Superload Move
April 06, 2013
Prasad Nallapaneni & Jonathan Mallard
Structure and Bridge, VDOT
![Page 2: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/2.jpg)
2
Superload - Route
![Page 3: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/3.jpg)
3
Superload- Details
Total Distance : Approximately 96 Miles
Number of Structures: 62 (61 VDOT)Bridges: 25
Culverts: 37
VDOT Structures:Analyzed in-house: 47
Third Party Analysis: 16
![Page 4: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/4.jpg)
4
Superload - Detials
Analysis Method: In house: LFR/LRFR –
»VIRTIS if available»Compared Simple span moments
with HS20 ratings
Third Party: LRFR -16 Bridges
Verified hand calculations
/ LFR analysis
Structures Jumped: 5 (five)
![Page 5: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/5.jpg)
5
Superload - Permit
![Page 6: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/6.jpg)
6
Superload - Permit
![Page 7: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/7.jpg)
7
Superload - Jump
![Page 8: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/8.jpg)
8
Superload - Restrictions
![Page 9: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/9.jpg)
9
Superload - Crabs
![Page 10: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/10.jpg)
10
Superload
![Page 11: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/11.jpg)
11
Superload
![Page 12: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/12.jpg)
12
Superload
Attempt Made:• Run few bridges in 6.5 with Non
Standard Gage Vehicle • Compare with calculations received
from Third Party and in-house STAAD runs
![Page 13: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/13.jpg)
13
Superload
Bridge Fed ID: 24505
![Page 14: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/14.jpg)
14
Superload
BrR ModelHand Clacs % Diff Reason
Dead Load Moment (K ft) 1550 1519 2.04%
Model has slightly higher Superimposed loads
Capacity (K Ft) 6271 6221 0.80% Round of error
Rating Factor 2.01 2.09 -4.22%
Live Load (K ft) 2355 2246 4.83%
May be round off error in Distribution Factor. No detail output in BrR for
Live Load.
Bridge Fed ID: 24505
Wheel Configuration: Straight
![Page 15: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/15.jpg)
15
Superload
Bridge Fed ID: 25334
![Page 16: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/16.jpg)
16
Superload
BrR ModelHand Clacs % Diff Reason
Dead Load Moment (K ft) 5701 5691 0.18%
Round OffCapacity (K Ft) 15475 15463 0.08% Round OffRating Factor 1.11 1.19 -6.48%
Live Load (K ft) 8805 8233 6.95%
May be round off error in Distribution Factor. No detail output in BrR for
Live Load.
Bridge Fed ID: 25334
Wheel Configuration: Straight
![Page 17: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/17.jpg)
17
Superload
Bridge 24231
![Page 18: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/18.jpg)
18
Superload
BrR ModelHand Clacs % Diff Reason
Dead Load Moment (K ft) 320 320 0.0%
Capacity (K Ft) 1828 1828 0.08%
Rating Factor 2.07 2.19 -5.6%
Live Load (K ft) 729 688 5.93%
May be round off error in Distribution Factor. No detail output in BrR for
Live Load.
Bridge Fed ID: 24231
Wheel Configuration: Straight
![Page 19: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/19.jpg)
19
Superload
Difficulties Faced• Installation issues with 64 vs. 32 bit• Long time run process• Memory issues• Run only from bridge explorer • Not able to get a detailed LL output.
![Page 20: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/20.jpg)
20
Superload
![Page 21: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/21.jpg)
21
Superload
http://www.youtube.com/watch?v=Dmacnt5GaHw
http://www.youtube.com/watch?v=v8_3uyecXSc
![Page 22: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/22.jpg)
22
Field Operations
Field Surveys• LIDAR survey was taken before and after on 5 long
span structures.• Calculated LL deflections from vehicle were up to 6”• Survey showed before and after elevations of the
bridge deck surface and the bottoms of the girders were within the tolerance of the method used.
• Any post move deflection was undetectable from a survey perspective.
![Page 23: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/23.jpg)
23
Field Operations
Structure 10720, Lee County• Originally designated to be ‘jumped’• Field review of route raised concerns about limited
hospital access for an extended period.• Detour length = 50 miles.• Hauler’s consultants recommended removing a 20 kip
counterweight from each of the tractors.• Tractors effectiveness was limited due to traction
loss.
![Page 24: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/24.jpg)
24
Field Operations
Structure 24362, Norton• Rated by private consultant. Substructure controlled
at pier due to uneven span arrangement• Travel restrictions were issued. • During transport, hydraulic line broke while crossing
the structure. Lead tractor was over critical pier.• After line replacement, vehicle initiated movement
from rear tractor, which was not on bridge.
![Page 25: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/25.jpg)
25
Field Operations
Structure 22454, Norton• Simple Span Plate Girder with partial depth welded
diaphragms• First diaphragm on girder 4 cracked at the base.• Retrofitted by drilling, arrested by next inspection
cycle.
![Page 26: Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT](https://reader035.vdocuments.us/reader035/viewer/2022062422/56649ed25503460f94be2346/html5/thumbnails/26.jpg)
26