subiaco ocean outfall duplication forrestfield reservoir ......wwps keralup south wwps port kennedy...
TRANSCRIPT
-
The information contained herein is the exclusive property of the Water Corporation and the respective copyright owners. It is subject to ongoing review and should be viewed in conjunction with the associated materials. No part of this production should be copied, modified, reproduced or published in any form other than that intended by the author.
Thomsons Second Reservoir
Jandakot GroundwaterExpansion
SDOOL Duplication
NambeelupTreatment Plant
West Murray WWPS
Pinjarra WWPSIndicative WestPinjarra WWPS
IndicativeBarragupWWPS
Keralup SouthWWPS
Port KennedyTreatment Plant
Byford Tank
Mundijong Reservoir
Medina Tank
Tamworth Hill Second Reservoir
Karnup Tank
Nambeelup TankNorth MandurahSecond Tank
Morrell TankCaddadupTank
Proposed Peel Reuse Corridor
Westfield Treatment Plant
Canns Rd Tank
Canning Trunk Main DuplicationForrestfield ReservoirSubiacoOcean OutfallDuplication
South Dandalup Dam
Conjurunup Dam
North Dandalup Dam
Serpentine Dam
Wungong Dam
Canning Dam
Victoria Dam
MANDURAH83
56 68
6569
2024
22
9
19 18
16
14
823
12
95
35 35
79
82
80
58
37
54
36
72
66
69
68
72
72
63
57
12
65
7151
16
97
95
46
49
47
36
92
55
60
92
17
11
68
67
74
53
35
94
20
16
70 21
73
13
96
10
Coordinate System: GDA 1994 MGA Zone 50 Vertical Datum: AHD
0 2 4 6 8 10Kilometres
LEGENDBore
Pump Station
Tank/Reservoir
Treatment PlantIndicative Water MainIndicative Wastewater MainIndicative Treated WastewaterPotential Treatment Plant
1:400,000 at A1
PERTHWanneroo
Mandurah
AUTH
OR: FL
ETTN0
File: S:\active\SpatialSystems\Projects\R1061_PerthPeel\mxd\StrategicAssessmentPerthPeelRegionsPreferred_A4_S.mxd
GROU
P: IPB
- Spatia
l System
sDA
TE: 2/
12/2015
DRAFT FOR PUBLIC COMMENT
Figure 24: Proposed water and wastewater infrastructure – South Metropolitan and Peel