successful projects

6
A and P Consultants A and P Consultants

Upload: craigpuljan

Post on 08-Aug-2015

203 views

Category:

Business


1 download

TRANSCRIPT

A and P ConsultantsA and P Consultants

Developed the use of high silica limestone that extended the life of a quarry by at least 25%.

Developed vertical raw mill operating procedures that maximized internal table and tire life as well as increased operational throughput.

Pioneered and optimized the use of whole rubber tires and was able to achieve sustained substitution rates of 15%-25% of total kiln fuel requirement.

Developed an operating strategy for aging whizzer blade type separator equipment to narrow the particle size distribution, which resulted in increased throughput as well as increased product strengths.

Optimized Type III production on a high efficiency separator that led to a 25% increase in throughput and increased product strengths.

Developed the use of coal fired power plant synthetically produced gypsum. Both cost saving and quality improvement targets were achieved.

Utilized mid-kiln mixing technologies to optimize the use of mid-kiln whole tire firing on two vintage wet kilns.

Spearheaded a limestone quarry development based on plans that utilized all the quarry assets thus lengthening its useful life.

Worked collectively with alternate raw material suppliers to achieve up to 12% substitution of virgin materials. This generated positive revenue for the facility as well as help achieve LEED certification for the facility.

Worked closely with multiple departments including sales to secure a long term cement specialty supply agreement. Led the team that manufactured the product that exceeded the customers specifications.

Led a team that successfully placed two chemists and proactively worked to develop manufacturing interns for the cement industry.

Implemented different levels of a Maintenance Excellence Process, “MEP” at three facilities achieving “Best in Class” at one of them.

Successful implementation of an ISO 14000 Environmental Compliance System.

Worked collaboratively to successfully achieve Title V permits.

Worked collaboratively to successfully negotiate two union contracts.