SPRING SUPPLY CHAIN CO-OP SUB-ZERO WOLF
Robert Granger
University of Wisconsin, Madison
![Page 2: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/2.jpg)
AGENDA
Returnable Packaging Project Counts and labeling
Improved forecasting
RFID
Documentation and sustainability
Supplier Scorecard
Department Dashboard
CMII Gantt Chart
CRP level loading
Phoenix Drawer Tub Analysis
OEE Report Breakdown
Brake Press Root Cause Analysis
Safety Stock Update Tracking
Fab Schedule Adherence Tracker
![Page 3: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/3.jpg)
RETURNABLE PACKAGING Developments since January 2016
![Page 4: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/4.jpg)
COUNTS, TL9 CREATION, AND LABELS
Created 25 new TL9 systems
TL9: Same dimensions, dunnage, vendor
Worked with vendors to performed bin counts
Nearly 100% of all bins now counted and documented
73 TL9 Systems
10,000 bins
Over $5 million in value
90% of all TL9 bins now properly labeled
![Page 5: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/5.jpg)
BIN NEED CALCULATOR
Redesigned Bin Need Calculator
All packaging data populated into XA’s planning tab
3-5 second updates (previously, 3-5 minutes)
Pop-up
Short-term bin need
Automatic error detection
Safety stock calculator
An example pop-up form in the Bin Need Calculator
![Page 6: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/6.jpg)
![Page 7: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/7.jpg)
RFID IMPLEMENTATION
Scanners at dock doors
1200 bins tagged
Populated SQL database
Developed in/out logic and associated software
Reports (aging, turns, shortage)
RFID Portable ScannerVBA/SQL to Handle Processing
Basics of RFID
Dock Door Scanners
![Page 8: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/8.jpg)
![Page 9: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/9.jpg)
![Page 10: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/10.jpg)
SUPPLIER SCORECARD Making informed, unbiased
comparisons of our suppliers
![Page 11: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/11.jpg)
SUPPLIER’S ARE RANKED ON:
Quality Material Acceptance (PPM report)
Responsiveness/Ease of business (Planner/Buyer Ranking)
Cost and Service Price Competitiveness and Value Added (Buyer Ranking)
On-Time Delivery (Late PO report)
Lead Time & Cycle Time (Lead time query table)
Order Confirmation (Vendor Confirm Report)
Accuracy and Timeliness of Paperwork (Discrepancies Query)
Capability Production Capability (Buyer Ranking)
Infrastructure (Buyer Ranking) A buyer’s view of his/her suppliers’ rankings
![Page 12: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/12.jpg)
![Page 13: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/13.jpg)
DEPARTMENT DASHBOARDEncouraging inter-warehouse
competition with accurate weekly
reports and analysis
![Page 14: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/14.jpg)
VISIBILITY AND COMPETITION
Warehouse dashboard
Percent Manufacturing Orders On Time
Total Fabrication Backlog Tracking
Percent Overall Equipment Effectiveness
Inventory Turns
Vendor Dashboard
Planning Availability
Phase Outs
Percent of Vendor Confirmation
Percent On Time Purchase Orders
![Page 15: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/15.jpg)
![Page 16: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/16.jpg)
![Page 17: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/17.jpg)
CMII GANTT CHART Microsoft Project for half the price
![Page 18: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/18.jpg)
CREATING PREDECESSOR TASK FUNCTIONALITY
A buyer’s view of his/her suppliers’ rankings
![Page 19: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/19.jpg)
CRP LEVEL LOADINGBalancing production levels
across FFT1 (Laser), FFT2 (Turret
Cluster), and FFT4 (Fiber Laser)
to reduce backlog
![Page 20: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/20.jpg)
BACKLOG AND UNEVEN LOADING
Significant amount of backlog on FFT1, FFT2, and FFT4. All perform similar functions.
Highly variable loading due to bi-weekly manufacturing orders
![Page 21: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/21.jpg)
MOVE PARTS TO DIFFERENT MACHINES TO REDUCE THIS BACKLOG/UNEVEN LOADING
Move 12 parts to a different machine
Consolidate 11 part families made on multiple machines to just one machine
![Page 22: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/22.jpg)
OEE REPORTBreaking down minutes
completed by Fab, Shift, and
Operator over time
![Page 23: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/23.jpg)
MINUTES COMPLETED BY SHIFT, OPERATOR
![Page 24: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/24.jpg)
BENEFITS AND ROOM FOR EXPANSION
Benefits:
Competition within and between shifts
Improved accuracy compared to Operation’s Efficiency Calculator
Applying minutes to 3rd shift
Relative set up times
Faster awareness of rising/falling productivity
Reports sent out daily
Can be applied to any machines
Room for expansion:
Compensation adjustments
Visibility for operators
![Page 25: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/25.jpg)
SLOW BRAKE PRESSES - ROOT CAUSE ANALYSIS
Why are some brake presses
performing less effectively than
others?
![Page 26: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/26.jpg)
CONCLUSIONS
Large differences between operators on different shifts Inefficiency caused by operators Identified 4 machines where this is the case; notified
management
Small differences between operators on different shifts, low average minutes, and a high percentage of ‘slow’ parts Inefficiency caused by slow parts
Identified 2 machines where this is the case; notified management
Majority of the inefficiencies due to differences in operators
0
100
200
300
400
500
600
1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 1 2 3 1 3 1 2 3 1 2 3 1 2 3
FAB51 FAB52 FAB53 FAB54 FAB55 FAB56 FAB57 FAB58 FAB59 FAB60FAB61FAB62FAB63FAB64 FAB65 FAB67
Average Daily Minutes by Shift, Machine
![Page 27: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/27.jpg)
SAFETY STOCK UPDATE TRACKINGMaking it simple for managers to
validate safety stock updates
and planner adherence to days
of safety stock targets
![Page 28: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/28.jpg)
ENSURING PLANNERS UPDATE SAFETY STOCK
Ensuring Recommended Safety Stock Days is followed Pulled both into monthly inventory report
Added a percent error field; automatically flags differences
Tracking Safety Stock updates
Created SS_LAST_UPDATED field in XA
Automatically updates when a part’s safety stock is changed
![Page 29: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/29.jpg)
PHOENIX DRAWER TUB ANALYSISCan we consolidate similar
drawer tub designs to reduce the
cost of large orders?
![Page 30: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/30.jpg)
CONSOLIDATING DRAWER TUB DESIGNS
Compared CAD drawings of 36 upper/lower ref/fre drawers
Sensitivity Analysis:
Potential to reduce cost by purchasing fewer tub variations
Most consolidations were approved by design engineering;
however, the tub supplier did not reduce the cost enough to justify
the changes
7024457 - 16.561x22.694x5.454
7024458 - 17.084x22.694x5.454
16.561”
17.084”
An example drawer tub consolidation
![Page 31: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/31.jpg)
FAB SCHEDULE ADHERENCE TRACKERCreating and analyzing
adherence to the schedule over
time
![Page 32: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/32.jpg)
MEASURING HOW WELL OPERATORS FOLLOW THE SCHEDULE OF MANUFACTURING ORDERS
A number of problems are created by deviation from Planning’s MO schedule
Shortages of parts we need
Excess of parts we don’t need
Slowed production
Created a report which:
Stores a machine’s schedule in order
Pulls in the date/time of MO’s actually run
Currently in the process of making these comparisons relative
![Page 33: Supply Chain Co-op](https://reader031.vdocuments.us/reader031/viewer/2022021507/58a88c501a28ab68208b4691/html5/thumbnails/33.jpg)
THANK YOU FOR A GREAT CO-OP EXPERIENCE!