super double-offset wall - construction details
TRANSCRIPT
24”OC24
”OC
R-13 FG batt
R-11 FG batt
1-1/2” Thermaxtape
The
rmax wall assembly stoptop plate stop (overlap)
5/8” drywall
EXT WALL PLAN VIEWSOLAR RANCH © 2009 FINISH WERKS LLC (Rev 10.09.09)
wal
l ass
embl
y st
opto
p pl
ate
stop
REVISION #1 10.09.09:
Exterior and interior 2x4 studs STAGGERED (offset = 12”) for better thermal break
REVISION #2 10.09.09:
•Use 2x3 studs at:corners (drywall)
1-1/2” Handi (closed cell) foam to wrap interior studs
24”OC
2x3
Studs
for d
rywall
12”
<<
1-1
/2”
Han
di f
oam
to
wra
p al
l pen
etra
tions
1/2” rigid foam board (cover full depth of rough opening, 4 sides)
2x4 exterior frame
2x3 interior frame
Pine window stool
Drywall casing in lieu of jams (sides/top)
Window (or Door)
EXT WALL PLAN VIEW (window/door opening)
REVISION #2 10.09.09:
•Use 2x3 studs at:corners (drywall)
•2x3 (interior wall) king/jack studs of window and door openings (if structurally suitable)
•2x3 framing at all rough openings to reduce thermal bridging
SOLAR RANCH © 2009 FINISH WERKS LLC (Rev 10.09.09)
2x3
Studs
for d
rywall
2x3
roug
h
open
EXT WALL ROUGH OPENING DETAIL
1-1/
2” H
andi
foam
(c
lose
d ce
ll)
Jack/crippleKing
Jack
Double 2x4 Sill
2x Header
1-1/
2” T
herm
ax
5/8”
dry
wa
ll
2x42x3
1/2” rigid foam board to cover full depth of rough opening, from outside of Thermax to back of
gypsum, on 4 sides)
AND 1/2” rigid foam sandwiched in the header
REVISION #2 10.09.09:
•2x3 (interior wall) king/jack studs of window and door openings (if structurally suitable)
•2x3 framing at all rough openings to reduce thermal bridging
SOLAR RANCH © 2009 FINISH WERKS LLC (Rev 10.09.09)
ENVELOPE SECTION
ENVELOPE SECTION (top half)
ENVELOPE SECTION (bottom half)