sumit resume_updated 2016

3
SUMIT KUMAR PANDEY E-Mail: [email protected] ~ Mobile: +91-8233885834, 9950465834 Seeking challenging assignments in the field of Maintenance Management, Industrial Automation & Project management that provides me opportunity to explore and implement new ideas for the growth of organization in which i work. SCHOLASTICS Executive-MBA (Power Management) from University of Petroleum & Energy Studies (UPES), Dehradun (Duration: 2013-2016). B.TECH (Electronics and Communication Engineering) from Moradabad Institute of Technology, Moradabad with 71.33% marks (Duration: 2006-2010). XII from Islamia Inter College, Shahjahanpur, and U.P. Board with 67.40% marks (Duration: 2004- 2005). X from Islamia Inter College, Shahjahanpur, and U.P. Board with 67.83% marks. (Duration: 2002- 2003). Summary Sr. Engineer (EE&I)” with over 6 years of experience in Breakdown, Maintenance Management, Project Engineering , Trouble Shooting & Fault Analysis, Safety and Energy Management of Bias Tyre industry, Chemical & Power Plant . Improve reliability through Continuous Improvement techniques/ up-gradation / Projects / implementation of advance diagnostic and online condition monitoring techniques. Worked on systems such as Electronic AC & DC Drives, PLCs, SCADA, HMI, Automation Logics, Starters, Sensors & Actuators, Low Voltage Devices & Field instruments. Handling all electrical breakdown, Preventive, Corrective maintenance activities related to Tyre Building, Curing, Extruders, Banbury, Calendaring unit and Sub-Station. Adept in spare parts management or inventory management along with ensuring quality standards of associated electrical & instrument circuits. Responsible for maintaining and maximising electrical equipment & power distribution system availability and reliability at manufacturing division with safety through continuous improvement techniques, predictive and preventive maintenance. Participate in all Electrical breakdown, maintenance & shutdown activities of semi auto & Full auto Bias tyre building machines. Conduct periodic audits to identify gaps and ensure electrical system operation and maintenance adherence to Group Standards and Best Maintenance Practices. Present Organisational Experience Currently serving as Sr. Electrical Engineer- Project & Maintenance (EE&I) in the capacity of Process Team Member-Engineering Services at J.K Tyre & Industries Ltd, Rajasthan (Duration : 2013-Till Now) Working on SAP for raising indents, Creating Purchase Orders, Keeping manpower records, Inventory tracking and monitoring the material cost used in plant equipment electrical maintenance.

Upload: sumit-pandey

Post on 11-Jan-2017

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sumit Resume_updated 2016

SUMIT KUMAR PANDEYE-Mail: [email protected] ~ Mobile: +91-8233885834, 9950465834

Seeking challenging assignments in the field of Maintenance Management, Industrial Automation & Project management that provides me opportunity to explore and implement new ideas for the growth of organization in which i work.

SCHOLASTICS

Executive-MBA (Power Management) from University of Petroleum & Energy Studies (UPES), Dehradun (Duration: 2013-2016).

B.TECH (Electronics and Communication Engineering) from Moradabad Institute of Technology, Moradabad with 71.33% marks (Duration: 2006-2010).

XII from Islamia Inter College, Shahjahanpur, and U.P. Board with 67.40% marks (Duration: 2004-2005). X from Islamia Inter College, Shahjahanpur, and U.P. Board with 67.83% marks. (Duration: 2002-2003).

Summary

“Sr. Engineer (EE&I)” with over 6 years of experience in Breakdown, Maintenance Management, Project Engineering , Trouble Shooting & Fault Analysis, Safety and Energy Management of Bias Tyre industry, Chemical & Power Plant .

Improve reliability through Continuous Improvement techniques/ up-gradation / Projects / implementation of advance diagnostic and online condition monitoring techniques.

Worked on systems such as Electronic AC & DC Drives, PLCs, SCADA, HMI, Automation Logics, Starters, Sensors & Actuators, Low Voltage Devices & Field instruments.

Handling all electrical breakdown, Preventive, Corrective maintenance activities related to Tyre Building, Curing, Extruders, Banbury, Calendaring unit and Sub-Station.

Adept in spare parts management or inventory management along with ensuring quality standards of associated electrical & instrument circuits.

Responsible for maintaining and maximising electrical equipment & power distribution system availability and reliability at manufacturing division with safety through continuous improvement techniques, predictive and preventive maintenance.

Participate in all Electrical breakdown, maintenance & shutdown activities of semi auto & Full auto Bias tyre building machines.

Conduct periodic audits to identify gaps and ensure electrical system operation and maintenance adherence to Group Standards and Best Maintenance Practices.

Present Organisational Experience

Currently serving as Sr. Electrical Engineer- Project & Maintenance (EE&I) in the capacity of Process Team Member-Engineering Services at J.K Tyre & Industries Ltd, Rajasthan (Duration : 2013-Till Now)

Working on SAP for raising indents, Creating Purchase Orders, Keeping manpower records, Inventory tracking and monitoring the material cost used in plant equipment electrical maintenance.

Maintain electrical testing laboratory, done calibration of all electrical weight balances and Indicators. Responsible for the daily schedule & monitoring of Electrical breakdown, Preventive and Predictive maintenance

work progress and manpower of Electrical Sub-contractors. Responsible for the preparation of daily and weekly Specific Power Report and progress report. Analysing the daily

Power report, Specific Power Consumption Report and seeking any opportunity of power saving. Ensure compliance of ISO-9000, TS16949, ISO-14001, OHSAS-18001, standard. Provide inputs for plant maintenance cost budgeting and optimization of resources. Reduce production losses from Electrical equipment defects / failures/ breakdowns by scheduled preventive

maintenance through various checklist and keeping records of MTBF, MTTR, MTTF. Executed a gamut of tasks such as:-

Servo and AC Variable Frequency Drives Commissioning, Operation, Maintenance & Trouble shooting.

Page 2: Sumit Resume_updated 2016

PLC (Allen Bradley 500/5000 Series, Micrologix-1200, SIEMENS SIMATIC S7 Series, LOGO) Ladder Programming & Commissioning. Monitoring & improvement of logic realization & interlocking of the process parameters & various systems.

Erection/ installation for Instruments, Junction Boxes, MCC & PCC Panels, AC Motors(HT & LT) DC Motors ,Cable Routing, Laying and Installations, Electrical Layout Design, Ferruling, Cable Continuity, etc.

Working experience of Power Management, Power Bidding, Energy Conservation Project, Transformers, HT Panel and Air Compressors etc.

Entrusted with the responsibility of operations and maintenance of:- 132KV G.S.S, 6.6 KV substation having VCB, ACB, Isolators, Bus Couplers, step down Transformers, Distribution

Systems. Oversaw effective operation & maintenance of - 30 TPH Travagrate water tube Boiler (Texmeco Ltd) and 11

TPH Travagrate water tube Boiler (ISGEC Johan Thompson Stoker), Utility, Water Complex, etc.

Previous Organisational Experience

Have 2.6 years working experience with Pasupati Acrylon Limited, Moradabad (U.P) as Electrical Engineer - Projects & Maintenance. (Duration : 2010-2013)

Monitoring and Executing Power Plant Projects with respect to budgeted cost, demand forecasts & time over-runs to ensure timely execution of the projects.

Oversaw effective operation & maintenance of- 50 TPH CFBC Boilers , 20 TPH Travagrate Boilers , 8 MW & 4 MW Extraction cum condensate type & 2 MW, 600 KW condensate type Steam Turbines, Process Plant and Utility, Exposure to Substation Automation.

Performed synchronization of 8 MW Turbo-Generator set with 4 MW, 2MW & 600 KW Turbo-generators set in parallel and solo mode as well as with 1250 KVA DG sets on High Voltage & Low Voltage System.

Review and maintain equipment protection schemes, protection relay setting & relay co-ordination

Skill Set

Knowledge of Power system operation and maintenance. Knowledge of SAP. Familiar with relevant codes and standards. Identify and Implement energy conservation initiatives. Analyse obsolescence and implement asset renewal plan at site. Conduct cost control activities by effective inventory planning & management of raw materials Support for Technical Due Diligence for major activities, minor projects, plant expansions and modifications. Support for Knowledge management and Documentation management. Carryout Trouble shooting & support for major & critical failures / issues occurring at site. Analytical thinking. Managing Ambiguity. Competent in MS Office.

Projects Handled

Successfully completed project of 30TPH Travagrate water tube boiler automation with Forbes Marshall DCS. (Duration:2015-2016)

Successfully completed Expansion Project of Substation 6.6KV, Curing Presses (L&T Make), Cold-Extruders, Semi-Automatic Tyre Building Machines, Strip Winders, Banbury Mixer, Hot Water Recovery & Energy Conservation, HT Motor & Drive installation, Harmonic Filter, Energy Efficient fume Exhausts & Feed Water Pump installation. (Duration : 2013- 2014)

Successfully completed commissioning and erection of Coal Based Thermal Power Plant, that was monitored & controlled by Yokogawa DCS CENTUM VP at Pasupati Acrylon, encompassing the following equipment’s:- (Duration : 2010-2012 50 TPH CFBC Boiler, 8 MW Extractions cum Condensing Type Steam Turbine, 8 MW/10000 KVA AC Generator,

28 & 12 Kg/cm2 PRDSH, Ash Handling System, Electrostatic Precipitator, Coal Handling Plant

Page 3: Sumit Resume_updated 2016

ACADEMIC PROJECT & WORKSHOPS

I have made a Dissertation on “Detailed Study of Business Framework and Open Access in Power Trading” during my Executive MBA from University of Petroleum and Energy Studies 2016.

One month Industrial Training at I.T.I. Mankapur in 2009. Received Certification of Workshop attended on PSPICE Software, Integrated Circuit & VLSI Design conducted by

CDAC NOIDA in 2008 Participated in the ROBO BEAM and ROBO SAPIENS Robotics Workshops conducted by IIT Roorkee in 2008.

PERSONAL DOSSIER

Date of Birth : 2nd February 1988Languages Known : English and HindiPermanent Address : C/O Pawan Kumar Mishra, Mohalla anta chamkani, near lakdimandi, vidrohi wali gali, Shahjahanpur – 242001, U.P.Passport Number : K6101170