Successful Implementation of anSuccessful Implementation of anIntegrated Production NetworkIntegrated Production Network
Model for the Heera FieldModel for the Heera Field
Pavan Aggarwal, ONGC LtdPavan Aggarwal, ONGC LtdManickam Nadar, EPS Ltd.Manickam Nadar, EPS Ltd.
Presenter:Presenter:
Pavan Aggarwal, ONGCLPavan Aggarwal, ONGCL
ASME / API / ISO Gas Lift Workshop,
Doha, QatarFeb 4-8, 2007
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 2
Tangible ResultsTangible Results
Successful construction and calibration of a large Successful construction and calibration of a large scale, complex production network model which is scale, complex production network model which is robust and reliablerobust and reliableFirst full field integrated production model First full field integrated production model operational in Indiaoperational in IndiaImplementation of recommendations (ongoing) has Implementation of recommendations (ongoing) has so far resulted in an increased production of 1700 so far resulted in an increased production of 1700 BOPD (4%)BOPD (4%)Model and workflows are being integrated into Model and workflows are being integrated into ongoing gas lift surveillance and field optimization ongoing gas lift surveillance and field optimization proceduresprocedures
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 3
OutlineOutline
IntroductionIntroductionObjectivesObjectivesModel Construction, Calibration & AnalysisModel Construction, Calibration & AnalysisOptimization RecommendationsOptimization Recommendations
Well Models: Well Models: GL Design improvementsGL Design improvementsNetwork Model: Network Model: Field Gas Lift reallocationField Gas Lift reallocation
Implementation StrategyImplementation StrategyResults achieved so farResults achieved so farConclusions & Lessons LearnedConclusions & Lessons Learned
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 4
IntroductionIntroduction
Heera Field, offshore Heera Field, offshore Mumbai, India.Mumbai, India.
OOIP OOIP –– 285 MMT.285 MMT.Mature Producing FieldMature Producing Field119 GL Producers + 59 119 GL Producers + 59 InjectorsInjectorsCurrent Production Current Production ~45,000 ~45,000 stbostbo/Day/DayFormation GOR 120 mFormation GOR 120 m33/m/m33
Average WC ~55%Average WC ~55%
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 5
ObjectivesObjectives
Present a case history describing successful Present a case history describing successful implementation of optimization methodology in a implementation of optimization methodology in a major gas lifted field.major gas lifted field.
Outline the structure and methodology for Outline the structure and methodology for constructing and calibrating a large integrated constructing and calibrating a large integrated production model.production model.
Provide an optimization solution which takes account Provide an optimization solution which takes account of network and other constraints.of network and other constraints.
Illustrate the potential applications in running the Illustrate the potential applications in running the completed model in optimization mode. completed model in optimization mode.
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 6
Well ModelingWell ModelingNodal AnalysisNodal Analysis
Well model construction:Well model construction:Reservoir, production string & artificial lift systemReservoir, production string & artificial lift system
Calibration with FGS/production test data (at date Calibration with FGS/production test data (at date of FGS)of FGS)Update model to current well production test dataUpdate model to current well production test dataCalibration of lift gas injection parameters Calibration of lift gas injection parameters Use updated model to perform gas lift diagnostics Use updated model to perform gas lift diagnostics and identify uplift potentialand identify uplift potentialGas Lift well performance surfaces generated for Gas Lift well performance surfaces generated for the network model the network model 119 wells on 15 well platforms119 wells on 15 well platforms
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 7
Well Performance CurveWell Performance Curve
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 8
Well ModelingWell ModelingPotential Uplift Potential Uplift
Well Gas lift designs were modified / Well Gas lift designs were modified / optimized to achieve the following: optimized to achieve the following:
Ensure single point liftEnsure single point liftImprove gas lift depth using the available Improve gas lift depth using the available injection pressureinjection pressureUpdate gas lift design for changed inflow Update gas lift design for changed inflow conditionsconditionsUse of orifice valves at operating mandrel Use of orifice valves at operating mandrel stationstation
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 9
Well Modeling ResultsWell Modeling Results
Gas Lift Redesign / Optimization potential: Gas Lift Redesign / Optimization potential: 22 Candidates identified with more than 50 BOPD 22 Candidates identified with more than 50 BOPD upliftuplift5 candidates require only gas lift rate 5 candidates require only gas lift rate optimizationoptimization17 candidates for gas lift redesign17 candidates for gas lift redesign
Of these, 12 candidates with potential gain of more than Of these, 12 candidates with potential gain of more than 100 BOPD (high priority) 100 BOPD (high priority) –– See chartSee chart
0
50
100
150
200
250
300
HC-5 HSA-2 HD-10 HC-3 HB-12 HF-10 HSB-2 HT-10 HC-2 HSA-1 HSB-1 HSB-5
Well Name
Oil
Gai
n (B
OPD
)
Gain Estimated
Gain Achieved
No WO Job Carried out
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 10
Network ModelingNetwork Modeling
PVT: Black Oil; 4 different fluid PVT datasets.PVT: Black Oil; 4 different fluid PVT datasets.Wells: well head performance curvesWells: well head performance curvesPipe/Flow Lines: 452 pipe elements Pipe/Flow Lines: 452 pipe elements
Production & gas injection lines on facilities and well Production & gas injection lines on facilities and well satellite platforms (including risers, flow lines, elevations, satellite platforms (including risers, flow lines, elevations, sea/air environment, pipeline insulation etc.):sea/air environment, pipeline insulation etc.):
Process Equipment:Process Equipment:Multistage separators (4xHP/1xLP/1xLLP)Multistage separators (4xHP/1xLP/1xLLP)Gas lift compressors (5)Gas lift compressors (5)heat exchangers, valves, chokes, etc.heat exchangers, valves, chokes, etc.
Recycle loop (LP gas recovery)Recycle loop (LP gas recovery)ICP and Neelam satellites (using ICP and Neelam satellites (using SourceSource objects)objects)
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 11
Network Model: ConstructionNetwork Model: Construction
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 12
Network Model: ConstructionNetwork Model: Construction
Process Modeling includes:•Flowlines, block valves•Chokes, control valves•Separators, Heat Exchangers•Compressors, Pumps•Various constraints (pressure, flow, temperature) in the network
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 13
Optimization Scenarios Optimization Scenarios
Optimization Scenarios Investigated with Optimization Scenarios Investigated with History matched Model:History matched Model:
Base Case Base Case –– gas lift reallocation (Network Gas gas lift reallocation (Network Gas Lift Optimization)Lift Optimization)
Optimum separator pressureOptimum separator pressure
Optimum gas lift header pressureOptimum gas lift header pressure
Compressor shutCompressor shut--inin
Pipeline dePipeline de--bottleneckingbottlenecking
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 14
Network Optimization GainsNetwork Optimization Gains
0
50
100
150
200
250
300
350
HA HB HC HD HE HF HQ HR HS HSA HSB HT HV HX HYPlatform
Oil
Gai
n (S
TB/d
)
Estimated Gain
Achieved Gain
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 15
Optimization ResultsOptimization ResultsOptimization gains (Base Case):Optimization gains (Base Case):
6%6%8%8%Lift Gas Savings Lift Gas Savings
900 900 bopdbopd1500 1500 bopdbopdField gas lift Field gas lift reallocationreallocation
800 800 bopdbopd1500 1500 bopdbopdWell GL designsWell GL designs
Achieved gainAchieved gainPredicted gainPredicted gain
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 16
Pipeline DePipeline De--bottleneckbottleneck
HC-HA Pipeline size, in.
HC Oil production rate, STB/Day
HC Water Production rate, STB/Day
HC Lift gas consumed, Mscm/day
HC Production manifold pressure, Kg/cm2g
10 4347 2261 90382.2 13.87
14 4792 2512 94784.4 9.08
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 17
HeeraHeera ReRe--development development (New pipeline)(New pipeline)
HVHX-12-WF
HXHRG-12-WF
HBHE-10-WF
HEHRG-10-WF
HYHRG-12-WF
HSAHRG-18-WF
HSBHRG-14-WF
HSHRG-12-WF
HTHRA-12-WF
HRHRG-10-WF
HQHA--10-WF
HCHA-10-WF HFHA-10-WF
HDHA-12-WF
HBHA-10-WF HEHA-12-WF
B134HI-12-WF
HIHRC-14-WF
HCHI-10-WF
HJHRC-12-WF
HSCHRG-16-WF
HZHRG-12-WF
HRG
HZ
HRC
HJ
HC HI
URAN
HB
HX
HE
HV
HY
HSA
HSB
HT
HS
HR
HQ HD
HF
HRA
HA
HE_1 HB_1
HX_1
HI_1
HSC
B-134A HC_1
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 18
ImplementationImplementation
Stepwise, Stepwise, fieldwidefieldwideOn each well: change On each well: change sstabilize tabilize monitor monitor then review resultsthen review results
Good Good –– continue to the next stepcontinue to the next stepNot good Not good –– review well model and updatereview well model and update
Work as a teamWork as a teamProduction rate changes better monitored at Production rate changes better monitored at the facilities level (the facilities level (measurable benefitsmeasurable benefits))Individual production well tests are critical Individual production well tests are critical for well model calibration and reviewfor well model calibration and review
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 19
ConclusionsConclusionsAn integrated production model of the Heera Field has been An integrated production model of the Heera Field has been successfully constructed, history matched and used to successfully constructed, history matched and used to optimize lift gas allocation for increasing oil production. Thisoptimize lift gas allocation for increasing oil production. Thisis the first model on this scale which has been successfully is the first model on this scale which has been successfully implemented in Indiaimplemented in IndiaOptimization results predict a potential uplift of 6Optimization results predict a potential uplift of 6--8% in oil 8% in oil production. Early implementation in the field to date production. Early implementation in the field to date through well interventions and lift gas reallocation have so through well interventions and lift gas reallocation have so far raised oil production by far raised oil production by 1700 BOPD (4%)1700 BOPD (4%)Optimization runs with the network model help assess the Optimization runs with the network model help assess the costcost--benefit impact of changes in separator pressure and benefit impact of changes in separator pressure and gas lift header pressuresgas lift header pressuresThe network model can be used to investigate the benefits The network model can be used to investigate the benefits of upof up--sizing pipelines. Additional economic analysis is sizing pipelines. Additional economic analysis is required to support such recommendationsrequired to support such recommendationsA calibrated & updated network model can be used for A calibrated & updated network model can be used for optimizing the size & location of future pipelines in the fieldoptimizing the size & location of future pipelines in the field
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 20
Lessons LearnedLessons LearnedModeling and optimization of field production networks should beModeling and optimization of field production networks should bean integral part of artificial lift surveillance, maintenance anan integral part of artificial lift surveillance, maintenance and d upgradingupgradingBuilding or analyzing results of models often results in new ideBuilding or analyzing results of models often results in new ideas as and gainsand gains
Collaborative thinkingCollaborative thinkingChallenging existing design criteriaChallenging existing design criteria
Challenges in implementing model recommendations: Challenges in implementing model recommendations: GLV changes could be done in 2/3GLV changes could be done in 2/3rdrd of the planned wells in of the planned wells in HeeraHeeraWell intervention jobs have inherent risks. Careful planning & Well intervention jobs have inherent risks. Careful planning & management support is requiredmanagement support is required
A MultiA Multi--discipline team (well production engineer, facilities discipline team (well production engineer, facilities engineer and operations personnel) was required to coengineer and operations personnel) was required to co--ordinate ordinate the jobs, and monitor and analyze the resultsthe jobs, and monitor and analyze the results
ASME Gas Lift Workshop, 4-8 Feb 2007, Doha, Qatar 21
AcknowledgementAcknowledgement
The authors wish to thank the management The authors wish to thank the management of Neelam and Heera Asset (ONGC) for of Neelam and Heera Asset (ONGC) for permission to publish this paper and for their permission to publish this paper and for their continuing commitment in maintaining the continuing commitment in maintaining the model and implementing the optimization model and implementing the optimization recommendations. recommendations.