summary key wordsfig.net/pub/fig2008/ppt/ts04f/ts04f_06_ajayi_owhojeta... · 2010. 11. 10. ·...
TRANSCRIPT
GPS DATA INTEGRATION INTO GIS FOR OFFSHORE FACILITIES MANAGEMENT –
CHEVRON NIGERIA EXPERIENCE
Emmanuel Olayinka AJAYI, Nigeria and
Sylvester Efe OWHOJETA, Nigeria
Key words: geo-information, geodetic services, GPS data integration, GIS technology adoption.
SUMMARY
The revolution of Geodetic information for operational and facilities management, and change in paradigm motivates GIS technology adoption by Chevron Nigeria. The production and management of geo-information, to cope with the increased demand for geodetic services within chevron naturally informed the need for modern methods of data capture.
When Chevron Nigeria was faced with problems of having different types of survey information, which were based on different reference datum. The Company decided to use GPS technology (LEICA GPS System 500 with SKI-Pro software) in 2002 to capture both spatial and attribute information of all offshore facilities (oil wells, jacket orientation, helicopter landing, etc.) in the Niger Delta area of Nigeria and exported data captured for use in ArcGIS.
Chevron Nigeria has found GPS to be a powerful, cost-effective data gathering tool. It is easily integrated into GIS and significantly improves the quality of information used in decision making. With update maps resulting from the integration of GPS and GIS, the company has benefited immensely from the combination of technologies which offer the potential of more and better spatial information for pipeline planning, decision making, and data management.
This presentation hereby highlighted the experience, the tasks, and moreover the challenges faced by Chevron Nigeria on the acquisition of GPS datasets for offshore facilities.
PROJECT STUDY AREA
1/4TS 4F - Hydrographic Information ManagementEmmanuel Olayinka Ajayi and Sylvester Efe OwhojetaGPS Data Integration into GIS For Offshore Facilities Management
WellWellTripod Tripod LegsLegs
HelideckHelideck((HelicopterHelicopterLanding)Landing)
StaircaseStaircase
RiserRiser
Spare Spare SlotsSlots
SurveySurvey PointPoint
Figure 2: An Offshore JacketFigure 1: An Offshore Production Platform
GPS PRE-PLANNING
2/4TS 4F - Hydrographic Information ManagementEmmanuel Olayinka Ajayi and Sylvester Efe OwhojetaGPS Data Integration into GIS For Offshore Facilities Management
Figure 4: Scanned Analogue Map Before Data Integration Into GIS
Figure 5: GPS Data Integrated Into GIS
SAMPLE GPS & EXISTING DATA SETS
299910.279
298892.487
298890.257
298891.677
297650.907
299910.433
299019.484
298976.228
297682.303
297400.493
MINNA_EAST
EXISTING _GRID RECORD
173411.850
174681.650
174681.954
174683.758
176971.161
173414.265
177256.437
176611.679
175808.675
178470.188
MINNA_NORTH
2.6361.798173414.486299912.0775 7 25.419998 E5 34 8.135087 NShut-InOilWell 1813-WH18DES10
1.7922.883174683.442298895.3705 6 52.421947 E5 34 49.487896 NShut-InOilWell 1715-WH17DES9
1.7612.532174683.715298892.7895 6 52.338082 E5 34 49.496893 NShut-InOilWell 1615-WH16DES8
2.2692.616174686.027298894.2935 6 52.387027 E5 34 49.572118 NShut-InOilWell 1515-WH15DES7
2.2352.717176973.396297653.6245 6 12.143644 E5 36 4.091764 NIn UseOilWell 1409-WH14DES6
2.7091.888173416.974299912.3215 7 25.427714 E5 34 8.216128 NShut-InOilWell 1313-WH13DES5
2.1800.968177258.617299020.4525 6 56.574557 E5 36 13.332181 NShut-InOilWell 1204-WH12DES4
2.0272.652176613.706298978.8805 6 55.201496 E5 35 52.335117 NShut-InOilWell 1108-WH11DES3
1.3631.595175810.038297683.8985 6 13.088448 E5 35 26.210782 NShut-InGasWell 1010-WH10DES2
1.6222.046178471.810297402.5395 6 4.033170 E5 36 52.888840 NShut-InOilWell 101-WH1DES1
MINNA_NORTHMINNA_EASTNorthing (M)Easting (M)Longitude (D M S)
Latitude(D M S)
StatusContentWellName
Point_IdFac_IDS/n
DIFFERENCES_IN CO-OD(∆ E ) (∆ N)
GPS_RESULT_GRIDGPS_RESULT_LAT/LONG
Figure 3: Table Showing GPS Result in Geographic and Grid Coordinates.
3/4TS 4F - Hydrographic Information ManagementEmmanuel Olayinka Ajayi and Sylvester Efe OwhojetaGPS Data Integration into GIS For Offshore Facilities Management
–– Sensitizing our customers toward adoption of new coordinate set Sensitizing our customers toward adoption of new coordinate set for for planning and design.planning and design.
–– Synchronization of all Spatial Database Engine (SDE) layer to thSynchronization of all Spatial Database Engine (SDE) layer to the new e new coordinate set.coordinate set.
–– Adoption of GPS in swamp and land locations (view blockageAdoption of GPS in swamp and land locations (view blockage--mangrove forest)mangrove forest)
–– Control extension to land locationsControl extension to land locations
–– Tracking and documenting changes resulting from data dynamicsTracking and documenting changes resulting from data dynamics
–– More economic and efficient data updating approachMore economic and efficient data updating approach
–– Opportunity for deformation studies of Chevron facilitiesOpportunity for deformation studies of Chevron facilities
–– SurveySurvey--aware features position updating in GIS (survey analyst Ext)aware features position updating in GIS (survey analyst Ext)
–– Provision of consistent data with known reliability in ArcIMS Provision of consistent data with known reliability in ArcIMS deploymentdeployment
– Geospatial data should be saved and stored so that it may be retrieved later.
– GPS positional data should be used to upgrade a less accurate GIS base map.
– All digital maps should have their associated metadata tagged tothem.
– By using accurate GPS points from a variety of projects can result in a digital base map that possesses a higher level of spatial accuracy in GIS environment.
– GPS data, combined with the field application of the conceptual work as presented in the study will generate more and better spatial information for offshore facilities planning, engineering, and research.
CONCLUSION CONCLUSION RECOMMENDATIONSRECOMMENDATIONS
BIOGRAPHICAL NOTESBIOGRAPHICAL NOTES
Surv. Emmanuel Olayinka Ajayi,Surv. Emmanuel Olayinka Ajayi, born in 1957 is a fellow of the born in 1957 is a fellow of the Nigeria Institution of Surveyors. Graduated in 1982 with a B.Sc Nigeria Institution of Surveyors. Graduated in 1982 with a B.Sc in in Surveying from University of Civil Engineering, Bucharest, RomanSurveying from University of Civil Engineering, Bucharest, Romania. ia. Obtained M.Sc degree in Surveying (with bias to Geodesy) from Obtained M.Sc degree in Surveying (with bias to Geodesy) from University of Lagos, Nigeria in 1988 and MBA degree in Project University of Lagos, Nigeria in 1988 and MBA degree in Project Management from Obafemi Awolowo University, IleManagement from Obafemi Awolowo University, Ile--Ife, Nigeria inIfe, Nigeria in2001. He was registered to practice as a Surveyor in Nigeria in2001. He was registered to practice as a Surveyor in Nigeria in 1989. 1989.
He joined Chevron Nigeria Limited in 1994 as a Survey Engineer iHe joined Chevron Nigeria Limited in 1994 as a Survey Engineer in the n the Facility Engineering Department and rose to the position of ChieFacility Engineering Department and rose to the position of Chief f Surveyor, GISSurveyor, GIS--Survey Unit, Chevron Nigeria Limited since May 1998. Survey Unit, Chevron Nigeria Limited since May 1998.
Surv. Sylvester Efe Owhojeta,Surv. Sylvester Efe Owhojeta, born in 1967 is a member of the born in 1967 is a member of the Nigerian Institution of Surveyors. Graduated in 1991 with a B.ScNigerian Institution of Surveyors. Graduated in 1991 with a B.Sc in in Surveying, Geodesy and Photogrammetry from University of NigeriaSurveying, Geodesy and Photogrammetry from University of Nigeria, , Nsukka, Nigeria. Obtained a Masters degree in Petroleum EconomicNsukka, Nigeria. Obtained a Masters degree in Petroleum Economics s from Ambrose Alli University, Ekpoma, Nigeria in 2005. He was from Ambrose Alli University, Ekpoma, Nigeria in 2005. He was registered to practice as a Surveyor in Nigeria in 2001. Up to dregistered to practice as a Surveyor in Nigeria in 2001. Up to date ate he has been practicing as a Registered Surveyor. Since July 2005he has been practicing as a Registered Surveyor. Since July 2005 on on contract engagement with the GIScontract engagement with the GIS--Survey Unit of Chevron Nigeria Survey Unit of Chevron Nigeria Limited, Escravos Limited, Escravos –– Nigeria. Nigeria.
CONTACTSCONTACTS
Surv. Emmanuel Olayinka Ajayi Surv. Emmanuel Olayinka Ajayi GISGIS--Survey Unit, Survey Unit, Chevron Nigeria Limited,Chevron Nigeria Limited,P.M.B 12825, Lagos State, NigeriaP.M.B 12825, Lagos State, NigeriaTel: +234Tel: +234--11--36737293673729Mobile: +234Mobile: +234--805805--588588--02650265Fax: +234Fax: +234--11--367367--47154715Email: [email protected]: [email protected]
Surv. Sylvester Efe OwhojetaSurv. Sylvester Efe OwhojetaGISGIS--Survey Unit,Survey Unit,Chevron Nigeria Limited,Chevron Nigeria Limited,P.M.B 12825, Lagos State, NigeriaP.M.B 12825, Lagos State, NigeriaTel: +234Tel: +234--11--36737233673723Mobile: +234Mobile: +234--805805--275275--6804; +2346804; +234--803803--721721--06310631Email: Email: [email protected]@chevron.com; [email protected]; [email protected]
4/4TS 4F - Hydrographic Information ManagementEmmanuel Olayinka Ajayi and Sylvester Efe OwhojetaGPS Data Integration into GIS For Offshore Facilities Management