA) LEICA 1100 & LEICA 1800 & LEICA 1103 & LEICA 1203 & LEICA 1201 2- Quantities survey for excavations & backfilling uses computer programs Autodesk Land Desktop program AutoCAD program Surfer program Microsoft windows Microsoft Office

Upload: ragabata

Post on 21-May-2015

10.479 views

Category:

Documents


3 download

DESCRIPTION

Surveyor & QUANTITY SURVEYOR

TRANSCRIPT

Page 1: Surveyor c.v

Page 1 of 12

CURRICULUM VITE

PERSONAL INFORMATION

Name: Ragab Atta Ragab

Nationality: Egyptian

Current address: Benha / Emam st. no16

Tel.no :01066010539

E.mail : [email protected]

Date of birth : 08/06/1973

Marital status : Married

Military status : Finished

Education : Zagazig University

B.SC. Sciences (math & computer dep.)

Languages: -Arabic (mother tongue)

-English (good)

SKILLS

1- User for total station (LEICA) LEICA 1100 & LEICA 1800 &

LEICA 1103 & LEICA 1203 & LEICA 1201

2- Quantities survey for excavations & backfilling uses computer

programs

Autodesk Land Desktop program

AutoCAD program

Surfer program

Microsoft windows

Microsoft Office

Page 2: Surveyor c.v

Page 2 of 12

Experiences

11-2011 ~ Till Now

(Besix-Orascom JV, Egypt)

Project:

El-Ain El sokhna Supercritical power plant

Consultant:

PGESCO

ENGINEERING AND CONSULTANTS (A & A)

Owner:

East Delta Electricity Production Company (EDEPC)

Position : Surveyor

DUTIES:

Prepare site layout & surveying work.

The scope of civil works includes the construction of 3 pipelines

totaling a length of approximately 5.1 km

Prepare shop drawing.

Controlling execution of work:

(Formwork, excavations, and backfilling) Make a surveying in each area.

Issue inspection and test plan.

Helping the site team and in preparing work procedure and

method statement.

Page 3: Surveyor c.v

Page 3 of 12

11-2010 ~ 11-2011:

(ARCHIRODON for Construction (Overseas) Co. S.A)

Project : Damietta cycle power plant 500mw.

Consultant: Power Generation Engineering and Services Company

PGESCo

Owner:

East Delta Electricity Production Company (EDEPC)

4 Gas Turbine (500 MW).

Piles .

Civil .

Infra Structure.

Position : Survey Senior

DUTIES:

Prepare site layout & surveying work.

Prepare shop drawing.

Controlling execution of work:

(Formwork, excavations, and backfilling) Make a surveying in each area.

Issue inspection and test plan.

Helping the site team and in preparing work procedure and

method statement.

Page 4: Surveyor c.v

Page 4 of 12

05-2010 ~ 11-2010:

(ARCHIRODON for Construction (Overseas) Co. S.A)

Project:

El-Ain El sokhna Supercritical power plant

(Piling works)

Consultant:

PGESCO

ENGINEERING AND CONSULTANTS (A & A)

Owner:

East Delta Electricity Production Company (EDEPC)

Position : Survey Senior

DUTIES:

Prepare site layout & surveying work.

Prepare shop drawing.

Controlling execution of work:

(Formwork, excavations, and backfilling) Make a surveying in each area.

Issue inspection and test plan.

Helping the site team and in preparing work procedure and

method statement.

Page 5: Surveyor c.v

Page 5 of 12

05-2009 ~ 04-2010 : El- Nasr Building & Construction Company " EGYCO " Project:

( المنيا –بنً سىيف )مشروع ابنً بيتك

Consultant:

مكتب الدكتىر السعداوي لالستشاراث الهندسيت

Owner:

( المنيا الجديده –بنً سىيف )جهاز تنميت

Project description:

انشاء محطة رفع

كيلومتز فى ارض صخزيو 5 كيلو متز الى 1 طزيق باطوال مختلفو من 46انشاء

(صزف صحى والتغذية بالمياه )انشاء البنية الداخلية

Position : Survey Senior

DUTIES:

Prepare site layout & surveying work.

Prepare shop drawing.

Controlling execution of work:

(Formwork, excavations, and backfilling) Make a surveying in each area.

Issue inspection and test plan.

Helping the site team and in preparing work procedure and

method statement.

Page 6: Surveyor c.v

Page 6 of 12

09-2007 ~ 03-2009 :

(ARCHIRODON for Construction (Overseas) Co.S.A)

(Archirodon Arab Contractor- JV)

Project:

New container terminal and Quay wall Damietta port Egypt

Consultant:

HPC Hamburg Port Consulting

SELLHORN INGENIEURGESELLSCHAFT

Owner:

Damietta international ports S.A.E.

Project description:

Quay wall for 1400m length with 38m height

Container terminal area (280000 m2)

Administration and amenities buildings and utilities

Position : Survey Senior

DUTIES:

Prepare site layout & surveying work.

Prepare shop drawing.

Controlling execution of work:

(Formwork, excavations, and backfilling) Make a surveying in each area.

Issue inspection and test plan.

Helping the site team and in preparing work procedure and

method statement.

Page 7: Surveyor c.v

Page 7 of 12

04-2005~ 05-2007:

شركت المشروعاث الصناعيت والهندسيو

Project:

Constructing of village at (Sahl-Eltena)

Consultant:

Development of Sinai instrument

Owner:

Ministry of irrigation

Project description:

Constructing village on 240,000 m2 includes 350 cabins

Constructing a main building for its village

Constructing its services (roads & pipe lines & elevated tank…etc.)

Position : Surveyor

DUTIES:

Prepare site layout & surveying work.

Prepare shop drawing.

Controlling execution of work:

(Formwork, excavations, and backfilling) Make a

surveying in each area.

Controlling assembling of pipelines and its joints.

Issue inspection and tests of pipelines and elevated tank.

Helping the site team and supervisor in preparing work

procedure and method statement.

Make a restrict and invoice with main contractor and

subcontractor.

Page 8: Surveyor c.v

Page 8 of 12

01-2004 ~ 02-2005:

(El salam-Misr for trading and contracting)

Project:

Livestock terminal handing facility & infra structure

Consultant:

Sabbour for consultants

Owner:

Sokhna port development co. (SPDC)

Project description:

Live stock terminal area (206080 m2)

.

Two roads (walk way & paving road).

Cover areas by steel structure.

Make water trough and footer trough for live stock terminal.

Position : Survey Senior

DUTIES:

Make leveling for area for live stock terminal

Issue inspection for leveling and compaction test.

Maintain document register in connection with quality records.

Make leveling for two roads (walk way & paving road).

Helping the site team in preparing work procedure and method

statement.

Make a restrict and invoice with main contractor and

subcontractor.

Page 9: Surveyor c.v

Page 9 of 12

01-2002 ~ 12-2003:

(ARCHIRODON for Construction (Overseas) Co. S.A)

Project:

Port Said East Container Terminal

Consultant:

Posford Duvivier Haskoning, Pacer, U.K

Owner:

Suez Canal Container Terminal S.A.E

Project description:

Container terminal area (400000 m2)

Administration and amenities buildings

Concrete paving blocks (360000 m2)

Sand cement under concrete paving block.

Position : Survey Senior

DUTIES:

Prepare site layout & surveying work.

Prepare shop drawing.

Controlling execution of work:

(Form work, excavations, backfilling Make a surveying in each area.

Issue inspection and test plan.

Helping the site team and in preparing work procedure and

method statement.

Make a restrict and invoice with main contractor and

subcontractor.

Page 10: Surveyor c.v

Page 10 of 12

10-2000 ~ 12-2001:

(شركت القنطره للبترول)

Project:

Preparing the sites and its roads of drilling for natural gas

Owner:

القنطزه للبتزول

Project description:

Yard of drilling of ten sites (180000 m2)

Roads service for this yards (50.0 km)

Backfilling of coarse aggregate with thick (40 cm)

Pipe lines services.

Position : Surveyor

DUTIES:

Prepare site layout & surveying work.

Make site leveling of areas and backfilling of it by coarse

aggregate to prepare it for drilling.

Make a surveying in each area and roads.

Issue inspection and surveying check.

Helping the site team in preparing work procedure and method

statement.

Make a restrict and invoice with main contractor and

subcontractor.

Page 11: Surveyor c.v

Page 11 of 12

05-1999~09-2000:

(ً ( الشركو العامت لألستصالح األراض

Project:

Intakes 3&5&7 in El-Salam Canal

Consultant:

Development of Sinai instrument

Owner:

Ministry of Irrigation

Project description:

3 pump stations

Main Pipes lines & sub main Pipes lines for El-Salam canal

Roads and excavations& backfilling work’s

Position : Surveyor

DUTIES:

Prepare shop drawing.

Controlling execution of work:

(Form work, excavations, backfilling)

Controlling assembling of pipelines and its joints.

Issue inspection and tests of pipelines and elevated tank.

Supervising for roads (cut & fill) and pipe lines connected with

intakes.

Make coarse agg. For roads with thick. (30.0 cm)

Page 12: Surveyor c.v

Page 12 of 12

02-1998~04-1999:

شركت مصر الجديدة لألسكان والتعمير

Project:

Group of resident building

Owner:

شركت مصر الجديدة لألسكان والتعمير

Project description:

Group of resident building

Infrastructure of resident building

Make a landscape of resident building

Position : Surveyor

DUTIES:

Prepare site layout & surveying work.

Controlling execution of work:

(Form wok, excavations, backfilling)

Supervising of group of resident building.

Supervising of Road service of its group and green area with

parking.

Helping the site team in preparing work procedure and method

statement.

Make invoice with main contractor.