    Business activity is dynamic in character and subject to wide fluctuations.

    The movement from working capital to income and profits and back to working capital is one of

    the most important characteristics of business administration. This operation is concerned with

    the deployment of funds with the hope that they will generate returns, rendering an additional

    amount called profit. If the operations of an enterprise are to run smoothly, a proper

    relationship between fixed capital and current capital must be maintained. Its

    aim is to use business funds in which a manner that earnings are maximized. Financial

    Management provides a frame work for selecting a proper course of action & deciding a viable

    commercial strategy. This objective can be achieved by-

    a) Profit maximization

    b) Wealth maximization

    Funds are needed for short term as well long term purposed. In short term we say current

    operation of the business. For a manufacturing unit, payment for raw materials and wages and

    for meeting routine expenses. All manager who is ready to play an important role in his

    organization the goods which are manufactured in a given time may not be sold in

    thatperiod. Naturally fund is blocked in inventory. It is also the fact that all goods may not

    be sold on credit basis. The credit sales also involve the blocking of funds till the cash

    received. The term working capital is closely related to the term funds and has two meaning. It

    is used to mean current assets minus current liabilities. In Simple words it is the

    investment needed for carrying out day-to-day operations of the business smoothly.

    Working capital management thus throws a challenge and should be a welcome

    opportunity for a financial manager who is ready to play an important role in his organization.

  • 8/11/2019 Sudesh Final (2)

    3/97

    3

    1.1 DEFINITIONWorking capital (abbreviated WC) is a financial metric which represents operating

    liquidity available to a business, organization or other entity, including governmental entity.

    Along with fixed assets such as plant and equipment, working capital is considered a part of

    operating capital. Net working capital is calculated as current assets minus current liabilities. It is

    a derivation of working capital, that is commonly used in valuation techniques such as DCFs

    (Discounted cash flows). If current assets are less than current liabilities, an entity has a working

    capital deficiency, also called a working capital deficit.

    A company can be endowed with assets and profitability but short of liquidity if its assets cannot

    readily be converted into cash. Positive working capital is required to ensure that a firm is able to

    continue its operations and that it has sufficient funds to satisfy both maturing short-term

    debt and upcoming operational expenses. The management of working capital involves

    managing inventories, accounts receivable and payable, and cash.

  • 8/11/2019 Sudesh Final (2)

    4/97

    4

    1.2 CALCULATION

    Current assets and current liabilities include three accounts which are of special

    importance. These accounts represent the areas of the business where managers have the most

    direct impact:

    accounts receivable (current asset)

    inventory (current assets), and

    accounts payable (current liability)

    The current portion of debt (payable within 12 months) is critical, because it represents a short-

    term claim to current assets and is often secured by long term assets. Common types of short-

    term debt are bank loans and lines of credit.

    An increase in working capital indicates that the business has either increased current assets (that

    it has increased its receivables or other current assets) or has decreased current liabilitiesfor

    example has paid off some short-term creditors, or a combination of both.

    Implications on M&A: The common commercial definition of working capital for the purpose of

    a working capital adjustment in an M&A transaction (i.e. for a working capital adjustment

    mechanism in a sale and purchase agreement) is equal to:

    Current AssetsCurrent Liabilities excluding deferred tax assets/liabilities, excess cash, surplus

    assets and/or deposit balances.

    Cash balance items often attract a one-for-one, purchase-price adjustment.

  • 8/11/2019 Sudesh Final (2)

    5/97

    5

    1.3 WORKING CAPITAL MANAGEMENT

    One of the most important areas in day-to-day management of the firm deals with the

    management of working capital, which is defined as all the Short-term assets used in daily

    operations. These consist primarily of cash, Marketable, securities, account receivable and

    inventories. Some of the decisions taken in working capital management are:

    An adequate supply of raw materials.

    Cash to meet the operation payments.

    The ability to grant credit to customers.

    The capacity to wait for market for its finished products.

    Investment in various current assets.

    Proportion in long term and short term funds to finance current assets.

    It may be clear that the objective management is to maintain a satisfactory level to working

    capital. In other words, the current assets should not only be sufficient enough or cover the

    current liabilities but at the same time should ensure the reasonable amount of safety margin.

    This is possible only when the different components of working capital are properly balanced.

  • 8/11/2019 Sudesh Final (2)

    6/97

    6

    1.4 WORKING CAPITAL CONCEPTS

    Decisions relating to working capital and short term financing are referred to

    as working capital management. These involve managing the relationship between a firm's short-

    term assets and itsshort. The goal of working capital management is to ensure that the firm is

    able to continue its operations and that it has sufficient cash flow to satisfy both maturing short-

    term debt and upcoming operational expenses.

    A managerial accounting strategy focusing on maintaining efficient levels of both components of

    working capital, current assets and current liabilities, in respect to each other. Working capital

    management ensures a company has sufficient cash flow in order to meet its short-term debt

    obligations and operating expenses. There are two concept of working capital

    I. Gross concepts

    II. Net concepts

    I. Gross working capita concepts

    Simply called as working capital refers to the firm investment in current assets are

    the assts which can converted into cash within an accounting year and includes cash short term

    securities, debtors, bills receivables and stocks.

  • 8/11/2019 Sudesh Final (2)

    7/97

    7

    II. Net working capital concepts

    Net working capital refers to the difference between current assets and current liabilities.

    Current liabilities are those claims of outsiders which are expected to mature for payments wit in

    an accounting year. Networking capital can be positive or negative. A negative working capital

    Means a negative liquidity and may prove to be harmful for the company. It occurs when the

    current liabilities are in the excess of current assets. It may be due to mismanagement of current

    Assets.

    In summary it may be emphasized that gross and net concepts of working capital are two

    important facts of working capital management. The data and problems of each firm is different,

    so it should be analyzed determine the amount of working capital and timely action should be

    taken by management to improve the liquidity position of the firm.

  • 8/11/2019 Sudesh Final (2)

    8/97

    8

    1.5 OBJECTIVES OF THE WORKING CAPITAL MANAGEMENT

    i. To minimize the amount of capital employed in financing the current assets. This will

    also lead to an improvement in return on capital employed.

    ii. To manage the current assets In such a way that the managerial returns on investment in

    these assets is not less than the cost of the capital acquired to finance them. This will

    ensure the maximization of the value of business unit.

    iii. To maintain proper balance between the amount of current assets and the amount of

    current liabilities in such a way that the firm is always able to meet its financial

    obligation whenever due. This will ensure smooth working of the unit without ant

    production held ups due to paucity of funds.

    Thus, the objective is to ensure the maintenance of the satisfactory level of

    working capital in such a way that it is neither inadequate nor excessive. In should not

    only be sufficient to cover the current liabilities but should ensure a reasonable margin of

    safety also.

  • 8/11/2019 Sudesh Final (2)

    9/97

    9

    1.6 MANAGEMENT OF WORKING CAPITAL

    Guided by the above criteria, management will use a combination of policies and techniques for

    the management of working capital. The policies aim at managing the current

    assets (generally cash and cash equivalents, inventories and debtors) and the short term

    financing, such that cash flows and returns are acceptable.

    Cash management. Identify the cash balance which allows for the business to meet day to

    day expenses, but reduces cash holding costs

    Inventory management. Identify the level of inventory which allows for uninterrupted

    production but reduces the investment in raw materials - and minimizes reordering costs -

    and hence increases cash flow. Besides this, the lead times in production should be lowered

    to reduce Work in Process (WIP) and similarly, the Finished Goods should be kept on as low

    level as possible to avoid over production - see Supply chain management; Just In

    Time (JIT); Economic order quantity (EOQ); Economic quantity

    Debtors management. Identify the appropriate credit policy, i.e. credit terms which will

    attract customers, such that any impact on cash flows and the cash conversion cycle will be

    offset by increased revenue and hence Return on Capital (or vice versa); see Discounts and

    allowances.

    Short term financing. Identify the appropriate source of financing, given the cash conversion

    cycle: the inventory is ideally financed by credit granted by the supplier; however, it may be

    necessary to utilize a bank loan (or overdraft), or to "convert debtors to cash" through

    "factoring".

  • 8/11/2019 Sudesh Final (2)

    10/97

  • 8/11/2019 Sudesh Final (2)

    11/97

    11

    Operating efficiency

    Batter operating efficiency, lower need of working capital. Most firms seek to maintain

    sufficient working capital to meet their need for liquidity.

    Manufacturing cycle

    Longer the manufacturing cycle larger will be the firm working capital requirements.

    Manufacturing cycle stands with the purchase and use of raw material and completes with the

    production of finished goods. In order to minimize their investment in working capital, some

    firms, like manufacturing industrial products, have a policy of asking for advance payments from

    their customers.

    Above all the amount of working capital that a firm would need. It is affected not only by

    the factors associated with firm itself but it is also affected by economic, monetary and general

    business environment.

  • 8/11/2019 Sudesh Final (2)

    12/97

    12

    1.8TYPES OF WORKING CAPITAL ON THE BASIS OF CONCEPT

    Generally there are two concepts of working capital. They are gross working capital and net

    working capital. But they are defined by different names. They are explained below:

    1) In Broad Sense: working capital refers to gross working capital. It is also defined as

    financial concept or going concern concept. It means the capital invested in the current

    assets of the firm. Current assets mean the assets which can be converted into cash easily

    or within one accounting period. It helps in determining the return on investment in

    working capital and providing correct amount of working capital at right time.

    2) In narrow sense: working capital refers to net working capital. It is also defined as

    accounting concept. It means excess of current assets over current liabilities. It helps in finding

    out firms capability to meet short term liabilities as well as indicates the financial soundness of

    the enterprise.

    NET WORKING CAPITAL = CURRENT ASSETS CURRENT LIABILITIES

    Net working capital can be +ve orve. When current assets are more than the current liabilities

    than working capital is +ve and when current assets are less than the current liabilities than

    working capital isve.

    At the end we can say, that both the working capital are important but according to the

    suitability gross working capital is suitable for companies having separate ownership or

    management while net working capital is suitable for sole trader companies or partnership firms.

  • 8/11/2019 Sudesh Final (2)

    13/97

    13

    Types of working capital on the basis of time

    1) Permanent working capital: it is also called fixed working capital. It means to carry on the

    day to day expenses the firm is required to maintain the minimum amount of working capital.

    For example the firm is required to maintain the minimum level of raw material, finished goods

    or cash balance etc.

    a) Regular working capital- it means the minimum amount which the firm has to keep with

    itself to carry on the day to day operation.

    b) Reserve working capital- it means the excess amount over the regular working capital for

    uncertain circumstances like strike, lock out, depression etc.

  • 8/11/2019 Sudesh Final (2)

    14/97

    14

    2) Temporary working capital: it is also called variable working capital, which is required to

    meet the seasonal demands as well as for special purposes.

    a) Seasonal working capital- it is required to meet the seasonal needs of the enterprise.

    b) Special working capital- it is required for some special purposes of the enterprise. For

    example advertising the product of the firm requires special working capital.

    Temporary working capital is for short period and fluctuates while permanent working capital is

    stable and fixed.

    These are the types or classification of working capital.

  • 8/11/2019 Sudesh Final (2)

    15/97

    15

    CASE STUDY

  • 8/11/2019 Sudesh Final (2)

    16/97

    16

    2.1 BHILAI STEEL PLANT

    Bhilai steel plant a symbol of indo-soviet techno-economic collaboration is the one of

    first three integrated steel plants set up by Government of India to build up a sound base for

    industrial growth of the country. The agreement for setting up the plant with a capacity of 1 MT

    of ingot steel was assigned between the Government of the USSR and India on 2nd

    February

    1955. Today the plant has already been expended to the capacity of 4.0 million tons of crude

    steel & is producing 3.925 million tons of crude steel & 3.153 million tons of saleable steel.

    The plant was the 1stto produce wide (3600mm) & heavy plates. A major exporter of

    steel products, Bhilai specializes in shaped products such as heavy rails, heavy structural

    merchant products of wore rods. Its coke making & chemicals, hot metal & pig from, entire

    making facility & Blooming and billet mill and all the finishing mills are armed with ISO-9002

    certification. Plate mill of Bhilai Steel Plant has received the ISO-14001 certification for its

    Environment Management System.

    Among various SAIL steel plant, is only plant, which has been earning profits

    continuously. More so when there has been a total loss to the tune of 1707 crores. BSP has

    individually earned a profit in crores Rs. For the year march 2003 732.20. BSP being one of

    the plant where modernization has not been fully effected & still B.S.P. is able to isolate itself,

    by earning profit, is a matter of great pride for the employee at Bhilai Steel Plant.

    Bhilai steel plant won the Prime Minister Trophy for the Best Integrated Steel

    Plant in the country five times out of eight times since the inception of the award.

  • 8/11/2019 Sudesh Final (2)

    17/97

    17

    ORGANISATION STRUCTURE

    OFFINANCE & ACCOUNTS DEPARTMENT

    CASH, WAGES-1,WAGES-III A,INCENTIVE CELL,

    STORES, FIN.ESTABLISHMENT,ADMINISTRATION& COORDINATION

    G. M. (F & A)

    D.G.M. (F

    &A)

    CFMD.G.M (F

    &A)

    CFM CFMCFM

    SALESEXCISE,SALES

    TAX, FRT.OUTWARD

    PROJECT FINANCE,CAPITAL BUDGET.WORKS FINANCE

    ZONAL A/Cs &WORKSCOMPLATION

    RAW MATERIALSA/Cs, FREIGHT &CLAIMS STOCK

    VERIFICATION,TOWNSHIPSERVICES,

    HOSPIAL A/Cs

    MINES, ZONALWAGES, WAGESCOORDINATION

    CENTRAL A/Cs, MANAGEMENTA/Cs, ASSETS A/Cs, OPERATIONBUDGET, COST A/Cs, ENERGY

    CELL OPERATION A/Cs, PC, CC

  • 8/11/2019 Sudesh Final (2)

    18/97

    18

    2.2

    STEEL AUTHORITY OF INDIA LIMITED

    Steel Authority of India Ltd. (SAIL) is Indias largest and one of the worlds leading

    steel producers with a turnover of Rs. 19702.10 crores during 2002-03, which was 24% higher

    than previous years turnover.

    VISION OF SAIL

    To be a respected world class corporation and the leader in Indian Steel Business in

    quality, Productivity, profitability and customer satisfaction.

    SAIL has four integrated steel plant at Bhilai, Durgapur, Rourkela and Bokaro having

    a total capacity of producing over 11 million tons of crude steel. Three plants at Salem,

    Durgapur and Bhadravati produce stainless and alloy steels. A subsidiary at Burnpur produce

    heavy structural and another at Chandrapur is a bulk producer of Ferro-alloys.

    SAILs vast Portfolio of long, flat and tabular products is marketed within and outside

    India by its central Marketing Organisation (CMO) and the InternationTrade Division (ITD)

    respectively steel plants. SAILs Raw Material Division, head quartered at Kolkatta Manages

    Indias second largest mines network. To develop new technologies for the steel industry and

    achieve world standards in steel, SAIL has a well-equipped research & Development center for

    iron and steel (RDCIS).

    Besides it has its own in house center for engineering & Technology (CET),

    Management Training Institute (MTI) and SAIL Safely Organization (SSO) at Ranchi. SAIL

  • 8/11/2019 Sudesh Final (2)

    19/97

    19

    Consultancy Division (SAILCON) at New Delhi provides consultancy services garnered over

    four decades of experience in steel making, to clients word wide.

    SAILs product mix has been reoriented to keep pace with market demand. Higher

    availability of special grade products like API grade HR Coils/Plates/Pipes. HR Coil for cold

    Reducing segment etc. It has enabled SAIL to maintain & achieve larger market in value added

    segment, with a market driven pricing system, key customers are provided special customer

    services and there is increased product focus and constant review of distribution channels.

    One of the leading steel producers in the world and the largest steel maker in the country,

    SAIL occupies a primes place in the industrial scenario of India. Quality steel products from

    SAIL have carved a niche for themselves in the globe steel market. The company aims at

    thinking its global presence felt through export joint ventures and strategic alliances with

    internationally reputed steel markets.

    SAIL is in the midst of organizational restructuring to bring greater focus on its core

    business of making carbon steel. Making employees aware of market requirements insuring

    greater involvement of plants in marketing initiatives, achieving cost leadership through rigorous

    cost cutting drives and rationalizing man power to bring down the total no. of employees to

    competitive levels are some other facets of the strategy to insure sustained profitability and

    growth.

    SAILSability to continuously grow in different market conditions reflects the inherent

    strengths of the company to manage its operations under the varying and fast changing business

    environment over a long span of time.

  • 8/11/2019 Sudesh Final (2)

    20/97

    20

    In the new millennium there is a strong focus of SAILs business activities for customer

    satisfaction, adopting an approach for increased synergy between production capabilities and

    market needs and ensuring supply of customized products with shorter lead times.

    The product mix is being continuously oriented to specific needs of different markets

    segments. SAIL has been progressively investing in technological up gradation of its facilities to

    supporting cost reduction, improving products quality and yields and for environment protection.

    In the new millennium, the accent in SAIL is to accelerate the process of change, adapt to

    emerging competitive business environment and excel as a business organization both within and

    outside India.

  • 8/11/2019 Sudesh Final (2)

    21/97

    21

    ORGANISATION STRUCTURE OF SAIL

    CHAIRMAN

    DIRECTORS

    TECH

    DIRECTOR

    PERSONAL

    DIRECTORFINANCE

    CHIEF VIGILANCE

    OFFICER

    EXE. DIRECTOR

    (OPRNS)

    EXE. DIRECTOR

    (IA)

    ED (TECH & LEGAL

    SERVICES)

    EXE. DIR.

    (PROJECTS)

    EXE. DIR.

    CMMG

    EXE. DIR. (CIG)

    EXE. DIR. (CP)

    MANAGING

    DIRECTIOR, BSP

    MANAGEING

    DIRECTOR, BSL

    MANAGENINGDIRECTOR, RSP

    MANAGENING

    DIRECTOR, DSP

    EXE. DIRECTOR,

    VISL

    EXE. DIRECTOR,

    SSP

    EXE. DIRECTORS,

    ASP

  • 8/11/2019 Sudesh Final (2)

    22/97

    22

    ORGANISATION STRUCTURE OF BHILAI STEEL PLANT

    DIR (M &HS)

    ACVO

    GM (M & SP)

    GM (IA)

    MANAGING

    DIRECTOR

    ED (PROJECTS)

    GM (IT)

    GM (F&A) ED (WORKS)

    GM (PP&E & BEDB)

    GM I/C (SERVICE)

    COC

    GM (P MILLS)

    GM (MS)

    GM (TS) GM (MM)

    ED (MM)

    GM (PROJECTS)

    GM I/C (MINES)

    GM I/C (STEEL)

    GM (PERS)GM (SAFTY)

    GM (HRD)

    DGM (L&A)

    GM (Refr)

    GM I/C (M&U)

    GM I/C (MILLS-LP)

    ED (P&A)

    GM (QUALITY)

    GM I/C (PE & EN)

    GM (IRON)

    GM (CO & CCD)

  • 8/11/2019 Sudesh Final (2)

    23/97

    23

    2.3 MAJOR UNITS OF SAIL

    STEEL PLAN.

    a. Bhilai Steel Plant (BSP) in C.G.

    b. Durgapur Steel Plant (DSP) in West Bengal.

    c. Rourkela Steel Plant (RSP) in Orissa.

    d. Bokaro Steel Plant (BSP)in Jharkhand.

    SPECIAL STEEL PLANTS

    a. Alloys Steel Plant (ASP) in West Bengal.

    b. Salem Steel Plants (SSP) in Tamilnadu.

    c. Vivesvaraya Iron & Steel Plants (VISP) in Karnataka.

    SUBSIDIARIES

    a. Indian Iron & Steel Co. Ltd. (I(SCO) in West Bengal.

    b. Maharashtra Elektrosmelt Ltd (MEL) in Maharashtra.

  • 8/11/2019 Sudesh Final (2)

    24/97

    24

    OTHER UNITS.

    a. Raw Material Division (RMD) at Kolkata.

    b. Central Marketing Organisation (CMO) at Kolkata.

    c. SAIL Consultancy Division (SAIL CON) at New Delhi.

    d. Research and Development Centre for Iron and Steel (RDCIS) at Ranchi.

    e. Centre for Engineering and Technology (CET) at Ranchi.

    f. Management Training Institute (MTI) at Ranchi.

    g. Central Power Training Institute (CPTI) at Rourkela, Orissa.

    h. SAIL Safety Organisation (SSO) at Ranchi.

    i. Environment Management Division (EMD) at Kolkata.

    j. Growth Division (G.D.) at Kolkata.

    k. Central Coal Supply Organisation (CCSO) at Dhanbad.

  • 8/11/2019 Sudesh Final (2)

    25/97

    25

    STORE ACCOUNTS

    FUNCTIONS:

    A.STORE AND MATERIAL FUNCTIONS

    I. To account purchase, issue and inventory of following items :-

    1) Stores and spares

    2) Minor raw materials, where A/T is placed and store is the custodian of

    materials.

    3) LSHS, where A/T is placed and Energy Management is the custodian

    II. Transfer of capital items to Expansion accounts section.

    III. Transfer of Stores and Spares consumed in mines section for booking in

    Cost of the raw material.

    IV. To account for materials issued to Local Fabricators for conversion.

    V. To adjust consumption based on the inventory available at shops

    VI. To account for consumption of gases, internally produced.

    VII. To account for consumption of steel, internally produced.

  • 8/11/2019 Sudesh Final (2)

    26/97

    26

    ACCOUNTING PROCEDURES

    1) Store accounts books the receipt transactions after the Generation of Receipt Certificate by

    stores, after inspection by inspection depts. and transferred to suppliers ledger.

    2) Issue transactions are booked cost centre wise, at the time of issue by stores.

    3) All the transactions are booked online in the MMIS system, for preparation of monthly

    accounts.

    4) Statement of shop floor inventory is received periodically from shops and consumption is

    adjusted for the stock after physical verification.

    5) Provision, as decided by the management, is being made for non-moving items where the

    items are not issued for more than 5 years from the date of receipt.

    6) Provision, as decided by the management, is being made for surplus items, declared out of

    non-moving items, which is no longer usable by shops.

    AGENCIES INVOLVED

    1) Stores, for preparations of RCs, issue notes & inventory keeping in the bin card.

    2) Purchase, for placement of Purchase order.

    3) Inspection, for clearance of RCs.

    4) MPD, for screening purchase Indents.

    5) Planning cell of all shops, for getting custody stock statements.

    6) MMIS, for maintenance & development of Material Management Database.

    7) EDP, for maintenance & development of Accounting Database.

    8) CMMS, for maintenance & development of Shop floor inventory system.

    9) INCOS, for maintenance of Plate Mill Dispatch Advice System.

  • 8/11/2019 Sudesh Final (2)

    27/97

    27

    FINANCE SECTION INVOLVED

    1) Stock ledger, for materials consumed internally out of own production.

    2) Store bill accounting, for transfer of RC liability to Supplier Ledger.

    3) Expansion finance section, for transfer of capital items.

    B.

    DISPOSAL STORES SALES SYSTEM FUNCTIONS

    1) To account for sale of store/steel items through Disposal Store Tender/Auction

    System.

    2) Maintenance of Customer Ledger.

    ACCOUNTING PROCEDURES

    1) Income is recognized at the time of invoice preparation and Sales & Tax portion is being

    transferred to sales & sales tax section respectively.

    2) Customer ledger is prepared after taking into account sales, refunds & other adjustments.

    3) Preparation of receipts, refund and other adjustment vouchers, based on DDs received from

    CMM (stores) along with Sales, Delivery orders.

  • 8/11/2019 Sudesh Final (2)

    28/97

    28

    AGENCIES INVOLVED

    1) DISPOSAL STORES

    2) CMM 9STORES0

    FINANCE SECTIONS INVOLVED

    1) Sales Tax

    2) Sales

    3) Store Bills, for recovery & adjustment

  • 8/11/2019 Sudesh Final (2)

    29/97

    29

    CASH MANAGEMENT

    INTRODUCTION

    Cash section is an important section of Finance & Accounts Deptt. It deals with the employees,

    contractors & suppliers for their payments.

    FUNCTIONS

    The main functional areas of the Cash Section are as follows:

    Liaison with Bankers

    Fund Management

    Daily Fund Monitoring and reporting

    Vouchers checking & control

    Preparation & signing of cheques

    Bank Reconciliation

    Coordination with EDP

    Preparation of Cash Book

    Control of Physical Cash

    Bank Guarantees control

    Coordination with other sections and depts.

  • 8/11/2019 Sudesh Final (2)

    30/97

    30

    LIAISON WITH BANKERS:-

    This section is required to closely interact with the bankers at times even on

    Minute-to-minute basis to ensure smooth functioning.

    FUND MANAGEMENT

    Fund allocations are made by SAIL corporate office on time-to-time basis whereas the payments

    are required to be made evenly throughout the month. This is done through rationing, prioritizing

    and constant monitoring so that all the obligations are met and at the same time all the payments

    are duly honored.

    DAILY FUND MONITORING AND REPORTING

    This involves constant monitoring the fund availability. Project the requirements to the higher

    authorities based on discussions with the payment section, report the management about the

    availability & utilization of funds on time to time basis.

    VOUCHERS CHECKING & CONTROL

    Voucher received in the cash section are as follows:-

    .Cash payment vouchers

    Cash Receipt vouchers

    Bank payment vouchers

    Bank receipt vouchers

    Adjustment vouchers

  • 8/11/2019 Sudesh Final (2)

    31/97

    31

    Vouchers with the required supporting documents are sent to the cash section for making

    payments and receiving deposits. These vouchers are scrutinized before processing for

    payment/deposits.

    PREPARATION & SIGNING OF CHEQUES

    For every bank payment voucher, the output is cheques. Normally around 200-250 cheques

    are prepared on average per day. These cheques are to be authenticated before issue by 2

    officers.

    BANK RECONCILIATION

    Bank reconciliation is a very important aspect of finance & accounts function. Through this

    process the cheques issued & instruments deposited are compared with the payments made and

    credits given by the bank. Differences if any are sorted out by passing necessary accounting

    entries.

    CO-ORDINATION WITH EDP

    The acceptance and processing of vouchers, cheques printing, organization of Central Bill

    Clearance System (CBCS) all such activities are computerized. Necessary hardware &

    software is supported by our EDP dept.

    PREPARATION OF CASH BOOK

    After all the payments & receipt of cash & cheques are reconciled, a consolidate cash book

    comprising cash and bank data is prepared.

  • 8/11/2019 Sudesh Final (2)

    32/97

    32

    CONTROL OF PHYSICAL CASH

    This involves dealing with the receipt and payment in terms of hard cash, its custody.

    Cash deposits into and withdrawals from the bank. Custody of cash and any other specified

    documents. Operation of a currency chest and a petty cash chest.

    BANK GUARANTEES CONTROL

    Custodial function of Bank Guarantees sent by various sections.

    CO-ORDINATION WITH OTHER SECTIONS AND DEPTS.

    Interaction and coordination with related agencies such as CISF, Garage, various branches of the

    banks.

  • 8/11/2019 Sudesh Final (2)

    33/97

    33

    OPERATIO ACCOUNTS

    OBJECTIVES:

    Various work orders / contracts are awarded by contract celloperation for smooth running,

    maintenance, repair, revamping, transportation & handling, capital work etc. of the plant . This

    section deals with payments of all such contractors.

    Apart from this, section also deals with various types of payments, such as CISF (postage,

    telephone bills, printing & stationery, library books, advertisement, law charges etc.), canteen,

    BWCCS, advance out of contingencies, training fees, BMTC/BTI expenses, telephone bills,

    imprest, NMR, RDCIS, CET, PRO etc. various miscellaneous receipts like -,EMD, ISD, vendor

    registration charges, refund of unspent advances etc.

    FUNCTIONS :-

    To make payments to various contractors working in works / non-works area strictly as

    per contract / W.O. conditions, miscellaneous payments as per DOP / budget etc.

    Accounting of miscellaneous payments as well as receipts and proper maintenance of

    ledger and other records thereof.

  • 8/11/2019 Sudesh Final (2)

    34/97

    34

    PAYMENTS ;-

    Works bills:-

    The type of job got done through contractual agencies inside the plant are mainly :

    1. Regular maintenance, repair, revamping to keep the plant in smooth running condition.

    2. Contract awarded for handling of Raw materials, pig iron, processing of scrap etc.

    3. Civil Engineering Dept. Undertakes some jobs like additions / alterations, which are

    normally revenue in nature.

    4. Some job capitals in nature are also undertaken by Civil Eng. Deptt./other Dept.sbased

    on the scope of capital scheme. Expenditures against such type of jobs is capitalized and

    added to fixed assets.

    Running bills duly filed in/recorded and signed MB and relevant documents are sent to this

    section for making payments. After payment are released strictly as per contracts terms. Before

    payments, deductions likeSD, IT, WCT etc. are also made.

    Final payments / SD refund are made only after completion of contract and on fulfillment,

    of contractual obligation. Capital exp. Amt. is tad to Expansion a/c sec.

    MISCELLANEOUS PAYMENTS:-

    This section also deals with the payments of entertainment bills, audit expenses, workers

    education expenses, A/C maintenance, attendant fees engaged at the residence of sr.executive,

    re-imbursement of cost of brief case and calculator, CET, RDCIS payments, payments of

  • 8/11/2019 Sudesh Final (2)

    35/97

    35

    interest/principal against SAIL bonds, payment from PM trophy fund and accounting and

    payment of CPD bills, NSVA payments, printing payments, administrative deptt. Payments etc.

    BANK GUARANTEES:-

    It is submitted by the contractor as SD and/or performance guarantee. These BGs are

    submitted to operating authority who in turn sends to contract cell. The section receives the

    BGs from the contract cell. The same are sent to cash section for safe custody. The operating

    depts. / contract cell are intimated status of bank guarantee well in advance to take care of the

    expiry. On request the BGs are returned to contract cell after verifying the fulfillment of

    contractual obligations.

    HSCL PAYMENTS:-

    As per the budget allocations, work orders are issued by RVC with approval competent

    authority. The same taken to the database of CMS. On execution of work, the final bills with

    the MBs submitted and checked in finance and payments are released/ adjustments are made if

    advances are already released.

    RECEIPTS;-

    Earnest money deposit:-

    This amount is taken in the form of DD at the time of opening of tender. Money is

    refunded back to the parties who are not successful. The EMD of the contractor who bags the

    order is converted into SD.

  • 8/11/2019 Sudesh Final (2)

    36/97

    36

    Security Deposits:-

    The successful tenderer has to deposit an amount of 2.5% of the total value of the work

    before the work is actually awarded to him after setting off the EMD. This amount along with

    EMD is accounted for as SD. The SD is refunded after getting clearance from IR section on

    successful completion of guarantee period.

    Accounting:-

    The accounting of contractorspayment is made through CMS system. This system is on

    line & the status of contracts can be taken at any time. All the vouchers when passed are

    accounted for immediately against Bank Payment Voucher entry. The accounting for advances

    is done through advance management system developed by EDP. The accounting for

    miscellaneous transaction is done through directly in VMS systems. TDS when recovered is

    deposit to the treasury in the following month by 7th

    of each month.

    Journal entries:-

    1. Adjustments for temporary advances.

    2. Clearances of inter sectional transfers.

    3. Acceptance of IUCA transactions.

    4. Preparation of quarterly/half yearly/annual accounts.

    5. Passing of rectification journal entries

  • 8/11/2019 Sudesh Final (2)

    37/97

    37

    CENTRAL ACCOUNTS AND ASSETS

    A. CENTRAL ACCOUNTS :-

    This section is engaged in the following jobs :-

    1. Monthly Closing of Accounts :

    Every month the accounts are closed taking into account all the J>E>s passed

    by all the sections of the Finance Deptt. for that particular month. Central Accounts

    Section takes special care that all the entries pertaining to any particular month are

    passed by the sections and are accepted by the Central Accounts Section. For

    performing this job it takes care that cash book is closed in time taking into account

    Resident Office transactions.

    This job is done every month by the third week of the month following the month for

    which the account is being closed.

    After the account is closed by running the program prepared by EDP following outputs

    are taken from EDP:-

    Five digit all division comparative This output gives the account code wide & in

    account code section-wise cumulative balance of current year & also the comparative

    cumulative balances of the previous year. This is available at central accounts section &

    is very useful for review of balances &checking whether proper booking has been done

    by all the sections by comparing the balances with that of previous year balances. This

    output is also useful for audit purpose.

  • 8/11/2019 Sudesh Final (2)

    38/97

    38

    Five digit all divisionthis output gives the account code wise & in account code section

    wise balances. This output is available at central accounts section & is used for review of

    balances & is also used by the auditors.

    Five digits division-wise- this output gives the balances division wise & in division

    account code wise & sectionwise this output is available at central account section for

    review of division wise balances and checking whether the booking has to be done in

    proper division.

    Seven digit balances: - This output gives the seven digit balances that is with by-codes of

    all the sections. It is useful to analyze the balance by-code wise. By-codes are given to

    identify the various nature of transactions in any particular account code.

    Accounts grouping: - This output gives the group wise totals with account code total

    division wise in the manner in which the balances are carried into B/S & P&L a/c.

    Thus, the total of any group can be traced & checked with the balance in B/S * P&L a/c

    depending upon the nature of Account Code & Group Code. It is also used for Audit

    purpose.

    Summarized Grouping: - This output gives the group-wise totals without account codes

    in the manner in which the balances are carried into the B/S & P&L a/c. It is also used

    by the auditors.

    Cumulative Balances: - This output is in the sequence of section codes & it gives the

    cumulative balances division wise & in division account code wise. This output is

    distributed to all the sections of Finance Deptt. & is used by the sections for the review of

    balances at any particular month. One copy is kept at central accounts for reference.

  • 8/11/2019 Sudesh Final (2)

    39/97

    39

    Account Sequences: - This output gives account code wise & in account code section-

    wise and in division-wise transactions details for any particular month. This output

    contains the details of all the vouchers passed by the section in one particular month.

    This is useful for tracing the particulars of any transaction. This output is available at

    Central Accounts Section.

    Section Sequence:- This output gives section code-wise and in section account code-wise

    & in division-wise transactions details for any particular month. This output contains the

    details of all the vouchers passed by the section in one particular month. This is useful

    for tracing the particulars of any transaction. This output is available at Central Accounts

    Section. This output is distributed to all the sections of Finance Deptt. On monthly basis.

    Responsibility Analysis: - This output gives the responsibility code-wise booking & is

    useful for responsibility analysis & MIS reporting. A copy is available at Central

    Account Section.

    ISA Balances:- This output gives the particular of ISA Balance & is helpful for clearance

    ISA Balances. It gives the details of J.E.s with account code of Raising Sections and the

    details of J.E. of Responding Section. Review of this output helps to locate un-responded

    J.E. this output is distributed to all the sections of Finance Deptt. & a copy of this is

    available at CSA.

    IUBA Balance: - This output gives the details of IUBA Balance & is distributed to all the

    concerned sections. This output contains the transactions between the Rajhara mines,

    Nandini mines, Hirri mines, Mines Coordination, Store Accounts & Energy Cell. This

    output helps in clearing the IUBA Balances.

  • 8/11/2019 Sudesh Final (2)

    40/97

    40

    2. Quarterly & Half yearly closing :

    As per SEBI guidelines all the listed companies have to published un-audited

    quarterly result this job is carried out by the central accounts section in the same manner as is

    done in Annual Closing. The program for quarterly & Half yearly closing is decided by

    corporate office within the time limit provided by SEBI i.e. within 1 month from the end of the

    quarter. Consolidation of accounts is carried out in the last week of the following month at the

    Corporate Office. The jobs involved at the time of quarterly & half yearly closing are :-

    Account are closed in various stages from 15th

    of the following month depending upon

    the flow of the information from different section and closing of Cash Book. Closing of

    accounts, its review & preparation of B/S & P&L a/c to be carried to Corporate Office for final

    consolidation is done within the time scheduled framed by Corporate Office.

    IUCA Balances are reconciled at IUCA meetings held at Kolkata as per corporate office

    program which usually takes place during the second or third week of the following month. All

    the information collected at Kolkata are then provided to respective sections for its accounting.

    Central Accounts takes care that all the transactions intimated through DA or CA are accounted

    for by the respective sections well in time.

    Collection of all the necessary information data for Note on Accounts & preparation of

    additional data are compiled by CAS well in time for purpose of Consolidation of accounts.

    Data to comply with all the AS issued by the institute of CAs & applicable to us are also

    furnished to Corporate Office by CAS.

  • 8/11/2019 Sudesh Final (2)

    41/97

    41

    3. Limited Review of Quarterly and Half-yearly accounts :-

    As per the SEBI guidelines Quarterly & Half-yearly accounts after consolidation at

    Corporate Office to be reviewed by the Statutory Auditors.

    CAS gets the accounts reviewed by the statutory auditors and furnished all the

    information and data required for the audit with the help of all the sections of Finance Deptt. this

    is also a time bound program, which has to be completed as per the time frame of Corporate

    Office. Finally the Audit Report is prepared & is sent to the Corporate Office for final

    consolidation at SAIL level by the Main Auditors.

    4. Annual Accounts Closing :-

    CAS plays a vital role in the completion of Annual A/c Closing with the help

    &coordination of all the Section of Finance Deptt. which is done during the month of April &

    May. As soon as the program for Annual Closing Accounts is intimated by the Corporate

    Office, CAS draws time schedule & program for closing of various stages of accounts, flow of

    information & data for Notes On A/cs, Additional Data & data to comply with all the AS

    issued by the ICAI applicable to SAIL.CAS monitors that all the sections of Finance Deptt.

    adheres to the time schedule to enable timely closing of accounts. Review of balances after

    every stage of accounts is carried out & discrepancies are informed to all the sections to take

    corrective actions. Al the necessary outputs after closing of every state are sent in time to all the

    section for review at their level. After the review all the transaction compilation of B/S & P&L

    a/c is carried out through SAIL a/c preparation system(SAILAPS), a s/w package provided by

    the Corporate Office and use by all the plants. After preparation of accounts data for Notes on

    accounts, Additional Data, and all the AS applicable to SAIL are compiled so that the same can

  • 8/11/2019 Sudesh Final (2)

    42/97

    42

    be submitted in time. Accounts along with all the data on Notes On Accounts and Additional

    Data are then placed before the Statutory Auditors for audit. AS with the help of EDP has

    developed its own SAILAPS program which can be prepared B/S & P&L a/c at any point of

    time after considering all the vouchers accepted up to that point of time.

    B. ASSETS SECTION:-

    Section 227 (4A) of the Companies Act, 1956 requires all

    manufacturing, mining & processing companies to maintain proper records showing full

    particulars, including quantitative & location of fixed assets. It is entrusted with the job of

    maintaining records related to fixed assets and as such our asset register contains the following

    information in the columnar form :-

    Location of assets (there are 500 locations in which assets are situated.)

    Few of the major locations are as under :-

    BBM, Blast Furnace, CCCS, CEZ, Coke oven, Compressed air station,

    DNW, DE coiling & Twisting Units, EDP, Fire Brigade, Health & Medical

    Services, Instrumentation, Machine Shop, Merchant Mill, Mines,

    Oxygen Plants, Plate Mill, SMS, T&D, WRM etc.

    Group

    Item code

    Division

    Section

    Asset description

    Date of capitalization

  • 8/11/2019 Sudesh Final (2)

    43/97

    43

    Quantity

    Original value.(Gross Block)

    Rate of depreciation(as per schedule XIV)

    Cumulative depreciation(total depreciation till previous year B/S date)

    Current depreciation (depreciation for the year)

    Total depreciation

    Net value (Net Block)

    Scheme No.

    Record No.

    Asset register is prepared on yearly basis after Incorporation & reconciliation of the following

    asset related activities / transactions during a financial year

    Inter Unit Current Account :

    Under the IUCA system, transactions between plants / units inter pertaining to IP transfers of

    materials, employees & other transactions are accounted for through book adjustment by

    exchange of debit/credit advices. Examples of IUCA transactions are mentioned as under:

    1) IP transfer of iron & steel products, by-products, scrap, etc. at mutually agreed price to &

    from sister plants.

    2) Receipt of indigenous coal from CCSO, imported coal from CMO

    (T&S-IMPORT) & other raw materials received through RMD.

  • 8/11/2019 Sudesh Final (2)

    44/97

    44

    3) Transactions with Corporate Office:

    Interest & finance charges allocated by the Corporate Office, Exchange Variation on account of

    FE loans & interest thereon, Foreign traveling expenses, Operation remittances / Public Deposit

    Scheme etc.

    4) Transactions with CMO:-

    Direct Sales through CMO, Stockyard Sales, Export Sales, Conversion charges, Warehousing &

    Handling Charges for fertilizers, under charges/siding charges paid to railways, demurrage, and

    wharf age transportation charges, credit for railway claims for shortages in transit, missing

    wagons.

    5) Transactions common to all units :-

    TA advance, payment of medical bills on behalf of other units, dues from and to employees on

    transfer, traveling advance/allowance for management trainees.

    The CAS of the originating plants must ensure that the IUCA debit/credit entries raised by

    different sections contain complete details before sending DA/CA to the responding plants /

    units.

    IUCA activities at BSP are computerized & linked to VMS of EDP.

  • 8/11/2019 Sudesh Final (2)

    45/97

    45

    Incoming Originating DA/CAs:-

    Original DA/CAs raised on BSP is centrally received at the CAS. After scrutiny, these DA/CAs,

    along with supporting documents, are forwarded to the respective section for acceptance. Unit-

    wise & Section-wise data are fed into the IUCA module of the VMS.

    Outgoing responding DA/CAs:-

    Sections respond to these Debit or Credit through Journal Vouchers.

    Responding debits & credit advices are prepared through VMS modules before sending them to

    respective units.

    Outgoing Originating DA/CAs :-

    Original debit/credit raised by our sections on various units identified by scrutiny of accounts

    sequence & sectional journal vouchers. DA/CAs are prepared through IUCA modules of VMS &

    sent to respective sister units along with supporting details.

    Incoming Responding DA/CAs :-

    On receipt of the DA/CAs responding to our originating debits or credits, concerned plants

    responding DA/CAs are received, fed in the VMS for linking. Section wise / unit-wise list of

    DA/CAs pending for acceptance are prepared periodically and taken up with the concern section

    for expediting acceptance. Cases of disputes or non-furnishing of supporting documents by any

    units are taken up with the respective sister units for early settlement.

    IUCA balances are drawn periodically through generation of statement accounts w.r.t the VMS

    and are cross tallied with accounting IUCA ledger balances.

  • 8/11/2019 Sudesh Final (2)

    46/97

    46

    Unrealized profit on unconsumed stock:-

    Unrealized profit on unconsumed stock of IPT from BSP with any other Sister Units worked out

    and credit, if any, given to the concerned units / plants.

    For the purpose of knocking of IPT transactions details of product, quantity & value etc.

    are furnished to the concerned official of the Corporate Office during Accounts Closing.

  • 8/11/2019 Sudesh Final (2)

    47/97

    47

    FIANANCE DEPARTMENT OF BHILAI STEEL PLANT

    Finance Department of BSP is subdivided into various sections. These sections are

    independently responsible for the duties assigned to them. The major sections are:-

    Cash: This section is responsible for the cost management at the plant. All cash inflows and

    outflows are managed by this particular section.

    Township: This section is responsible for matters concerning to the township area associated

    with plant. Township Education and Medical also come under the preview of Township section.

    Raw Material Accounts: This section looks after & everything from the purchase of raw

    material. This includes maintaining accounts for the raw materials and payment of bill due for

    the raw material purchased by the plant.

    Stores Account: This section is responsible for accounting of store items and looks after the

    issue of materials from stores. This section isdivided into2.

    a. Import Accounts.

    b. Indigenous Accounts.

    a. Import Accounts look after the payment and payment of imported store items.

    b. Indigenous Accounts handles only the payments of bills for store items excluding the

    import items

  • 8/11/2019 Sudesh Final (2)

    48/97

    48

    Sales: This section is responsible for all sales related matters. This section is further divided

    into invoicing section, Excise section, sales tax section, direct sales section and stock

    ledger. All sections look after their area and the stock ledger section is responsible

    for accounting of stockyard sales and stock valuation at the end of the year.

    Expansion: This section deals with all the project works and the expansion plans undertaken at

    Bhilai Steel Plant. This section also prepares the capital budget.

    Costing: This section is responsible for ascertainment of cost of production of various products

    of produced at Bhilai Steel Plant.

    Management Accounting: This section is responsible for all accounting details. This is done by

    preparation of various financial reports for providing information to the and middle

    level management.

    Central Accounts: This section complies of all the accounts including the statutory & legally

    required statements like accounts manual.

  • 8/11/2019 Sudesh Final (2)

    49/97

    49

    Operation Budget: This section is responsible for preparation of that to related to the

    operations.

    Provident Fund: This section is looks after provident fund.

    Finance (Mines): There are three more sections for the captive mines handle the finance

    requirements of the mines.

  • 8/11/2019 Sudesh Final (2)

    50/97

    50

    OVERVIEW

  • 8/11/2019 Sudesh Final (2)

    51/97

    51

    OVERVIEW OF W.C. MGT AT BHILAI STEEL PLANT

    Working Capital typically means the firms holding of current or short term assets such as cash,

    receivables, inventory & marketable securities. BSP a major unit of SAIL tries to manage its

    working capital in the best possible manner.

    Forecasting:

    The corporate office allocates the funds to various units of SAIL. The amount of

    fund required is decided by individual unit during the preparation of operation budget of for the

    coming year & the amt. is intimated to the corporate office. Cash inflows and outflows are also

    estimated in the budget. The marketing of all SAIL prime products is done by the Central

    Marketing Organization and the receipts of sales are directly sent into the Inter Unit Current

    Account which is centrally controlled by the corporate office and the corporate office allocates

    the funds as per intimation to individual units. Besides coordinating with Central Marketing

    Organization, the cash realization is also done by the plant itself through the sale of scrap,

    defectives & by products.

    Monitoring:

    In Bhilai Steel Plant, all the three aspects of working capital are monitored separately.

  • 8/11/2019 Sudesh Final (2)

    52/97

    52

    1. Cash:

    Cash is monitored every day and intimated to top management as well as fortnightly to

    the company. The cash report generated daily has all details of cash inflows & outflows. The

    annual cash budget is again broken into month wise cash budget which tries to estimate the cash

    inflows & outflows on monthly basis. In the total cash inflow, 12% is from the plant & the rest

    88% is from that of Inter Unit Current Account.

    2. Inventory:

    Inventory is monitored differently for stores, raw materials and finished goods on

    monthly basis. Every month one report is directly sent to the Chairman through the finance dept.

    of corporate office known as the 3rd day report providing the bill details of sales, inventory,

    working capital position and debtors of the local sales for the previous month. These figures are

    compared with month wise budgeted figures in this particular report. This report is prepared at

    plant level. The Production Planning & Control report gives the closing stock of Raw Material

    and closing stock of finished goods are estimated while preparing the monthly profitability

    report.

  • 8/11/2019 Sudesh Final (2)

    53/97

    53

    3. Receivables.

    The receivables are monitored separately. The major portion of debtors are dealt by the

    Central Marketing Organization and at the plant level only the debtors concerning the sale of

    scrap or some of the township debtors are dealt with. As for the creditors, the coal is monitored

    by corporate office and the individual creditors are monitored by the concerned departments i.e.

    the Raw Material. Stores & Spares & the Operations accounts department which look after the

    contracts. In this way the main creditors and debtors are estimated. To summaries, Working

    Capital at a plant level of SAIL, mainly involve fore-casting & monitoring of different elements

    which is done quite systematically. However, decisions regarding borrowing of funds for

    working capital are done at corporate level. Major portion of Sunday debtors are managed by

    Central Marketing Organization for all plants & part of Sunday creditors with regard to coal

    purchase- a major raw material is managed by Central Coal Supply Organization.

  • 8/11/2019 Sudesh Final (2)

    54/97

    54

    WORKING

    CAPITAL

    MANAGEMENT

  • 8/11/2019 Sudesh Final (2)

    55/97

    55

    MANAGEMENT OF CASH

    Cash is the life blood of a business firm needed to acquire supplies, resource, equipment, and

    other assets used in generating the products and services providing by the firm, cash is the

    medium of exchange that allows management to carry on the varies activities of the business

    firm from day to day.

    Objective of Cash Management

    (i) To meet cash disbursement needs as per the payment schedule.

    (ii) To minimize the amount of funds held as cash balance [non-earning & lying idle].

    Mgt. of Cash in Bhilai Steel Plant

    Basically the cash is managed by the corporate office. The corporate office

    allocates different amounts of each to different steel plant as per requirement. We can say that

    corporate office acts as a linkage between the SAIL & the main bank i.e. the SBI known as the

    Corporate Account Group.

    Here also, the bank has a limit for credit facility for the company known as the Rolling Cash

    Credit Limit. This limit keeps on changing from year to year depending upon company s

    position, profitability & inventory position. For this particular year the Rolling Cash Credit Limit

    for SAIL-> Rs.5000 Crores.For BSP -> Rs. 250 Crores. [Including the deferredpayments]

  • 8/11/2019 Sudesh Final (2)

    56/97

    56

    The corporate office manages the cash & it doesnt provide the money in bulk to the individual

    steel plants. Therefore BSP priorities its payment depending upon status of the disbursement and

    send it to the corporate office. Here also, we can see that BSP is not fully dependent on the

    corporate office but at first it adjusts fund from collection through sale of scrap & defectives at

    plant level and then balance amount is only intimated to the corporate office for payment. After

    the prioritization intimated, the corporate office releases the cash.

    Fund Allocation:

    Initially the fund allocation is done by the corporate office. The corporate office

    allocates the fund for all steel plants & particularly talking about Bhilai Steel Plant the corporate

    office allocates it for the steel plant, the 3 mines & the 2 resident offices. All the three mines and

    two resident office work independently and all activities are same as that of Bhilai Steel Plant.

    The mines are situated at:

    Rajhara - Iron ore

    Nandini - Limestone

    Hirri - Dolomite

    Resident office: Basically there are 3 resident office sat:-

    (i) Delhi - Looked after by the corporate office

    (ii) Kolkata both are Looked after

    (iii) Mumbai} by Bhilai Steel Plant

    Here the initial allocation for mine & resident office is done by the corporate office and all

    supplementary requirements are to be looked by Bhilai Steel Plant.

  • 8/11/2019 Sudesh Final (2)

    57/97

    57

    Fund Utilization:

    Funds are generated to different department as per their requirements. It is always

    seen at BSP that proper utilization of cash should be done. Daily reports on cash transitions are

    prepared by the cash section to keep a track of all payments made in the day s work. Based on

    the report sent by cash section another report is prepared which is sent to be management daily

    for scrutinizing. Every day Bank Statements are received which tells the actual money left with

    them and the payments actually to be made on that particular day. Every month report is sent to

    the corporate office showing the working of the plant. Apart from monthly report, the

    comparison between allocation and the actual utilization of cash is also provided. If the

    justification is not found convincing then letters of improvement is given by the corporate office.

    Sometimes the credit note arrangement is also given. This credit note arrangement is a kind of

    barter system which is a letter of arrangement for lifting the material.

    Annual Cash Forecasting:

    Annually the forecasting is done by preparation of cash budget. The annual cash

    requirement is got from cash budget. Again this cash budget is broken into month wise budget

    where allocation of cash on month wise it becomes easier to allocate the amount. Thus we can

    say in BSP, the management of cash is not so emphasized as the major allocation of cash is given

    by the corporate office and the plant just have to follow its working according to the allocated

    amount.

  • 8/11/2019 Sudesh Final (2)

    58/97

    58

    MANAGEMENT OF INVENTORY

    Every enterprise needs inventory for a smooth running of its activities. On an average,

    inventories are approximately 60% of current assets in public limited companies India. Because

    of the large size of inventories maintained by firms, a considerable amount of funds is required

    to be committed to them. It serves as a link between production and distribution processes. The

    unforeseen fluctuations in demand and supply of goods necessitate need for inventory. The

    investment in inventories constitute the most signification part of working capital in most of the

    undertakings. The purpose of inventory management is to ensure availability of material in

    sufficient quality as when required and also minimizes investment in inventories.

    Objective of Inventory Management:

    To ensure continuous supply of material, spares and finished goods so that production is

    not hindered.

    To maintain investments in inventories at the optimum level as required by operational

    and sales activities.

    Inventory Management in Bhilai Steel Plant:

    Here, inventory is divided into 3 parts namely:

    i. Raw material

    ii. Stores/Spares

    iii. Semi-finished & Finished Goods

  • 8/11/2019 Sudesh Final (2)

    59/97

  • 8/11/2019 Sudesh Final (2)

    60/97

    60

    Mainly the bulk purchase are made on global tender basic by SAIL itself whereas the regional

    purchase are done on limited tender basic by BSP which means limited people are called for

    tender & they give their offers and tender

    prices are fixed. While fixing the tender price, a special eye is kept on the specification; quality

    parameters, rates of taxes by the in tender. These tenders are been seen in 3-bits known as the

    Technical Bit, The Commercial Bit and The Price Bit. The lower offer party is decided.

    Negotiation can be done for pricing and acceptance is through the acceptance of Tender which

    contains all terms and conditions of tender including the specification. The movement of material

    is by rail or road. Bhilai Steel Plant is more dependent on railways and for this a special division

    is there inside the plant known as the Transport and Diesel Division. The main function of this

    division is to coordinate the movement of material inside the plant. Once the raw materials are

    inside the plant they are transported to their particular depots near the consuming units by

    roadways.

    The pricing method followed is the weighted average method. For this, periodically norms are

    setup by the committee of corporate office and these norms acts as a guiding factor for the stock

    holding at different plants. At the year end, physical stock verification is done and if any surplus

    is found then it is treated to the profit and loss a/c. In all there are 25 raw materials and the total

    annual consumption of raw material is of Rs.2000 crores in addition of keeping an inventory of 5

    -7%. The inventory of bulk material is maintained from 1 week 3 week.

  • 8/11/2019 Sudesh Final (2)

    61/97

    61

    2. Stores & Spares

    Here the inventory is categorized into:

    a. ABC analysis,

    b. XYZ analysis,

    c. Non-moving inventory,

    d. Surplus inventory.

    (i) ABC Analysis: Items which constitute top 70% of total consumption (of stores & spares)

    value when arranged in descending order of consumption value will be termed as A Class items.

    Next 20% of total consumption value will be termed as B class items and the rest 10% as the C

    items.

    (ii) XYZ Analysis: Items which constitute the top 70% of total stock (of stores & spares) holding

    value when arranged in descending order of stock holding will be termed as X class items. Next

    20% of stock value is Y class items & the rest 10% as the Z class items.

    (iii) Non-moving inventory: Items which have not been issued for the last 3 or 5 years shall be

    considered as non-moving items.

    (iv) Surplus inventory: Out of the above non-moving inventory when there is issue made to

    various shops asking for the requirements of the inventory and if there also it is not needed then

    transferred to another steel plant and if again not needed there also then sent for disposal through

    auction sale.

  • 8/11/2019 Sudesh Final (2)

    62/97

    62

    3. Placement of order:

    The procurement of items of common use is done through automatic procurement which means

    that as these items reach the reorder level the orders are placed for the same. Here again, another

    department comes into action i.e. the Material Planning Department. This department takes

    responsibility of floating the purchase of Material and the process of purchasing starts only when

    it scrutinizes that the orders made are specifically as per the requirements and there is sufficient

    capital to make the purchase. But at first, the Material Planning Department checks in the stock

    and see to whether making the item is cost beneficial or not and if the decision is in favor of

    buying then MPD looks into budget and then the purchase is registered . Again here, the

    purchase department will issue enquiry letters to different vendors who are registered. The

    quotations are received from various bidders and the technical analysis are made i.e. the

    technicalities as well as the price are compared. Here again the discretion is with the purchase

    department to whom the tender should be given based on their experience.

    Procurement

    After the purchase order is of delivery whether through rail\road, nature of sharing taxes, the

    inspection time, the terms and documents needed with the material all the formalities are

    finalized. Once the material is received then it is examined by visual survey. Then the whole lot

    is sent to the central store which takes into account the whole documentation process known as

    the central documentation Cell. After the documentation the wagons are unloaded and materials

    are sent to those stores which have been allocated to the products as per the nature of material by

    Central Documentation Cell. The details of stores and materials stored are given below:

  • 8/11/2019 Sudesh Final (2)

    63/97

    63

    Bulk Store - Bulk material

    Central Plant Store Cell - Silicon Manganese

    Borio Store - Capital Items

    Plant Spare Store - Spare items

    When the material is received the consignment control number is provided and when the

    identification of material with the purchase order is done then the R.N number is given. Here

    again, the inspection takes place and if the quality received is accepted then receipt is prepared

    and accounting is done and if the quality is rejected then no receipt is prepared and here again

    there is a clause that if the quality rejected is accepted to the acceptable level by the Material

    Review Board then new receipt certificate is prepared by Material Review Board.

    Budgetary Control

    The budgeting section monitors the shop wise procurement budgets for indents raised by the

    shop. The amounts sanctioned are utilized for the items and quantities. The material

    Management Department monitors the receipt budget on monthly basis and control the daily

    receipts. Separate funds are being allocated to the product.

    Here the inventory pileup is very large i.e., the annual consumption is of Rs.50 crores while the

    pile up of inventory is of Rs.70 crores which is more than the annual consumption.

  • 8/11/2019 Sudesh Final (2)

    64/97

    64

    Semi/Finished Goods

    The entire process of selling steel is quite cumbersome & the dynamics involved mind

    boggling. The specifications are stringent, operations are complex, the tonnage is staggering and

    logistics are troublesome. A long chain of activity is configured to make sure that right material

    reach customer at the right time. At SAIL, the coordination between plant and marketing wing is

    done through a section of its marketing outfit the Sales Residence Manager s office better known

    as SRM s office situated in each of 4 plant locations Bhilai, Bokaro, Durgapur and Rourkela.

    SRM`s office is the single point of coordination between respective plant and CMO. The

    plant officials interact with SRM to collect feedback on marketing trend, customer s satisfaction

    level and the criticalness of the orders. Sales coordination meeting are held every month which

    becomes a forum for both plant and marketing to meet the customer requirements. The

    movement plan is issued after the SRM office receives order from the branches. The SRM office

    has to think globally and act locally.

    Once the movement plan is prepared it is immediately sent to the Production, Planning and

    control Department of the plant and to other concerned department. The critical point in

    production plan is to match the rolling plan with the market requirements so that with the

    minimum inventory the company satisfies the maximum customers. The movement plan is

    discussed in the presence of the heads of mills and their planning section. Accordingly the

    requirements are communicated to the Steel Melting Shops and Rolling Mills and depending

    upon the priorities &mill availability the production commences. The movement plan no. now

    becomes the point of reference for any further communication among the units.

  • 8/11/2019 Sudesh Final (2)

    65/97

    65

    Once the material is produced it is dispatched through rail or road. For rail dispatch rake

    formation is there which means that minimum 35 numbers of wagons are to be filled. Every

    week a Committee Review Meeting is held. Now at the end of the year while the valuation of

    stock is done it is seen whether the stock remaining with the plant is Roll able or saleable.

    Valuation is done on basis of cost or NRV whichever is less. At BSP, it is valued at Plant,

    Stockyard and at export yard. The entire process of movement planning, monitoring and

    documentation is on line. The smooth and efficient function of SAIL s marketing is a testimony

    to this harmonious work culture.

  • 8/11/2019 Sudesh Final (2)

    66/97

    66

    MANAGEMENT OF RECEIVABLES

    A Sound managerial control requires proper management of liquid assets and inventory. When

    the firm sells its products and services and does not receive cash for it immediately, the firm is

    said to have granted trade credit to. Trade credit thus creates receivables or book debts which the

    firm is expected to collect in near future. The purpose of maintaining or investment in

    receivables is to meet competition and to increase the sales and profit.

    Objectives of Receivables Management.

    a. To take a sound decision as regards to investment in debtors

    b. To promote sales and profit until that point is reached where the return on investment in

    future funding of receivables is less than the cost funds raised to finance that additional credit.

    Management of Receivables in Bhilai Steel Plant

    Managing the receivables is basically done by Corporate office and the

    Central Marketing Organization directly deals with it. The major part of receivables is managed

    by CMO and the minor part relating to the plant is dealt at the Bhilai Steel Plant. The minor part

    consists of the recovery of the direct sales of defectives and by products and employee related

    matters. In most of the cases the due month is 1 month and only in the case of ex employees

    money is not recovered as the final payment are only due. Mostly the whole of sundry debtors

    and the 3rd party and debtors like CISF, IT and shopkeepers. The shop keepers are the ones to

    whom the BSP quarters and shops are given from whom the money is recovered and that too the

    credit given is one month s credit. In case of interests which are basically got from house

  • 8/11/2019 Sudesh Final (2)

    67/97

    67

    building advances given where 1 month recovery is done. Other debtors are the claims which

    cannot be controlled. These are got as per the negotiations with the party for freight, raw

    materials etc.

    Sundry Creditors

    The creditors are managed at plant level only. Mostly the creditors comprises of contractors to

    whom payments are to be given and the capital works. This is basically done as per terms and

    conditions with the respective parties. In the case of small scale industries it is done within 30

    days if the dues are above 1 lakh. There is also a scheme of Earnest Money Deposit for the

    registered small industries. The scheme allows having a security deposit which is refundable at

    the contract. In case of statutory payments i.e. the Income Tax, Sale Tax, Excise Tax one month

    due is there. The account of receivables are prepared quarterly on estimated basic and finally

    prepared on the closing date.

    Ex- Employees

    When the final payment is to be made, it is only done after the file reaches the department as per

    the individual case. Major chunk is from statutory liabilities which are repaid as per i.e. one

    month due is given.

  • 8/11/2019 Sudesh Final (2)

    68/97

    68

    Credit Note Facility

    According to this facility no outflow of money from the department is made and as such the

    material is also lifted. Therefore with the facility of credit note we are able to manage funds

    without actual outflow of cash but through material. Thus we can say that management of

    receivables in Bhilai Steel Plant is done on minor basis and the major work of managing it is

    done in the corporate office.

  • 8/11/2019 Sudesh Final (2)

    69/97

    69

    STORE ACCOUNTS

    FUNCTIONS:

    C. STORE AND MATERIAL FUNCTIONS

    a. To account purchase, issue and inventory of following items:-

    i. Stores and spares

    ii.

    Minor raw materials, where A/T is placed and store is the custodian of

    materials.

    iii. LSHS, where A/T is placed and Energy Management is the custodian.

    b. Transfer of capital items to Expansion accounts section.

    c. Transfer of Stores and Spares consumed in mines section for booking in

    Cost of the raw material.

    d. To account for materials issued to Local Fabricators for conversion.

    e. To adjust consumption based on the inventory available at shops VI. To account

    for consumption of gases, internally produced.

    f. To account for consumption of steel, internally produced.

  • 8/11/2019 Sudesh Final (2)

    70/97

    70

    ACCOUNTING PROCEDURES

    1. Store accounts books the receipt transactions after the Generation of Receipt Certificate

    by stores, after inspection by inspection deptt.and transferred to suppliers ledger.

    2. Issue transactions are booked cost Centre wise, at the time of issue by stores.

    3. All the transactions are booked online in the MMIS system, for preparation of monthly

    accounts

    4. Statement of shop floor inventory is received periodically from shops and consumption is

    adjusted for the stock after physical verification.

    5. Provision, as decided by the management, is being made for non-moving items where the

    items are not issued for more than 5 years from the date of receipt.

    6. Provision, as decided by the management, is being made for surplus items, declared out

    of non-moving items, which is no longer usable by shops.

  • 8/11/2019 Sudesh Final (2)

    71/97

    71

    AGENCIES INVOLVED

    1. Stores, for preparations of RCs, Issue notes & inventory keeping in the bin card.

    2. Purchase, for placement of Purchase order.

    3. Inspection, for clearance of RCs.

    4. MPD, for screening purchase Indents.

    5. Planning cell of all shops, for getting custody stock statements.

    6. MMIS, for maintenance & development of Material Management Database.

    7. EDP, for maintenance & development of Accounting Database.

    8. CMMS, for maintenance & development of Shop floor inventory system.

    9. INCOS, for maintenance of Plate Mill Dispatch Advice system.

  • 8/11/2019 Sudesh Final (2)

    72/97

    72

    FINANCE SECTIONS INVOLVED

    1. Stock ledger, for materials consumed internally out of own production.

    2. Store bill accounting, for transfer of RC liability to Supplier Ledger.

    3. Expansion finance section, for transfer of capital items.

    D. DISPOSAL STORES SALES SYSTEM FUNCTIONS

    1) To account for sale of store/steel items through Disposal Store Tender / Auction System.

    2) Maintenance of Customer Ledger.

    ACCOUNTING PROCEDURES

    1. Income is recognized at the time of invoice preparation and Sales & Tax portion is being

    transferred to sales & sales tax section respectively.

    2. Customer ledger is prepared after taking into account sales, refunds & other adjustments.

    3. Preparation of receipts, refund and other adjustment vouchers, based on DDs received

    from CMM (stores) along with Sales, Delivery orders.

  • 8/11/2019 Sudesh Final (2)

    73/97

    73

    AGENCIES INVOLVED

    i. DISPOSAL STORES

    ii. CMM (STORES)

    FINANCE SECTIONS INVOLVED

    1. Sales Tax

    2. Sales

    3. Store Bills, for recovery & adjustment.

  • 8/11/2019 Sudesh Final (2)

    74/97

    74

    CASH MANAGEMENT

    INTRODUCTION

    Cash section is an important section of Finance & Accounts Dept. It deals with the

    employees, contractors & suppliers for their payments.

    FUNCTIONS

    The main functional areas of the Cash Section is as follows :-

    1. Liaison with Bankers

    2. Fund Management

    3. Daily Fund Monitoring and reporting

    4. Vouchers checking & control

    5. Preparation & signing of cheques

    6. Bank Reconciliation

    7. Coordination with EDP

  • 8/11/2019 Sudesh Final (2)

    75/97

    75

    8. Preparation of Cash Book

    9. Control of Physical Cash

    10.Bank Guarantees control

    11.Coordination with other sections and depts.

    1.

    Liaison with Bankers:-

    This section is required to closely interact with the bankers at times even on minute-to-

    minute basis to ensure smooth functioning.

    2. Fund Management:-

    Fund allocations are made by SAIL corporate office on time-to-time basis whereas the

    payments are required to be made evenly throughout the month. This is done through

    rationing, prioritizing and constant monitoring so that all the obligations are met and at

    the same time all the payments are duly honored.

    3. Daily Fund Monitoring and reporting

    This involves constant monitoring the fund availability, project the requirements to the

    higher authorities based on discussions with the payment section, report the management

    about the availability & utilization of funds on time to time basis.

  • 8/11/2019 Sudesh Final (2)

    76/97

    76

    4. Vouchers checking & control

    Voucher received in the cash section are as follows:-

    Cash payment vouchers

    Cash Receipt vouchers

    Bank payment vouchers

    Bank receipt vouchers

    Adjustment vouchers

    Vouchers with the required supporting documents are sent to the cash section for making

    payments and receiving deposits. These vouchers are scrutinized before processing for

    payment / deposits.

    5. Preparation & signing of cheques

    For every bank payment voucher, the output is cheques. Normally around 200-250

    cheques are prepared on average per day. These cheques are to be authenticated before

    issue by 2 officers.

  • 8/11/2019 Sudesh Final (2)

    77/97

    77

    6. Bank Reconciliation

    Bank reconciliation is a very important aspect of finance & accounts function. Through

    this process the cheques issued & instruments deposited are compared with the payments

    made and credits given by the bank. Differences if any are sorted out by passing

    necessary accounting entries.

    7. Coordination with EDP

    The acceptance and processing of vouchers, cheques printing, organization of Central

    Bill Clearance System (CBCS) all such activities are computerized. Necessary hardware

    & software is supported by our EDP dept.

    8. Preparation of Cash Book

    After all the payments & receipt of cash & cheques are reconciled, a consolidate cash

    book comprising cash and bank data is prepared.

    9. Control of Physical Cash

    This involves dealing with the receipt and payment in terms of hard cash, its custody.

    Cash deposits into and withdrawals from the bank. Custody of cash and any other

    specified documents. Operation of a currency chest and a petty cash chest.

  • 8/11/2019 Sudesh Final (2)

    78/97

  • 8/11/2019 Sudesh Final (2)

    79/97

    79

    OPERATION ACCOUNTS

    OBJECTIVES:

    Various work orders / contracts are awarded by contract cell operation for

    smooth running, maintenance, repair, revamping, transportation & handling, capital work etc. of

    the plant. This section deals with payments of all such contractors. Apart from this, section also

    deals with various types of payments, such as CISF (Postage, telephone bills, printing &

    stationery, library books, advertisement, law charges etc.), canteen, BWCCS, advance out of

    contingencies, training fees, BMTC/BTI expenses, telephone bills, interest,

    NMR,RDCIS,CET,PRO etc various miscellaneous receipts like EMD, ISD, vendor registration

    charges, refund of unspent advances etc.

    FUNCTIONS:-

    To make payments to various contractors working in works / non-works area

    strictly as per contract / W.O. conditions, miscellaneous payments as per DOP / budget etc.

    Accounting of miscellaneous payments as well as receipts and proper maintenance of ledger and

    other records thereof.

  • 8/11/2019 Sudesh Final (2)

    80/97

    80

    PAYMENTS:-

    Works bills:-

    The type of job got done through contractual agencies inside the plant are mainly :

    1. Regular maintenance, repair, revamping to keep the plant in smooth running condition.

    2. Contract awarded for handling of Raw materials, pig iron, processing of scrap etc.

    3. Civil Engineering Dept. undertakes some jobs like additions / alterations, which are

    normally revenue in nature.

    4. Some job capital in nature is also undertaken by Civil Eng. Dept. / Other Deptt s, based

    on the scope of capital scheme. Expenditures against such type of jobs is capitalized and

    added to fixed assets.

    5. Running bills duly filled in/recorded and signed MB and relevant documents are sent to

    this section for making payments. After verifications, payments are released strictly as

    per contracts terms. Before payments, deductions like SD, IT, WCT etc. are also made.

    Final payments / SD refund are made only after completion of contract and on fulfillment

    of contractual obligation. Capital exp. Amt. is tad to Expansion a/c sec.

  • 8/11/2019 Sudesh Final (2)

    81/97

    81

    Miscellaneous payments:-

    This section also deals with the payments of entertainment bills, audit expenses,

    workers education expenses, A/C maintenance, attendant fees engaged at the residence of sr.

    executive, re-imbursement of cost of brief case and calculator, CET, RDCIS payments, payments

    of interest/principal against SAIL bonds, payment from PM trophy fund and accounting and

    payment of CPD bills, NSVA payments, printing payments, administrative dept. Payments etc.

    Bank guarantees:-

    It is submitted by the contractor as SD and/or performance guarantee. This BG s is

    submitted to operating authority that in turn sends to contract cell. The section receives the BG s

    from the contract cell. The same are sent to cash section for safe custody. The operating dept. /

    Contract cell are intimated status of bank guarantee well in advance to take care of the expiry.

    On request the BG s are returned to contract cell after verifying the fulfillment of contractual

    obligations.

    HSCL Payments:-

    As per the budget allocations, work orders are issued by RVC with approval

    competent authority. The same taken to the database of CMS. On execution of work, the final

    bills with the MB s submitted and checked in finance and payments are released / adjustments

    are made if advances are already released.

  • 8/11/2019 Sudesh