subsea - page 12

Upload: lulalala8888

Post on 02-Jun-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/11/2019 subsea - page 12

    1/12

    SubseaBOP Stack

    Arrangements

  • 8/11/2019 subsea - page 12

    2/12

    Subsea Engineer s Handbook Section 12

    In-Spec Inc. 1999 Subsea BOP Stack Arrangement

    Table Of ContentsSection 12

    Page

    1. Subsea BOP Stack Arrangement - A 1

    2. Subsea BOP Stack Arrangement - B 2

    3. Subsea BOP Stack Arrangement - C 3

    4. Subsea BOP Stack Arrangement - D 4

    5. Subsea BOP Stack Arrangement - E 56. Subsea BOP Stack Arrangement - F 6

    7. Subsea BOP Stack Arrangement - G 7

    8. Subsea BOP Stack Arrangement - H 8

    9. NTL No. 99-G09 MMS Letter to Lessees 5/10/99 9

  • 8/11/2019 subsea - page 12

    3/12

    Subsea Engineer s Handbook Section 12

    In-Spec Inc. 1999 1 Subsea BOP Stack Arrang ement

    1) Subsea BOP Stack - Arrangement A

    UpperAnnular

    Connector

    LowerAnnular

    Connector

    Blind Shear

    Upper PipeRam (UPR)

    Middle PipeRam (MPR)

    Lower PipeRam (LPR)

    LIK LOK

    UOC UIC

    LOC LIC

    Features

    1. Can hang off on 2 piperams circulating normally.

    2. Can hang off all pipe ramswith shear ram closed.

    3. No outlet below lower ram.4. Two routes to circulate kick

    with pipe rams closed.

  • 8/11/2019 subsea - page 12

    4/12

    Subsea Engineer s Handbook Section 12

    In-Spec Inc. 1999 2 Subsea BOP Stack Arrang ement

    2) Subsea BOP Stack - Arrangement B

    UpperAnnular

    Connector

    LowerAnnular

    Blind Shear

    Upper PipeRam (UPR)

    Middle PipeRam (MPR)

    Lower PipeRam (LPR)

    Connector

    LIK LOK

    UOC UIC

    LOC LIC

    Features1. Can hang off all pipe rams.2. Can hang off on 2 pipe

    rams with shear ramclosed.

    3. Two routes to circulate kickwith pipe rams closed.

  • 8/11/2019 subsea - page 12

    5/12

    Subsea Engineer s Handbook Section 12

    In-Spec Inc. 1999 3 Subsea BOP Stack Arrang ement

    3) Subsea BOP Stack - Arrangement C

    Features

    1. Can hang off all pipe ramscirculating normally.

    2. Can hang off on 3 piperams with shear ramclosed.

    Upper

    Annular

    Connector

    LowerAnnular

    Blind Shear

    Upper PipeRam (UPR)

    Middle PipeRam (MPR)

    Lower PipeRam (LPR)

    Connector

    LIK LOK

    UOC UIC

    LOC LIC

  • 8/11/2019 subsea - page 12

    6/12

    Subsea Engineer s Handbook Section 12

    In-Spec Inc. 1999 4 Subsea BOP Stack Arrang ement

    4) Subsea BOP Stack - Arrangement D

    UpperAnnular

    Connector

    LowerAnnular

    Blind Shear

    Upper PipeRam (UPR)

    Middle PipeRam (MPR)

    Lower PipeRam (LPR)

    Connector

    LIK LOK

    UOC UIC

    LOC LIC

    Features

    1. Can hang off 2 pipe ramscirculating normally.

    2. Can hang off on 1 piperams with shear ramclosed.

    3. One route to circulate kickwith pipe rams closed.

    4. No outlet under lower pipe

    ram.

  • 8/11/2019 subsea - page 12

    7/12

    Subsea Engineer s Handbook Section 12

    In-Spec Inc. 1999 5 Subsea BOP Stack Arrang ement

    5) Subsea BOP Stack - Arrangement E

    UpperAnnular

    Connector

    LowerAnnular

    Blind Shear

    Upper PipeRam

    Middle PipeRam (MPR)

    Lower PipeRam (LPR)

    Connector

    LIK LOK

    UOC UIC

    LOC LIC

    Features

    1. Can hang off all pipe ramscirculating normally.

    2. Can hang off on 2 piperams with shear ramclosed.

  • 8/11/2019 subsea - page 12

    8/12

    Subsea Engineer s Handbook Section 12

    In-Spec Inc. 1999 6 Subsea BOP Stack Arrang ement

    6) Subsea BOP Stack - Arrangement F

    Features

    1. Can hang off all pipe ramscirculating normally.

    2. Can hang off on 3 piperams with shear ramclosed.

    UpperAnnular

    Connector

    LowerAnnular

    Blind Shear

    Upper PipeRam (UPR)

    Middle PipeRam (MPR)

    Lower PipeRam (LPR)

    Connector

    LIK LOK

    UOC UIC

    LOC LIC

    UOK UIK

  • 8/11/2019 subsea - page 12

    9/12

    Subsea Engineer s Handbook Section 12

    In-Spec Inc. 1999 7 Subsea BOP Stack Arrang ement

    7) Subsea BOP Stack - Arrangement G

    UpperAnnular

    Connector

    LowerAnnular

    Blind Shear

    Upper PipeRam (UPR)

    Middle PipeRam (MPR)

    Lower PipeRam (LPR)

    Connector

    LIK LOK

    UOC UIC

    LOC LIC

    Features

    1. Upper and Lower Annularis on the LMRP.

  • 8/11/2019 subsea - page 12

    10/12

    Subsea Engineer s Handbook Section 12

    In-Spec Inc. 1999 8 Subsea BOP Stack Arrang ement

    8) Subsea BOP Stack - Arrangement H

    UpperAnnular

    Connector

    LowerAnnular

    Blind Shear

    Upper PipeRam (UPR)

    Middle PipeRam (MPR)

    Lower PipeRam (LPR)

    Connector

    LIK LOK

    UIK UOK

    C/K Isolation

    C/K Isolation

    UOC UIC

    LOC LIC

    Features

    1. Upper Inner and Outer KillValves below the Upper

    Annular.2. C/K Isolation Valves are on

    the LMRP package. Note:these valves are normallyopen.

  • 8/11/2019 subsea - page 12

    11/12

    Subsea Engineer s Handbook Section 12

    In-Spec Inc. 1999 9 Subsea BOP Stack Arrang ement

    UNITED STATES DEPARTMENT OF THE INTERIORMINERALS MANAGEMENT SERVICE

    GULF OF MEXICO OCS REGION

    NTL No. 99-G09 Effective Date: May 10, 1999

    NOTICE TO LESSEES AND OPERATORS OF FEDERAL OIL, GAS, AND SULPHURLEASES IN THE OUTER CONTINENTAL SHELF, GULF OF MEXICO OCS REGION

    Location of Choke and Kill Lines on BOP Stacks

    This Notice to Lessees and Operators (NTL) supersedes the Letter to Lessees andOperators, dated November 17, 1994, on this subject. It updates regulatory citationsand includes a statement on the Paperwork Reduction Act of 1995.

    The purpose of this NTL is to specify the location of the choke and kill lines servingblowout preventer (BOP) stacks. This is necessary because the requirements at 30CFR 250.406 (oil and gas drilling operations), 250.515 (oil and gas well-completionoperations), 250.615 (oil and gas well-workover operations), 250.1610 (sulphur drillingoperations), and 250.1624 (sulphur well-completion and well-workover operations) donot specify their exact location.

    Operators usually install the choke and kill lines above the bottommost ram. However,some operators have requested to install them below the bottommost ram. For chokelines, this is not acceptable. Failure of a choke line installed below the bottommost ramcould result in a blowout because this configuration does not provide a backup systemfor proper well control.

    Therefore, the Gulf of Mexico OCS Region District Offices will not approve anApplication for Permit to Drill (APD) or a Sundry Notice and Report (Sundry) to conductwell-workover operations that indicates a BOP stack with a choke line installed belowthe bottommost ram. However, they may approve your requests to install a kill linebelow the bottommost ram. You must include a schematic drawing of the BOP stack

    and choke and kill lines with any APD or well-workover Sundry if the tree is to beremoved.

    Paperwork Reduction Act of 1995 Statement

    This NTL refers to the collection of information on forms MMS-123 and MMS-124. TheOffice of Management and Budget (OMB) has approved the information collectionrequirements for these forms and assigned OMB Control Nos. 1010-0044 and 1010-

  • 8/11/2019 subsea - page 12

    12/12

    Subsea Engineer s Handbook Section 12

    In-Spec Inc. 1999 10 Subsea BOP Stack Arrang ement

    0045, respectively. This NTL does not impose additional information collectionrequirements subject to the Paperwork Reduction Act of 1995.

    Contact

    If you have any questions on this NTL, you may contact Mr. Bill Martin at (504) 736-2849.

    Chris C. Oynes

    Regional Director