summary from the secondary beam working group meeting ( link ) cenf meeting 6 th june 2013
DESCRIPTION
Summary from the Secondary Beam working group meeting ( link ) CENF meeting 6 th June 2013. M. Calviani for the SBWG. Integration. S . Girod. S . Girod. Transport items. Detailed assessment of requirements with HE ongoing 40 ton crane Redundant , but at which level? - PowerPoint PPT PresentationTRANSCRIPT
Summary from the Secondary Beam working
group meeting (link)CENF meeting 6th June 2013
M. Calviani for the SBWG
2 M. Calviani - CENF PTM
Integration
6 June 2013
S. Girod
3 M. Calviani - CENF PTM 6 June 2013
S. Girod
4 M. Calviani - CENF PTM
Transport items Detailed assessment of
requirements with HE ongoing 40 ton crane
Redundant, but at which level? Issue when hot object are removed
form the trench to move into the morgue
Ideas of modify the support structure (*) to allow for a “flask/bell”-like configuration factor of ~50x attenuation with 4 cm Pb
+ 2 cm Fe (1 Sv/h 20 mSv/h) … but ~25 ton shielding
5 ton crane for “small” manipulation
6 June 2013
Possible need for a “crane” to move material inside the cooling station rooms (manual?) ~2 ton (CV input!)
5 M. Calviani - CENF PTM
“Croquis”
6 June 2013
N. Baddams/K. Kershaw
6 M. Calviani - CENF PTM
CE drawings b.755
6 June 2013
L. Faisandel
CATIA MODEL ST0517376_01
Ongoing modifications: Modification for access to the service galleries Personnel access Control room and proximity EL equipment space
reservation (Jura-side)
7 M. Calviani - CENF PTM
“Croquis”
6 June 2013
N. Baddam
s
8 M. Calviani - CENF PTM
Target brainstorming
6 June 2013
Target design/brainstorming ongoing to try to solve the issue of target bending Design with a max acceptable sagitta of 1 mm,
with 3 mm clearance between external target container and inner conductor
One idea is to have Be stiffeners to sustain the weight of the graphite max thickness of the Ti-body shall be ~0.5 mm
9 M. Calviani - CENF PTM
VSC sector valves principle
6 June 2013
First ideas with TE/VSC for the sectorization of the primary line
Further discussions needed for the primary/secondary beam interface
G. Vandoni
10 M. Calviani - CENF PTM 6 June 2013
11 M. Calviani - CENF PTM
RP: primary/secondary beam interface
6 June 2013
C. Strabel, Hei. Vincke
12 M. Calviani - CENF PTM 6 June 2013
C. Strabel, Hei. Vincke
13 M. Calviani - CENF PTM 6 June 2013
14 M. Calviani - CENF PTM
RP: air activation
6 June 2013
15 M. Calviani - CENF PTM
Comments
1. Reduction of upstream shielding will be considered
1.6 m pure Fe2. Investigate the possibility to reduce the
aperture Depends on the design of the primary beam line
and the effect of losing an MB Installation of a passive “mask” should be
considered DGS/SEE will perform a thorough analysis of
the ventilation/extraction requirements with the RP input He-vessel flush every shutdown 3H release Ventilation requirements underground area
6 June 2013
16 M. Calviani - CENF PTM
Follow-up
EN/CV = requirements, loads, space, accessibility, etc.
EN/EL = configuration/requirements as soon as loads are ready Max 50 m between switchgear and HV transformer
DGS/RP/RW = possible reuse of CERN waste GS/ASE = first discussions on access system
requirements TE/VSC (TBC) = primary/secondary beam
interface and He pumping PH/DT (TBC) = Horn/reflector electrical
configuration CNGS experience 6 June 2013