substructure technology of offshore wind farm
TRANSCRIPT
![Page 1: Substructure Technology of Offshore Wind Farm](https://reader030.vdocuments.us/reader030/viewer/2022012609/619c82d36b64365ad75c26b0/html5/thumbnails/1.jpg)
Substructure Technology of Offshore Wind FarmAt the center of the energy transformation…
![Page 2: Substructure Technology of Offshore Wind Farm](https://reader030.vdocuments.us/reader030/viewer/2022012609/619c82d36b64365ad75c26b0/html5/thumbnails/2.jpg)
Ship RepairingConversion
Tubular Special Ship
Business Line
「SAMKANG M&T」
「SAMKANG S&C」
2
On-OffshorePlant
On-OffshorePlant
![Page 3: Substructure Technology of Offshore Wind Farm](https://reader030.vdocuments.us/reader030/viewer/2022012609/619c82d36b64365ad75c26b0/html5/thumbnails/3.jpg)
63
2020.05 First fabricator exporting Jacket type Foundation for OWF in Korea
2017.12 Designated as Defense Industry Company• Contracted 1,500 ton Maritime Police Patrol Ship
2017.11 Acquired STX Goseong Offshore & Shipbuilding (Re-named Samkang S&C)
2016.12 Gold Tower Order of Industrial Service Merit awarded to Chairman Mr. MS Song on Korean 53rd Trade Day
2014.08 Opened Technical Training & Education Center
2008.08 Changed Company Name to Sam Kang M&TAnd Listed on the KOSDAQ
2000.11 Became Korea’s first fabricator successfully producing Heavy Wall Thickness Pipe
1999.08 Established Sam Kang Industries in Miryang
Corporate History
![Page 4: Substructure Technology of Offshore Wind Farm](https://reader030.vdocuments.us/reader030/viewer/2022012609/619c82d36b64365ad75c26b0/html5/thumbnails/4.jpg)
64
Technical Strength Points
1. Advanced workforce with extensive experience in offshore oil & gas field- IWE, QM, HSE, Supervisor, PM, Scheduler, Welder, Painter
3. Large workspace for serial production- Total 1 Million Square Meter
2. Lifting capacity- Various Goliath cranes (900T, 800T, 350T, 300T etc.)
4. Water depth at quayside- Ave. 12m
5. Painting capacity (4 Blasting & 11 Painting Shop)- Blasting shop : 50m x 35m x 18.5m (1)
50m x 50m x 17m (1)30m x 45m x 17m (1)25m x 35m x 18.5m (1)
- Painting shop : 75m x 35m x 18.5m (3)50m x 50m x 17m (5)40m x 35m x 17m (3)
![Page 5: Substructure Technology of Offshore Wind Farm](https://reader030.vdocuments.us/reader030/viewer/2022012609/619c82d36b64365ad75c26b0/html5/thumbnails/5.jpg)
5
Summary of OWF Track RecordsSer.No. Project Name Client Description
(W1 x W2 x H) Weight (MT) Duration Remarks
1 Jeju, Kimnyoung KHNP (Doosan), Korea 4 Leg Jacket: 11m x 11m x 37m3 Leg Jacket: 17m x 17m x 38m 727 May. 2020 – Jun. 2011
2 TPC, Changhua TCP (Jan De Nul), Taiwan 20m x 20m x 58.6m21 Jackets 16,800 Jan. 2019 – Apr. 2020
3 Changfang & Xidao CIP (Bladt), TaiwanUpper Jacket: 25m x 25m x 31mLower Jacket: 31m x 31m x 32m
8 Jackets & 46 Upper Jackets28,764 Aug. 2020 – Oct. 2022
4 Greater Changhua 01/02a Orsted, Taiwan 32.2m x 32.2 x 80.6m62 Jackets 73,259 Jun. 2019 – Dec. 2021
5 Greater Changhua Orsted (KFELS), Taiwan 31m x 31m x 68m2 Jackets 8,440 Jul. 2020 – May. 2021
6 Kunsan, Turbine Demo Penta-pod foundation
Kunsan Industry University Cooperation, Korea
Foundation of Turbine: 33m x 33m x 60m(Suction Bucket: OD9m x L7m – 5ea)
Foundation of Lidar: 21m x 21m x 48m(Suction Bucket: OD6m x L6m – 3ea)
1,300 Nov. 2020 – May. 2021
7Jeju, Development of floating offshore wind power system
(National Assignment)
Ministry of Trade, Industry and Energy
Floating Foundation (Under the Engineering) 3,500 Jan. 2023 – Feb. 2024
Consortium(IAE, KOEN, DOOSAN,
SAMKANG,etc)
![Page 6: Substructure Technology of Offshore Wind Farm](https://reader030.vdocuments.us/reader030/viewer/2022012609/619c82d36b64365ad75c26b0/html5/thumbnails/6.jpg)
6
Project Track RecordsTaiwan, TPC Changhua Offshore Wind Farm Phase-1
Developer Taiwan Power Company(TPC)
Contractor Jan De Nul
Period 2019. 7 ~ 2020. 5
Field West Changhua Country in Taiwan(109.2MW)
Scope of Work 21 Jackets included TP (16,562MT)
![Page 7: Substructure Technology of Offshore Wind Farm](https://reader030.vdocuments.us/reader030/viewer/2022012609/619c82d36b64365ad75c26b0/html5/thumbnails/7.jpg)
7
Project Track RecordsTaiwan, Changfang Xidao Offshore Wind Farm
Developer CIP (Copenhagen Infrastructure Partners)
Contractor BLADT (Denmark)
Period 2020. 06 ~ 2021. 05 (8 Jackets)2021. 04 ~ 2022. 10 (46 Upper Jackets)
Field West Changfang Xidao in Taiwan (650MW)
Scope of Work • 8 Jackets included TP• 46 Upper Jackets
![Page 8: Substructure Technology of Offshore Wind Farm](https://reader030.vdocuments.us/reader030/viewer/2022012609/619c82d36b64365ad75c26b0/html5/thumbnails/8.jpg)
8
Taiwan, Greater Changhua Offshore Wind Farm (Total 900MW)
Project Track Records
Developer Orsted
Period 2019. 12 ~ 2021. 12
Field West Changhua Country in Taiwan (900MW)
Scope of Work 28 Jackets included TP + α (Upscoping)
![Page 9: Substructure Technology of Offshore Wind Farm](https://reader030.vdocuments.us/reader030/viewer/2022012609/619c82d36b64365ad75c26b0/html5/thumbnails/9.jpg)
9
Taiwan, Greater Changhua OSS Jacket and Pile
Project Track Records
Developer Orsted
Contractor Keppel FELS (Singapore)
Period 2020. 1 ~ 2021. 5
Field West Changhua Country in Taiwan(900MW)
Scope of Work OSS Jacket 2 sets (8,440MT) and 16 Skirt Piles (8,235MT) fabrication
![Page 10: Substructure Technology of Offshore Wind Farm](https://reader030.vdocuments.us/reader030/viewer/2022012609/619c82d36b64365ad75c26b0/html5/thumbnails/10.jpg)
10
Taiwan, Greater Changhua OSS Jacket and Pile
Project Track Records
Developer Kunsan Industry University Cooperation, Korea
Contractor Kunsan Industry University Cooperation, Korea
Period 2020. 11 ~ 2021. 5
Field West off the coast of Kunsan, Korea (5.2MW)
Scope of Work
Foundation of Turbine: 33m x 33m x 60m(Suction Bucket: OD9m x L7m – 5ea)
Foundation of Lidar: 21m x 21m x 48m(Suction Bucket: OD6m x L6m – 3ea)
![Page 11: Substructure Technology of Offshore Wind Farm](https://reader030.vdocuments.us/reader030/viewer/2022012609/619c82d36b64365ad75c26b0/html5/thumbnails/11.jpg)
11
Major plan
Key comprehensive Supplier for OWF
Preemptive response to future growth in OWF foundation
demand
Top priority HSE system and sustainable HSE
improvement activities
Responsible supply of OWF foundation in APAC region
![Page 12: Substructure Technology of Offshore Wind Farm](https://reader030.vdocuments.us/reader030/viewer/2022012609/619c82d36b64365ad75c26b0/html5/thumbnails/12.jpg)
Ms. Yumi Ko / [email protected]. Sundai Kim / [email protected]
Individually, we are one drop.Together, we are an ocean.