Surrender Detail of 144 DUs and Proportionate Infrastructure of BSUP Project of Lucknow -1632
S.No.
District/Project
Name
Dus ProjectCost
ACAS
anctioned
ACAR
eleased
Bal.ACAB
efore
Surr.
Surrender Detail ACABalance
after
Surr.Dwelling Unit Infrastructure Total
Nos. Cost ACA Cost ACA Total
Cost
Total
ACA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1- Lucknow
Nagar
1632 3252.65 1478.48 1108.86 369.62 144 224.64 112.32 36.25 18.125 260.89 130.45 239.18
Note:-In the above project 144 Dus are to be surrendered due to boundary dispute with army. In this partial surrender
infrastructure is proposed to be surrender on pro-rata basis.
-
8/12/2019 Surrender PPT Lucknow-1632
2/5
Comparative Chart of BSUP Project of Lucknow-1632
Original Sanctioned in 8thCSMC 29/12/2006Revised Proposal Approved in the 147thCSMC
26/09/2013
ComponentsProject
Cost
Central
Share
State
ShareComponents
Project
Cost
Central
Share
State
Share
A. Housing
Housing 1632 Dus @Rs. 1.56 lacs per unit
2545.92 1272.96 1272.96Housing 1488 Dus @Rs. 1.56 lacs per DU
2321.28 1160.64 1160.64
Sub Total (A) 2545.92 1272.96 1272.96 Sub Total (A) 2321.28 1160.64 1160.64
B. Infrastructure
1. Water Supply 50.58 25.29 25.29 1. Water Supply 46.26 23.13 23.13
2. Sewerage 72.61 36.31 36.31 2. Sewerage 65.39 32.70 32.70
3. Roads, Pathways &
Drainage 192.08 96.04 96.04
3. Roads, Pathways &
Drainage 175.94 87.97 87.97
4. Street Lighting 20.76 10.38 10.38 4. Street Lighting 18.88 9.44 9.44
5. Common Amenities 45.00 22.50 22.50 5. Common Amenities 41.03 20.51 20.51
6. Site Leveling 30.00 15.00 15.00 6. Site Leveling 27.29 13.64 13.64
Sub Total (B) 411.03 205.52 205.52 Sub Total (B) 374.79 187.39 187.39
Total (A+B) 2956.95 1478.48 1478.48 Total (A+B) 2696.07 1348.03 1348.03
C. Other Charges1. A&OE @ 5% 147.85 0.00 147.85 1. A&OE @ 5% 134.80 0.00 134.80
2. IEC & Project
Preparation @ 5%147.85 0.00 147.85
2. IEC & Project
Preparation @ 5%134.80 0.00 134.80
Sub Total (C) 295.70 0.00 295.70 Sub Total (C) 269.60 0.00 269.60
Project Cost (A+B+C) 3252.65 1478.48 1774.17 Project Cost (A+B+C) 2965.67 1348.03 1617.63
-
8/12/2019 Surrender PPT Lucknow-1632
3/5
Details of the Truncated Qty. to be Executed after curtailment at Kharika, Lucknow-1632 Dus
S.
No.Item of Work
Provision of Original Sanctioned DPR for
456 Houses
Truncated Qty. to be Executed for 312
Houses
Qty. Unit Rate Amount Qty. Unit Rate Amount
1 C.C. Pavements 7774.40 Sqm. 623.00 4843451.20 5321.40 Sqm. 623.00 3315232.20
Total 7774.40 Sqm. 623.00 4843451.20 5321.40 Sqm. 623.00 3315232.20
2S.W. Pipes for
Sewer Work1000 Rmt. 772.00 772000.00 684.21 Rmt. 772.00 528210.12
Manhole
90x90x10020 No. 8950.00 179000.00 14 No. 8950.00 125300.00
900x800x900 85 No. 5923.00 503455.00 58 No. 5923.00 343534.00
900x800x450 150 No. 5635.00 845250.00 103 No. 5635.00 580405.00
Total 2299705.00 1577449.12
3 Storm Water Drain 1326.70 Rmt. 203.00 269320.10 907.74 Rmt. 203.00 184271.22
Total 1326.70 Rmt. 203.00 269320.10 907.74 Rmt. 203.00 184271.65
4Water Supply
System1326.70 Rmt. 1031.00 1367827.70 907.75 Rmt. 1031.00 935890.25
Total 1326.70 Rmt. 1031.00 1367827.70 907.75 Rmt. 1031.00 935885.10
5 Street Light Pole 50.00 No. 11800.00 590000.00 34.00 No. 11800.00 401200.00
Total 50.00 No. 11800.00 590000.00 34.00 No. 11800.00 401200.00
Grant Total 9370304.00 6414038.07
-
8/12/2019 Surrender PPT Lucknow-1632
4/5
Details of the Truncated Qty. to be Executed after curtailment at BSUP Lucknow-1632 Dus
S.
No.Item of Work
Provision of Original Sanctioned DPR for
1632 Houses
Truncated Qty. to be Executed for 1488
Houses
Qty. Unit Rate Amount Qty. Unit Rate Amount
1 C.C. Pavements 29234.58 Sqm. 623.00 18213143.34 26781.58 Sqm. 623.00 16684924.34
Total 29234.58 Sqm. 623.00 18213143.34 26781.58 Sqm. 623.00 16684924.34
2S.W. Pipes for
Sewer Work3200.00 Rmt. 772.00 2470400.00 2884.21 Rmt. 772.00 2226610.12
Manhole 90x90x100 68.00 No. 8950.00 608600.00 62.00 No. 8950.00 554900.00
900x800x900 240.00 No. 5923.00 1421520.00 213.00 No. 5923.00 1261599.00
900x800x450 490.00 No. 5635.00 2761150.00 443.00 No. 5635.00 2496305.00
Total 7261670.00 6539414.12
3 Storm Water Drain 4895.38 Rmt. 203.00 993762.14 4476.42 Rmt. 203.00 908713.26
Total 4895.38 Rmt. 203.00 993762.14 4476.42 Rmt. 203.00 908713.26
4Water Supply
System4906.38 Rmt. 1031.00 5058477.78 4487.42 Rmt. 1031.00 4626530.02
Total 4906.38 Rmt. 1031.00 5058477.78 4487.42 Rmt. 1031.00 4626530.02
5 Street Light Pole 176 No. 11800.00 2076800.00 160.00 No. 11800.00 1888000.00
Total 176 No. 11800.00 2076800.00 160.00 No. 11800.00 1888000.00
Sub Total 33603853.26 30647581.74
6 Common Amenities Lump sum taken in all slums 4500000.00 Lump sum taken in all slums 4103000.00
7 Site Leveling Lump sum taken in all slums 3000000.00 Lump sum taken in all slums 2729000.00
Grant Total 41103853.26 37479581.74
-
8/12/2019 Surrender PPT Lucknow-1632
5/5
Detail of Services
S.No. Item of WorkAmount
(Rs. in lacs)
Paara Gram Kharika Semra Gauri Hewat Mau Total
1- C.C. Pavements 58.73 33.15 32.79 42.17 166.84
2- S.W. Pipes for Sewer Work 21.34 15.77 12.95 15.33 65.39
3- Storm Water Drains 3.22 1.84 1.92 2.12 9.10
4- Water Supply System 16.36 9.36 9.76 10.78 46.26
5- Street Light Pole 5.43 4.01 5.31 4.13 18.88
6-Park & Abroculture, Compound
Wall etc.-- -- -- -- 41.03
7- Site Leveling -- -- -- -- 27.29
Grand Total 105.08 64.13 62.73 74.53 374.79