submission doc.: ieee 11-14/0050r0 january 2014 donald eastlake, huaweislide 1 may 2014 ad hoc...

7
Submission doc.: IEEE 11-14/0050r0 January 2014 Donald Eastlake, Huawei Slide 1 May 2014 Ad Hoc Meeting Proposal Date: 2014-01-15 Authors:

Upload: nathaniel-sullivan

Post on 18-Jan-2016

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Submission doc.: IEEE 11-14/0050r0 January 2014 Donald Eastlake, HuaweiSlide 1 May 2014 Ad Hoc Meeting Proposal Date: 2014-01-15 Authors:

Submission

doc.: IEEE 11-14/0050r0January 2014

Donald Eastlake, HuaweiSlide 1

May 2014 Ad Hoc Meeting ProposalDate: 2014-01-15

Authors:

Page 2: Submission doc.: IEEE 11-14/0050r0 January 2014 Donald Eastlake, HuaweiSlide 1 May 2014 Ad Hoc Meeting Proposal Date: 2014-01-15 Authors:

Submission

doc.: IEEE 11-14/0050r0January 2014

Donald Eastlake, HuaweiSlide 2

Abstract

Proposal for a Ad Hoc meeting in Kauai at the end of the week before the 802.11 WG meeting in Waikoloa. The proposed facility has hosted three previous IEEE 802 TG / WG meetings.

Page 3: Submission doc.: IEEE 11-14/0050r0 January 2014 Donald Eastlake, HuaweiSlide 1 May 2014 Ad Hoc Meeting Proposal Date: 2014-01-15 Authors:

Submission

doc.: IEEE 11-14/0050r0

Kaua‘i Beach Resort, Hawai‘i

4331 Kauai Beach DriveLihue, HI 96766 USA

January 2014

Donald Eastlake, HuaweiSlide 3

Page 4: Submission doc.: IEEE 11-14/0050r0 January 2014 Donald Eastlake, HuaweiSlide 1 May 2014 Ad Hoc Meeting Proposal Date: 2014-01-15 Authors:

Submission

doc.: IEEE 11-14/0050r0

Site of 3 Previous Meetings

• 12-14 September 2007:• co-located 802.11 TGr & TGs Ad Hocs

• 3-5 September 2008:• co-located 802.11 TGn, TGs, & TGu Ad Hocs

• 10-13 January 2011:• 802.1 Interim Working Group Meeting

Slide 4 Donald Eastlake, Huawei

January 2014

Page 5: Submission doc.: IEEE 11-14/0050r0 January 2014 Donald Eastlake, HuaweiSlide 1 May 2014 Ad Hoc Meeting Proposal Date: 2014-01-15 Authors:

Submission

doc.: IEEE 11-14/0050r0

Basic Data

• Kaua‘i Beach Resort, Lihu‘e, Hawai‘i• Suggested Dates:

• Wednesday-Friday, 7-9 May 2014• 802.11 WG meeting will be in Waikoloa 11-6 May

• Room Rate (excluding tax)• $139/night

• Registration assuming 3 days, includes lunch:• Early Bird $225 through 28 February 2014

• Regular $275 through 28 March 2014

• After that and at the Door $375

Slide 5 Donald Eastlake, Huawei

January 2014

Page 6: Submission doc.: IEEE 11-14/0050r0 January 2014 Donald Eastlake, HuaweiSlide 1 May 2014 Ad Hoc Meeting Proposal Date: 2014-01-15 Authors:

Submission

doc.: IEEE 11-14/0050r0

More Details• Room rates:• Expected to apply from 4 days before to 4 days after

meeting and include breakfast• One night deposit when reserving, refunded if

cancelled 72 hours or more in advance of arrival

• Free shuttle from airport• http://www.wizardpub.com/kauai/krkauaibeach.html

Slide 6 Donald Eastlake, Huawei

January 2014

Page 7: Submission doc.: IEEE 11-14/0050r0 January 2014 Donald Eastlake, HuaweiSlide 1 May 2014 Ad Hoc Meeting Proposal Date: 2014-01-15 Authors:

Submission

doc.: IEEE 11-14/0050r0

Lihue Airport

• Service by: Alaskan, American, Delta, go!, Hawaiian, Island, United, US Airlines, and WestJet

Donald Eastlake, Huawei

January 2014

Slide 7