supplier quality manual - hi-lex 15 rev 18 ingles firm.pdf · supplier quality manual objective 06...
TRANSCRIPT
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
1 de 22
Supplier Quality Manual
Version 2015
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
2 de 22
Mission
Our mission is to achieve customer satisfaction through
quality and durable products with the confidence of
always delivering on time.
Providing personal and professional security to our HI-
LEX Mexicana Family, generate suppliers and
shareholders with a mutual satisfaction of goods and
services.
Vision
Keep the preference of our customers, exceeding their
expectations to generate more utilities, keeping our
costs together with the participation of all providers and
our Hi Lex Mexicana family.
Quality and Environmental Policy
HI-LEX Mexicana manufacture control cables and
window regulators for the automotive industry, we
are committed to prevention of pollution, to reduce
potential environmental impacts and compliance
with legal requirements, volunteers and our
customers. Through continuous improvement
activities we engage in quality, cost and delivery
of all our products.
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
3 de 22
INDEX
TOPICS PAGE
Mission, vision, quality and environmental policy. 02
Supplier´s Objectives 2014 – 2015 04
Quality Creed 05
Supplier Quality Manual Objective 06
Purpose and Scope.
HI-LEX Mexicana Requirements.
I.- Requirements for the approval of potential suppliers 06
Initial contact with Supplier Developers of Purchasing Area.
Potential Supplier initial assessment.
Potential Supplier Process.
II.- Advanced Product Quality Planning. 07
III.- Production Parts Process Approval. 08
Special Characteristics.
IV.- Quality System and/or Production Process Evaluation and Audits. 11
V.- HI-LEX Mexicana S.A. de C.V. Specific Requirements. 12
Quality Certificate.
Information needed for label of Raw Materials and Components to be received at HLM.
Update drawings.
Invoicing.
Control statistical summary.
Engineering deviation request.
Packing and Shipping Identification
VI.- Continuous Improvement. 15
Engineering Change Requisition (ECR).
Supplier Cost Reduction Approvals.
VII. - Discrepant Materials report. 15
Corrective action report (8D´s) 16
Penalties 17
Recurrence and Containment Levels 17
Developing of Supplier Quality System Management 17
VIII.- Supplier Reliability. 17
Delivery on time.
Number of DMN issued.
Parts Per Million (PPM).
Response to problems (quality, commercial or development).
Cost.
IX.-Score analysis. 18
Classification of the reliability.
X.-Assessment tool owned by HI-LEX Mexicana 19
XI.-Glossary. 20
XII.-Appendices. 21
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
4 de 22
October, 2014
Dear Supplier:
I want to thank the support you gave to Hi-Lex Mexicana during October 2013 – September 2014, in
your total performance it is so, that regarding quality and deliveries there was a lot of improvement
comparing to last year’s.
I would also like to share the objectives for this new FY October 2014 – September 2015 in which we
line up our supplier data base with the requirements from our customers. Following are the objectives.
OBJECTIVES FROM OUR SUPPLIERS FROM OCTOBER 2014 TO SEPTEMBER 2015
1. DELIVERIES: 100%
2. QUALITY (SQA)
a) PPM´s max. 15PPM
b) Product audit before shipment (Dock Audit).
These audits are just after packing the product, tag it and be in stand by for the shipment, in
that moment a random sample is taken and audited, the requirement is to fulfill that and
document it.
c) PPAP (PSW). Complete and on time according to the program agreement. Previously
revised and send to the titular buyer, in order to start the process of revision, evaluation and
approval from the ASQA of Hi-Lex Mexicana. PPAP samples are delivered together with
the PPAP information at level requested.
d) Quality Creed of Hi-Lex Mexicana and their suppliers. Signed Quality creed from Hi-
Lex Mexicana and suppliers.
e) Sub-suppliers audits. Have a supplier audits plan or evidence in which you can prove that
the sub-supplier sends the material according to Hi-Lex Mexicana’s specifications.
3. PRICES
a) Price reduction of 3%. to be implemented starting from Oct 01 2014
b) Improvement Ideas for cost reduction. Submit for analysis to our buyers during the first
quarter of this period (Oct-Dic14) at least 3 cost reduction ideas (associated with the
material, design or logistics), from each of the 100% savings obtained per idea implemented
50% will be shared with the supplier.
4. TERMS. Will be updated and sent from our buyers.
5. PAYMENT CONDITION. According to Hi-Lex Mexicana’s calendar.
6. ISO TS 16949 & ISO 9001 CERTIFICATE. All suppliers need to send to the SQA their
update certificate every time you have a renewal.
7. ISO 14000 CERTIFICATE. All suppliers must promote with their sub-supplier ISO 14000,
and have the ISO 14000.
This points will be measured, evaluated and taken into account for their. 1.- business revision, 2.-
negotations, 3.- awarded new project and 4.- participate in the annual suppliers event of 2015.
For any doubt or comment please contact directly our buyers.
Mr.Carlos García S.
Purchasing Manager
Hi-Lex Mexicana S.A de C.V.
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
5 de 22
HI-LEX MEXICANA AND SUPPLIERS QUALITY CREED.
Hi-Lex Mexicana and its suppliers have a high commitment with their product quality in which we
declare our commitment in fulfilling the following basic principles.
1. We don’t have any material, process, drawing, lay-out and supplier change without our
customer authorization, if it´s necessary we will officially request throughout an ECR
(Engineering Change Request).
2. Assure that the materials used in the manufacturing out products is my responsibility, which is
why we audit, monitor and give support to our suppliers in order to assure that our supply chain
improvement continues.
3. Follow the procedures declared in our Quality Manual and we follow the standard in which we
have been registered.
4. We work through the Ethic and Conduct code of Hi-Lex Mexicana and the seven principles of
the Automotive Enterprise:
Professional conduct
No discrimination
No social harassment
No alcohol nor drugs
Confidentiality of personal data
Company’s documents and data (Confidentiality)
Company’s documents and data are protected
Be an Earth responsible company
Fulfill norms and practices
No forced work
Minors working under the permit of the tutor/according the law of the
country
Benefits and salaries according to the entity or country law
Safe work conditions
Working hours according to the entity or country law
Mr. Oscar Rivera Martínez Mr. Carlos García Sánchez
Supplier Quality Assurance
(SQA)
Purchasing Manager
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
6 de 22
Objetive
All Hi-Lex Mexicana’s supplier must develop and maintain their quality system to provide continual
improvement, focusing on the prevention of flaws and the reduction of the process variety and the
disposals in the costumer-supplier chain.
Purpose
Communicate all Hi-Lex Mexicana, SA de CV, requirements to fulfill the quality system of the
companies which provide materials to our company.
Approach
All Hi-Lex Mexicana’s national suppliers of component parts for our control cables connection and
window elevators (directly to production) with a possible application of USA and Hi-Lex Japan
suppliers (TSK).
Hi-Lex Mexicana Requirements.
Hi-Lex Mexicana adopted and ISO/TS16949:2009 Quality System to its organization, and it is a
requirement that all of its component suppliers directly to production must have that certification in
their quality system SAC in ISO 9001:2008 as minimum. This requirements support and are an
extension during the purchase order.
Supporting documents.
The appendix A lists the supporting documents referred in this manual among all the sources. It is, Hi-
Lex Mexicana actual and future supplier’s responsibility to obtain and maintain the actual editing of
those documents.
HI-LEX MEXICANA REQUIREMENTS.
I.- Approval requirements for potential suppliers
Initial contact with purchasing supplier developers.
The potential suppliers and Purchasing Supplier Developers team get to an agreement regarding their
business opportunities, quality system and installation evaluations.
Initial potential supplier evaluation
Hi-Lex Mexicana Purchasing Supplier Developers team give out the Supplier Opening Format
(Appendix B, format HFM-C.005) to the new supplier. Same that should be totally filled in and handed
in back to Purchasing Supplier Developers.
This questionnaire will help to have a general vision and idea of the facilities, abilities, Quality system
operation and supplier study organization. In order to approve a new supplier Quality manager,
Purchasing manager, Finance manager, the Vice-president and the President have to sign as an
approval´s agreement.
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
7 de 22
Potential Suppliers Process.
It is required for potential suppliers a Process (QAV2) audit (format HFM-C.09) for the current year. If
the process verification list (by commodity) is not available the auditor should stick to the control plan
regarding a part number that includes the most of the process including ins and outs.
For the quality system audit case this audit can be omitted only if the potential supplier presents a copy
of their ISO/TS 16949:2009 or ISO-90001:2008 certificate.
In case the potential supplier is starting to implement their quality system based on ISO/TS 16949:2009
or ISO-9001:2008 it is necessary that the supplier presents a preview of their certification program, this
will be evaluated (first part). The second parts evaluation not realized by HI-LEX Mexicana SA de CV
will be also evaluated. Once these documents are handed in, the approval should be done and the
supplier will be part of HI-LEX Mexicana SA de CV suppliers list.
Those suppliers who are not based on the quality system ISO/TS 16949:2009 or ISO-9001:2008 will be
conditions or rejected based on the result of the Supplier Opening Format (HFM-1.002)
II.- Advanced Product Quality Planning APQP
Purpose
Assures the realization of all the previous production activities of a product in order to achieve 0
defects and avoid delays. The assigned characteristics should fulfill requirements a 100%.
As a part of the APQP process the supplier feasibility revision is to assure that the product can be
produced as the drawing specification, Process ability and required capacity. These revisions should be
done before approving a contract.
The APQP process for suppliers must be accordance of APQP Manual of reference about A.I.A.G.
Supplier should have a main contact for each new program or component. Coordinator and
quality/purchasing representative of Hi-Lex Mexicana will review that each step should be confirmed
and verify it.
The supplier will state responsibility and application of:
The APQP Stages:
1.- Program Planning and Definition
2.- Product Design and Develop
3.- Design and Development Process
4.- Product and Process Validation
5.- Continuous Improvement
The Compliance dates of supplier to deliver at HLM must be labeled and we will apply a penalty if
supplier has a delay according schedule of tooling, design, samples, etc.
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
8 de 22
III.- PPAP Production Part Approval Process
Is mandatory submit PPAP, when it happens any of situations set on chart I.3.1 of last edition of
PPAP’s Handbook
The levels to submit PPAP are:
Level 3.- For All suppliers certified on ISO TS16949: 2009
Level 3.- For all suppliers without certification and new components, unless there is
Another agreement with our ASQA
For all parts that will be delivered to our customer FORD, is mandatory requirement to submit PPAP
level 3 (Ref. chart I.4.1 Levels of submission of PPAP manual).
Likewise for our customer Honda is mandatory to meet with IPP system (Initial Production Parts),
which is basically to identify the first shipment byproduct of some change mentioned on the section II
of PPAP manual (Appendix C) and/or according another agreement with our ASQA.
Suppliers should send to purchasing area – Suppliers Development – such samples and documentation
requested on PPAP manual according last revision). The samples must be 6 pieces as minimum,
identified according pre-production scheme Label and must be adhered on the box Samples must be
marked considering same as samples that supplier use for their layout report and were taken from as
initial normal production that totals 300 pieces as minimum or with another agreement with HI-LEX
Mexicana and supplier.
PRE-PRODUCTION LABEL SKETCH
(Filling instructions)
If there is some doubt, you could contact to supplier developer or ASQA.
Supplier name _____
Parte number _____ Component Description ____ Engineering Level ___
Quantity of pieces ____ Program/Project _________
(Please mark with X according reference)
PROTOTIPE SAMPLES Deliver to Program Manager
PPAP SAMPLE Deliver to Incoming Inspection.
(Fill out by HI-LEX)
Stage: Internal Dimension / test
External test
Hi-Lex Analysis results
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
9 de 22
There is an option to samples are reviewed on supplier facilities, agreement with supplier.
When component is approved our MRP system will be updated. If a component is rejected, the supplier
must fix it and submit samples again.
About PPAP Annual Validation, supplier must submit PSW level 2 or 4, to update current condition
of process and dimensions.
- PSW
- Dimensional Report
- Raw material certificate (No more than one year)
- Schedule of preventive maintenance for tooling ( If Apply)
MANDATORY REQUIREMENTS IN PPAP DOCUMENTS (before to send to HLM Supplier must
check completely and request support from ASQA, SQA and/or Supplier Developer if it is necessary).
The material can’t be shipped until PSW has been approved.
* The Supplier needs to consider the timing or due dates before make any modification to PPAP. If
Supplier has doubts or questions do not hesitate to contact to ASQA, SQA or Supplier Developer
assigned to Project. Please consider that all Documents need to cover the International Standards
indicated by AIAG and meet HI Lex expectations.
1. The format to issue a PPAP document for new projects or engineering changes is:
a. Paper size: A4
b. Letter size: Preference Arial 10, however Supplier can use any formal and legible letter
(There aren’t acceptable characters that affecting the formality of this document).
c. Hi Lex is not going to accept documents with erasures or deletions. If Suppliers needs to
make any modification must be on original document.
d. The complete PPAP must be delivered on schedule and date indicated by ASQA, SQA
or Supplier Developer. Please consider that HI Lex will not accept incomplete
information.
e. If PPAP is sent by a Foreign Supplier, the Documents needs to be send by
Envelope/Package. The documents needs be packed to ensure safe transportation with
ordinary care in handling.
f. Hi Lex will not accept obsolete documents. Please review that all documents are active
according to AIAG Manuals.
g. It is necessary that complete PPAP accomplish the PPAP’s Check List (before provided
by Hi Lex).
PSW (Part submission Warrant): This is the form that summarizes the whole PPAP package. This
form shows the reason for submission (design change, annual revalidation, etc.) and the level of
documents submitted to the customer. There is a section that asks for "results meeting all drawing and
specification requirements: yes/no" refers to the whole package. If there are any deviations the supplier
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
10 de 22
should note on the warrant or inform that PPAP cannot be submitted. This document needs to fulfill
according to AIAG Standards. If you have fields without information it is necessary to indicate:
“N/A”. If you have any doubt or question do not hesitate to contact to ASQA, SQA or Supplier
Developer.
Samples: The minimum quantity of samples required is 6 pcs however ASQA, SQA and Supplier
Developer could request more material. The samples must be identified by cavities (if applies) and
packed with a label indicating the part number and/or “Bar Code”.
Dimensional Report: It is a list of every dimension noted on the drawing. This list shows the product
characteristic, specification, the measurement results and the assessment showing if this dimension is
"ok" or "not ok". Usually a minimum of 6 pieces is reported per product/process combination. The
critical characteristics need to be marked.
Warranty Certificate (Product): The reports have to indicate the tolerances applied on design and
measurement system. The Product Warranty Certificate must be added to PPAP Package.
Raw Material Certificate: Certificates of raw material of sub-suppliers must refer to material
required in the design. Moreover the certificate must offer support and traceability according to
applicable standard. Example: Include ASTM Standard. "The certificate must have 1 year maximum
as validity or effective date."
Flowchart: Process Flow Diagram, also known as a process flow chart, shows the document and
clarifies all steps required in the manufacturing of the part in question. The process flow diagram must
match both the control plan and the Process Failure Mode and Effects Analysis (PFEMA). The process
flow diagram must include all of the main steps in the processing of the part and also all offline
activities such as handling, measuring, inspection etc. The diagram also needs to show the flow of non-
conforming materials (rejects), parts that can be salvaged, and parts that can be waste or scrap from the
product.
Control Plan: A control plan of the process should be included in PPAP submission. It should mirror
the PFEMA and be signed by the relevant parties. This area can also be seen as a Pre-Launch Control
Plan if the part is completely new or if no relevant control plans exist.
Flawless Launch Contract: Must be filled qualifying characteristics that are identified in the
processes before starting negotiations with Hi-Lex Mexicana. The method is:
Well = G
Wrong = R
Requires improvements = Y
Team Feasibility Commitment: Team Feasibility determines whether the proposed design can be
manufactured within the guidelines and specifications. A cross-functional design/manufacturing review
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
11 de 22
team is charged with assessing design feasibility. Once workability is established, the Supplier
undertakes the responsibility of following the design/manufacturing review process and reassessing
feasibility for any design or part change that may occur during product development. This document
must be delivered with PPAP package.
Special Characteristics:
ASQA, SQA or Supplier Developer must notify to Supplier the Control Key Features or Customer’s
special designations. The special characteristic must be included in PPAP package by Supplier.
In case of deviation:
If any parts do not meet the correct specification for a valid reason which could continue into mass
production then the supplier should create an exception report. This will document any abnormal
readings, and these should be commented on to show why these anomalies have taken place in two
Phases to HI Lex:
a) Adjustments to machinery (pressures, loads, time machines, etc.)
b) Changes in lot materials, new features to Sub-supplier.
c) Changes in working methods, (Visual aid, operation sheet, testing format, etc.)
d) Environment Analysis (heat, noise, moisture, transportation, packaging, etc.)
e) Use alternative equipment (gauges, jig, etc.)
f) Minor tooling adjustments (pin gages, bolts, punches, sensor, etc.)
g) Dimensional changes in tolerances must meet and demonstrate compliance with
phase I before test run at Customer plant, must be in two sections: the proposal
and analysis (see example).
h) In case of Major changes in Tooling the Supplier must deliver two quotes as
minimum to Hi Lex for analysis.
The points that can cause penalties from Hi-Lex Mexicana, S.A. de C.V. to their Suppliers are:
a) The Non-Fulfillment in pre-production programs on timing required.
b) The Non-Fulfillment in PPAP Package on timing required.
c) The Non-Fulfillment in Samples (pieces) on timing required.
IV. Supplier evaluation system and QAV2: Production Process
It is requirement of Hi-Lex Mexicana that all Suppliers being able to demonstrate that its Quality
System is in accordance with requirements detailed in ISO/TS16949 and/or ISO 9000 or that they are
in Certification process.
Considering our Environmental Policy, we recommend to our suppliers implement Environmental
Guidelines applicable to products under ISO-14001 standard being applied to the care of our
environment, in the future this Standard will be Mandatory, with previous notification from HI Lex.
Suppliers certified in ISO/TS16949: 2009 and ISO 9001: 2008 must deliver a copy of their valid
Certificate to HI LEX.
I PHASE
II PHASE
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
12 de 22
Auditing Quality System and/or QAV2: Production Process
HI - LEX Mexicana reserves the right to audit their suppliers (even if they are certified) when any of
the following situations occurs:
a) Before assign a new project.
b) According to result in Quality Reliability,
c) Continuous Quality problems (DMN's),
d) When it is a Customer’s requirement.
The audit process (QAV2) is leaded by Purchasing and Quality areas of HI-LEX Mexicana. The
follow up to observations as a result of audit will be defined internally by responsible auditor.
At the beginning fiscal year the Supplier must delivery to Supplier Developer or SQA its Annual
Internal Audit Program and at the end of the fiscal year the Supplier must deliver the result of this
Program. This information is auditable by Hi Lex Mexicana.
V. Specific Requirements from HI-LEX Mexicana S.A. de C.V.
Quality certificates / receipt of materials at HI-LEX.
The Quality of all Products received at HI LEX is responsibility of Supplier. Each lot of material or
each shipment must be delivering with a Certificate of Conformance that meets the required
specifications according to drawing, this document must have:
a) Part number with current engineering level.
b) Dimensional report.
c) Testing’s required.
d) The special dimensional characteristics must be indicated in format HFM-Q-041.
The internal process of receipt of materials at HI Lex is as follow:
Stop material
on Quarentine
Area
Shipping
documents:
Invoice,
packing list,
and import
manifest if it is
necessary.
GOOD Arrival of
Components Inspection
YES Deliver to
Warehouse
WAREHOUSE
NO
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
13 de 22
Information needed for label of Raw Materials and Components to be received at Hi Lex
Mexicana.
All the products (components and raw materials) received at Hi Lex Mexicana must be identified with
“Bar Code” with following information:
1. Supplier info (internal code used at HI Lex, Name, address) **
2. Part number (internal code used at Hi Lex). **
3. Item Description.
4. Quantity. **
5. Supplier production Date
6. Production Lot (Prefix 1T) **
The supplier must meet the following special instructions:
1. Printing out code is 39.
2. Mandatory Fields **
3. The lot information must include Prefix (1T)
4. The Label size must be adapted to product or package.
Example:
Note:
The supplier must keep the information 10 years. If the commercial relationship is over, the supplier
must deliver the information to HLM.
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
14 de 22
Update drawings.
Hi-Lex Mexicana Supplier Development Engineer is responsible for updating and delivers the
components drawings at last level to our suppliers and also the specifications mentioned on the
drawings.
Invoicing.
All materials should be delivered to Hi-Lex Mexicana together with invoice/s and Purchase Order. If
the supplier does not have this info together with the material, the material is not going to be received.
Furthermore, suppliers should deliver the material respecting the Warehouse Schedules.
Statistical Control Summary.
The supplier should keep must records for statistical process control related with the critical
characteristics, which should be available at any time in order to be reviewed by Hi-Lex Mexicana. In
case that the supplier does not have this information, supplier should verify all inventories at Hi-Lex
Mexicana in order to be sure that the Quality of the materials are meeting the specification.
All thise characteristics that does not meet a CPk > = 1.33 should be include in a Corrective action
Program in order to meet the CPk requested in a short period of time notified to the SQA.
All suppliers should have all their processes under a consistent statistical control guided by the AIAG´s
SPC and all related manuals.
Engineering Deviation Request.
The supplier is responsible to assure the Quality of all the material before the shipment to Hi-Lex
Mexicana. If the supplier finds nonconforming material, should request a deviation to Hi-Lex
Mexicana before the shipment. Hi-Lex Mexicana reserves the right to accept or not the deviation.
The deviations have to be send it to the SQA or ASQA following the Internal deviation request format
together with a Corrective and Preventive (8 D´s) in order to be analyzed.
Note: Supplier should meet the delivery request at 100%.
Packing and Shipment Identification.
Products must be packaged and shipped to Hi-Lex Mexicana providing the necessary protection for
their storage.
All material delivered to Hi-Lex Mexicana should have its packaging norm previously approved by Hi-
Lex Mexicana ASQA or SQA. Material should also have the production lot number for its traceability.
The packaging should match/correspond with the material shape, dimension and weight otherwise
should be considered as a nonconforming product.
Each returnable container should be used only for the parts which are approved by Hi-Lex Mexicana.
Any container damaged due mismanagement, will be deducted from the supplier invoices.
Each container should be identified with the following information:
* Hi-Lex Mexicana part number, including the engineering level.
* Quantity
* Lot number.
* Bar code.
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
15 de 22
* Number of deviation from quality/engineering Hi-Lex Mexicana (Only if is applicable).
* Supplier name.
* Identification of contention (Only if is applicable. If is applicable, please mentioned the
issue).
VI.- Continuous improvement.
Engineering change request (ECR).
If the supplier suggests an Engineering or Process Change that improves the quality of the product, the
safety and reduce costs improving the product optimization or cost reductions due the usage of new
materials shall be through a Engineering Change Request (ECR). This request will be analyzed and
approved by a multidisciplinary team at Hi-Lex Mexicana.
Hi-Lex Mexicana hopes that suppliers present suggestions with a mutual benefit/s. The
multidisciplinary (including Engineering Area) result shall be communicated to the suppliers through
the Developers.
Supplier cost reduction proposals.
Taking and advantage of all the efforts made to improve the productivity and consolidate the
purchasing amounts, Hi-Lex Mexicana expects that suppliers present to our Buyers an annual cost
reductions ideas.
VII.- Defective material reports.
At the moment that the defective material is detected in our Customers facilities or in Hi-Lex
Mexicana, the supplier is informed via telephone and/or through the notification of Material Defective
Notice (DMN “HFM-Q.047”). The disposition of the material must be confirmed by the supplier using
this document in period of time not longer than 12 hours. (12 X 12 program). If you exceed this time,
Hi-Lex Mexicana is going to determine the disposition of the material, which must be respected by the
supplier. This material might be reworked or returned to the supplier. If the problem occurs in our
Customers facilities and the issue is supplier responsibility, Hi-Lex Mexicana will give immediate
assistance to our Customer, requesting in some cases the suppliers services only if is necessary. All
costs incurred due the issue like travelling expenses related to Hi-Lex Mexicana personnel, will be
charged to the supplier through a credit note, as well as the costs incurred for Customer or Hi-Lex
Mexicana assy lines shutdowns.(Format HFM-Q.017).
Once the supplier is informed of the existence and material not conformity, the supplier must give full
and timely service to Hi-Lex Mexicana (containment of the problem and material disposition). It is
important to point out that is not allow to make sorting and reworks in Hi-Lex Mexicana. In the cases
that Hi-Lex Mexicana urgently needs to apply these kinds of activities, we will do it with our staff
charging the costs mentioned on below chart to the suppliers. Please consider that these activities could
be made by an outsourcing company. Therefore, Hi-Lex Mexicana will charge to the supplier the
outsourcing company cost plus some administrative charges.
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
16 de 22
TABLE 2. SORTING CHARGES / MATERIAL DISPOSITION (USD / MAN/HR)
CONCEPT DOMESTIC INTERNATIONAL ASIA- Hi-Lex Mexicana
SORTING $20 $40 $20
FG INSPECTION $20 $40 $20
RE-WORK $30 $50 $30
SCRAP APPLY THE UNIT PRICE + 50 usd per defect.
TABLE NOTE 2: The recovery made by Hi-Lex Mexicana staff, can only be performed when
resources are available.
TABLE 3. SHUTDOWNS CHARGES ON ASSY LINES (USD / MINUTE)
LINE Up to the
min. 15
Up to the.
16 al 30
Up to the
31 al 60
Up to the
61 al 120
Change model for lack
of materials
CHANGE ON SET-UP
INNER-OUTER $59 $62 $65 $72 $59
CABLE ASSY LINE $46 $49 $52 $59 $65
W/R ASSY LINE $65 $72 $78 $85 $65
If Hi-Lex Mexicana does not receive any material disposition from suppliers within the following 30
calendar days after the notification, we will have the right to take any decision on the material.
All administrative charges arising from re-works authorized by the supplier (DMN) will be confirmed
through Purchasing Area to Finance in order to apply the charges.
Corrective actions report DMN (8 D’s).
All Quality issue that interrupts Hi-Lex Mexicana production program or jeopardize our deliveries to
our Customers must be answered by Suppliers with a report of corrective and preventive actions
following up all the necessary actions in order to solve the issue and avoid happens again in future. The
Suppliers has 10 days in order to deliver and close the corrective actions reported since the date in
which was notified.
The supplier must respond on the DMN the materials dispositions, attaching the corrective actions
taken. The final decision about the material disposition must be made within the following 12 days
after the issue was reported. If a supplier requires additional time to respond, a written request should
be send it the SQA and must include the action plan considering the additional timeline for the solution
implementation.
The supplier sometimes may be required by Hi-Lex Mexicana to complete a corrective actions report
or critical non-conformities following the format of corrective and preventive actions.
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
17 de 22
Penalties:
The supplier that presents defective material, will receive and administrative charge from Hi-Lex
Mexicana. In the same Hi-Lex Mexicana is going to apply charges on the following cases:
Release DMN No material disposition
answers No answers to DMN No close DMN on time
US$200 US$100 US$100 US$100
Repetitive issues and Containment Levels (Control Shipping, CS1, CS2, Business on Hold)
Every quality or failure modes variety in one or more part numbers supplied, which could be chronic or
presents repetitive incidences; should be fixed by supplier showing evidence to the SQA for all
corrective actions already implemented.
The SQA is responsible for defining and notify to the supplier through a letter the corresponding
containment levels that should be apply by the supplier. The supplier must follow the guidelines
required by the SQA on the documentation, criteria, as well as the costs incurred for each contingency
level.
Hi-Lex Mexicana reserves the right to enforce contingency levels using internal/external resources.
If a suppliers is having these kind of issues, Hi-Lex Mexicana could place the supplier in a Business on
Hold status.
Supplier Quality Management Systems Development.
Hi-Lex Mexicana promotes the development of the Supplier Quality Management System. We are
reviewing this point every time that the Suppliers answer the annual self-assessment audit that we send
to them. This self-assessment answer have to include evidence of the Quality Management System that
each suppliers is handling.
VIII.- Suppliers Reliability.
Deliveries on time: All the suppliers should meet 100% the deliveries requested by Hi-Lex Mexicana
through the releases and Purchase Orders.
DMN´s submitted to the suppliers: The DMN´s submitted to the suppliers should be zero, because all
suppliers must be looking to meet the zero defects and zero complains from Hi-Lex Mexicana.
Parts per Million (PPM): PPM = Nonconforming material estimated X 1’000,000
Total material received
Response to problems (quality, commercial or development): The suppliers should share on time
any kind of information requested by Hi-Lex Mexicana.
** It is mandatory to use the GP12 methodology for initial samples on the first lots with a minimum
period of time of 40 days for preventing defects and get the process and test level maturation required
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
18 de 22
assuring the quality since the beginning of the project. Suppliers should use GP12 labels for this
material. (See attached GP12 steps).
Cost: All suppliers should be looking to offer competitive prices to Hi-Lex Mexicana in order to have
possibilities to be considered for new business opportunities.
IX.- Performance Analysis.
The total supplier performance rate will be obtained considering all the monthly results and their effort
in order to meet Hi-Lex Mexicana requirements. We would like to explain to all the suppliers how Hi-
Lex Mexicana classified the Suppliers Reliability.
Supplier Reliability Classification.
The results of the supplier’s performance are classified in 5 categories (SUPPLIER
PERFORMANCE STATUS):
EXCELLENT (99.5 – 100 %)
Supplier meeting ISO/TS16949: 2009 requirements and all Hi-Lex Mexicana specifics requirements. If
the suppliers keep this result during 12 months consecutive months will be considered as a
distinguished supplier demonstrating a consistency on quality, deliveries and cost. Also this supplier
could be considered for new business in the short term.
GOOD (95 – 99.4 %)
Suppliers demonstrating that their quality system is working in compliance with the requirements of
Hi-Lex Mexicana. The suppliers can keep current business with Hi-Lex Mexicana and he could
considered for new business in the medium term.
RELIABLE (85 – 94 %)
Suppliers who has problems on keeping the quality level required by Hi-Lex Mexicana. If the suppliers
is having this kind of performance for 3 consecutive months, a plan of corrective actions in the medium
term is going to require by Hi-Lex Mexicana. This supplier is going to have as conditioned their current
contracts with Hi-Lex Mexicana. If the supplier status does not change, Hi-Lex Mexicana deserves the
right to terminate the business relationship at the end of the contract and this supplier should not be
considered for new business in future.
NOT RELIABLE (0 – 84 %)
Supplier that has demonstrated minimum ability to meet all Hi-Lex Mexicana ´s requirements.
A corrective action plan should be submitted within a period of thirty days after being notified. The
supplier is going to have as conditioned their current contracts with Hi-Lex Mexicana not having the
opportunity to be considered for future business. Purchasing Area shall prepare an emergency plan to
develop a new alternative source for the materials provided by this kind of supplier.
If the supplier keeps the same kind of performance, Hi-Lex Mexicana deserves the right to terminate
the business relation.
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
19 de 22
X. Tooling evaluation owned by Hi-Lex Mexicana.
The Development Area is going to request to all suppliers a Tooling Annual Program in which all the
suppliers that have tooling and devices owned by Hi-Lex Mexicana, should confirm the status of each
one. All these goods should be mentioned on the Commodatum Contract that Hi-Lex Mexicana has
with each supplier.
As soon as the Tooling Annual Program is received, the Development Area could request to the
suppliers some visit to the suppliers facilities in order to evaluate and verify the tooling and devices
status. The Developer should take some pictures and make the tooling status report together with the
supplier.
At the moment that the evaluation and verification is finished, the tooling annual program shall be
adjusted and the supplier should give to the Developer a copy of the tooling status report. (See
attachment F).
Upon completion the verification will be updated tooling study program. Also, the original to the
shopping area of the report on physical condition of the tooling for its control and a copy will be
delivered to the supplier.
The supplier should meet the PPAP revalidation according with the SQA request. By other hand, in
case that we have a tooling transfer, the documentation approval should be approved by the ASQA.
The supplier is responsible to make a report before start the project or ship samples to Hi-Lex
Mexicana notifying to the Developer, the SQA and the ASQA (depends on the case) in case that the
tooling does not meet the specifications required on the drawing. If the suppliers does not inform to Hi-
Lex Mexicana about this issue, all the expenses generated are going to be charge to the supplier.
Every time that we have and Engineering change, the supplier should have records about it. For the
tooling transfer the supplier should place and identification tag/mark in order to keep a traceability
between previous supplier and the current one.
Each level in the piece the provider change must be considered in the records of the mold, turn in
transfer of molds must be a mark of identification, in relation the previous provider to be able to
determine responsibilities and better tracking to the final product.
The supplier is responsible for the proper use and the maintenance of the tooling and device owned by
Hi-Lex Mexicana. The supplier should keep records about the quantity of pieces produced and all the
maintenance applied to the tooling. The supplier should report to the Buyers the remaining tooling life
in order to apply the proper actions before the tooling life is over.
The tooling and devices owned by HI-LEX should be identified properly as follow: “Property of Hi-
Lex Mexicana”.
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
20 de 22
XI.- GLOSSARY
QMS.- Quality Management System
QAV.- Quality Audit Visit
A.I.A.G.- Automotive Industry Action Group
ASQA.- Advanced Supplier Quality Assurance
IMDS.- International Material Data System
CPK.- Process Capability.
DMN.- Defective Material Notice.
Purchase order.- It is the document in which Hi-Lex Mexicana states its commercial terms and
conditions that are not negotiable. This document is submitted to our suppliers by the Buyers reflecting
our releases requirements.
Potential suppliers.- All suppliers that are starting business relations with Hi-Lex Mexicana and also
the ones that are being reviewed and developed by our Developer Area. These suppliers does not have
a firm commercial relation with Hi-Lex Mexicana.
PPAP.- Production Part Approval Process.
PPM . - Parts Per Million.
TIMING (Program).- Official document for following up any kind of issue.
Mass Production.- Components used directly in our assy lines.
SQA.- Supplier Quality Assurance.
ASQA.- Advance Supplier Quality Assurance.
Purchasing Quality Assurance: This is the supplier result of all the combined efforts (technical,
commercial and human) in order to meet all the specifics requirements for Hi-Lex Mexicana.
CS1.- Contingency level 1.
CS2.- Contingency level 2.
Business on Hold.- Final level as a consequence from the CS1 and CS2 and other issues caused by the
suppliers.
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
21 de 22
XII.- Appendix.
Appendix A
These documents are ISO/TS16849: 2009 requirements and contain information mentioned on this
Manual:
** APQP - (ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN)
** PPAP - (PRODUCTION PART APPROVAL PROCESS)
** PFMEA - (POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS)
** SPC - (STATISTICAL PROCESS CONTROL)
** MSA - (MEASUREMENT SYSTEMS ANALYSIS)
These documents are available on the AIAG, Automotive Industry Action Group and can be purchased
on:
AUTOMOTIVE INDUSTRY ACTION GROUP
26200 Lahser Road, Suite 200
Southfield, Michigan 48034
Phone: (810) 358-3570
Fax: (810) 358-3253
Internet: http//www.aiag.org
Appendix B.- Supplier opening sheet (HFM-1.002)
Appendix C.- IPP flow diagram.
Appendix D.- Internal Deviation Request (HFM-Q.007)
Appendix E- Tooling status report.
Appendix F- PPAP check list.
This Supplier Quality Manual and all the related documents should be available in all the Suppliers
Productions Areas.
This Manual is Hi-Lex Mexicana property, the partial or total reproduction is prohibited. Only the
Purchasing Manager and the SQA of HLM could authorize any kind of changes on it.
Hi-Lex Mexicana documents are for Hi-Lex Mexicana and Sister Companies usage. The suppliers are
responsible to use the latest revision of this Manual.
The suppliers that received and used Hi-Lex Mexicana documents, are agree to assume any kind of
responsibility in order to accomplish with the patents as well any kind of infringement of those patents
too.
Código de Manual
MCP-74.12
Núm. de Rev.:
18
Fecha aprobación:
16/10/2014
Página
22 de 22
This Manual was reviewed by:
Mr. Carlos García.
Hi-Lex Mexicana, Purchasing Manager.
Mr. Oscar Rivera
Hi-Lex Mexicana, SQA.
This Manual was edited by: Mr. Oscar Rivera, Hi-Lex Mexicana SQA
Change control
Change
Information needed for label of Raw
Materials and Components to be received at
Hi Lex Mexicana.
Annual revision
Approval
Owner of the document:
Responsible for development or updating.
SUPPLIER QUALITY ASSURANCE (SQA)
Mr. OSCAR RIVERA
Name and signature
Responsible for approval:
Head of Document Owner.
PURCHASING MANAGER
MR. CARLOS GARCÍA
Name and signature