surfacebopjob.xls
TRANSCRIPT
7/28/2019 SurfaceBopJob.xls
http://slidepdf.com/reader/full/surfacebopjobxls 1/2
WELL GEOMETRY SEC 1 SEC 2 SEC 3 SEC 4 SEC 5 SEC 6
Length, ft? = 927 8,794
Hole Size, in? = 8.75 8.75
Pipe OD, in? = 7 5
Pipe ID, in? = 3 4.276PRE-KICK DATA MUD PU
Original Mud Weight, ppg? = 8.9 Liner Size, in? =
TVD Last Casing Shoe, ft? = 5,400 Stroke Length, in? =
EMW of Last Shoe Test, ppg? = 12.0 Rod Size, in? =
Slow Pump Pressure, psi? = 0 Pump Efficiency, %? =
Slow Pump Rate, spm? = 0 TRIPLEX, bbl/stk
Volume Active Mud Pits, bbls? = 0 USER NOTES . . . .
KICK DATA
TVD of Well, ft? = 9,721
SIDPP, psi? = 0
SICP, psi? = 0
Pit Gain, bbls? = 0CALCULATIONS
Kill Mud Weight 8.90 Mud Weight For a 100 psi Trip Margin, ppg
Initial Circulating Drill Pipe PSI 1,000 Estimated Length of Kick Material
Final Circulating Drill Pipe PSI 1,000 Estimated Density of Kick Material, ppg
Kill Mud - Surface to Bit, stks 1,798 Max Allowable Casing Pressure, psi
Kill Mud - Surface to Surface, stks 6,891 Min Depth to Run Drill Pipe For a Kill Off-Bottom
DRILL PIPE SCHEDULE DRILL PIPE SUMMA
STROKES PRESSURE MINUTES Capacity, bbls
0 1000 #DIV/0! Displacement, bbls
180 1000 #DIV/0! Surface to Bit, strokes
360 1000 #DIV/0! Measured Depth or Length of Drill String, ft
540 1000 #DIV/0! ANNULUS SUMMAR
719 1000 #DIV/0! Capacity, bbls
899 1000 #DIV/0! Bit to Surface, strokes
1079 1000 #DIV/0! Bit to surface, minutes
1259 1000 #DIV/0! BARITE REQUIREME
1439 1000 #DIV/0! Sacks Needed to Weight-Up 100 Barrels of Mud
1619 1000 #DIV/0! Total Sacks For System
1798 1000 #DIV/0! Volume Increase in System, bbl
ensity of kick material < 2 ppg = POSS GA Mixing Rate, sxs/min
DRILL PIPE SECTIONS SEC 1 SEC 2 SEC 3 SEC 4 SEC 5 SEC 6
Barrels 8.1 156.2 0.0 0.0 0.0 0.0
Strokes 89 1710 0 0 0 0
Displacement, bbl 36.0 57.4 0.0 0.0 0.0 0.0
ANNULUS SECTIONS SEC 1 SEC 2 SEC 3 SEC 4 SEC 5 SEC 6
Barrels 24.8 440.5 0.0 0.0 0.0 0.0
Strokes 272 4821 0 0 0 0
Annular Velocity, fpm 0 0 0 0 0 0
UPDATE APRIL 1995 THE END APP
A GENERAL WELL KILL PROCEDURE FOR "WAIT & WEIGHT METHOD" USING SURFACE BOP STACK
1. Increase mud weight in active pits to KILL WEIGHT.
2. Zero stroke counters. Start pump and simultaneously open choke. Pressure on the choke initially should be the
shut-in casing pressure and this pressure should be maintained while the pump rate is brought up to the kill rate.
3. HOLD PUMP RATE CONSTANT and adjust choke so that the drill pipe pressure follows the above schedule. If drill
pipe pressure is too high, open the choke slightly; if it is too low, close choke slightly.
4. After the Kill Mud has filled the drill pipe, MAINTAIN CONSTANT PUMP RATE and CONSTANT DRILL PIPE
PRESSURE until the annulus is filled with the kill mud.
5. When kill weight mud reaches surface, stop pump and shut well in. At this time, the casing pressure and drill pipe
pressure should be zero. If some pressure still exist on casing, open choke slightly and bleed a small amount or
volume of mud. If the well is dead, pressure should fall to zero and the flow should stop.
Reference: LSU Blow
A. Enter Well Geometry starting from bottom of hole in SEC 1B. The pump output defaults to a TRIPLEX, if Rod Size equalC. Result in cell J24 is the TVD to spot a mud weight equivale
shoe test to generate a BHP equal to the hole being full oD. Standard industry equations used for all calculations and s
CANNON 1-21
BECKHAM COUNTY OK.
WELL CONTROL WORKSH
FOR A SURFACE BOP STA
7/28/2019 SurfaceBopJob.xls
http://slidepdf.com/reader/full/surfacebopjobxls 2/2