summer training projects

2
656152044 MATLAB Based Project VHDL Based Projects Sr No. Project Name Duration 1. 16-Bit Microprocessor 4-5 Days 2. Microcontroller Design 5-6 Days 3. Simulation of Huffman Coding 5-6 Days 4. Landline Switching System Design 4-5 Days 5. UART Design 4-5 Days 6. Neuron Design 4-5 Days 7. Digital Clock Design 2-3 Days 8. 16 Bit ALU Design 2-3 Days Sr No. Project Name Duration 1. Implementation OFDM System Using MATLAB/Simulink 2-3 Days 2. Image Processing Using Neural Network Toolbox 2-3 Days 3. Image Compression Using Wavelet Toolbox 2-3 Days 4. Implementation of CDMA System in MATLAB/Simulink 2-3 Days

Upload: manoj-singh-rawal

Post on 12-Mar-2016

212 views

Category:

Documents


0 download

DESCRIPTION

CETPA INFOTECH PVT LTD is one of the IT education and training service provider brands of India that is preferably working in 3 most important domains. It includes IT Training services, software and embedded product development and consulting services.

TRANSCRIPT

656152044

MATLAB Based Project

VHDL Based Projects

Sr No. Project Name Duration

1. 16-Bit Microprocessor 4-5 Days

2. Microcontroller Design 5-6 Days

3. Simulation of Huffman Coding 5-6 Days

4. Landline Switching System

Design

4-5 Days

5. UART Design 4-5 Days

6. Neuron Design 4-5 Days

7. Digital Clock Design 2-3 Days

8. 16 Bit ALU Design 2-3 Days

Sr No. Project Name Duration

1. Implementation OFDM

System Using

MATLAB/Simulink

2-3 Days

2. Image Processing Using

Neural Network Toolbox

2-3 Days

3. Image Compression Using

Wavelet Toolbox

2-3 Days

4. Implementation of CDMA

System in

MATLAB/Simulink

2-3 Days

EMBEDDED SYSTEM PROJECT:

S. no. Project name Duration

1. Digital Bus

3-4 Days

2. Metro Train Prototype 3-4 Days

3. Automatic Lift System 3-4 Days

4. Password Based Door Locking System

3-4 Days

5. Electronic Voting Machine 3-4 Days

6. Automatic Parking system 3-4 Days

7. Temperature Sensing with

Buzzer

3-4 Days

7. Line follower robot 3-4 Days

8. RF based robot 4-5 Days

9. RF based electrical appliance control

4-5 Days

10. DTMF base projects 4-5days

11. Frequency measurement 3-4days

12. Relay base projects 3-4days