Subsurface Exploration Program and Geotechnical Evaluation
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Prepared for:
Mr. Tom Slavens
45-508 Puoni Place
Kaneohe, Hawaii 96744
Job Number: 14-3083 October 22, 2014
TABLE OF CONTENTS
Page
Purpose and Scope of Study ...................................................................................... 1
Proposed Construction ................................................................................................ 1
Site Conditions ............................................................................................................ 2
Geologic Setting ........................................................................................................... 2
Subsurface Exploration ............................................................................................... 3
Laboratory Testing ...................................................................................................... 3
Subsurface Conditions ................................................................................................ 3
Seismic Classification .................................................................................................. 5
Geotechnical Considerations for Design ...................................................................... 5
Shallow Foundations ..................................................................................................... 7
Slab-on-Grade Floor .................................................................................................... 9
Lateral Loads ............................................................................................................... 13
Water Soluble Sulfates ................................................................................................. 14
Soil Corrosivity ............................................................................................................. 15
Project Earthwork ....................................................................................................... 16
Excavation Considerations .......................................................................................... 20
Utility Lateral Installation .............................................................................................. 21
Surface Drainage ......................................................................................................... 23
Subsurface Drainage ................................................................................................... 27
Pavement Sections ....................................................................................................... 29
Exterior Flatwork .......................................................................................................... 34
Closure ........................................................................................................................ 37
Locations of Test Holes ..................................................................................... Figure 1
Logs of Test Holes ........................................................................................... Figure 2
Legend and Notes ............................................................................................. Figure 3
Gradation Plot .................................................................................................... Figure 4
Typical Underdrain Detail ................................................................................... Figure 5
Summary of Laboratory Test Results ........................................................ Tables 1 & 2
Pavement Section Calculations ................................................................... Appendix A
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 1
PURPOSE AND SCOPE OF STUDY
This report presents the results of a subsurface exploration program performed by
GROUND Engineering Consultants, Inc. (GROUND) to provide a geotechnical
evaluation in support of design and construction of a preschool facility to be constructed
at 8361 South Park Lane in Littleton, Colorado. Our study was conducted in general
accordance with GROUND’s Proposal No. 1408-1450 Revised, dated August 11, 2014.
Field and office studies provided information obtained at the test hole locations regarding
surface and subsurface conditions, including the existing site vicinity improvements.
Material samples retrieved during the subsurface exploration were tested in our
laboratory to assess the engineering characteristics of the site earth materials, and
assist in our geotechnical analysis. Results of the field, office, and laboratory studies are
presented below.
Additional information was obtained from a preliminary geotechnical evaluation of the
site prepared by GROUND, dated September 17, 2014.1
This report has been prepared to summarize the data obtained and to present our
findings and conclusions based on the proposed construction and the subsurface
conditions encountered. Design parameters and a discussion of engineering
considerations related to construction of the proposed improvements are included
herein.
PROPOSED CONSTRUCTION
We understand that the proposed facility will consist largely of a single-story,
approximately 11,000-square foot school building. We anticipate that structural loads
will be low, typical of this type of structure. No below-grade level is planned. A paved
parking area will be installed to north of the building. Underground utility laterals will be
installed to serve the new facility.
1 GROUND Engineering Consultants, Inc., 2014, Preliminary Geotechnical Evaluation, Proposed Preschool, 8361 South Park Lane, Littleton, Colorado, Job No. 14-3069, prepared for Mr. Tom Slavens, dated September 17.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 2
The building will be surrounded by landscaping including sidewalks and other
hardscaping. Limited cuts are planned for the northern portion of the site. Fill increasing
in thickness southward across the site, reaching up to about 7 feet in nominal thickness
are planned to construct the building pad. As a result, the building finished floor
elevation will be 3 to 6 feet above existing grades.
If the proposed construction differs significantly from that described above, GROUND
should be notified to re-evaluate the conclusions and parameters contained herein.
SITE CONDITIONS
At the time of our subsurface exploration program, the site consisted of a largely un-
improved lot approximately 1½ acres in area. The ground surface supported grasses
and weeds, although apparently some grading had been performed previously.
Scattered small trees were observed along the northern margin of the property and
mature trees were noted near the southern margin. The ground surface sloped gently to
the south over the majority of the site. Total relief across the property was
approximately 5 feet. Near the southern boundary, closer to the Highline Canal, the
southward slope steepened markedly.
The site was bordered by South Park Lane to the north, the High Line Canal, the High
Line Canal Trail and County Line Road to the south. Commercial properties were noted
to the east, north and west. Ground that was unimproved or in use for agriculture lay to
the south. A moderately sized reservoir lay about 1,000 feet to the west.
GEOLOGIC SETTING
Published geologic maps, e.g., Trimble and Machette (1979)2 depict the site as underlain
by Quaternary Colluvium (‘slope-wash’ deposits), underlain in turn by bedrock of the
upper Cretaceous / lower Tertiary Denver Formation. Colluvial soils typically consist of
sands, silts and clays in varying proportions typically reflecting the compostion of the
underlying, source materials. The Denver Formation in the project area consists of
interbedded claystones and sandstones with local siltstones.
2 Trimble D. and Machette, M., 1979, Geologic Map of Greater Denver Area, Front Range Urban Corridor,
Colorado: U.S. Geological Survey, Geologic Quadrangle Map I-856-H.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 3
SUBSURFACE EXPLORATION
Subsurface exploration for the project was conducted in October, 2014. A total of four
(4) test holes were drilled with a conventional, truck-mounted, drilling rig to evaluate the
subsurface conditions as well as to retrieve samples for laboratory testing and analysis.
Two test holes advanced to depths of about 50 and 51 feet in the approximate footprint
of the proposed building. The other test holes were drilled to depths of about 5 feet in
the area proposed for parking. A GROUND engineer directed the subsurface
exploration, logged the test holes in the field, and prepared the samples for transport to
our laboratory.
Samples of the subsurface materials were retrieved with a 2-inch I.D. ‘California’ liner
sampler. The sampler was driven into the substrata with blows from a 140-pound
hammer falling 30 inches, a procedure similar to that described by ASTM Method
D1586. Penetration resistance values, when properly evaluated, indicate the relative
density or consistency of soils. Depths at which the samples were obtained and
associated penetration resistance values are shown on the test hole logs.
The approximate locations of the test holes, including the test hole drilled for GROUND’s
preliminary evaluation, are shown on Figure 1. Logs of the test holes are presented on
Figure 2. Explanatory notes and a legend are provided on Figure 3.
LABORATORY TESTING
Samples retrieved from our test holes were examined and visually classified in the
laboratory by the project engineer. Laboratory testing of soil samples included standard
property tests, such as natural moisture contents, dry unit weights, grain size analyses,
and Atterberg limits. Swell-consolidation, water-soluble sulfate content and a suite of
corrosivity tests were completed on selected samples, as well. Resilient modulus testing
was performed on a bulk sample of the shallow soils. Laboratory tests were performed
in general accordance with applicable ASTM and AASHTO protocols. Results of the
laboratory testing program are summarized in Tables 1 and 2.
SUBSURFACE CONDITIONS
Beneath a variably thick layer of poorly developed topsoil, the test holes penetrated
about 5 feet of clayey fill soils at test holes B-1 and P-2. At the other test hole locations
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 4
and beneath the fill soils, native sands and clays were encountered that extended to
depths of about 13 to 21 feet. The sands and clays were underlain by silty to clayey
sands that extended to the depths explored. Bedrock was not encountered to the
depths explored (about 51 feet).
We interpret the shallow sands and clays to be upper Pleistocene Loess (a wind-
deposited material) possibly interbedded with alluvial (stream-laid) soils. We interpret
the underlying silty and clayey sands to be Pleistocene alluvial soils, likely Slocum
Alluvium.
Loess commonly exhibits a potential for hydro-consolidation or “collapse.” This refers to
volume loss in the soil due to re-structuring of the constituent grains of the soil to a more
compact arrangement upon wetting.
Fill soils were recognized in two of the test holes and likely are present elsewhere at the
site. Delineation of the complete lateral and vertical extents of any fills at the site, or
their compositions, was beyond our present scope of services. If fill soil volumes and
compositions at the site are of significance, they should be evaluated by the contractor
using test pits.
Coarse gravel and larger clasts are not well represented in small diameter liner samples
collected from 4-inch diameter test holes. Therefore, such materials may be present
even where not called out in the material descriptions herein.
Fill consisted of sandy clays and clayey sands with local gravel. The sand fractions
were fine to medium. They were dry to moist, moderately to highly plastic, stiff / medium
dense to hard / dense, and brown in color.
Sands and Clays ranged from clayey sands to sandy clays with local silts. The sand
fractions were fine to medium to fine to coarse. They were moist to wet, moderately to
highly plastic, stiff / medium dense, and brown in color.
Silty and Clayey Sands included silty sands, clayey sands and scattered lenses of
clay. The sand fractions were fine to medium to fine to coarse. Cleaner sands were
encountered in the deeper portion of the section. Gravels were encountered locally.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 5
Groundwater was encountered in Test Holes B-2 and B-3 at depths of about 38 to 39
feet below existing grades at the time of drilling. Subsequent re-measurement 8 days
later indicated water a depth of about 33½ feet at B-2.
Groundwater levels can be expected to fluctuate, however, in response to annual and
longer-term cycles of precipitation, irrigation, surface drainage, land use, and the
development of transient, perched water conditions.
Swell-consolidation Testing indicated consolidation potentials between 1 and 2
percent in the sands and clays under surcharges approximately equal to foundation or
overburden pressures.
SEISMIC CLASSIFICATION
Based on extrapolation of available data to depth and our experience in the project area,
we consider the site likely to meet the criteria for a Seismic Site Classification of D
according to the 2012 IBC classification (Table 1613.5.2). Exploration and/or shear
wave velocity testing to a depth of 100 feet or more (necessary to evaluate the Seismic
Site Classification quantitatively, or possibly to obtain a higher classification) was not
part of our present scope of services. GROUND can provide a proposal in that regard
upon request. We consider the likelihood of achieving a Site Classification of C at the
subject location to be low.
The USGS’s Earthquake Ground Motion Tool v.5.0.9a indicated an SDS value of 0.237g
and an SD1 value of 0.092g for the site’s latitude/longitude coordinates and Seismic Site
Class of D.
GEOTECHNICAL CONSIDERATIONS FOR DESIGN
Geotechnical Risk The soils underlying the site exhibited potentials for post-
construction settlement that can cause damaging, post-construction, structural
movements. This condition, if not mitigated, could affect nearly all improvements at the
site, and represent the primary geotechnical constraint on design at the facility. Specific
geotechnical measures in this regard are provided in subsequent sections of this report.
Additional discussion and information regarding the geotechnical risks that they address
are provided below.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 6
The conclusions and parameters provided in this report were based on the data
presented herein, our experience in the general project area with similar structures, and
our engineering judgment with regard to the applicability of the data and methods of
forecasting future performance. A variety of engineering parameters were considered as
indicators of potential future soil movements. Our conclusions were based on our
judgment of “likely movement potentials,” (i.e., the amount of movement likely to be
realized if site drainage is generally effective, estimated to a reasonable degree of
engineering certainty) as well as our assumptions about the owner’s willingness to
accept geotechnical risk. “Maximum possible” movement estimates necessarily will be
larger than those presented herein. They also have a significantly lower likelihood of
being realized in our opinion, and generally require more expensive measures to
address. We encourage the client, upon receipt of this report, however, to discuss these
risks and the geotechnical alternatives with us. In addition to the risks and remedial
approaches presented in this report, the client also must understand the risk-cost trade-
offs addressed by the civil engineer and structural engineer in order to direct his design
team to the portion of the Higher Cost / Lower Risk – Lower Cost / Higher Risk spectrum
in which this project should be designed. If the client does not understand these risks, it
is critical that additional information or clarification be requested so that the owner’s
expectations reasonably can be met.
Likely Post-Construction Movements Based on the data obtained for this study and
our experience on other projects in similar geotechnical settings, we estimate likely,
post-construction, vertical movements on the order of 2 to 3 inches where improvements
are supported directly on the existing earth materials. Lateral movements will result, as
well. Significant structure distress could result from movements of these magnitudes.
General Building Foundation Types Supporting the building on a deep foundation
systems (e.g., drilled piers) and providing it with a structural floor also supported on deep
foundations can reduce estimated post-construction movements to about ½ inch. A
deep foundation system and a structural floor is the most positive approach to limit the
risk of post-construction settlement at this site. We have assumed, however, that the
use of deep foundations may not be practical for this facility. Geotechnical parameters
for deep foundation design can be provided upon request, however.
Conventional, shallow, foundations can be used for the proposed buildings, together with
slab-on-grade concrete floors, if supported on a section of properly compacted fill that
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 7
extends down to elevation 5534 (based on the approximate elevations on Figure 2).
(Remedial earthwork to that elevation likely will re-work all the existing, undocumented
fill soils beneath the building, as well as the upper portion of the collapsible soils.) If
footings and floor slabs bear on such a fill section, and effective drainage is established
and maintained, we estimate likely post-construction foundation movements to be on the
order of 1 inch, with similar differential movements over spans of about 40 feet.
However, because earthwork to the above indicated depths will leave a portion of the
collapsible deposits in place, a risk for greater, post-construction settlement will remain.
Therefore, it is critical to establish and maintain effective surface and subsurface
drainage at the site.
The limited risk of greater than estimated, post-construction movement can be reduced
further by construction of a deeper fill section beneath the building. Geotechnical
parameters in that regard can be provided upon request. Excavation and replacement
to depths of at least 20 feet below existing grades would be necessary to re-work all of
the potentially collapsible soil.
More detailed parameters for design and construction of shallow, spread footing
foundations and slab-on-grade floors are provided in the Shallow Foundations and Slab-
on-Grade Floor sections of this report.
SHALLOW FOUNDATIONS
Geotechnical Parameters for Shallow Foundation Design
1) Footings should bear on a section of properly compacted fill soils below the
footings and to an elevation of 5534 feet based on the approximate elevations
shown on Figure 2. This is in addition to scarification and re-compaction of the
underlying surface, as outlined in the Project Earthwork section of this report.
If project earthworking exposes existing, undocumented fill soils that extend to
depths of more than 6 feet below foundation bearing elevation, then those soils
should be excavated to their full depth and replaced with properly compacted fill.
Where grades are raised in areas where existing fills are present, any existing fill
soils still should be excavated fully and replaced with properly compacted fill.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 8
The fill section should extend should extend at full thickness across the building
footprint and at least 6 feet laterally beyond the building perimeter.
Considerations for fill placement and compaction are provided in the Project
Earthwork section of this report.
The fill section beneath the building should be laterally consistent and of uniform
depth to reduce differential, post-construction foundation movements. A
differential fill section will tend to increase differential movements.
The contractor should provide survey data of the excavation beneath each
building indicating the depth and lateral extents of the remedial excavation.
2) Footings bearing on firm native soils or properly compacted fill may be designed
for an allowable soil bearing pressure of 1,500 psf for footings up to 6 feet in
width (least lateral dimension). This value may be increased by ⅓ for transient
loads such as wind or seismic loading. For larger footings, a lower allowable
bearing pressure may be appropriate.
The estimated 1 inch of likely, post-construction settlement associated with this
fill section and allowable bearing pressure is based on an assumption of effective
site drainage. If foundation soils are subjected to an increase/fluctuation in
moisture content, the effective bearing capacity will be reduced and greater post-
construction movements than those estimated above may result.
In order to reduce differential settlements between footings or along continuous
footings, footing loads should be as uniform as possible. Differentially loaded
footings will settle differentially.
3) Spread footings should have a minimum lateral dimension of 16 or more inches
for linear strip footings and 24 or more inches for isolated pad footings. Actual
footing dimensions, however, should be determined by the structural engineer.
4) Footings should bear at an elevation 3 or more feet below the lowest adjacent
exterior finish grades to have adequate soil cover for frost protection.
5) Continuous foundation walls should be reinforced top and bottom to span an
unsupported length of at least 10 feet.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 9
6) Geotechnical parameters for lateral resistance to foundation loads are provided
in the Lateral Loads section of this report.
7) Connections to the building of all types must be flexible and/or adjustable to
accommodate the anticipated, post-construction movements.
Shallow Foundation Construction Considerations
8) Care should be taken when excavating the foundations to avoid disturbing the
supporting materials. Hand excavation or careful backhoe soil removal may be
required in excavating the last few inches.
9) Footing excavation bottoms may expose loose, organic or otherwise deleterious
materials, including debris. Firm materials may become disturbed by the
excavation process. All such unsuitable materials should be excavated and
replaced with properly compacted fill.
10) Foundation soils may be disturbed or deform excessively under the wheel loads
of heavy construction vehicles as the excavations approach footing bearing
levels. Construction equipment should be as light as possible to limit
development of this condition. Track-mounted vehicles generally should be used
because they exert lower contact pressures. The movement of vehicles over
proposed foundation areas should be restricted.
11) All footing areas should be compacted with a vibratory plate compactor prior to
placement of concrete.
12) Compacted fill placed against the sides of the footings should be compacted in
accordance with the criteria in the Project Earthwork section of this report.
SLAB-ON-GRADE FLOOR
Geotechnical Parameters for Design of a Slab-on-Grade Floor
1) A slab-on-grade floor should bear on a section of properly compacted fill soils
below the footings and to an elevation of 5534 feet based on the approximate
elevations shown on Figure 2. This is in addition to scarification and re-
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 10
compaction of the underlying surface, as outlined in the Project Earthwork
section of this report.
If project earthworking exposes existing, undocumented fill soils that extend to
depths of more than 8 feet below slab bearing elevation, then those soils should
be excavated to their full depth and replaced with properly compacted fill. Where
grades are raised in areas where existing fills are present, the existing fill soils
still should be excavated fully and replaced with properly compacted fill.
The remedial fill section should extend at full depth 6 or more feet laterally
beyond the slab perimeter.
The thickness of the re-worked section should be taken from the bottom of the
slab + gravel layer system. (If the gravel layer is not installed, the re-worked
section should be correspondingly thickened.)
Criteria and compaction standards for fill placement and compaction are provided
in the Project Earthwork section of this report.
2) Floor slabs should be adequately reinforced. Floor slab design, including slab
thickness, concrete strength, jointing, and slab reinforcement should be
developed by a structural engineer.
3) A vertical modulus of subgrade reaction (Kv) of 78 tcf (90 pci) may be used for
design of a concrete, slab-on-grade floor bearing on firm, properly compacted,
clayey fill. This value is for a 1-foot x 1-foot plate; it should be adjusted for slab
dimension.
4) Floor slabs should be separated from all bearing walls and columns with slip
joints, which allow unrestrained vertical movement.
Slip joints should be observed periodically, particularly during the first several
years after construction. Slab movement can cause previously free-slipping
joints to bind. Measures should be taken to assure that slab isolation is
maintained in order to reduce the likelihood of damage to walls and other interior
improvements.
5) Concrete slabs-on-grade should be provided with properly designed control
joints.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 11
ACI, AASHTO and other industry groups provide guidelines for proper design
and construction concrete slabs-on-grade and associated jointing. The design
and construction of such joints should account for cracking as a result of
shrinkage, curling, tension, loading, and curing, as well as proposed slab use.
Joint layout based on the slab design may require more frequent, additional, or
deeper joints, and should reflect the configuration and proposed use of the slab.
Particular attention in slab joint layout should be paid to areas where slabs
consist of interior corners or curves (e.g., at column blockouts or reentrant
corners) or where slabs have high length to width ratios, significant slopes,
thickness transitions, high traffic loads, or other unique features. The improper
placement or construction of control joints will increase the potential for slab
cracking.
6) Interior partitions resting on floor slabs should be provided with slip joints so that
if the slabs move, the movement cannot be transmitted to the upper structure.
This detail is also important for wallboards and doorframes. Slip joints which will
allow 1½ inches or more of differential vertical movement should be considered.
Accommodation for differential movement also should be made where partitions
meet bearing walls.
7) Post-construction soil movements may not displace slab-on-grade floors and
utility lines in the soils beneath them to the same extent. Design of floor
penetrations, connections and fixtures should accommodate at least 2 inches of
differential movement.
8) Moisture can be introduced into a slab subgrade during construction and
additional moisture will be released from the slab concrete as it cures. A properly
compacted layer of free-draining gravel, 4 or more inches in thickness, should be
placed beneath the slabs. This layer will help distribute floor slab loadings, ease
construction, reduce capillary moisture rise, and aid in drainage.
The free-draining gravel should contain less than 5 percent material passing the
No. 200 Sieve, more than 50 percent retained on the No. 4 Sieve, and a
maximum particle size of 2 inches.
The capillary break and the drainage space provided by the gravel layer also
may reduce the potential for excessive water vapor fluxes from the slab after
construction as mix water is released from the concrete.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 12
We understand, however, that professional experience and opinion differ with
regard to inclusion of a free-draining gravel layer beneath slab-on-grade floors. If
these issues are understood by the owner and appropriate measures are
implemented to address potential concerns including slab curling and moisture
fluxes, then the gravel layer may be deleted.
9) A vapor barrier beneath a building floor slab can be beneficial with regard to
reducing exterior moisture moving into the building, through the slab, but can
retard downward drainage of construction moisture. Uneven moisture release
can result in slab curling. Elevated vapor fluxes can be detrimental to the
adhesion and performance of many floor coverings and may exceed various
flooring manufacturers’ usage criteria.
Per the 2006 ACI Location Guideline, a vapor barrier is required under concrete
floors when that floor is to receive moisture-sensitive floor covering and/or
adhesives, or the room above that floor has humidity control.
Therefore, in light of the several, potentially conflicting effects of the use vapor-
barriers, the owner and the architect and/or contractor should weigh the
performance of the slab and appropriate flooring products in light of the intended
building use, etc., during the floor system design process and the selection of
flooring materials. Use of a plastic vapor-barrier membrane may be appropriate
for some building areas and not for others.
In the event a vapor barrier is utilized, it generally should consist of a minimum
15 mil thickness, extruded polyolefin plastic (no recycled content or woven
materials), maintain a permeance less than 0.01 perms per ASTM E-96 or ASTM
F-1249, and comply with ASTM E-1745 (Class “A”). Vapor barriers should be
installed in accordance with ASTM E-1643.
Polyethylene (“poly”) sheeting (even if 15 mils in thickness which polyethylene
sheeting commonly is not) does not meet the ASTM E-1745 criteria and
generally should not be used as vapor barrier material. It can be easily torn
and/or punctured, does not possess necessary tensile strength, gets brittle, tends
to decompose over time, and has a relatively high permeance.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 13
Construction Considerations for a Slab-on-Grade Floor
10) Loose, soft or otherwise unsuitable materials exposed on the prepared surface
on which the floor slab will be cast should be excavated and replaced with
properly compacted fill.
11) The fill section beneath a slab should be of uniform thickness. Where existing, fill
soils are encountered and re-worked (See the Project Earthwork section of this
report.) a fill section thicker than that indicated above may result. The increased
section thickness should be constructed beneath the entire slab.
12) Concrete floor slabs should be constructed and cured in accordance with
applicable industry standards and slab design specifications.
13) All plumbing lines should be carefully tested before operation. Where plumbing
lines enter through the floor, a positive bond break should be provided.
LATERAL LOADS
Shallow Foundations Resisting Lateral Loads Footings and similar elements
designed for frictional resistance to lateral loads may be designed using a friction
coefficient between the foundation element and fill soils of 0.31.
Passive soil pressure may be estimated at this site using an equivalent fluid pressure of
305 pcf for drained conditions to a maximum of 3,050 psf. The upper 1 foot of
embedment should be neglected for passive resistance. Where passive soil pressure is
used to resist lateral loads, it should be understood that significant lateral strains will be
required to mobilize the full value indicated above, likely 1 inch or more. A reduced
passive pressure can be used for reduced anticipated strains, however.
Note that the values indicated above (and preliminarily, below) were based on a moist
unit weight (γ') of 125 pcf and an angle of internal friction () of 25 degrees for the
shallow, on-site soils and are un-factored. Appropriate factors of safety should be
included in design calculations.
Preliminary At-Rest and Active Lateral Earth Pressures for Retaining Walls We are
not aware that retaining walls are planned at this time as part of the proposed facility
improvements. Preliminary ‘active’ and ‘at-rest’ equivalent fluid pressures are provided
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 14
below for initial wall cost estimates. They assume that on-site soils will be used as wall
backfill, conditions will be well-drained, and that the backfill surface will be horizontal. In
the event that retaining walls are added once project design begins, a geotechnical
engineer should be retained to develop parameters for retaining wall parameter design.
Global stability analysis may be needed, as well. The owner should realize that
additional subsurface exploration may be necessary.
Preliminary Equivalent
Condition Fluid Pressure
Active: 51 pcf
At-Rest: 73pcf
Actual wall design should incorporate any upward sloping backfills, live loads such as
construction equipment, material stockpiles, etc., and other surcharge pressures. The
build-up of hydrostatic pressures behind a wall also will increase lateral earth pressures
on the walls.
WATER-SOLUBLE SULFATES
The concentration of water-soluble sulfates measured in a selected sample of site soils
was approximately 0.01 percent by weight. (See Table 2.) Such a concentration of
soluble sulfates represents a negligible environment for sulfate attack on concrete
exposed to these materials. Degrees of attack are based on the scale of 'negligible,'
'moderate,' 'severe' and 'very severe' as described in the “Design and Control of
Concrete Mixtures,” published by the Portland Cement Association (PCA). The Colorado
Department of Transportation (CDOT) utilizes a corresponding scale with four classes of
severity of sulfate exposure (Class 0 to Class 3) as described in the table below.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 15
REQUIREMENTS TO PROTECT AGAINST DAMAGE TO CONCRETE BY SULFATE ATTACK FROM EXTERNAL SOURCES OF SULFATE
Severity of Sulfate
Exposure
Water-Soluble Sulfate (SO4
=) In Dry Soil
(%)
Sulfate (SO4=)
In Water
(ppm)
Water / Cementitious Ratio
(maximum)
Cementitious Material
Requirements
Class 0 0.00 to 0.10 0 to 150 0.45 Class 0
Class 1 0.11 to 0.20 151 to 1,500 0.45 Class 1
Class 2 0.21 to 2.00 1,501 to 10,000 0.45 Class 2
Class 3 2.01 or greater 10,001 or greater 0.40 Class 3
Based this datum, no special, sulfate-resistant cement need be used in project concrete.
SOIL CORROSIVITY
Data were obtained to support an initial assessment of the potential for corrosion of
ferrous metals in contact with earth materials at the site, based on the conditions at the
time of GROUND’s evaluation. The test results are summarized in Table 2.
Soil Resistivity In order to assess the “worst case” for mitigation planning, samples of
materials retrieved from the test holes were tested for resistivity in the laboratory, after
being saturated with water, rather than in the field. Resistivity also varies inversely with
temperature. Therefore, the laboratory measurements were made at a controlled
temperature. Measurement of electrical resistivity indicated a value of approximately
4,911 ohm-centimeters in a sample of site soils.
pH Where pH is less than 4.0, soil serves as an electrolyte; the pH range of about 6.5 to
7.5 indicates soil conditions that are optimum for sulfate reduction. In the pH range
above 8.5, soils are generally high in dissolved salts, yielding a low soil resistivity.3
Testing indicated a pH value of about 7.9.
Reduction-Oxidation testing indicated a red-ox potential of -84 millivolts. Such a low
potential typically creates a more corrosive environment.
Sulfide Reactivity testing indicated a ‘negative’ results in the local soils. The absence
of sulfides in the soils suggests a less corrosive environment.
3 American Water Works Association ANSI/AWWA C105/A21.5-05 Standard.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 16
Corrosivity Assessment The American Water Works Association (AWWA) has
developed a point system scale used to predict corrosivity. The scale is intended for
protection of ductile iron pipe but is valuable for project steel selection. When the scale
equals 10 points or higher, protective measures for ductile iron pipe are indicated. The
AWWA scale is presented below. The soil characteristics refer to the conditions at and
above pipe installation depth.
Table A.1 Soil-test Evaluation Soil Characteristic / Value Points
Soil Resistivity
<1,500 ohm-cm ..........................................................................................… 10 1,500 to 1,800 ohm-cm ................................................................……......…. 8 1,800 to 2,100 ohm-cm .............................................................................…. 5 2,100 to 2,500 ohm-cm ...............................................................................… 2 2,500 to 3,000 ohm-cm .................................................................................. 1 >3,000 ohm-cm ................................................................................… 0
pH
0 to 2.0 ............................................................................................................ 5 2.0 to 4.0 ......................................................................................................... 3 4.0 to 6.5 ......................................................................................................... 0 6.5 to 7.5 ......................................................................................................... 0 * 7.5 to 8.5 ......................................................................................................... 0 >8.5 .......................................................................................................... 3
Redox Potential
< 0 (negative values) ....................................................................................... 5 0 to +50 mV ................................................................................................…. 4 +50 to +100 mV ............................................................................................… 3½ > +100 mV ............................................................................................... 0
Sulfide Reactivity
Positive ........................................................................................................…. 3½ Trace .............................................................................................................… 2 Negative .......................................................................................................…. 0
Moisture
Poor drainage, continuously wet ..................................................................…. 2 Fair drainage, generally moist ....................................................................… 1 Good drainage, generally dry ........................................................................ 0
* If sulfides are present and low or negative redox-potential results (< 50 mV) are
obtained, add three (3) points for this range.
We anticipate that drainage at the site after construction will be effective. Nevertheless,
based on the values obtained for the soil parameters, the overburden soils and bedrock
appear to comprise a moderately corrosive environment for ferrous metals (5 points).
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 17
If additional information or evaluations are needed regarding soil corrosivity, then the
American Water Works Association or a corrosion engineer should be contacted. It
should be noted, however, that changes to the site conditions during construction, such
as the import of other soils, or the intended or unintended introduction of off-site water,
might alter corrosion potentials significantly.
PROJECT EARTHWORK
The earthwork criteria below are based on our interpretation of the geotechnical
conditions encountered in the test holes. Where these criteria differ from applicable
municipal specifications, e.g., for backfill compaction for a publicly maintained utility line,
the latter should be considered to take precedence.
Prior to earthwork construction, existing construction debris, vegetation and other
deleterious materials should be removed and disposed of off-site. Relic underground
utilities should be abandoned in accordance with applicable regulations, removed as
necessary, and properly capped.
Use of Existing Fill Soils Fill soils were recognized in some of the test holes and likely
are present elsewhere on-site. In general, we anticipate that most fill soils will be
suitable for re-use as compacted fill. Because they were not sampled and tested,
however, it is possible that some existing fill materials when excavated may not be
suitable for re-use as compacted fill, including trash, organic material, coarse cobbles
and boulders, and construction debris. Excavated fill materials should be evaluated and
tested, as appropriate, with regard to re-use.
All existing fill soils exposed under the proposed building footprint, pavements, flatwork
or other improvements should be excavated and replace with properly compacted fill.
Cobbles and fragments of rock, as well as inert construction debris, e.g., concrete or
asphalt, up to 6 inches in maximum dimension may be included in project fills, in
general. Such materials should be evaluated on a case-by-case basis where identified
during earthwork.
Use of Native Site Soils The existing site soils – free of organic materials, coarse
cobbles, boulders, or other deleterious materials – appeared suitable, in general, for re-
use as compacted fill.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 18
Imported Fill Materials Materials imported to the site as fill should be free of organic
material, and other deleterious materials. Imported material should exhibit 40 percent
or less passing the No. 200 Sieve and a plasticity index of 15 or less. Materials
proposed for import should be approved prior to transport to the site.
Fill Platform Preparation Prior to filling, the top 12 inches of in-place materials on
which fill soils will be placed (except for utility trench bottoms where bedding will be
placed) should be scarified, moisture conditioned and properly compacted in accordance
with the criteria below to provide a uniform base for fill placement.
General Considerations for Fill Placement Fill soils should be thoroughly mixed to
achieve a uniform moisture content, placed in uniform lifts not exceeding 8 inches in
loose thickness, and properly compacted. No fill materials should be placed, worked,
rolled while they are frozen, thawing, or during poor/inclement weather conditions.
Where soils supporting foundations or on which foundation will be placed are exposed to
freezing temperatures or repeated freeze – thaw cycling during construction – commonly
due to water ponding in foundation excavations – bearing capacity typically is reduced
and/or settlements increased due to the loss of density in the supporting soils. After
periods of freezing conditions, the contractor should re-work areas affected by the
formation of ice to re-establish adequate bearing support.
Care should be taken with regard to achieving and maintaining proper moisture contents
during placement and compaction. Materials that are not properly moisture conditioned
may exhibit significant pumping, rutting, and deflection at moisture contents near
optimum and above. The contractor should be prepared to handle soils of this type,
including the use of chemical stabilization, if necessary.
Compaction areas should be kept separate, and no lift should be covered by another
until relative compaction and moisture content within the specified ranges are obtained.
Compaction Standards Fill soils should be compacted to 100 percent or more of the
maximum dry density at moisture contents within 2 percent of the optimum moisture
content as determined by ASTM D698, the ‘standard Proctor.’
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 19
Use of Squeegee Relatively uniformly graded fine gravel or coarse sand, i.e.,
“squeegee,” or similar materials commonly are proposed for backfilling foundation
excavations, utility trenches (excluding approved pipe bedding), and other areas where
employing compaction equipment is difficult. In general, this procedure should not be
followed.
Even when properly densified, uniformly graded granular materials are comparatively
permeable and allow water to reach and collect in the lower portions of the excavations
backfilled with those materials. This leads to wetting of the underlying soils and resultant
potential loss of bearing support as well as increased local heave or settlement.
Wherever possible, excavations should be backfilled with approved, on-site soils placed
as properly compacted fill. Where this is not feasible, use of “Controlled Low Strength
Material” (CLSM), i.e., a lean, sand-cement slurry (“flowable fill”) or a similar material for
backfilling should be considered.
Where “squeegee” or similar materials are proposed for use by the Contractor, the
design team should be notified by means of a Request for Information (RFI), so that the
proposed use can be considered on a case-by-case basis. Where “squeegee” meets
the project requirements for pipe bedding material, however, it is acceptable for that use.
Settlements Settlements will occur in filled ground, typically on the order of 1 to 2
percent of the fill depth. For a 6-foot fill, for example, that corresponds to a total
settlement of about 1 inch. If fill placement is performed properly and is tightly
controlled, in GROUND’s experience the majority (on the order of 60 to 80 percent) of
that settlement typically will take place during earthwork construction, provided the
contractor achieves the compaction levels indicated herein. The remaining potential
settlements likely will take several months or longer to be realized, and may be
exacerbated if these fills are subjected to changes in moisture content.
Cut and Filled Slopes Permanent, graded slopes supported by local soils up to 10 feet
in height should be constructed no steeper than 3:1 (horizontal : vertical). Minor raveling
or surficial sloughing should be anticipated on slopes cut at this angle until vegetation is
well re-established. Surface drainage should be designed to direct water away from
slope faces into designed drainage pathways or structures.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 20
EXCAVATION CONSIDERATIONS
Excavation Difficulty Test holes for the subsurface exploration were advanced to the
depths indicated on the test hole logs by means of conventional, truck-mounted,
geotechnical drilling equipment. We anticipate no unusual excavation difficulties in
these materials, in general, for the proposed construction with conventional, heavy duty,
excavating equipment.
Coarse gravel and cobbles, as well as construction debris may be encountered,
however. The contractor should be prepared to excavate, handle, process and export
these materials.
Temporary Excavations and Personnel Safety Excavations in which personnel will
be working must comply with all applicable OSHA Standards and Regulations,
particularly CFR 29 Part 1926, OSHA Standards-Excavations, adopted March 5, 1990.
The contractor’s “responsible person” should evaluate the soil exposed in the
excavations as part of the contractor’s safety procedures. GROUND has provided the
information in this report solely as a service to the client and is not assuming
responsibility for construction site safety or the contractor’s activities.
The contractor should take care when making excavations not to compromise the
bearing or lateral support for any adjacent, existing improvements. The contractor also
should take sufficient care to locate the existing, buried utility lines and other in-ground
improvements which appeared to be relatively numerous.
Temporary, un-shored excavation slopes up to 15 feet in height, in general, should be
cut no steeper than 1½:1 (horizontal : vertical) in the on-site soils in the absence of
seepage. Some surface sloughing may occur on the slope faces at these angles.
Should site constraints prohibit the use of the above-indicated slope angle, temporary
shoring should be used. GROUND is available to provide shoring design upon request.
Groundwater and Surface Water Groundwater was encountered at depths of as
shallow as about 33 feet below existing grades. Therefore, groundwater is not
anticipated to be a significant factor in project excavations except for limited volumes of
perched groundwater.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 21
Should seepage or flowing groundwater be encountered in project excavations, the
slopes should be flattened as necessary to maintain stability or a geotechnical engineer
should be retained to evaluate the conditions. The risk of slope instability will be
significantly increased in areas of seepage along excavation slopes.
The contractor should take pro-active measures to control surface waters during
construction and maintain good surface drainage conditions to direct waters away from
excavations and into appropriate drainage structures. A properly designed drainage
swale should be provided at the tops of the excavation slopes. In no case should water
be allowed to pond near project excavations.
Temporary slopes should also be protected against erosion. Erosion along the slopes
will result in sloughing and could lead to a slope failure.
UTILITY LATERAL INSTALLATION
The measures and criteria below are based on GROUND’s evaluation of the local,
geotechnical conditions. Where the parameters herein differ from applicable municipal
requirements, the latter should be considered to govern.
Pipe Support The bearing capacity of the site soils appeared adequate, in general, for
support of typical utility lines. The pipes + contents are less dense than the soils which
will be displaced for installation. Therefore, GROUND anticipates no significant pipe
settlements in these materials where properly bedded.
Areas allowed to pond water will require excavation and replacement with properly
compacted fill or bedding. The contractor should take particular care to ensure
adequate support near pipe joints which are less tolerant of extensional strains.
Where thrust blocks are needed, the parameters provided in the Lateral Loads section of
this report may be used for design.
Trench Backfilling Some settlement of compacted soil trench backfill materials should
be anticipated, even where all the backfill is placed and compacted correctly. Typical
settlements are on the order of 1 to 2 percent of fill thickness. However, the need to
compact to the lowest portion of the backfill must be balanced against the need to
protect the pipe from damage from the compaction process. Some thickness of backfill
may need to be placed at compaction levels lower than specified (or smaller compaction
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 22
equipment used together with thinner lifts) to avoid damaging the pipe. Protecting the
pipe in this manner can result in somewhat greater surface settlements. Therefore,
although other alternatives may be available, the following options are presented for this
project:
Controlled Low Strength Material Because of the above considerations, the entire depth
of the trench should be backfilled (both bedding and common backfill zones) with
“controlled low strength material” (CLSM), i.e., a lean, sand-cement slurry, “flowable fill,”
or a similar material (e.g., air-entrained “flash fill”) along all trench alignment reaches
with low tolerances for surface settlements.
CLSM used as pipe bedding and trench backfill should exhibit a 28-day unconfined
compressive strength between 50 to 150 psi so that re-excavation is not unusually
difficult. The contractor should establish design mix and a quality control program to
facilitate keeping the CLSM strengths within this range.
Placement of the CLSM in several lifts or other measures likely will be necessary to
avoid ‘floating’ the pipe. Measures also should be taken to maintain pipe alignment
during CLSM placement.
Compacted Soil Backfilling As an alternative that will result in surface settlements, for
use in reaches that are tolerant of such settlements, the utility trenches may be
backfilled with compacted soil using the on-site soils or similar materials. Where
compacted soil backfilling is employed as backfill, the risk of trench backfill settlements
entailed must be anticipated and accepted by the client.
We anticipate that the on-site soils excavated from trenches will be suitable, in general,
for use as common trench backfill within the above-described limitations. Backfill soils
should be free of vegetation, organic debris and other deleterious materials. Fragments
of rock, cobbles, and inert construction debris (e.g., concrete or asphalt) coarser than 6
inches in maximum dimension should not be incorporated into trench backfills. As
discussed in the Project Earthwork section of this report, the excavated soils commonly
will exhibit moisture contents above the optimum which will require drying prior to
placement as compacted fill.
If it is necessary to import material for use as backfill, the imported soils should be free
of vegetation, organic debris, and other deleterious materials and meet the criteria for
imported soils provided in the Project Earthwork section of this report.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 23
Soils placed for compaction as trench backfill should be conditioned to a relatively
uniform moisture content, placed and compacted in accordance with the criteria in the
Project Earthwork section of this report.
Pipe Bedding Pipe bedding materials, placement and compaction should meet the
specifications of the pipe manufacturer and applicable municipal standards. Bedding
should be brought up uniformly on both sides of the pipe to reduce differential loadings.
As discussed above, we CLSM or similar material should be used in lieu of granular
bedding and compacted soil backfill where the tolerance for surface settlement is low.
(Placement of CLSM as bedding to at least 12 inches above the pipe can protect the
pipe and assist construction of a well-compacted conventional backfill, although possibly
at an increased cost relative to the use of conventional bedding.)
If a granular bedding material is specified, then with regard to potential migration of fines
into the pipe bedding, design and installation should follow ASTM D2321, Appendix
X1.8. The on-site sols largely classify as Class III and Class IV soils with regard to that
standard. If the granular bedding does not meet filter criteria for the enclosing soils, then
non-woven filter fabric (e.g., TenCate Mirafi® 140N, or the equivalent) should be placed
around the bedding to reduce migration of fines into the bedding which can result in
severe, local surface settlements. Where this protection is not provided, settlements can
develop/continue several months or years after completion of the project.
In addition, clay or concrete cut-off walls should be installed at the margins of the pad to
interrupt the granular bedding section to reduce the rates and volumes of water
transmitted along utility alignments which can contribute to migration of fines. We
anticipate that cut-off walls also will be beneficial with regard to limiting migration of
methane along the pipe bedding.
If granular bedding is specified, some site soils may be suitable for that use with
significant processing. Materials proposed for use as pipe bedding should be tested for
suitability prior to use. Imported materials should be approved prior to transport to the
site.
SURFACE DRAINAGE
The site soils are relatively stable with regard to moisture content – volume relationships
at their existing moisture contents. Other than the anticipated, post-placement
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 24
settlement of fills, post-construction soil movements will result primarily from the
introduction of water into the soils underlying the proposed structure, hardscaping and
pavements. Wetting of the soils may result from infiltrating surface waters (precipitation,
irrigation, etc.), water flowing along constructed pathways such as bedding in utility pipe
trenches, or a rise in the local water table.
The following drainage measures should be followed both for during construction and as
part of project design. The facility should be observed periodically to evaluate the
surface drainage and identify areas where drainage is ineffective. Routine maintenance
of site drainage should undertaken throughout the design life of the proposed facility. If
these measures are not implemented and maintained effectively, the movement
estimates provided in this report could be exceeded.
1) Wetting or drying of the foundation excavations and underslab areas should be
avoided during and after construction as well as throughout the improvements’
design life. Permitting increases/variations in moisture to the adjacent or
supporting soils may result in a decrease in bearing capacity and an increase in
volume change of the underlying soils, and increased total and/or differential
movements.
2) Positive surface drainage measures should be provided and maintained to
reduce water infiltration into foundation soils.
The ground surface surrounding the exterior of each building should be sloped to
drain away from the foundation in all directions. A minimum slope of 12 inches
in the first 10 feet should be incorporated in the areas not covered with
pavement or concrete slabs, or a minimum 3 percent in the first 10 feet in the
areas covered with pavement or concrete slabs. Reducing the slopes to comply
with ADA requirements may be necessary by other design professionals but may
entail an increased potential for moisture infiltration and subsequent volume
change of the underlying soils and resultant distress.
In no case should water be allowed to pond near or adjacent to foundation
elements, utility trench alignments, etc.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 25
It should be noted that the maintenance necessary to maintain effective surface
drainage may include removal and replacement of improvements, local
earthwork to restore drainage gradients, etc.
3) Drainage also should be established to direct water away from sidewalks and
other hardscaping as well as utility trench alignments which are not tolerant of
moisture-volume changes in the underlying soils or flow of infiltrating water.
The ground surface near foundation elements should be able to convey water
away readily. Cobbles or other materials that tend to act as baffles and restrict
surface flow should not be used to cover the ground surface near the
foundations.
Where the ground surface does not convey water away readily, additional post-
construction movements and distress should be anticipated.
4) In GROUND’s experience, it is common during construction that in areas of
partially completed paving or hardscaping, bare soil behind curbs and gutters,
and utility trenches, water is allowed to pond after rain or snow-melt events.
Wetting of the subgrade can result in loss of subgrade support and increased
settlements / increase heave. By the time final grading has been completed,
significant volumes of water can already have entered the subgrade, leading to
subsequent distress and failures. The contractor should maintain effective site
drainage throughout construction so that water is directed into appropriate
drainage structures.
In no case should water be permitted to pond adjacent to or on sidewalks,
hardscaping, or other improvements as well as utility trench alignments, which
are likely to be adversely affected by moisture-volume changes in the underlying
soils or flow of infiltrating water.
5) Roof downspouts and drains should discharge well beyond the perimeter of the
structure foundations (minimum 10 feet) and backfill zones and be provided with
positive conveyance off-site for collected waters.
If roof downspouts and drains are not used, then surface drainage design should
anticipate concentrated volumes of water adjacent to the buildings.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 26
6) Irrigation water – both that applied to landscaped areas and over-spray –
commonly is a significant cause of distress to improvements. Where (near-)
saturated soil conditions are sustained, distress to nearby improvements should
be anticipated.
To reduce to potential for such distress, vegetation requiring watering should be
located 10 or more feet from building perimeters, flatwork, or other
improvements. Irrigation sprinkler heads should be deployed so that applied
water is not introduced near or into foundation/subgrade soils. Landscape
irrigation should be limited to the minimum quantities necessary to sustain
healthy plant growth.
Use of drip irrigation systems can be beneficial for reducing over-spray beyond
planters. Drip irrigation also can be beneficial for reducing the amounts of water
introduced to building foundation soils, but only if the total volumes of applied
water are controlled with regard to limiting that introduction. Controlling rates of
moisture increase beneath the foundations, floors and other improvements
should take higher priority than minimizing landscape plant losses.
Where plantings are desired within 10 feet of a building, the plants should be
placed in water-tight planters, constructed either in-ground or above-grade, to
reduce moisture infiltration in the surrounding subgrade soils. Planters should be
provided with positive drainage and landscape underdrains.
As an alternative involving only a limited increase in risk, the use of water-tight
planters may be replaced by local shallow underdrains beneath the planter beds.
7) Plastic membranes should not be used to cover the ground surface near the
building without careful consideration of other components of project drainage.
Plastic membranes can be beneficial to directing surface waters away from the
building and toward drainage structures. However, they effectively preclude
evaporation and transpiration of shallow soil moisture. Therefore, soil moisture
tends to increase beneath a continuous membrane. Where plastic membranes
are used, additional shallow, subsurface drains should be installed.
Perforated “weed barrier” membranes that allow ready evaporation from the
underlying soils may be used.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 27
SUBSURFACE DRAINAGE
As a component of project civil design, properly functioning, subsurface drain systems
(underdrains) can be beneficial for collecting and discharging saturated subsurface
waters. Underdrains will not collect water infiltrating under unsaturated (vadose)
conditions, or moving via capillarity, however. In addition, if not properly constructed and
maintained, underdrains can transfer water into foundation soils, rather than remove it.
This will tend to induce heave or settlement of the subsurface soils, and may result in
distress. Underdrains can, however, provide an added level of protection against
relatively severe post-construction movements by draining saturated conditions near a
structure should they arise, and limiting the volume of wetted soil.
If, as we anticipate, some of the potentially collapsible soils are left in-place beneath the
structure, then the building should be protected by an underdrain system. In addition, if
below-grade or partially below-grade level(s) are added to a building, then damp-
proofing should be applied to the exteriors of below-grade elements. The provision of
Tencate MiraFi® G-Series backing (or comparable wall drain provisions) on the exteriors
of (some) below-grade elements may be appropriate, depending on the intended use. If
a (partially) below-grade level is limited in extent, it may be efficient to install a separate,
local underdrain system, in that area.
Geotechnical Parameters for Underdrain Design Where an underdrain system is
included in project drainage design, design should incorporate the parameters below.
The actual underdrain layout, outlets, and locations should be developed by a civil
engineer. A typical, cross-section detail of an underdrain for this project is provided on
Figure 5.
An underdrain system should be tested by the contractor after installation and after
placement and compaction of the overlying backfill to verify that the system functions
properly.
1) An underdrain system for a building should consist of perforated, rigid, PVC
collection pipe at least 4 inches in diameter, non-perforated, rigid, PVC
discharge pipe at least 4 inches in diameter, free-draining gravel, and filter
fabric, as well as a waterproof membrane.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 28
2) The free-draining gravel should contain less than 5 percent passing the No. 200
Sieve and more than 50 percent retained on the No. 4 Sieve, and have a
maximum particle size of 2 inches. Each collection pipe should be surrounded
on the sides and top (only) with 6 or more inches of free-draining gravel.
3) The gravel surrounding the collection pipe(s) should be wrapped with filter fabric
(MiraFi 140N® or the equivalent) to reduce the migration of fines into the drain
system.
4) The waterproof membrane should underlie the gravel and pipe, and be attached
to the foundation stem wall as shown in the detail.
5) The underdrain system should be designed to discharge at least 5 gallons per
minute of collected water.
6) The high point(s) for the collection pipe flow lines should be below the grade
beam or shallow foundation bearing elevation as shown on the detail. Multiple
high points can be beneficial to reducing the depths to which the system would
be installed.
The collection and discharge pipe for the underdrain system should be laid on a
slope sufficient for effective drainage, but a minimum of 1 percent.
Pipe gradients also should be designed to accommodate at least 1 inch of
differential movement after installation along a 40-foot run.
Gradients flatter than 1 percent may be used but will convey water less efficiently
and entail an increased risk of local post-construction movements. Steeper
gradients, e.g., 1½ percent, will make the system more tolerant of local,
differential settlements, possibly resulting in less frequent repairs.
7) Underdrain ‘clean-outs’ should be provided at intervals of no more than 100 feet
to facilitate maintenance of the underdrains. Clean-outs also should be provided
at collection and discharge pipe elbows of 60 degrees or more.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 29
8) The underdrain discharge pipes should be connected to one or more sumps from
which water can be removed by pumping, or to outlet(s) for gravity discharge.
We suggest that collected waters be discharged directly into the storm sewer
system, if possible.
PAVEMENT SECTIONS
A pavement section is a layered system designed to distribute concentrated traffic loads
to the subgrade. Performance of the pavement structure is directly related to the
physical properties of the subgrade soils and traffic loadings.
Standard practice in pavement design describes a typical flexible pavement section as a
“20-year” design pavement. However, most pavements will not remain in satisfactory
condition without routine maintenance and rehabilitation procedures performed
throughout the life of the pavement.
Subgrade Materials Based on the results of our field and laboratory studies, the
subgrade materials at the subject site consisted largely of silty sands, commonly with
gravel. These materials were classified largely as A-2-6 and A-7-5 soils in accordance
with the AASHTO classification system, with Group Index values of 0 to 3.
Resilient Modulus (MR) testing (AASHTO T-307) was performed on a representative
composite sample of the subgrade materials encountered at the site. For the sandy
materials typical of the proposed grades, a resilient modulus of 4,294 psi was obtained
at 2 percent above the optimum moisture content for use in development of the
pavement sections.
It is important to note that significant decreases in soil support as quantified by the
resilient modulus have been observed as the moisture content increases above the
optimum. Therefore, pavements that are not properly drained may experience a loss of
the soil support and subsequent reduction in pavement life.
Anticipated Traffic No project specific traffic loadings were available at the time of
preparation of this report. Therefore, for the small parking lot an EDLA of 4 was
assumed for the pavements. The EDLA value of 4 was converted to equivalent 18-kip
single-axle load (ESAL) values of 29,200, for a 20-year design life. An EDLA of 50,
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 30
corresponding to an ESAL value of 365,000, was assumed for trash collection zones
and other routes subject to heavier traffic including large trucks.
If design traffic loadings differ significantly from these assumed values, GROUND should
be notified to re-evaluate the pavement sections below.
Pavement Sections The soil resilient modulus and the anticipated ESAL values were
used to determine the required structural number for the project pavements. The
required structural number was then used to develop minimum, pavement sections for
the project. Pavement sections were based on the DARWin™ computer program that
solves the 1993 AASHTO pavement design equation. Pavement parameters and
calculations are summarized in Appendix A. A Reliability Level of 80 percent was
utilized develop the pavement sections. A structural coefficients of 0.40 and 0.12 were
used for hot bituminous asphalt and aggregate base course, respectively. The resultant
minimum pavement sections that should be placed at the site are tabulated below.
MINIMUM PAVEMENT SECTIONS
Location: Parking Lot Heavy Vehicles & High
Turning Stress
Full Depth Asphalt: 5½ in. AC -
Composite Section: 4 in. AC / 5 in. Ag. Base -
Concrete Section: (6 in. PCC / 6 in. Ag. Base)
6½ in. PCC / 6 in. Ag. Base
Heavy traffic areas/routes serving the facility such as the trash collection areas should
be provided with rigid pavements consisting of 6½ or more inches of portland cement
concrete underlain by 6 or more inches of properly compacted CDOT Class 6
Aggregate Base Course. (A mathematically equivalent composite flexible section for
these areas would be 5 inches of asphalt over 10 inches of aggregate base, but this
section will not perform as well as the concrete section where heavy vehicles are
parked, turn repeatedly, etc.)
Pavement Materials Asphalt pavement should consist of a bituminous plant mix
composed of a mixture of aggregate and bituminous material. Asphalt mixture(s) should
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 31
meet the requirements of a job-mix formula established by a qualified engineer as well
as applicable City of Littleton design requirements.
Aggregate base material should meet the criteria of CDOT Class 6 aggregate base
course. Base course should be placed in and compacted in accordance with the criteria
in the Project Earthwork section of this report.
Where rigid (concrete) pavements are placed, the concrete should consist of a plant mix
composed of a mixture of aggregate, portland cement and appropriate admixtures
meeting the requirements of a job-mix formula established by a qualified engineer as
well as applicable design requirements of the City of Littleton. Concrete should have a
minimum modulus of rupture of third point loading of 650 psi. Normally, concrete with a
28-day compressive strength of 4,500 psi should develop this modulus of rupture value.
The concrete should be air-entrained with approximately 6 percent air and should have a
minimum cement content of 6 sacks per cubic yard. Maximum allowable slump should
be 4 inches.
These concrete mix design criteria should be coordinated with other project
requirements including any criteria for sulfate resistance presented in the Water-Soluble
Sulfates section of this report. To reduce surficial spalling resulting from freeze-thaw
cycling, we suggest that pavement concrete meet the requirements of CDOT Class P
concrete. In addition, the use of de-icing salts on concrete pavements during the first
winter after construction will increase the likelihood of the development of scaling.
Placement of flatwork concrete during cold weather so that it is exposed to freeze-thaw
cycling before it is fully cured also increases its vulnerability to scaling. Concrete placing
during cold weather conditions should be blanketed or tented to allow full curing.
Depending on the weather conditions, this may result in 3 to 4 weeks of curing, or more.
Concrete pavements should contain sawed or formed joints. CDOT and various industry
groups provide guidelines for proper design and concrete construction and associated
jointing. In areas of repeated turning stresses, the concrete pavement joints should be
fully tied and doweled. Example layouts for joints, as well as ties and dowels, that may
be applicable can be found in CDOT’s M standards, found at the CDOT website:
http://www.dot.state.co.us/DesignSupport/. PCA, ACI and ACPA publications also
provide useful guidance in these regards.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 32
Subgrade Preparation Although subgrade preparation to a depth of 12 inches is typical
in the project area, pavement performance commonly can be improved by a greater
depth of moisture-density conditioning of the soils. Also, the contractor should be
prepared to prepare the subgrade as outlined herein even where elevated subgrade
moisture contents are encountered beneath the existing pavements.
Remedial Earthwork Based on CDOT guildlines, shortly before paving, the pavement
subgrade should be excavated and/or scarified to a depth of 12 inches or more,
moisture-conditioned and properly re-compacted. However, as noted in the Project
Earthwork section of this report, all existing, undocumented fill soils encountered in the
pavement subgrade should be excavated and replaced with properly compacted fill.
Because soils vulnerable to “collapse” underlay the site to significant depths, the extent
of earthwork indicated above will entail a greater than typical potential for pavement
distress at this project site. Greater than typical pavement maintenance is likely.
Greater depths of remedial earthwork beneath the pavement, e.g., 4 feet or to the full
depth of the shallow soils vulnerable to “collapse,” will improve flatwork performance.
We do not anticipate that excavation and replacement of the existing soils to depths of
21 feet or more will be feasible in all areas of the project. However, more detailed
geotechnical parameters can be provided in that regard, upon request.
Subgrade preparation should extend the full width of the pavement from back-of-curb to
back-of-curb. The subgrade for sidewalks and other project hardscaping also should be
prepared in the same manner.
Criteria and standards for fill placement and compaction are provided in the Project
Earthwork section of this report. The contractor should be prepared either to dry the
subgrade materials or moisten them, as needed, prior to compaction.
Where adequate drainage cannot be achieved or maintained, excavation and
replacement should be undertaken to a greater depth, in addition to the edge drains
discussed below.
Proof Rolling Immediately prior to paving, the subgrade should be proof rolled with a
heavily loaded, pneumatic tired vehicle. Areas that show excessive deflection during
proof rolling should be excavated and replaced and/or stabilized. Areas allowed to pond
prior to paving will require significant re-working prior to proof-rolling. Establishment of a
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 33
firm paving platform (as indicated by proof rolling) is an additional requirement beyond
proper fill placement and compaction. It is possible for soils to be compacted within the
limits indicated in the Project Earthwork section of this report and fail proof rolling,
particularly in the upper range of specified moisture contents.
Additional Considerations The collection and diversion of surface drainage away from
paved areas is extremely important to satisfactory performance of the pavements. The
subsurface and surface drainage systems should be carefully designed to ensure
removal of the water from paved areas and subgrade soils. Allowing surface waters to
pond on pavements will cause premature pavement deterioration. Where topography,
site constraints or other factors limit or preclude adequate surface drainage, pavements
should be provided with edge drains to reduce loss of subgrade support. The long-term
performance of the pavement also can be improved greatly by proper backfilling and
compaction behind curbs, gutters, and sidewalks so that ponding is not permitted and
water infiltration is reduced.
Landscape irrigation in planters adjacent to pavements and in “island” planters within
paved areas should be carefully controlled or differential heave and/or rutting of the
nearby pavements will result. Drip irrigation systems should be used for such planters to
reduce over-spray and water infiltration beyond the planters. Enclosing the soil in the
planters with plastic liners and providing them with positive drainage also will reduce
differential moisture increases in the surrounding subgrade soils.
In our experience, infiltration from planters adjacent to pavements is a principal source of
moisture increase beneath those pavements. This wetting of the subgrade soils from
infiltrating irrigation commonly leads to loss of subgrade support for the pavement with
resultant accelerating distress, loss of pavement life and increased maintenance costs.
This is particularly the case in the later stages of project construction after landscaping
has been emplaced but heavy construction traffic has not ended. Heavy vehicle traffic
over wetted subgrade commonly results in rutting and pushing of flexible pavements,
and cracking of rigid pavements. Where the subgrade soils are expansive, wetting also
typically results in increased pavement heave. In relatively flat areas where design
drainage gradients necessarily are small, subgrade settlement or heave can obstruct
proper drainage and yield increased infiltration, exaggerated distress, etc. (These
considerations apply to project flatwork, as well.)
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 34
Also, GROUND’s experience indicates that longitudinal cracking is common in asphalt-
pavements generally parallel to the interface between the asphalt and concrete
structures such as curbs, gutters or drain pans. This of this type is likely to occur even
where the subgrade has been prepared properly and the asphalt has been compacted
properly.
The anticipated traffic loadings do not include excess loading conditions imposed by
heavy construction vehicles. Consequently, heavily loaded concrete, lumber, and
building material trucks can have a detrimental effect on the pavement.
Most pavements will not remain in satisfactory condition without regular maintenance
and rehabilitation procedures performed throughout the life of the pavement.
Maintenance and rehabilitation measures preserve, rather than improve, the structural
capacity of the pavement structure. Therefore, an effective program of regular
maintenance should be developed and implemented to seal cracks, repair distressed
areas, and perform thin overlays throughout the lives of the pavements. The greatest
benefit of pavement overlaying will be achieved by overlaying sound pavements that
exhibit little or no distress.
Crack sealing should be performed at least annually and a fog seal/chip seal program
should be performed on the pavements every 3 to 4 years. After approximately 8 to 10
years after construction, patching, additional crack sealing, and asphalt overlay may be
required. Prior to overlays, it is important that all cracks be sealed with a flexible,
rubberized crack sealant in order to reduce the potential for propagation of the crack
through the overlay. If actual traffic loadings exceed the values used for development of
the pavement sections, however, pavement maintenance measures will be needed on
an accelerated schedule.
EXTERIOR FLATWORK
We anticipate that the exteriors of proposed buildings and other portions of the site will
be provided with concrete flatwork. Like other site improvements, flatwork will
experience post-construction settlements as soil moisture contents increase after
construction and distress likely will result. The following measures will help to reduce
damages to these improvements.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 35
The soils beneath project sidewalks, paved entryways and patios, masonry planters and
short, decorative walls, and other flatwork should be excavated and/or scarified to a
depth of 12 inches or more, moisture-conditioned and properly re-compacted.
However, as noted in the Project Earthwork section of this report, all existing,
undocumented fill soils encountered in the flatwork subgrade should be excavated and
replaced with properly compacted fill. Because soils vulnerable to “collapse” underlay the
site to significant depths, the extent of earthwork indicated above will entail a greater
than typical potential for hardscaping distress at this project site. Greater than typical
hardscape maintenance should be anticipated.
Greater depths of remedial earthwork beneath hardscaping, e.g., 4 feet or to the full
depth of the shallow soils vulnerable to “collapse,” will improve flatwork performance.
We do not anticipate that excavation and replacement of the existing soils to depths of
20 feet or more will be feasible in all areas of the project. However, more detailed
geotechnical parameters can be provided in that regard, upon request.
1) Prior to placement of flatwork, a proof roll should be performed to identify areas
that exhibit instability and deflection. The deleterious soils in these areas should
be removed and replaced with properly compacted fill. The contractor should
take care to achieve and maintain compaction behind curbs to reduce differential
sidewalk settlements. As in the case of pavements, passing a proof roll is an
additional requirement to placing and compacting the subgrade fill soils within the
specified ranges of moisture content and relative compaction in the Project
Earthwork section of this report. Subgrade stabilization may be cost-effective in
this regard.
2) Flatwork should be provided with control joints extending to an effective depth
and spaced no more than 10 feet apart, both ways. Narrow flatwork, such as
sidewalks, likely will require more closely spaced joints.
3) In no case should exterior flatwork extend to under any portion of the building
where there is less than 2 inches of vertical clearance between the flatwork and
any element of the building. Exterior flatwork in contact with brick, rock facades,
or any other element of the building can cause damage to the structure if the
flatwork experiences movements.
Construction and Drainage Between Buildings and Pavements Proper design,
drainage, construction and maintenance of the areas between individual buildings and
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 36
parking/driveway areas are critical to the satisfactory performance of the project.
Sidewalks, entranceway slabs and roofs, fountains, raised planters and other highly
visible improvements commonly are installed within these zones, and distress in or near
these improvements is common. Commonly, proper soil preparation in these areas
receives little attention during overlot construction because they fall between the building
and pavement areas which typically are built with heavy equipment. Subsequent
landscaping and hardscape installation often is performed by multiple sub-contractors
with light or hand equipment, and necessary over-excavation and soil processing is not
performed. Consequently, subgrade soil conditions commonly deviate significantly from
specified ranges. Therefore, the contractor should take particular care with regard to
proper subgrade preparation in the immediate building exteriors.
Frost and Ice Considerations Nearly all soils other than relatively coarse, clean,
granular materials are susceptible to loss of density if allowed to become saturated and
exposed to freezing temperatures and repeated freeze – thaw cycling. The formation of
ice in the underlying soils can result in heaving of pavements, flatwork and other
hardscaping (“ice jacking”) in sustained cold weather of 2 inches or more. This heaving
can develop relatively rapidly. A portion of this movement typically is recovered when
the soils thaw, but due to loss of soil density some degree of displacement typically will
remain. This can result even where the subgrade soils were prepared properly.
Where hardscape movements are a design concern, e.g., at doorways, replacement of
the subgrade soils with 3 or more feet of clean, coarse sand or gravel with a drain should
be considered, or the element supported on foundations similar to the building and
spanning over a void. Detailed parameters and discussion in this regard can be
provided upon request. It should be noted that where such open graded granular soils
are placed, water can infiltrate and accumulate in the subsurface relatively easily, which
can lead to increased settlement or heave from factors unrelated to ice formation. The
relative risks from these soil conditions should be taken into consideration where ice
jacking is a concern. GROUND will be available to discuss this upon request.
Concrete Scaling Surface scaling of sidewalks and other exterior concrete can result
from poor workmanship during construction, such as ‘over-finishing’ the surface. It also
can result from exposure to relatively severe weather conditions with repeated freeze-
thaw cycles. In GROUND’s experience, if reducing the potential for freeze-thaw scaling
is a design consideration, the following measures are beneficial: a) maintaining a
maximum water/cement ratio of 0.45 by weight for exterior concrete, b) including Type F
fly ash in the mix for exterior concrete as 20 percent of the cementitious material, and c)
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 37
use of exterior concrete that exhibits a minimum compressive strength of 4,500 psi.
Inclusion of ‘fibermesh’ in the concrete mix also may be beneficial for reducing surficial
scaling. (These concrete mix design criteria should be coordinated with other project
requirements including the criteria for sulfate resistance presented in the Water-Soluble
Sulfates section of this report.) In addition, the use of de-icing salts on exterior concrete
flatwork during the first winter after construction will increase the likelihood of the
development of scaling. Placement of flatwork concrete during cold weather so that it is
exposed to freeze-thaw cycling before it is fully cured also increases its vulnerability to
scaling. Concrete placing during cold weather conditions should be blanketed or tented
to allow full curing. Depending on the weather conditions, this may result in 3 to 4 weeks
of curing, and possibly more.
CLOSURE
Geotechnical Review The author of this report should be retained to review project
plans and specifications to evaluate whether they comply with the intent of the measures
discussed in this report. The review should be requested in writing.
The geotechnical conclusions and parameters presented in this report are contingent
upon observation and testing of project earthworks by representatives of GROUND. If
another geotechnical consultant is selected to provide materials testing, then that
consultant must assume all responsibility for the geotechnical aspects of the project by
concurring in writing with the parameters in this report, or by providing alternative
parameters.
Materials Testing The client should consider retaining a geotechnical engineer to
perform materials testing during construction. The performance of such testing or lack
thereof, however, in no way alleviates the burden of the contractor or subcontractor from
constructing in a manner that conforms to applicable project documents and industry
standards. The contractor or pertinent subcontractor is ultimately responsible for
managing the quality of his work; furthermore, testing by the geotechnical engineer does
not preclude the contractor from obtaining or providing whatever services that he deems
necessary to complete the project in accordance with applicable documents.
Limitations This report has been prepared for the client as it pertains to design and
construction of the proposed building and related improvements as described herein. It
may not contain sufficient information for other parties or other purposes.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 38
In addition, GROUND has assumed that project construction will commence by Summer,
2015. Any changes in project plans or schedule should be brought to the attention of a
geotechnical engineer, in order that the geotechnical conclusions in this report may be
re-evaluated and, as necessary, modified.
The geotechnical conclusions and criteria in this report relied upon subsurface
exploration at a limited number of exploration points, as shown in Figure 1, as well as
the means and methods described herein. Subsurface conditions were interpolated
between and extrapolated beyond these locations. It is not possible to guarantee the
subsurface conditions are as indicated in this report. Actual conditions exposed during
construction may differ from those encountered during site exploration.
If during construction, surface, soil, bedrock, or groundwater conditions appear to be at
variance with those described herein, a geotechnical engineer should be retained at
once, so that re-evaluation of the conclusions for this site may be made in a timely
manner. In addition, a contractor who relies upon this report for development of his
scope of work or cost estimates may find the geotechnical information in this report to be
inadequate for his purposes or find the geotechnical conditions described herein to be at
variance with his experience in the greater project area. The contractor is responsible
for obtaining the additional geotechnical information that is necessary to develop his
workscope and cost estimates with sufficient precision. This includes current depths to
groundwater, etc.
ALL DEVELOPMENT CONTAINS INHERENT RISKS. It is important that ALL aspects
of this report, as well as the estimated performance (and limitations with any such
estimations) of proposed improvements are understood by the client. Utilizing these
criteria and measures herein for planning, design, and/or construction constitutes
understanding and acceptance of the conclusions with regard to risk and other
information provided herein, associated improvement performance, as well as the
limitations inherent within such estimates.
If any information referred to herein is not well understood, then the client or anyone
using this report, should contact the author or a GROUND principal immediately. We will
be available to meet to discuss the risks and remedial approaches presented in this
report, as well as other potential approaches, upon request.
Proposed Preschool 8361 South Park Lane
Littleton, Colorado
Job No. 14-3083 GROUND Engineering Consultants, Inc. Page 39
This report was prepared in accordance with generally accepted soil and foundation
engineering practice in the Douglas County, Colorado, area at the date of preparation.
Current applicable codes may contain criteria regarding performance of structures
and/or site improvements which may differ from those provided herein. Our office should
be contacted regarding any apparent disparity. GROUND makes no warranties, either
expressed or implied, as to the professional data, opinions or conclusions contained
herein.
This document, together with the concepts and conclusions presented herein, as an
instrument of service, is intended only for the specific purpose and client for which it was
prepared. Reuse of or improper reliance on this document without written authorization
and adaption by GROUND Engineering Consultants, Inc., shall be without liability to
GROUND Engineering Consultants, Inc.
GROUND appreciates the opportunity to complete this portion of the project and
welcomes the opportunity to provide the client with a proposal for construction
observation and materials testing prior to construction commencement.
Sincerely,
GROUND Engineering Consultants, Inc. Brian H. Reck, P.G., C.E.G., P.E. Reviewed by James B. Kowalsky, P.E.
Sam
ple
of:
Sand
y C
LAY
GR
AD
ATI
ON
TE
ST
RE
SU
LTS
JOB
NO
.: 14
-308
3FI
GU
RE
: 4
69%
From
: B-2
at 1
0 fe
etLi
quid
Lim
it38
Plas
ticity
Inde
x21
Gra
vel
0%Sa
nd31
%Si
lt an
d C
lay
3"2"
1.5"
1"3/
4"1/
2"3/
8"#4
#10
#16
#40
#50
#100
#200
0102030405060708090100
0.00
10.
010.
11
1010
0
PERCENT PASSING
DIA
ME
TE
R O
F P
AR
TIC
LE
IN
MIL
LIM
ET
ER
S
SIE
VE
AN
ALY
SIS
: AS
TM C
136
with
C 1
17 o
r D 1
140
Sie
ve O
peni
ngs:
U.S
Sta
ndar
d S
ieve
sH
YD
RO
ME
TER
AN
ALY
SIS
: AS
TM D
422
Tim
ed R
eadi
ngs
COBBLE
GRA
VEL
Coarse
Fine
SAND
Coarse
Med
ium
SILT
CLAY
Fine
Sa
mp
le L
oc
ati
on
Na
tura
lN
atu
ral
Pa
ss
ing
Att
erb
erg
Lim
its
Sw
ell
- C
on
so
lid
ati
on
Un
co
nf.
US
CS
Te
st
Mo
istu
reD
ryN
o.
20
0L
iqu
idP
las
tic
ity
Sw
ell
or
Co
mp
res
s.
Cla
ss
ifi-
So
il o
rH
ole
De
pth
Co
nte
nt
De
ns
ity
Gra
vel
Sa
nd
Sie
veL
imit
Ind
ex
Co
ns
ol.
*S
urc
ha
rge
Str
en
gth
ca
tio
nB
ed
roc
k T
ype
No
.(f
eet)
(%)
(pcf
)(%
)(%
)(%
)(%
)(%
)(%
)(p
sf)
(psf
)
B-1
315
.5 -
5648
21C
LFi
ll: S
andy
CLA
Y
B-1
814
.511
0.1
4441
18-1
.71,
000
SC
Cla
yey
SA
ND
B-1
1814
.011
5.0
5740
19-1
.02,
200
CL
San
dy C
LAY
B-2
1017
.011
4.5
031
6938
21-1
.01,
200
CL
San
dy C
LAY
B-2
4019
.510
6.7
4731
10S
C
C
laye
y S
AN
D
B-3
314
.010
7.3
6147
19-1
.52,
000
ML
San
dy S
ILT
B-3
1317
.510
5.1
4641
14S
M
S
ilty
SA
ND
P-2
34.
111
6.9
1831
13S
CFi
ll: C
laye
y S
AN
D
Com
posi
te56
4018
M
R =
4,2
94 p
siC
L
S
andy
CLA
Y
* Neg
ativ
e va
lues
indi
cate
con
solid
atio
n.Jo
b N
o. 1
4-30
83
Gra
da
tio
nSU
MM
AR
Y
OF
L
AB
OR
AT
OR
Y
TE
ST
R
ES
UL
TS
TA
BL
E
1
Sam
ple
Lo
cati
on
Wat
er-
Tes
tS
olu
ble
Red
ox
Su
lfid
eS
oil
or
Ho
leD
epth
Su
lfat
esR
esis
itiv
ity
pH
Po
ten
tial
Rea
ctiv
ity
Bed
rock
Typ
eN
o.
(fee
t)(%
)(o
hm
-cm
)(m
V)
15
0.01
4,91
17.
9-8
4N
egat
ive
San
dy L
ean
CLA
Y
Job
No.
14-
3083
SU
MM
AR
Y
OF
L
AB
OR
AT
OR
Y
TE
ST
R
ES
UL
TS
, CO
NT
INU
ED
TA
BL
E
2
APPENDIX A
Pavement Section Calculations
Page 1
1993 AASHTO Pavement Design
DARWin Pavement Design and Analysis System
A Proprietary AASHTOWareComputer Software Product
Network Administrator
Flexible Structural Design Module
Job No. 14-3083Parking Lot
Asphalt Section
Flexible Structural Design
18-kip ESALs Over Initial Performance Period 29,200 Initial Serviceability 4.5 Terminal Serviceability 2 Reliability Level 80 %Overall Standard Deviation 0.44 Roadbed Soil Resilient Modulus 4,294 psiStage Construction 1
Calculated Design Structural Number 2.17 in
Specified Layer Design
Layer
Material Description
StructCoef.(Ai)
DrainCoef.(Mi)
Thickness(Di)(in)
Width
(ft)
Calculated
SN (in)1 Asphalt 0.4 1 5.5 - 2.20
Total - - - 5.50 - 2.20
Page 1
1993 AASHTO Pavement Design
DARWin Pavement Design and Analysis System
A Proprietary AASHTOWareComputer Software Product
Network Administrator
Flexible Structural Design Module
Job No. 14-3083Parking Lot
Composite Section
Flexible Structural Design
18-kip ESALs Over Initial Performance Period 29,200 Initial Serviceability 4.5 Terminal Serviceability 2 Reliability Level 80 %Overall Standard Deviation 0.44 Roadbed Soil Resilient Modulus 4,294 psiStage Construction 1
Calculated Design Structural Number 2.17 in
Specified Layer Design
Layer
Material Description
StructCoef.(Ai)
DrainCoef.(Mi)
Thickness(Di)(in)
Width
(ft)
Calculated
SN (in)1 Asphalt 0.4 1 4 - 1.602 Aggregate Base 0.12 1 5 - 0.60
Total - - - 9.00 - 2.20
Page 1
1993 AASHTO Pavement Design
DARWin Pavement Design and Analysis System
A Proprietary AASHTOWareComputer Software Product
Network Administrator
Rigid Structural Design Module
Job No. 14-3083Concrete Pavements
Rigid Structural Design
Pavement Type JPCP 18-kip ESALs Over Initial Performance Period 365,000 Initial Serviceability 4.5 Terminal Serviceability 2 28-day Mean PCC Modulus of Rupture 650 psi28-day Mean Elastic Modulus of Slab 3,400,000 psiMean Effective k-value 16 psi/inReliability Level 80 %Overall Standard Deviation 0.34 Load Transfer Coefficient, J 3.6 Overall Drainage Coefficient, Cd 1
Calculated Design Thickness 6.36 in