submission of report on school-based management (sbm)
DESCRIPTION
reportTRANSCRIPT
Republic of the PhilipPinesDEPARTMENT OF EDUCATION
RDGION Iv-A CATABARZONGate 2, Karanga.lan Village, Cainta Rizal
Email; deped ro4alnvahoo corn Fa'\: (0216A2-2114
MEMORA.NDUM
Fmm
To THE SCHOOLS DIVISION SUPERI
-1 A n/'-''l A'n) U W\r,ftrnu,l otc ulo. cEso rv
D'lr""to, IIIOfficerJn-Char ge
Olfice of the Regional Ditector
Subject : SUBMISSION OF REPORT ON SCHOOL-BASED
MANAGEMBNT (SBI{) LEVELS OF PR.A'CTICE OF
BOTH ELEMENTARY AND SECONDARY SCHOOLS AS
OF MARCH 2012
' March 20' 2012 'Date
To determine the curent status ofthe schools in SBM which serves as a sound basis for
the establishment of a plan of action to address certain gaps or challenges' please submit a repod
on SBM levels of practice of both elementaly and secondary schools as of- March 2012' Said
report must be submitted on or before March 30, 2012 through email at
elinentan elivisiouirutqbqg.glll Altached is the scoring template of SBM Level of Practice by
School.
Validation of said report will be conducted by this Office to sample schools in your
division.
, .)l1a !tL
J o!.Pt! nlot d'r
,r5'6
Immediate dissemination ofthis Memorandun is eamestly desired'
SCORING TEMPLATE OF SBM LEVEL OF PRACTICE BY SCHOOLsY 2ol1 2012 | As of March 2012)
, DtvtsloN :
schoolName SchoolIt)
LEVEL OF PRACTICE
Level 1
SBM DIMENSION TotalScore
% SBM DIMENSION TotalScore
SBM DIMENSION TotalScore
%
7 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
Prepared by:
SBM Coordinator
Noted by :
SDS