subcontractor: phuc hung prepared by: 1 lach huyen port infrastructure construction project
TRANSCRIPT
CONSTRUCTION FOR TETRAPOD PRESENTATION
Subcontractor: Phuc HungPrepared by:
1
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT
CONSTRUCTION SEQUENCE FOR CONSTRUCTION TETRAPOD BLOCK
1. Site preparation
2. Operate & transport Tetrapod’s formwork to the site
3. Installation formwork
4. Installation scaffolding
5. Casting conscrete
6. Dismantling scaffoiding, formwork
7. Curing, transport to Tetrapod’s storage yard & go to the other
blocks
Prepared by: 2
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT
1. SITE PREPARATION
Prepared by: 3
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT
Construction for auxiliaries building & Casting Tetrapod’s yard
2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE
Prepared by: 4
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT
Tetrapod’s Formwork
2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE
Prepared by: 5
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT
Installation for concrete mixed plant
2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE
Prepared by: 6
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT
Installation for concrete mixed plant
3. INSTALLATION FORMWORK
Prepared by: 7
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT
Installation for Tetrapod’sformwork
3. INSTALLATION FORMWORK
Prepared by: 8
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT
Installation for Tetrapod’sformwork
3. INSTALLATION FORMWORK
Prepared by: 9
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT
Installation for Tetrapod’sformwork & scaffolding
4. CASTING CONCRETE
Prepared by: 10
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT
Casting concrete
5. DISMANTLING SCAFFOIDING, FORMWORK
Prepared by: 11
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT
Dismantling scaffoiding, formwork
6. CURING CONCRETE
Prepared by: 12
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT
Curing concrete
7. TRANSPORT TO TETRAPOD’S STORAGE YARD
Prepared by: 13
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT
Transport to tetrapod’s storage yard
AS ABOVE, ALL THE IMAGES WERE COLLECTED BY OUR
ENGINEERS WHEN THEY WERE CARYING OUT FOR CASTING
TETRAPOD BLOCK IN DA NANG PORT IMPROVEMENT PROJECT.
Prepared by: 14
LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT
THANK YOU SO MUCH !!!