sumit_update_cv - 2015

3
SUMIT KUMAR PANDEY E-Mail: [email protected] ~ Mobile: +91-8233885834, 9950465834 Seeking challenging assignments in the field of Engineering & Project management that provides me opportunity to explore and implement new ideas for the growth of organization in which i work. SCHOLASTICS Pursuing EMBA (Power Management) from University of Petroleum & Energy Studies (UPES), Dehradun (Duration: 2013-2016). B.Tech. (Electronics & Communication Engineering) from Moradabad Institute of Technology, Moradabad with 71.33% marks (Duration: 2006-2010). XII from Islamia Inter College, Shahjahanpur, and U.P. Board with 67.40% marks (Duration: 2004- 2005). X from Islamia Inter College, Shahjahanpur, and U.P. Board with 67.83% marks. (Duration: 2002- 2003). Career Summary An “Sr. Engineer (EE&I)” with over 5.2 years of experience in Project Engineering ,Erection & Commissioning, Trouble Shooting & Fault Analysis, Operations & Maintenance Management, Safety and Energy Management of Process industry & Power Plant . Through knowledge about the tasks involving designing, implementation and commissioning of automated assembly machines, Power and energy systems. Worked on systems such as Electronic AC & DC Drives, PLCs, SCADA, Automation Logics, DOL & Star- delta Starters, Sensors & Actuators, Low Voltage Devices & Field instruments. Adroit in handling projects from concept to commissioning stage & activities involving gathering various requirements with respect to utilities, machines, manpower as well as in ensuring timely completion of the same. Adept in spare parts management or inventory management along with ensuring quality standards of associated electrical & instrument circuits. An effective communicator and team leader with skills in crisis management, troubleshooting, team building capability and proven abilities in planning and managing resources. Enriched with the ability to learn new concepts & technology within a short span of time. Flourish in a deadline intensive environment, multi-task, perform under pressure and meet deadlines. Present Organisational Experience Currently serving as Sr. Electrical Engineer- Project & Maintenance (EE&I) in the capacity of Process Team Member-Engineering Services at J.K Tyres & Industries Ltd, Rajasthan (Duration : 2013-Till Now) Working on SAP for raising indents, Creating P.Os, Keeping manpower records, Inventory tracking and monitoring the material cost used in maintenance. Responsible for the daily schedule & monitoring of Electrical Installation work progress and manpower of Electrical Sub-contractors. Responsible for the preparation of daily and weekly progress report. Analysing the daily Power report and seeking any opportunity of power saving. Ensure compliance of ISO-9000, TS16949, ISO-14001, ISO-18001 standard. Conduct cost control activities by effective inventory planning & management of raw materials. To achieve downtime within target by scheduled preventive maintenance through various checklist and keeping records of MTBF, MTTR, MTTF. Executed a gamut of tasks such as:- AC Variable Frequency Drives Commissioning, Operation & Maintenance. DP Transmitters, RTDS, Thermocouples, PID Controllers, Various S/V Filters, regulators, other field instruments, Servo Drive & Motor.

Upload: sumit-pandey

Post on 19-Aug-2015

58 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sumit_Update_CV - 2015

SUMIT KUMAR PANDEYE-Mail: [email protected] ~ Mobile: +91-8233885834, 9950465834

Seeking challenging assignments in the field of Engineering & Project management that provides me opportunity to explore and implement new ideas for the growth of organization in which i work.

SCHOLASTICS

Pursuing EMBA (Power Management) from University of Petroleum & Energy Studies (UPES), Dehradun (Duration: 2013-2016).

B.Tech. (Electronics & Communication Engineering) from Moradabad Institute of Technology, Moradabad with 71.33% marks (Duration: 2006-2010).

XII from Islamia Inter College, Shahjahanpur, and U.P. Board with 67.40% marks (Duration: 2004-2005). X from Islamia Inter College, Shahjahanpur, and U.P. Board with 67.83% marks. (Duration: 2002-2003).

Career Summary

An “Sr. Engineer (EE&I)” with over 5.2 years of experience in Project Engineering ,Erection & Commissioning, Trouble Shooting & Fault Analysis, Operations & Maintenance Management, Safety and Energy Management of Process industry & Power Plant .

Through knowledge about the tasks involving designing, implementation and commissioning of automated assembly machines, Power and energy systems.

Worked on systems such as Electronic AC & DC Drives, PLCs, SCADA, Automation Logics, DOL & Star-delta Starters, Sensors & Actuators, Low Voltage Devices & Field instruments.

Adroit in handling projects from concept to commissioning stage & activities involving gathering various requirements with respect to utilities, machines, manpower as well as in ensuring timely completion of the same.

Adept in spare parts management or inventory management along with ensuring quality standards of associated electrical & instrument circuits.

An effective communicator and team leader with skills in crisis management, troubleshooting, team building capability and proven abilities in planning and managing resources.

Enriched with the ability to learn new concepts & technology within a short span of time. Flourish in a deadline intensive environment, multi-task, perform under pressure and meet deadlines.

Present Organisational Experience

Currently serving as Sr. Electrical Engineer- Project & Maintenance (EE&I) in the capacity of Process Team Member-Engineering Services at J.K Tyres & Industries Ltd, Rajasthan (Duration : 2013-Till Now)

Working on SAP for raising indents, Creating P.Os, Keeping manpower records, Inventory tracking and monitoring the material cost used in maintenance.

Responsible for the daily schedule & monitoring of Electrical Installation work progress and manpower of Electrical Sub-contractors.

Responsible for the preparation of daily and weekly progress report. Analysing the daily Power report and seeking any opportunity of power saving.

Ensure compliance of ISO-9000, TS16949, ISO-14001, ISO-18001 standard. Conduct cost control activities by effective inventory planning & management of raw materials. To achieve downtime within target by scheduled preventive maintenance through various checklist and keeping

records of MTBF, MTTR, MTTF. Executed a gamut of tasks such as:-

AC Variable Frequency Drives Commissioning, Operation & Maintenance. DP Transmitters, RTDS, Thermocouples, PID Controllers, Various S/V Filters, regulators, other field instruments,

Servo Drive & Motor. PLC (Allen Bradley 500/5000 Series, Micrologix-1200, SIEMENS SIMATIC S7 Series, LOGO) Ladder Programming

& Commissioning. Monitoring & improvement of logic realization & interlocking of the process parameters & various systems.

Erection/installation for Instruments, Junction Boxes, MCC & PCC Panels, AC Motors(HT & LT) DC Motors ,Cable Routing, Laying and Installations, Electrical Layout Design, Ferruling, Cable Continuity, etc.

Working experience of Power Management, Power Bidding, Energy Conservation Project, Transformers, HT Panel and Air Compressors etc.

Entrusted with the responsibility of operations and maintenance of:- 132KV G.S.S, 6.6 KV substation having VCB, ACB, Isolators, Bus Couplers, step down Transformers, Distribution

Systems. Oversaw effective operation & maintenance of - 30 TPH Travagrate water tube Boiler (Texmeco Ltd) and 11

TPH Travagrate water tube Boiler (ISGEC Johan Thompson Stoker), Utility, Water Complex, etc.

Previous Organisational Experience

Page 2: Sumit_Update_CV - 2015

Have 2.6 years working experience with Pasupati Acrylon Limited, Moradabad (U.P) as Electrical Engineer - Projects & Maintenance. (Duration : 2010-2013)

Monitoring and Executing Power Plant Projects with respect to budgeted cost, demand forecasts & time over-runs to ensure timely execution of the projects.

Oversaw effective operation & maintenance of- 50 TPH CFBC Boilers , 20 TPH Travagrate Boilers , 8 MW & 4 MW Extraction cum condensate type & 2 MW, 600 KW condensate type Steam Turbines, Process Plant and Utility, Exposure to Substation Automation.

Performed synchronization of 8 MW Turbo-Generator set with 4 MW, 2MW & 600 KW Turbo-generators set in parallel and solo mode as well as with 1250 KVA DG sets on High Voltage & Low Voltage System.

Actively carried out works related to Alastom & Areva Make Numerical relay, Generator Protection Relay & Control Panel.

Accountabilities & Skill Set

Installed VFD’s on several blowers & pump for energy saving in Process & Power Plant. Conduct cost control activities by effective inventory planning & management of raw materials Managing on-site erection & commissioning activities to ensure completion of project within the time & cost

parameters; ensuring effective resource utilization to maximize the output. Inspecting field sites to observe & evaluate facilities & structures and to collect field survey data & measurements;

procuring project material, coordination and following up with vendors for various projects. Handling documentation, conducting cost benefit analysis of projects including feasibility studies, assessment of

the requirements, interface & commissioning; guiding the preparation and submission of offers for tender inquiries.

Prepare Specific Power Consumption Reports & Maintenance Schedule, execute daily basis.

Projects Handled

Presently working on 30TPH Travagrate water tube boiler automation with Forbes Marshall DCS. (Duration:2015-Till now)

Successfully completed Expansion Project of Substation 6.6KV, Curing Presses (L&T Make), Cold-Extruders, Semi-Automatic Machines, Strip Winders, Mixer, Hot Water Recovery & Energy Conservation, HT Motor & Drive installation, Harmonic Filter, Energy Efficient fume Exhausts & Feed Water Pump installation. (Duration : 2013- 2014)

Successfully completed commissioning and erection of Coal Based Thermal Power Plant, that was monitored & controlled by Yokogawa DCS CENTUM VP at Pasupati Acrylon, encompassing the following equipment’s:- (Duration : 2010-2012 50 TPH CFBC Boiler, 8 MW Extractions cum Condensing Type Steam Turbine, 8 MW/10000 KVA AC Generator,

28 & 12 Kg/cm2 PRDSH, Ash Handling System, Electrostatic Precipitator, Coal Handling Plant

ACADEMIC PROJECT & WORKSHOPS

One month Industrial Training at I.T.I. Mankapur in 2009. Four weeks’ summer training on VLSI (VHDL Language) held at Vedant Semiconductor Technologies, Lucknow in

2009. Received Certification of Workshop attended on PSPICE Software, Integrated Circuit & VLSI Design conducted by

CDAC NOIDA in 2008 Participated in the ROBO BEAM and ROBO SAPIENS Robotics Workshops conducted by IIT Roorkee in 2008.

PERSONAL DOSSIER

Date of Birth : 2nd February 1988Languages Known : English and HindiPermanent Address : C/O Pawan Kumar Mishra, Mohalla anta chamkani, near lakdimandi, vidrohi wali gali, Shahjahanpur – 242001, U.P.Passport Number : K6101170