SuDS in Wales 06/09/2018 1 SuDS Delivery in Wales 6 th September 2018 Key Facts Welsh Water Capital Delivery Alliance We have five Alliance partners Which equates to around 1000 people We currently have circa 1400 live capital schemes being designed and delivered by our in-house Engineering Delivery Team and Alliance Partners We submit around 150 planning applications a year This equates to circa £1.3m of investment per day during this AMP

Upload: others

Post on 08-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SuDS Delivery in Wales - Sustainable Drainage System...SuDS in Wales 06/09/2018 1 SuDS Delivery in Wales 6th September 2018 Key Facts Welsh Water Capital Delivery Alliance • We have

SuDS in Wales 06/09/2018

1

SuDS Delivery in Wales 6th September 2018

Key Facts

Welsh Water Capital Delivery Alliance

• We have five Alliance partners

• Which equates to around 1000 people

• We currently have circa 1400 live capital schemes being designed and delivered by our in-house Engineering Delivery Team and Alliance Partners

• We submit around 150 planning applications a year

• This equates to circa £1.3m of investment per day during this AMP

Page 2: SuDS Delivery in Wales - Sustainable Drainage System...SuDS in Wales 06/09/2018 1 SuDS Delivery in Wales 6th September 2018 Key Facts Welsh Water Capital Delivery Alliance • We have

SuDS in Wales 06/09/2018

2

Llanelli and Gowerton

The Loughor

Page 3: SuDS Delivery in Wales - Sustainable Drainage System...SuDS in Wales 06/09/2018 1 SuDS Delivery in Wales 6th September 2018 Key Facts Welsh Water Capital Delivery Alliance • We have

SuDS in Wales 06/09/2018

3

Loughor Estuary – Pre-1997 discharges

Loughor Estuary – Post-1997 discharges

Page 4: SuDS Delivery in Wales - Sustainable Drainage System...SuDS in Wales 06/09/2018 1 SuDS Delivery in Wales 6th September 2018 Key Facts Welsh Water Capital Delivery Alliance • We have

SuDS in Wales 06/09/2018

4

Developing solutions

Storage won’t work in

this catchment!

Page 5: SuDS Delivery in Wales - Sustainable Drainage System...SuDS in Wales 06/09/2018 1 SuDS Delivery in Wales 6th September 2018 Key Facts Welsh Water Capital Delivery Alliance • We have

SuDS in Wales 06/09/2018

5

Llanelli Overview

• Investment in Llanelli and Gowerton :-

• AMP5 £15m

• AMP6 NEP £26m – 7nr. Intermittent Discharges

• NRW L2 Driver £73m – Northumberland SPS and Both Llanelli and

Gowerton WwTW

• Maintenance improvements of £5m – Halfway SPS

• Total Permeable Area removed by end of AMP6 >44 Ha

• Total flow removed during a 1:5 year storm – 6,116 l/sec

• “Smart Networks” has ‘mobilised’ >25,000 cu.m of previously unused storage

across the network

• Peak Flow Equivalent Treatment – PFET – used at Llanelli WwTW

Investment

Page 6: SuDS Delivery in Wales - Sustainable Drainage System...SuDS in Wales 06/09/2018 1 SuDS Delivery in Wales 6th September 2018 Key Facts Welsh Water Capital Delivery Alliance • We have

SuDS in Wales 06/09/2018

6

Stebonheath Primary School (AMP5)

Queen Mary’s Walk (AMP5)

Page 7: SuDS Delivery in Wales - Sustainable Drainage System...SuDS in Wales 06/09/2018 1 SuDS Delivery in Wales 6th September 2018 Key Facts Welsh Water Capital Delivery Alliance • We have

SuDS in Wales 06/09/2018

7

Glevering Street (AMP5)

— £2m scheme, part funded via the European Regional Development Fund

— Mix of green infrastructure and below ground interventions

— Close engagement needed with residents

— Lessons learnt

Swale - before

Cambrian North basin – Before (AMP6)

Page 8: SuDS Delivery in Wales - Sustainable Drainage System...SuDS in Wales 06/09/2018 1 SuDS Delivery in Wales 6th September 2018 Key Facts Welsh Water Capital Delivery Alliance • We have

SuDS in Wales 06/09/2018

8

Cambrian North basin - After (AMP6)

Station road

16 Station Road

Page 9: SuDS Delivery in Wales - Sustainable Drainage System...SuDS in Wales 06/09/2018 1 SuDS Delivery in Wales 6th September 2018 Key Facts Welsh Water Capital Delivery Alliance • We have

SuDS in Wales 06/09/2018

9

Station road

17

Station Road

Asda Phase 2

18

Station Road

Page 10: SuDS Delivery in Wales - Sustainable Drainage System...SuDS in Wales 06/09/2018 1 SuDS Delivery in Wales 6th September 2018 Key Facts Welsh Water Capital Delivery Alliance • We have

SuDS in Wales 06/09/2018

10

Welsh Water 2050

19

• Strategic vision with the goal of resilience by

2050

• Strategic response 15 – using nature to reduce

flood risk and pollution

• Recognises RainScape as a tool to be used in

managing a range of issues and deliver multiple

benefits

• Resilient solutions will provide the best value

solution, whilst managing catchment risk

• Close working with local authorities and others