summerhaven nha 27may2011 formatted...figure: 4-1a project no. 10-1151-0035 scale as shown project...

9
G:\Projects\2010\10-1151-0035_NextEraNanticokeWind\GIS\MXDs\Draft\Report\NaturalHeritage\EOS\Fig4_1a_LandbirdMigratoryStopoverHabitat.mxd LEGEND Base Data - MNR NRVIS, obtained 2004, CANMAP v2008.4 Produced by Golder Associates Ltd under licence from Ontario Ministry of Natural Resources, © Queens Printer 2010 Projection: UTM Datum: NAD 83 Coordinate System: UTM Zone 17 REFERENCE REV. Mississauga, Ontario DESIGN SITE INVESTIGATION OF LANDBIRD MIGRATORY STOPOVER HABITAT FIGURE: 4-1a PROJECT NO. 10-1151-0035 SCALE AS SHOWN PROJECT TITLE GIS REVIEW JR 27 Aug. 2010 CHECK Summerhaven Wind Energy Centre PP/JB 16 May. 2011 DM 16 May. 2011 SCALE 113 FOD 5-8 116b FOD 5-8 114 FOD 9-4 CONCESSION RD 3 Gates Creek 44 595000 595000 0 100 200 300 400 50 METRES 1:5,000 Project Location Turbine and Number Meteorological Tower Overhead Cable Underground Cable – Trenched Underground Cable – Bored Transmission Line Project Area Base Data Road Railway Hydro One Transmission Line Water Golder Data ELC Boundary Significant Landbird Migratory Stopover Habitat Candidate Landbird Migratory Stopover Habitat Jarvis Cayuga Port Dover Hagersville Lake Erie INDEX MAP Project Area

Upload: others

Post on 30-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Summerhaven NHA 27May2011 formatted...FIGURE: 4-1a PROJECT NO. 10-1151-0035 SCALE AS SHOWN PROJECT TITLE GIS REVIEW JR 27 Aug. 2010 CHECK Summerhaven Wind Energy Centre PP/JB 16 May

G:\Pr

ojects

\2010

\10-11

51-00

35_N

extEr

aNan

ticok

eWind

\GIS\

MXDs

\Draf

t\Rep

ort\N

atural

Herita

ge\EO

S\Fig4

_1a_

Land

birdM

igrato

ryStop

overH

abita

t.mxd

LEGEND

Base Data - MNR NRVIS, obtained 2004, CANMAP v2008.4 Produced by Golder Associates Ltd under licence from Ontario Ministry of Natural Resources, © Queens Printer 2010Projection: UTM Datum: NAD 83 Coordinate System: UTM Zone 17

REFERENCEREV.

Mississauga, Ontario

DESIGN

SITE INVESTIGATION OFLANDBIRD MIGRATORY STOPOVER HABITAT

FIGURE: 4-1aPROJECT NO. 10-1151-0035 SCALE AS SHOWN

PROJECT

TITLE

GIS

REVIEW

JR 27 Aug. 2010

CHECK

Summerhaven Wind Energy Centre

PP/JB 16 May. 2011DM 16 May. 2011

SCALE

113FOD 5-8

116bFOD 5-8

114FOD 9-4

CONCESSION RD 3

Gates Creek

44

595000

595000

0 100 200 300 40050METRES1:5,000Project Location

Turbine and NumberMeteorological TowerOverhead CableUnderground Cable – TrenchedUnderground Cable – Bored

Transmission LineProject Area

Base DataRoadRailwayHydro One Transmission LineWater

Golder DataELC BoundarySignificant Landbird Migratory Stopover HabitatCandidate Landbird Migratory Stopover Habitat

6

Jarvis

Cayuga

Port Dover

Hagersville

Lake ErieINDEX MAP

Project Area

Page 2: Summerhaven NHA 27May2011 formatted...FIGURE: 4-1a PROJECT NO. 10-1151-0035 SCALE AS SHOWN PROJECT TITLE GIS REVIEW JR 27 Aug. 2010 CHECK Summerhaven Wind Energy Centre PP/JB 16 May

G:\Pr

ojects

\2010

\10-11

51-00

35_N

extEr

aNan

ticok

eWind

\GIS\

MXDs

\Draf

t\Rep

ort\N

atural

Herita

ge\EO

S\Fig4

_1b_

Land

birdM

igrato

ryStop

overH

abita

t.mxd

LEGEND

Base Data - MNR NRVIS, obtained 2004, CANMAP v2008.4 Produced by Golder Associates Ltd under licence from Ontario Ministry of Natural Resources, © Queens Printer 2010Projection: UTM Datum: NAD 83 Coordinate System: UTM Zone 17

REFERENCEREV.

Mississauga, Ontario

DESIGN

SITE INVESTIGATION OFLANDBIRD MIGRATORY STOPOVER HABITAT

FIGURE: 4-1bPROJECT NO. 10-1151-0035 SCALE AS SHOWN

PROJECT

TITLE

GIS

REVIEW

JR 27 Aug. 2010

CHECK

Summerhaven Wind Energy Centre

PP/JB 16 May. 2011DM 16 May. 2011

SCALE

126FOD 9-4

242FOD 9-4

241FOD 6-5

FISHERVILLE

48

590000

590000

0 100 200 300 40050METRES1:5,000Project Location

Turbine and NumberMeteorological TowerOverhead CableUnderground Cable – TrenchedUnderground Cable – Bored

Transmission LineProject Area

Base DataRoadRailwayHydro One Transmission LineWater

Golder DataELC BoundarySignificant Landbird Migratory Stopover HabitatCandidate Landbird Migratory Stopover Habitat

6

Jarvis

Cayuga

Port Dover

Hagersville

Lake ErieINDEX MAP

Project Area

Page 3: Summerhaven NHA 27May2011 formatted...FIGURE: 4-1a PROJECT NO. 10-1151-0035 SCALE AS SHOWN PROJECT TITLE GIS REVIEW JR 27 Aug. 2010 CHECK Summerhaven Wind Energy Centre PP/JB 16 May

G:\Pr

ojects

\2010

\10-11

51-00

35_N

extEr

aNan

ticok

eWind

\GIS\

MXDs

\Draf

t\Rep

ort\N

atural

Herita

ge\EO

S\Fig4

_1c_

Land

birdM

igrato

ryStop

overH

abita

t.mxd

LEGEND

Base Data - MNR NRVIS, obtained 2004, CANMAP v2008.4 Produced by Golder Associates Ltd under licence from Ontario Ministry of Natural Resources, © Queens Printer 2010Projection: UTM Datum: NAD 83 Coordinate System: UTM Zone 17

REFERENCEREV.

Mississauga, Ontario

DESIGN

SITE INVESTIGATION OFLANDBIRD MIGRATORY STOPOVER HABITAT

FIGURE: 4-1cPROJECT NO. 10-1151-0035 SCALE AS SHOWN

PROJECT

TITLE

GIS

REVIEW

JR 27 Aug. 2010

CHECK

Summerhaven Wind Energy Centre

PP/JB 17 May. 2011DM 17 May. 2011

SCALE

138FOD 5-3

135FOD 5-8

133FOD7-2

REGIONAL RD 8

52

53

595000

595000

0 100 200 300 40050METRES1:5,000Project Location

Turbine and NumberMeteorological TowerOverhead CableUnderground Cable – TrenchedUnderground Cable – Bored

Transmission LineProject Area

Base DataRoadRailwayHydro One Transmission LineWater

Golder DataELC BoundarySignificant Landbird Migratory Stopover HabitatCandidate Landbird Migratory Stopover Habitat

6

Jarvis

Cayuga

Port Dover

Hagersville

Lake ErieINDEX MAP

Project Area

Page 4: Summerhaven NHA 27May2011 formatted...FIGURE: 4-1a PROJECT NO. 10-1151-0035 SCALE AS SHOWN PROJECT TITLE GIS REVIEW JR 27 Aug. 2010 CHECK Summerhaven Wind Energy Centre PP/JB 16 May

G:\Pr

ojects

\2010

\10-11

51-00

35_N

extEr

aNan

ticok

eWind

\GIS\

MXDs

\Draf

t\Rep

ort\N

atural

Herita

ge\EO

S\Fig4

_1d_

Land

birdM

igrato

ryStop

overH

abita

t.mxd

LEGEND

Base Data - MNR NRVIS, obtained 2004, CANMAP v2008.4 Produced by Golder Associates Ltd under licence from Ontario Ministry of Natural Resources, © Queens Printer 2010Projection: UTM Datum: NAD 83 Coordinate System: UTM Zone 17

REFERENCEREV.

Mississauga, Ontario

DESIGN

SITE INVESTIGATION OFLANDBIRD MIGRATORY STOPOVER HABITAT

FIGURE: 4-1dPROJECT NO. 10-1151-0035 SCALE AS SHOWN

PROJECT

TITLE

GIS

REVIEW

JR 27 Aug. 2010

CHECK

Summerhaven Wind Energy Centre

PP/JB 17 May. 2011DM 17 May. 2011

SCALE

147bFOD 5-8

147bFOD 5-8147b

FOD 5-8

149CUP3-2

Gates

Creek

55

0 100 200 300 40050METRES1:5,000Project Location

Turbine and NumberMeteorological TowerOverhead CableUnderground Cable – TrenchedUnderground Cable – Bored

Transmission LineProject Area

Base DataRoadRailwayHydro One Transmission LineWater

Golder DataELC BoundarySignificant Landbird Migratory Stopover HabitatCandidate Landbird Migratory Stopover Habitat

6

Jarvis

Cayuga

Port Dover

Hagersville

Lake ErieINDEX MAP

Project Area

Page 5: Summerhaven NHA 27May2011 formatted...FIGURE: 4-1a PROJECT NO. 10-1151-0035 SCALE AS SHOWN PROJECT TITLE GIS REVIEW JR 27 Aug. 2010 CHECK Summerhaven Wind Energy Centre PP/JB 16 May

G:\Pr

ojects

\2010

\10-11

51-00

35_N

extEr

aNan

ticok

eWind

\GIS\

MXDs

\Draf

t\Rep

ort\N

atural

Herita

ge\EO

S\Fig4

_2a_

Repti

leHibe

rnacu

la.mx

d

LEGEND

Base Data - MNR NRVIS, obtained 2004, CANMAP v2008.4 Produced by Golder Associates Ltd under licence from Ontario Ministry of Natural Resources, © Queens Printer 2010Projection: UTM Datum: NAD 83 Coordinate System: UTM Zone 17

REFERENCEREV.

Mississauga, Ontario

DESIGN

SITE INVESTIGATION OFREPTILE HIBERNACULA

FIGURE: 4-2aPROJECT NO. 10-1151-0035 SCALE AS SHOWN

PROJECT

TITLE

GIS

REVIEW

JR 27 Aug. 2010

CHECK

Summerhaven Wind Energy Centre

PP/JB 17 May. 2011DM 17 May. 2011

SCALE

84dFOD9-0

84eFOD 7-4

85FOD 9-4

314CUP 3-8

42CUP 3-2 / SWD/SAC 10

185cSWD 4-1

CONCESSION RD 4

Stone

y Cree

k

6227

0 100 200 300 40050METRES1:5,000Project Location

Turbine and NumberMeteorological TowerOverhead CableUnderground Cable – TrenchedUnderground Cable – Bored

Transmission LineProject Area

Base DataRoadRailwayHydro One Transmission LineWater

Golder DataELC BoundaryReptile Hibernacula

6

Jarvis

Cayuga

Port Dover

Hagersville

Lake ErieINDEX MAP

Project Area

Page 6: Summerhaven NHA 27May2011 formatted...FIGURE: 4-1a PROJECT NO. 10-1151-0035 SCALE AS SHOWN PROJECT TITLE GIS REVIEW JR 27 Aug. 2010 CHECK Summerhaven Wind Energy Centre PP/JB 16 May

G:\Pr

ojects

\2010

\10-11

51-00

35_N

extEr

aNan

ticok

eWind

\GIS\

MXDs

\Draf

t\Rep

ort\N

atural

Herita

ge\EO

S\Fig4

_2b_

Repti

leHibe

rnacu

la.mx

d

LEGEND

Base Data - MNR NRVIS, obtained 2004, CANMAP v2008.4 Produced by Golder Associates Ltd under licence from Ontario Ministry of Natural Resources, © Queens Printer 2010Projection: UTM Datum: NAD 83 Coordinate System: UTM Zone 17

REFERENCEREV.

Mississauga, Ontario

DESIGN

SITE INVESTIGATION OFREPTILE HIBERNACULA

FIGURE: 4-2bPROJECT NO. 10-1151-0035 SCALE AS SHOWN

PROJECT

TITLE

GIS

REVIEW

JR 27 Aug. 2010

CHECK

Summerhaven Wind Energy Centre

PP/JB 17 May. 2011DM 17 May. 2011

SCALE

66FOD 4-1

72FOD 9-4

69CUS 1-1

69CUS 1-1

CONCESSION RD 5

SANDUSKSandusk Creek

59

16

21

0 100 200 300 40050METRES1:5,000Project Location

Turbine and NumberMeteorological TowerOverhead CableUnderground Cable – TrenchedUnderground Cable – Bored

Transmission LineProject Area

Base DataRoadRailwayHydro One Transmission LineWater

Golder DataELC BoundaryReptile Hibernacula

6

Jarvis

Cayuga

Port Dover

Hagersville

Lake ErieINDEX MAP

Project Area

Page 7: Summerhaven NHA 27May2011 formatted...FIGURE: 4-1a PROJECT NO. 10-1151-0035 SCALE AS SHOWN PROJECT TITLE GIS REVIEW JR 27 Aug. 2010 CHECK Summerhaven Wind Energy Centre PP/JB 16 May

G:\Pr

ojects

\2010

\10-11

51-00

35_N

extEr

aNan

ticok

eWind

\GIS\

MXDs

\Draf

t\Rep

ort\N

atural

Herita

ge\EO

S\Fig4

_3a_

BatM

aterni

tyRoo

stHab

itat.m

xd

LEGEND

Base Data - MNR NRVIS, obtained 2004, CANMAP v2008.4 Produced by Golder Associates Ltd under licence from Ontario Ministry of Natural Resources, © Queens Printer 2010Projection: UTM Datum: NAD 83 Coordinate System: UTM Zone 17

REFERENCEREV.

Mississauga, Ontario

DESIGN

SITE INVESTIGATION OFBAT MATERNITY ROOST HABITAT

FIGURE: 4-3aPROJECT NO. 10-1151-0035 SCALE AS SHOWN

PROJECT

TITLE

GIS

REVIEW

JR 27 Aug. 2010

CHECK

Summerhaven Wind Energy Centre

PP/JB 17 May. 2011DM 17 May. 2011

SCALE

84dFOD9-0

84eFOD 7-4

85FOD 9-4

314CUP 3-8

42CUP 3-2 / SWD/SAC 10

198aFOD 9-4

185cSWD 4-1

CONCESSION RD 4

Stone

y Cree

k

6227

0 100 200 300 40050METRES1:5,000Project Location

Turbine and NumberMeteorological TowerOverhead CableUnderground Cable – TrenchedUnderground Cable – Bored

Transmission LineProject Area

Base DataRoadRailwayHydro One Transmission LineWater

Golder DataELC BoundarySignificant Bat Maternity Roost HabitatCandidate Bat Maternity Roost Habitat

6

Jarvis

Cayuga

Port Dover

Hagersville

Lake ErieINDEX MAP

Project Area

Page 8: Summerhaven NHA 27May2011 formatted...FIGURE: 4-1a PROJECT NO. 10-1151-0035 SCALE AS SHOWN PROJECT TITLE GIS REVIEW JR 27 Aug. 2010 CHECK Summerhaven Wind Energy Centre PP/JB 16 May

G:\Pr

ojects

\2010

\10-11

51-00

35_N

extEr

aNan

ticok

eWind

\GIS\

MXDs

\Draf

t\Rep

ort\N

atural

Herita

ge\EO

S\Fig4

_3b_

BatM

aterni

tyRoo

stHab

itat.m

xd

LEGEND

Base Data - MNR NRVIS, obtained 2004, CANMAP v2008.4 Produced by Golder Associates Ltd under licence from Ontario Ministry of Natural Resources, © Queens Printer 2010Projection: UTM Datum: NAD 83 Coordinate System: UTM Zone 17

REFERENCEREV.

Mississauga, Ontario

DESIGN

SITE INVESTIGATION OFBAT MATERNITY ROOST HABITAT

FIGURE: 4-3bPROJECT NO. 10-1151-0035 SCALE AS SHOWN

PROJECT

TITLE

GIS

REVIEW

JR 27 Aug. 2010

CHECK

Summerhaven Wind Energy Centre

PP/JB 17 May. 2011DM 17 May. 2011

SCALE

SMT04

120bFOD 9-4

120xMAM2

LAKE SHORE

FISHERVILLE

50

590000

590000

0 100 200 300 40050METRES1:5,000Project Location

Turbine and NumberMeteorological TowerOverhead CableUnderground Cable – TrenchedUnderground Cable – Bored

Transmission LineProject Area

Base DataRoadRailwayHydro One Transmission LineWater

Golder DataELC BoundarySignificant Bat Maternity Roost HabitatCandidate Bat Maternity Roost Habitat

6

Jarvis

Cayuga

Port Dover

Hagersville

Lake ErieINDEX MAP

Project Area

Page 9: Summerhaven NHA 27May2011 formatted...FIGURE: 4-1a PROJECT NO. 10-1151-0035 SCALE AS SHOWN PROJECT TITLE GIS REVIEW JR 27 Aug. 2010 CHECK Summerhaven Wind Energy Centre PP/JB 16 May

G:\Pr

ojects

\2010

\10-11

51-00

35_N

extEr

aNan

ticok

eWind

\GIS\

MXDs

\Draf

t\Rep

ort\N

atural

Herita

ge\EO

S\Fig4

_3c_

BatM

aterni

tyRoo

stHab

itat.m

xd

LEGEND

Base Data - MNR NRVIS, obtained 2004, CANMAP v2008.4 Produced by Golder Associates Ltd under licence from Ontario Ministry of Natural Resources, © Queens Printer 2010Projection: UTM Datum: NAD 83 Coordinate System: UTM Zone 17

REFERENCEREV.

Mississauga, Ontario

DESIGN

SITE INVESTIGATION OFBAT MATERNITY ROOST HABITAT

FIGURE: 4-3cPROJECT NO. 10-1151-0035 SCALE AS SHOWN

PROJECT

TITLE

GIS

REVIEW

JR 27 Aug. 2010

CHECK

Summerhaven Wind Energy Centre

PP/JB 17 May. 2011DM 17 May. 2011

SCALE

138FOD 5-3

135FOD 5-8

REGIONAL RD 8

53

595000

595000

0 100 200 300 40050METRES1:5,000Project Location

Turbine and NumberMeteorological TowerOverhead CableUnderground Cable – TrenchedUnderground Cable – Bored

Transmission LineProject Area

Base DataRoadRailwayHydro One Transmission LineWater

Golder DataELC BoundarySignificant Bat Maternity Roost HabitatCandidate Bat Maternity Roost Habitat

6

Jarvis

Cayuga

Port Dover

Hagersville

Lake ErieINDEX MAP

Project Area